Form-2
APPLICATION FOR PRIOR ENVIRONMENTAL CLEARANCE
S. No.Item Details
1.
Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? No
Details of Project:
(a)Name of the project(s) ADITYA COLOR CHEM
(b)Name of the Company / Organisation ADITYA COLOR CHEM
(c)Registered Address Plot No 66 to 70, Rudra Ind Park, Bakrol, Ahmedabad,,Ahmedabad,Gujarat-382210
(d)Legal Status of the Company Private
(e)Joint Venture No
2.
Address for the correspondence:
(a)Name of the Applicant NILESH I PATEL
(b)Designation (Owner/ Partner/ CEO) OWNER
(c)Address Plot No. 66 to 70, Rudra Ind Park, Bakrol, Ahmedabad,,Daskroi,Ahmedabad,Gujarat-382210
(d)Pin code 382210
(e)E-mail naresh@adityacolorchem.com
(f)STD Code. 79(f)Telephone No. 40083150
(g)Fax No.
(h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . Annexure-Uploaded Copy of documents in support of the competence/authority
3.
Category of the Project/Activity as per Schedule of EIA Notification,2006:
(a.I)Project/Activity5(f) Synthetic organic chemicals industry (dyes & dye intermediates; bulk
Minor Activity
(b)Category A
(c)Proposal Number IA/GJ/IND2/67946/2017
(d)Master Proposal Number(Single Window) SW/81594/2018
(e)EAC concerned (for category A Projects only) Industrial Projects - 2
(f)Project Type Fresh EC
4.
Location of the Project:
(a)Plot/Survey/Khasra No. Plot No. 66-70,Rudra Industrial Park Bakrol
(b)Pincode 382210
(c)Bounded Latitudes (North)
From
Degree 22.97215
Minutes
Second
From
Degree 22.97254
Minutes
Second
(d)Bounded Longitudes (East)
From
Degree 72.7241
Minutes
Second
From
Degree 72.72436
Minutes
Second
(e)Survey of India Topo Sheet No. C-1/B/5
(f)Uploaded Topo Sheet File Copy of Topo Sheet File
(g)Maximum Elevation Above Means Sea Level(AMSL) 50
(h)Uploaded (kml) File Copy of Kml File      
(i)Distance of Nearest HFL from the project boundary within the study area 1.57
(j)Seismic Zone 2
5.
(a)Number of States in which Project will be Executed 1
(b)Main State of the project Gujarat
Details of State(s) of the project
S. No. State Name District Name Tehsil Name Village Name
(1.)GujaratAhmedabadDaskroi
6.
Details of Terms of Reference (ToR):
(a)MoEF&CC / SEIAA File Number IA-J-11011/450/2017-IA-II(I)
(b)Date of Apply of TOR 05 Oct 2017
(c)Date of Issue of TOR / Standard ToR 16 Nov 2017
(d)Previous TOR Letter Copy of Previous TOR letter
7.
Details of Public Consultation:
(a)Whether the Project Exempted from Public Hearing?No
(b)Whether details of Public Hearing available? Yes
(c)Whether Public hearing was presided over by an officer of the rank of Additional District Magistrate or above Yes
     7.1.       Details of Public Hearing
S. No.Details of Advertisement Details of Public Hearing Venue Location DetailsNo. of People AttendedIssues RaisedDesignation of Presiding OfficerOther Designation of Presiding Officer
(1.)
Date of Advertisement :16 May 2018
Copy of advertisement :Copy of Advertisement
Copy of Public Hearing :Copy of Public Hearing
Date :26 Jun 2018
Distance of Public Hearing Venue from the Proposed Project :0.0
PROJECT SITE
State :Gujarat
District :Ahmedabad
Tehsil :Daskroi
Village :BAKROL BUJRANG
37Pollution status should not be increased, Mode of the waste water discharge, Movement of vehicle should not be disturbed to the path of school children, • Necessary permissions for construction shallOthersAdditional District Magistrate
8.
Details of Project Configuration/Product:
     8.1.       Project Configuration
S. No.Plant/Equipment/FacilityConfigurationRemarks
(1.)Boiler1 Ton1 NO
(2.)Filter Press36’ x 36’3 NOS
(3.)Reaction Vessel15 KL3
(4.)Ball Mill1 TON1 NO
(5.)Reaction Vessel50 KL1 NO
(6.)Spray Dryer750 KL1 NO
(7.)Centrifuge5 KL1 NO
(8.)Oven 1 nos.1 TON1 NO
     8.2.       Product
S. No.Product/Activity (Capacity/Area)QuantityUnitOther UnitMode of Transport / Transmission of ProductOther Mode of Transport / Transmission of Product
(1.)POWDER DYES480Tons per AnnumRoad
(2.)LIQUID DYES1080Tons per AnnumRoad
9.
In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii):
Details Not Applicable
9.1.
Details of Consent to Operate
(i)Whether Consent to operate obtained ? NA
(ii)Copies of all Consent to operate obtained since inception NA
(iii)Date of Issue N/A
(iv)Valid Upto N/A
(v)File No. NA
(vi)Application No. NA
(vii)Copy of Consent to operate valid as on date NA
10.
Project Cost:
(a)Total Cost of the Project at current price level (in Crores) 3.75
(b) Funds Allocated for Environment Management (Capital) (in Crores) 0.79
(c) Funds Allocated Towards CER (Corporate Environment Responsibility) (in Crores) 0.006
(d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in Crores) 0.015
11.
Whether project attracts the General Condition specified in the Schedule of EIA Notification ? No
12.
Whether project attract the Specific Condition specified in the Schedule of EIA Notification ? No
13.
Raw Material / Fuel Requirement:
(a)Proposed quantity of raw material/fuel 936
(b)Existing quantity of raw material/fuel N/A
(c)Total quantity of raw material/fuel 936
    13.1.        Raw Material / Fuel Profile
S. No.Raw Material / Fuel QuantityUnitOther UnitSource (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received )Mode of TransportOther Mode of TransportDistance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received)Type of Linkage Other Type of Linkage Uploaded Copy of Linkage
(1.)HCl (30% Solution)936Tons per AnnumLOCALRoad1 Open MarketCopy of Linkage
14.
Baseline Data :
(a)Period of Base Line Data Collection FROM 01 Dec 2017 To 27 Feb 2018
(b)Season Winter
    14.1.     No. of ambient Air Quality (AAQ) monitoring locations : 8
S. No.Criteria Pollutants Other Criteria PollutantsUnitMaximum ValueMinimum Value98 Percentile ValuePrescribed Standard
(1.)PM10Micro Gram per Meter Cube75.8042.674.3100
(2.)SO2Micro Gram per Meter Cube44.63.643.780
(3.)NOxMicro Gram per Meter Cube41.5012.040.6780
(4.)PM2.5Micro Gram per Meter Cube47.432.546.460
(5.)OthersVOCMicro Gram per Meter Cube0.180.10.16-
    14.2.     No. of Ground Water monitoring locations : 8
S. No.Criteria Pollutants Other Criteria PollutantsHeavy MetalUnitOther UnitMaximum ValueMinimum ValueDesirable LimitMaximum Permissible Limit
(1.)pHNA7.67.37.07.5
(2.)TDSmg/l9664505002100
(3.)Chloridesmg/l220135600600
(4.)TSSmg/l861020
(5.)Fluoridemg/l0.070.060.61.5
(6.)OthersSulphatemg/l158128150400
(7.)Heavy MetalsZincmg/l0.720.58510
(8.)Total Hardnessmg/l180125300600
    14.3.     No. of Surface Water monitoring locations : 3
S. No.Criteria Pollutants Other Criteria PollutantsUnitOther UnitMaximum ValueMinimum ValueClassification of inland water body
(1.)pHmg/l7.87.04A
(2.)DOmg/l7.55.8B
(3.)CODmg/l26.518.5D
(4.)OthersTDSmg/l596284E
(5.)BODmg/l65C
    14.4.     No. of Ambient Noise monitoring locations : 8
S. No.Parameter UnitMaximum ValueMinimum ValuePrescribed Standard
(1.)Leq(Day)A-weighted decibels(dB(A))54.251.255
(2.)Leq(Night)A-weighted decibels(dB(A))45.241.245
    14.5.     No. of Soil Sample Monitored locations : 8
S. No.Parameter UnitOther UnitMaximum ValueMinimum Value
(1.)N(Nitrogen)Milligram per Kilogram0.060.04
(2.)P(Phosphorus)Milligram per Kilogram0.080.03
(3.)Electric ConductivityMillisiemens per Centimetre15090
(4.)pHOthersNA7.67.2
(5.)K(Potassium)Milligram per Kilogram0.080.03
14.6.
Details of Ground Water Table:
(a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) From 20 To 20
(b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) From 10 To 10
(c)Whether Ground Water Intersection will be there ? No
     15.      Details of Water Requirement (During Operation)
S. No.Source Source Other Required Quantity (Kilolitre per Day (Kld))Distance from SourceCopy of Permission from Competent Authority Mode of TransportOther Mode of TransportMethod of Water WithdrawalOther Method of Water WithdrawalLetter No.Date of IssuePermitted Quantity
(1.)GroundWater410.1 Not Appliacble PipelineTube WellUNDER PROCESS01 Oct 201841
15.1.
(a)Whether Desalination is proposed No
    16.       Waste Water Management(During Operation)
S. No.Type/Source Quantity of Waste Water Generated (Kilolitre per Day)Treatment Capacity (Kilolitre per Day) Treatment MethodMode of DisposalOther Mode of DisposalQuantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day)Quantity of Discharged Water (Kilolitre per Day)
(1.)Industrial Projects - 21820PRIMARY, R.O. SYSTEMReuse within the Plant & Recycling180
16.1.
(a)Total Waste Water Generation (Kilolitre per Day) 18
(b)Total Discharged Water (Kilolitre per Day) 0
(c)Total Reused Water (Kilolitre per Day) 18
    17.       Solid Waste Generation/Management
S. No.Name of Waste Item Other ItemQuantity per AnnumUnitDistance from Site(KM)Mode of TransportOther Mode of TransportMode of DisposalOther Mode of Disposal
(1.)EVAPORATION RESIDUEIndustrial Waste0.5Tons67.02RoadTreatment, Storage and Disposal Facility(TSDF)
(2.)DISCARDED CONTAINERIndustrial Waste6Tons14RoadAuthorized Recyclers
(3.)Used OilIndustrial Waste0.03Kilolitre14RoadAuthorized Recyclers
(4.)ETP WASTEIndustrial Waste15Tons67.02RoadTreatment, Storage and Disposal Facility(TSDF)
18.
    18.1.     Air Quality Impact Prediction
S. No.Criteria Pollutants Other Criteria PollutantsUnitBaseline ConcentrationDistance GLCIncremental ConcentrationTotal GLCPrescribed Standard
(1.)PM2.5Microgram per Meter Cube52.600.00.0552.6560
(2.)SO2Microgram per Meter Cube35.200.00.0935.2980
(3.)NOxMicrogram per Meter Cube44.600.00.2644.8680
(4.)PM10Microgram per Meter Cube73.4000.0873.48100
    18.2.     Stack Details
S. No.Source FuelStack Height(m)Stack Diameter(m)PollutantsOther PollutantsEmission (GLS)
(1.)HAGCOAL/LIGNITE.NATURAL GAS150.3PM100.30
(2.)FLUE GASCOAL/LIGNITE /NATURAL GAS150.2PM100.2
19.
Power Requirement:
(a)Quantity (Kilo Volt Amps (kVA)) 180
(b)Source UGVCL
(c)Uploaded Copy of Agreement Not Applicable
(d)Standby Arrangement (Details of DG Sets) 125 KVA
(e)Stack Height (in m) 5
20.
Land Ownership Pattern:
(a)Forest Land (ha.) 0
(b)Private Land (ha.) 0.149896
(c)Government Land (ha.) 0
(d)Revenue Land (ha.) 0.0
(e)Other Land (ha.) 0
    Total Land (ha.) 0.149896
21.
Present Land Use Breakup of the Study Area in Ha:
(a)Agriculture Area (ha.) 0
(b)Waste/Barren Land (ha.) 0
(c)Grazing/ Community Land (ha.) 0
(d)Surface Water Bodies (ha.) 0
(e)Settlements (ha.) 0
(f)Industrial (ha.) 0.14896
(g)Forest (ha.) 0
(h)Mangroves (ha.) 0
(i)Marine Area (ha.) 0
(j)Others (ha.) : INDUSTRIAL ESTATE 0
    Total (ha.) 0.14896
    22.     Land requirement for various activities
S. No.Description of Activity / Facility / Plant / Others OthersLand Requirement (ha.)Remarks
(1.)Main Plant0.07032
(2.)Green belt0.04927
(3.)OthersNON PROCESSING AND UTILITY0.030306
Total (ha.) 0.149896
23.
Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Sanctuaries; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones :
    23.1.     Details of Ecological Sensitivity :
S. No.Details of Ecological Sensitivity NameDistance from the Project (Km)Remarks
(1.)Critically Polluted AreaVAPI288.6INDUSTRIAL CLUSTER
(2.)NPANAVSARI225NATIONAL PARK
(3.)WLSTHOL39.66BIRD CENTURY
(4.)CorridorsDHOLERA100Ahmedabad-Dholera Investment Region
(5.)ESAsTHOL39.66BIRD CENTURY
(6.)ESZsTHOL39.66BIRD CENTURY
(7.)Wildlife CorridorsTHOL39.66BIRD CENTURY
    23.2.     Details of Environmental Sensitivity :
S. No.Details of Environmental Sensitivity Other Details of Environmental Sensitivity NameDistance from the Project (Km)Remarks
(1.)ForestVALSAD263DISTANCE FAR AWAY THAN 10 KM
(2.)Archaeological SitesChampane99Pavagadh Archaeological Park
(3.)Defence InstallationsKALOL30-
(4.)OthersLAKEKANKARIYA15-
23.3.
(a)Whether Noc / Permission from the competent authority is required? Yes
(i)Uploaded Noc / Permission from the competent authority Copy of Noc / Permission from the competent authority
(b)Whether NBWL recommendation is required? No
24.
Forest Land:
Whether any Forest Land involved? No
25.
Tree Cutting:
(a)No. of Trees Cut for the Project (if Forest Land not Involved) 00
(b)Details of Tree Cutting and Planting of Trees Not Applicable
26.
Land Acquisition Status:
(a)Acquired Land(Ha) 0.149296
(b)Land yet to be acquired(Ha) 00
(c)Status of Land acquisition if not acquired Yes
27.
Rehabilitation and Resettlement (R&R):
(a)No. of Villages 00
(b)No. of Households 00
(c)No. of PDFs (Project Displaced Families) 00
(d)No. of PAFs (Project Affected Families) 00
(e)Funds Allocated for R&R(in INR) (in Lacs) 00
(f)Status of R&R Yet To Start
28.
Details of Presence of Schedule-I Species:
(a)Whether there is Presence of Schedule-I Species ? No
(b)Whether conservation plan for Schedule-I Species has been prepared ? No
(c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? No
29.
Details of Presence of Water Bodies in Core Area:
(a)Whether there is Presence of Water Bodies in Core Area ? No
(b)Whether there is Diversion Required ? No
(c)Whether permission has been obtained from competent authority ? No
30.
Details of Presence of Water Bodies in Buffer Area:
(a)Whether there is Presence of Water Bodies in Buffer Area ? Yes
(i)Details of Water Bodies in Buffer Area Vatrak River
(ii)Direction of Water Bodies in Buffer Area South East
(iii)Distance of Water Bodies in Buffer Area 13
31.
Manpower Requirement:
(a)Permanent Employment-During Construction 0
(b)Permanent Employment-During Operation 20
(c)Temporary Employment- During Construction 5
(d)Temporary Employment- During Operation 0
(e)No. of working days 350
(f)Total Manpower 25
32.
Green Belt in Ha:
(a)Total Area of Green Belt 0.04927
(b)Percentage of Total Project Area 32.87
(c)No. of Plants to be Planted 5
(d)Funds Allocated for Plantation 5
(e)Uploaded Green Belt plan Copy of Green Belt Plan
    33.         Project Benefits
S. No.Type of Project Benefits Details of Project Benefits
(1.)Socialempolyment opportunity
(2.)FinancialEMPLOYMENT DIRECT
   34.   CRZ Specific Details : Not Applicable
   35.   Sector Specific Details : NOT APPLICABLE
   35.   Sector Specific Details For Industrial Projects - 2
S. No.Item Details
S. No.Item Details
36.
Details of Court Cases:
(a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? No
37.
Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act:
(a)Whether any Direction issued under EPA Act/Air Act/Water Act ? No
38.
Details of EIA Consultant:
(a)Have you hired Consultant for preparing document? Yes
(i)Accreditation No. NABET/EIA/1720/IA0029
(ii)Name of the EIA Consultant GREEN CIRCLE INC. VADODARA
(iii)Address NEAR AXIS BANK, GOTRI ROAD, VADODARA, GUJARAT
(iv)Mobile No. 9998036028
(v)Landline No. 2652371269
(vi)Email Id info@ggcipl.net
(vii)Category of Accreditation A
(viii)Sector of Accreditation Industrial Projects - 2
(ix)Validity of Accreditation 04 Jun 2020
(x)Uploaded Certificate of Accreditation certified by QCI/NABET Copy of Certificate of Accreditation
39.
Documents to be Attached:
(a)Uploaded Copy of EIA/EMP Report Copy of EIA/EMP
Copy of EIA/EMP(Annexures)
Copy of EIA/EMP(Plans/Figures)
(b)Uploaded Copy of Risk Assessment Report Copy of Risk Assessment
(c)Uploaded Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan
(d)Uploaded Copy of Final Layout Plan Copy of Final Layout Plan
(e)Uploaded Cover Letter Copy of Cover Letter
(f)Uploaded Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency
(g)Uploaded Additional File Copy of Additional File
(h)Uploaded Proposal Presentation (To be given in EAC meeting) NA
            Essential Detail Sought:
Sno. EDS Letter Remarks Date of EDS
1.NAYour reply in response to our earlier observations vide query dated 23/8/2018 is not reflected in Form-2. Please ensure the same for further consideration of the proposal. 13 Oct 2018
2.NAThe correction have been made as per the instruction received 21 Oct 2018
      Additional Detail Sought : NIL
Undertaking
I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief. And I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity/ construction/ expansion has since been taken up.
Name of ApplicantNILESH I PATEL
DesignationOWNER
Name of Company (Applicant Name should not be given here)ADITYA COLOR CHEM
AddressPlot No 66 to 70, Rudra Ind Park, Bakrol, Ahmedabad