Form-2
APPLICATION FOR PRIOR ENVIRONMENTAL CLEARANCE
S. No.Item Details
1.
Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? No
Details of Project:
(a)Name of the project(s) 60 KLPD Molasses Based Ethanol Plant & 2.5 MW co generation plan with 25 TPH Incineration Boiler
(b)Name of the Company / Organisation NARMADA SUGAR PVT LIMITED
(c)Registered Address Shri Vivek Maheshwari Vill-Thaini,Post-Bankhedi, Dist-Hoshangabad (MP),,Narsimhapur,Madhya Pradesh-461990
(d)Legal Status of the Company Private
(e)Joint Venture No
2.
Address for the correspondence:
(a)Name of the Applicant Vivek Maheshwari
(b)Designation (Owner/ Partner/ CEO) Director
(c)Address Vill-Thaini,Post-Bankhedi, Dist-Hoshangabad (MP),,Gadarwara,Narsimhapur,Madhya Pradesh-487551
(d)Pin code 487551
(e)E-mail nsplpower@gmail.com
(f)STD Code. 7576(f)Telephone No. 228888
(g)Fax No. 228888
(h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . Annexure-Uploaded Copy of documents in support of the competence/authority
3.
Category of the Project/Activity as per Schedule of EIA Notification,2006:
(a.I)Project/Activity5(g) Distilleries
Minor Activity5(g) Distilleries
(b)Category A
(c)Proposal Number IA/MP/IND2/73313/2018
(d)Master Proposal Number(Single Window) SW/81694/2018
(e)EAC concerned (for category A Projects only) Industrial Projects - 2
(f)Project Type Fresh EC
4.
Location of the Project:
(a)Plot/Survey/Khasra No. 132/1dha, 132/4 2.150 Acre
(b)Pincode 487551
(c)Bounded Latitudes (North)
From
Degree 22.8535
Minutes
Second
From
Degree 22.8563
Minutes
Second
(d)Bounded Longitudes (East)
From
Degree 78.6494
Minutes
Second
From
Degree 78.6533
Minutes
Second
(e)Survey of India Topo Sheet No. 55J/9
(f)Uploaded Topo Sheet File Copy of Topo Sheet File
(g)Maximum Elevation Above Means Sea Level(AMSL) 348
(h)Uploaded (kml) File Copy of Kml File      
(i)Distance of Nearest HFL from the project boundary within the study area 3.25
(j)Seismic Zone 3
5.
(a)Number of States in which Project will be Executed 1
(b)Main State of the project Madhya Pradesh
Details of State(s) of the project
S. No. State Name District Name Tehsil Name Village Name
(1.)Madhya PradeshNarsimhapurGadarwara
6.
Details of Terms of Reference (ToR):
(a)MoEF&CC / SEIAA File Number IA-J-11011/82/2018-IA-II(I)
(b)Date of Apply of TOR 05 Mar 2018
(c)Date of Issue of TOR / Standard ToR 08 Apr 2018
(d)Previous TOR Letter Copy of Previous TOR letter
7.
Details of Public Consultation:
(a)Whether the Project Exempted from Public Hearing?No
(b)Whether details of Public Hearing available? Yes
(c)Whether Public hearing was presided over by an officer of the rank of Additional District Magistrate or above Yes
     7.1.       Details of Public Hearing
S. No.Details of Advertisement Details of Public Hearing Venue Location DetailsNo. of People AttendedIssues RaisedDesignation of Presiding OfficerOther Designation of Presiding Officer
(1.)
Date of Advertisement :18 Jul 2018
Copy of advertisement :Copy of Advertisement
Copy of Public Hearing :Copy of Public Hearing
Date :20 Aug 2018
Distance of Public Hearing Venue from the Proposed Project :0
Plant Permsis
State :Madhya Pradesh
District :Narsimhapur
Tehsil :Gadarwara
Village :Pondar
81S.N. Name & Address Raised issues Comments of the applicant Action Plan Written Comments 1 Bhagwan Das Salichauka Gadawara (MP) We do not have any objection towards the proposal. IndustriesOthersAdditional District Magistrate
8.
Details of Project Configuration/Product:
     8.1.       Project Configuration
S. No.Plant/Equipment/FacilityConfigurationRemarks
(1.)Fuel Ethanol60KLD/25TPH incineration boiler
     8.2.       Product
S. No.Product/Activity (Capacity/Area)QuantityUnitOther UnitMode of Transport / Transmission of ProductOther Mode of Transport / Transmission of Product
(1.)Fuel Ethanol60Kilo Litre per DayRoad
9.
In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii):
Details Not Applicable
9.1.
Details of Consent to Operate
(i)Whether Consent to operate obtained ? NA
(ii)Copies of all Consent to operate obtained since inception NA
(iii)Date of Issue 01 Jan 2018
(iv)Valid Upto 30 Nov 2018
(v)File No. 18070
(vi)Application No. 405864
(vii)Copy of Consent to operate valid as on date NA
10.
Project Cost:
(a)Total Cost of the Project at current price level (in Crores) 63.58
(b) Funds Allocated for Environment Management (Capital) (in Crores) 20.9155
(c) Funds Allocated Towards CER (Corporate Environment Responsibility) (in Crores) 0.64
(d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in Crores) 0.34
11.
Whether project attracts the General Condition specified in the Schedule of EIA Notification ? No
12.
Whether project attract the Specific Condition specified in the Schedule of EIA Notification ? No
13.
Raw Material / Fuel Requirement:
(a)Proposed quantity of raw material/fuel 220
(b)Existing quantity of raw material/fuel N/A
(c)Total quantity of raw material/fuel 220
    13.1.        Raw Material / Fuel Profile
S. No.Raw Material / Fuel QuantityUnitOther UnitSource (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received )Mode of TransportOther Mode of TransportDistance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received)Type of Linkage Other Type of Linkage Uploaded Copy of Linkage
(1.)Molasses72600Tons per AnnumExisting sugar millPipe Conveyor0 CaptiveCopy of Linkage
14.
Baseline Data :
(a)Period of Base Line Data Collection FROM 01 Mar 2018 To 31 May 2018
(b)Season Summer
    14.1.     No. of ambient Air Quality (AAQ) monitoring locations : 08
S. No.Criteria Pollutants Other Criteria PollutantsUnitMaximum ValueMinimum Value98 Percentile ValuePrescribed Standard
(1.)NOxMicro Gram per Meter Cube16.32813.2480
(2.)PM2.5Micro Gram per Meter Cube31.9415.6414.3060
(3.)SO2Micro Gram per Meter Cube66680
(4.)PM10Micro Gram per Meter Cube79.7336.3341.39100
    14.2.     No. of Ground Water monitoring locations : 08
S. No.Criteria Pollutants Other Criteria PollutantsHeavy MetalUnitOther UnitMaximum ValueMinimum ValueDesirable LimitMaximum Permissible Limit
(1.)TSSmg/l56.004.0000
(2.)TDSmg/l750.00280.00500.002000
(3.)Total Hardnessmg/l460.00232.00200600
(4.)Chloridesmg/l33.9113.99250.001000.00
(5.)Fluoridemg/l0.800.101.01.5
(6.)pHNA7.176.806.58.5
    14.3.     No. of Surface Water monitoring locations : 07
S. No.Criteria Pollutants Other Criteria PollutantsUnitOther UnitMaximum ValueMinimum ValueClassification of inland water body
(1.)pHNA8.207.07C
(2.)BODmg/l17.002.00C
(3.)CODmg/l80.0010.00C
(4.)DOmg/l4.804.00C
    14.4.     No. of Ambient Noise monitoring locations : 07
S. No.Parameter UnitMaximum ValueMinimum ValuePrescribed Standard
(1.)Leq(Night)A-weighted decibels(dB(A))38.7431.6245
(2.)Leq(Day)A-weighted decibels(dB(A))66.9553.7455
    14.5.     No. of Soil Sample Monitored locations : 05
S. No.Parameter UnitOther UnitMaximum ValueMinimum Value
(1.)N(Nitrogen)Kilogram per hectare235.2075.26
(2.)P(Phosphorus)Kilogram per hectare61.0719.20
(3.)Electric ConductivityMillisiemens per Centimetre0.1420.04268
(4.)K(Potassium)Kilogram per hectare384.16144.25
(5.)pHOthersNA7.807.20
14.6.
Details of Ground Water Table:
(a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) From 12.0 To 8.50
(b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) From 5 To 6.90
(c)Whether Ground Water Intersection will be there ? No
     15.      Details of Water Requirement (During Operation)
S. No.Source Source Other Required Quantity (Kilolitre per Day (Kld))Distance from SourceCopy of Permission from Competent Authority Mode of TransportOther Mode of TransportMethod of Water WithdrawalOther Method of Water WithdrawalLetter No.Date of IssuePermitted Quantity
(1.)GroundWater4660Copy of Permission LetterPipelineTube Wellapplication under process14 Sep 2018466
15.1.
(a)Whether Desalination is proposed No
    16.       Waste Water Management(During Operation)
S. No.Type/Source Quantity of Waste Water Generated (Kilolitre per Day)Treatment Capacity (Kilolitre per Day) Treatment MethodMode of DisposalOther Mode of DisposalQuantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day)Quantity of Discharged Water (Kilolitre per Day)
(1.)spent wash600600Condensate Polishing Unit (CPU) will treat spent lees, and process condensate. Spent wash will be concentrated by using multi effect evaporator and concentrated spent wash 58% w/w will be fed to Incineration BoilerReuse within the Plant & Recycling6000
16.1.
(a)Total Waste Water Generation (Kilolitre per Day) 600
(b)Total Discharged Water (Kilolitre per Day) 0
(c)Total Reused Water (Kilolitre per Day) 600
    17.       Solid Waste Generation/Management
S. No.Name of Waste Item Other ItemQuantity per AnnumUnitDistance from Site(KM)Mode of TransportOther Mode of TransportMode of DisposalOther Mode of Disposal
(1.)used oilHazardous Waste (as per Hazardous and Other Waste Management rules 2016)0.50Kilolitre180RoadTreatment, Storage and Disposal Facility(TSDF)
(2.)waste resin from DM plantHazardous Waste (as per Hazardous and Other Waste Management rules 2016)0.20Tons180RoadTreatment, Storage and Disposal Facility(TSDF)
(3.)spent wash ashIndustrial Waste621Tons0RoadOthersfertilzer
(4.)waste activated CarbonHazardous Waste (as per Hazardous and Other Waste Management rules 2016)0.075Tons180RoadTreatment, Storage and Disposal Facility(TSDF)
18.
    18.1.     Air Quality Impact Prediction
S. No.Criteria Pollutants Other Criteria PollutantsUnitBaseline ConcentrationDistance GLCIncremental ConcentrationTotal GLCPrescribed Standard
(1.)PM10Microgram per Meter Cube65.4700.00465.47100
(2.)SO2Microgram per Meter Cube6.0000.046.0080
(3.)PM2.5Microgram per Meter Cube26.3800.00426.3860
(4.)NOxMicrogram per Meter Cube13.240.750.0113.2580
    18.2.     Stack Details
S. No.Source FuelStack Height(m)Stack Diameter(m)PollutantsOther PollutantsEmission (GLS)
(1.)Incinerator Boilerbaggase and spent603PM100.24gm/sec
(2.)boilerbaggase and spent wash603SO226.83
(3.)boilerbaggase & spent wash603NOx8.19
19.
Power Requirement:
(a)Quantity (Kilo Volt Amps (kVA)) 1050
(b)Source captive Co generation plant and MPSEB
(c)Uploaded Copy of Agreement Copy of Agreement
(d)Standby Arrangement (Details of DG Sets) 1000kva x 2no
(e)Stack Height (in m) 30
20.
Land Ownership Pattern:
(a)Forest Land (ha.) 0
(b)Private Land (ha.) 1.7199
(c)Government Land (ha.) 0
(d)Revenue Land (ha.) 0
(e)Other Land (ha.) 0
    Total Land (ha.) 1.7199
21.
Present Land Use Breakup of the Study Area in Ha:
(a)Agriculture Area (ha.) 28480.00
(b)Waste/Barren Land (ha.) 1575.00
(c)Grazing/ Community Land (ha.) 486.11
(d)Surface Water Bodies (ha.) 1491.28
(e)Settlements (ha.) 403.81
(f)Industrial (ha.) 35.298
(g)Forest (ha.) 437.00
(h)Mangroves (ha.) 150.00
(i)Marine Area (ha.) 0
(j)Others (ha.) : NA 0
    Total (ha.) 33058.498
    22.     Land requirement for various activities
S. No.Description of Activity / Facility / Plant / Others OthersLand Requirement (ha.)Remarks
(1.)Main Plant1.0517
(2.)Green belt0.57
Total (ha.) 1.6217
23.
Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Sanctuaries; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones :
    23.1.     Details of Ecological Sensitivity :
S. No.Details of Ecological Sensitivity NameDistance from the Project (Km)Remarks
(1.)Critically Polluted AreaNA500None within 10km radius
(2.)NPANA350None within 10km radius
(3.)ESZsNA500None within 10km radius
(4.)WLSNA400None within 10km radius
(5.)Wildlife CorridorsNA500None within 10km radius
(6.)ESAsNA500None within 10km radius
(7.)CorridorsNA500None within 10km radius
    23.2.     Details of Environmental Sensitivity :
S. No.Details of Environmental Sensitivity Other Details of Environmental Sensitivity NameDistance from the Project (Km)Remarks
(1.)ForestNA25None within 10km radius
(2.)Defence InstallationsNA150None within 10km radius
(3.)Archaeological SitesNA200None within 10km radius
23.3.
(a)Whether Noc / Permission from the competent authority is required? No
(b)Whether NBWL recommendation is required? No
24.
Forest Land:
Whether any Forest Land involved? No
25.
Tree Cutting:
(a)No. of Trees Cut for the Project (if Forest Land not Involved) 0
(b)Details of Tree Cutting and Planting of Trees Not Applicable
26.
Land Acquisition Status:
(a)Acquired Land(Ha) 1.7199
(b)Land yet to be acquired(Ha) 0
(c)Status of Land acquisition if not acquired Already in possession of Unit
27.
Rehabilitation and Resettlement (R&R):
(a)No. of Villages 0
(b)No. of Households 0
(c)No. of PDFs (Project Displaced Families) 0
(d)No. of PAFs (Project Affected Families) 0
(e)Funds Allocated for R&R(in INR) (in Lacs) 0
(f)Status of R&R Completed
28.
Details of Presence of Schedule-I Species:
(a)Whether there is Presence of Schedule-I Species ? No
(b)Whether conservation plan for Schedule-I Species has been prepared ? No
(c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? No
29.
Details of Presence of Water Bodies in Core Area:
(a)Whether there is Presence of Water Bodies in Core Area ? No
(b)Whether there is Diversion Required ? No
(c)Whether permission has been obtained from competent authority ? No
30.
Details of Presence of Water Bodies in Buffer Area:
(a)Whether there is Presence of Water Bodies in Buffer Area ? Yes
(i)Details of Water Bodies in Buffer Area Umar (Shukhi) Nadi
(ii)Direction of Water Bodies in Buffer Area North East
(iii)Distance of Water Bodies in Buffer Area 3.25
31.
Manpower Requirement:
(a)Permanent Employment-During Construction 0
(b)Permanent Employment-During Operation 90
(c)Temporary Employment- During Construction 0
(d)Temporary Employment- During Operation 0
(e)No. of working days 330
(f)Total Manpower 90
32.
Green Belt in Ha:
(a)Total Area of Green Belt 0.55
(b)Percentage of Total Project Area 31.98
(c)No. of Plants to be Planted 1100
(d)Funds Allocated for Plantation 176000
(e)Uploaded Green Belt plan Copy of Green Belt Plan
    33.         Project Benefits
S. No.Type of Project Benefits Details of Project Benefits
(1.)SocialM/s NSPL will implement various rural development programmes at proposed site. The following will be focus area of the rural development programme. The same measures will be extended to the nearby villages and these programmes will be implemented as per the need and requirement of the area. 1. Drinking Water Projects At Nearby 06 Villages Namely Amdhana, Sanwari, Pondar, Aregaon Kalan, Sakichouka, 2. Improvement In Existing Educational Facilities: By providing infrastructure, drinking water
   34.   CRZ Specific Details : Not Applicable
   35.   Sector Specific Details : NOT APPLICABLE
   35.   Sector Specific Details For Industrial Projects - 2
S. No.Item Details
S. No.Item Details
36.
Details of Court Cases:
(a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? No
37.
Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act:
(a)Whether any Direction issued under EPA Act/Air Act/Water Act ? No
38.
Details of EIA Consultant:
(a)Have you hired Consultant for preparing document? Yes
(i)Accreditation No. NABET/EIA/1619/RA0071
(ii)Name of the EIA Consultant Creative Enviro Services
(iii)Address SR-4, Shri Ramkunj, E-8, Bharat Nagar, Bhopal
(iv)Mobile No. 9425009319
(v)Landline No. 0755429931
(vi)Email Id creative.bpl@gmail.com
(vii)Category of Accreditation A
(viii)Sector of Accreditation Industrial Projects - 2
(ix)Validity of Accreditation 23 Oct 2019
(x)Uploaded Certificate of Accreditation certified by QCI/NABET Copy of Certificate of Accreditation
39.
Documents to be Attached:
(a)Uploaded Copy of EIA/EMP Report Copy of EIA/EMP
Copy of EIA/EMP(Annexures)
Copy of EIA/EMP(Plans/Figures)
(b)Uploaded Copy of Risk Assessment Report Copy of Risk Assessment
(c)Uploaded Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan
(d)Uploaded Copy of Final Layout Plan Copy of Final Layout Plan
(e)Uploaded Cover Letter Copy of Cover Letter
(f)Uploaded Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency
(g)Uploaded Additional File NA
(h)Uploaded Proposal Presentation (To be given in EAC meeting) NA
      Essential Detail Sought : NIL
      Additional Detail Sought : NIL
Undertaking
I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief. And I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity/ construction/ expansion has since been taken up.
Name of ApplicantVivek Maheshwari
DesignationDirector
Name of Company (Applicant Name should not be given here)NARMADA SUGAR PVT LIMITED
AddressShri Vivek Maheshwari Vill-Thaini,Post-Bankhedi, Dist-Hoshangabad (MP)
Print