Form-2
APPLICATION FOR PRIOR ENVIRONMENTAL CLEARANCE
S. No.Item Details
1.
Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? No
Details of Project:
(a)Name of the project(s) ACC LIMITED, SINDRI CEMENT WORKS (GRINDING UNIT)
(b)Name of the Company / Organisation ACCLIMITED
(c)Registered Address ACC Limited Sindri Cement Works, P.O.ACC Colony – 828124. Gender* Male,,Dhanbad,Jharkhand-828124
(d)Legal Status of the Company Others
(e)Joint Venture No
2.
Address for the correspondence:
(a)Name of the Applicant Atul Dutta
(b)Designation (Owner/ Partner/ CEO) PlantHead
(c)Address ACC Limited Sindri Cement Works, P.O.ACC Colony,,Dhanbad-Cum-Ken-duadih-Cum-Jagta,Dhanbad,Jharkhand-828124
(d)Pin code 828124
(e)E-mail atul.dutta@acclimited.com
(f)STD Code. 326(f)Telephone No. 2245515
(g)Fax No. 03262245515
(h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . Annexure-Uploaded Copy of documents in support of the competence/authority
3.
Category of the Project/Activity as per Schedule of EIA Notification,2006:
(a.I)Project/Activity3(b) Cement plants
Minor Activity
(b)Category B1
   Reason for Applying at Ministry Other
   Other Reason for Applying at Ministry Interstate Boundary with West Bengal is 2.4 km
(c)Proposal Number IA/JH/IND/5925/2011
(d)Master Proposal Number(Single Window) SW/81137/2018
(e)EAC concerned (for category A Projects only) Industrial Projects - 1
(f)Project Type Expansion
4.
Location of the Project:
(a)Plot/Survey/Khasra No. Mauza: Jamadoba -188, Khata No. : 188, khesra No.:
(b)Pincode 828124
(c)Bounded Latitudes (North)
From
Degree 2627235.15
Minutes
Second
From
Degree 2628166.74
Minutes
Second
(d)Bounded Longitudes (East)
From
Degree 1061079.02
Minutes
Second
From
Degree 1061836.14
Minutes
Second
(e)Survey of India Topo Sheet No. 73I/10
(f)Uploaded Topo Sheet File Copy of Topo Sheet File
(g)Maximum Elevation Above Means Sea Level(AMSL) 155
(h)Uploaded (kml) File Copy of Kml File      
(i)Distance of Nearest HFL from the project boundary within the study area 1.2
(j)Seismic Zone 3
5.
(a)Number of States in which Project will be Executed 1
(b)Main State of the project Jharkhand
Details of State of the project
S. No. State Name District Name Tehsil Name Village Name
NIL
6.
Details of Terms of Reference (ToR)/EC:
(a)MoEF&CC / SEIAA File Number J-11011/623/2009-IA.II(I)
(c)Date of Issue of TOR 09 Dec 2009
(f)Previous TOR Letter Copy of Previous TOR letter
(b)Date of Apply of EC 27 Apr 2011
(c)Date of Issue of EC 13 May 2011
(d)Previous EC Letter Copy of Previous EC letter
7.
Details of Public Consultation:
(a)Whether the Project Exempted from Public Hearing?No
(b)Whether details of Public Hearing available? Yes
(c)Whether Public hearing was presided over by an officer of the rank of Additional District Magistrate or above Yes
     7.1.       Details of Public Hearing
S. No.Details of Advertisement Details of Public Hearing Venue Location DetailsNo. of People AttendedIssues RaisedDesignation of Presiding OfficerOther Designation of Presiding Officer
(1.)
Date of Advertisement :22 Jul 2018
Copy of advertisement :Copy of Advertisement
Copy of Public Hearing :Copy of Public Hearing
Date :25 Aug 2018
Distance of Public Hearing Venue from the Proposed Project :0
ACC Country Club -Within Plant site
State :Jharkhand
District :Dhanbad
Tehsil :Dhanbad-Cum-Kenduadih-Cum-Jagta
Village :Sindri
500requested for RO water plant installation ;Solar lights on roads planning & Irrigation pump ; to provide Scholarship, Skill development and coaching classes for educated youth preparing Govt. ServicesOthersAdditional District Magistrate
8.
Details of Project Configuration/Product:
Details Not Applicable
9.
In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii):
(a)Details of certified report on compliance of earlier environmental clearance condition
(i)Certified Compliance By Regional
(ii)Details of Regional Office of MoEFCC / Zonal Office of CPCB / SPCB / UTPCC from which certified report on Ranchi
(iii)Letter No. 103-275/10/EPE/2495
(iv)Status of Compliance Compiled
(v)Certified report on compliance of earlier environmental clearance conditions (Including Monitoring Report) Copy of Certified Compliance Report
(vi)Date of site visit Jan 30 2018 12:00AM
(b)Details of Capacity Expansion
S. No.Product/Activity (Capacity/Area)Quantity FromQuantity ToTotal UnitOther UnitMode of Transport / Transmission of ProductOther Mode of Transport / Transmission of Product
(1.)Cement Grinding - PSC/PPC/OPC/GGBFS/CC250000020000004500000Tons per Annum(TPA)Road,Rail
(c)Details of Configuration
S. No.Plant / Equipment / Facility Existing ConfigurationProposed ConfigurationFinal configuration after expansionRemarks
(1.)Cement Mills315 TPH253 TPH568 TPHModification of Existing mills and Installation of new cement mill
9.1.
Details of Consent to Operate
(i)Whether Consent to operate obtained ? NA
(ii)Copies of all Consent to operate obtained since inception NA
(iii)Date of Issue 25 May 2018
(iv)Valid Upto 31 Dec 2018
(v)File No. JSPCB/HO/RNC/CTO-2526806/2018/919
(vi)Application No. NA
(vii)Copy of Consent to operate valid as on date Copy of Consent to Operate
10.
Project Cost:
(a)Total Cost of the Project at current price level (in Crores) 255
(b) Funds Allocated for Environment Management (Capital) (in Crores) 25
(c) Funds Allocated Towards CER (Corporate Environment Responsibility) (in Crores) 2
(d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in Crores) 0.9
11.
Whether project attracts the General Condition specified in the Schedule of EIA Notification ? Yes
d)Inter-State boundaries and international boundaries Yes
12.
Whether project attract the Specific Condition specified in the Schedule of EIA Notification ? No
13.
Raw Material / Fuel Requirement:
(a)Proposed quantity of raw material/fuel 2435380
(b)Existing quantity of raw material/fuel 3912000
(c)Total quantity of raw material/fuel 6347380
    13.1.        Raw Material / Fuel Profile
S. No.Raw Material / Fuel QuantityUnitOther UnitSource (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received )Mode of TransportOther Mode of TransportDistance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received)Type of Linkage Other Type of Linkage Uploaded Copy of Linkage
(1.)Clinker2679000Tons per AnnumcaptiveRoad,Rail320 CaptiveCopy of Linkage
(2.)GYPSUM246000Tons per AnnumImportedRoad,Rail270 Open MarketCopy of Linkage
(3.)Slag/GGBFS2419000Tons per AnnumSteel plantsRoad,Rail80 Open MarketCopy of Linkage
(4.)Fly ash950000Tons per AnnumPower plantsRoad40 Open MarketCopy of Linkage
(5.)Coal53380Tons per AnnumE AuctionRoad,Rail120 e-auctionCopy of Linkage
14.
Baseline Data :
(a)Period of Base Line Data Collection FROM 05 Mar 2018 To 29 May 2018
(b)Season Summer
    14.1.     No. of ambient Air Quality (AAQ) monitoring locations : 8
S. No.Criteria Pollutants Other Criteria PollutantsUnitMaximum ValueMinimum Value98 Percentile ValuePrescribed Standard
(1.)PM2.5Micro Gram per Meter Cube40.117.539.960
(2.)SO2Micro Gram per Meter Cube16.88.116.380
(3.)NOxMicro Gram per Meter Cube18.59.318.380
(4.)PM10Micro Gram per Meter Cube68.337.067.4100
    14.2.     No. of Ground Water monitoring locations : 8
S. No.Criteria Pollutants Other Criteria PollutantsHeavy MetalUnitOther UnitMaximum ValueMinimum ValueDesirable LimitMaximum Permissible Limit
(1.)Fluoridemg/l0.820.671.01.5
(2.)pHOthersNA7.537.026.58.5
(3.)Heavy MetalsZincmg/l0.210.09515
(4.)TDSmg/l7803215002000
(5.)Total Hardnessmg/l350139200600
(6.)Chloridesmg/l183612501000
(7.)TSSmg/l0000
    14.3.     No. of Surface Water monitoring locations : 2
S. No.Criteria Pollutants Other Criteria PollutantsUnitOther UnitMaximum ValueMinimum ValueClassification of inland water body
(1.)pHNA7.187.12A
(2.)BODmg/l43A
(3.)CODmg/l1412A
(4.)DOmg/l5.95.6A
    14.4.     No. of Ambient Noise monitoring locations : 8
S. No.Parameter UnitMaximum ValueMinimum ValuePrescribed Standard
(1.)Leq(Day)A-weighted decibels(dB(A))51.145.655
(2.)Leq(Night)A-weighted decibels(dB(A))44.140.245
    14.5.     No. of Soil Sample Monitored locations : 6
S. No.Parameter UnitOther UnitMaximum ValueMinimum Value
(1.)pHOthersNA7.416.12
(2.)P(Phosphorus)Kilogram per hectare34.221.2
(3.)N(Nitrogen)Kilogram per hectare217170
(4.)K(Potassium)Kilogram per hectare148103
(5.)Electric ConductivityMillisiemens per Centimetremicro0.3160.180
14.6.
Details of Ground Water Table:
(a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) From 18 To 20
(b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) From 10 To 15
(c)Whether Ground Water Intersection will be there ? No
     15.      Details of Water Requirement (During Operation)
S. No.Source Source Other Required Quantity (Kilolitre per Day (Kld))Distance from SourceCopy of Permission from Competent Authority Mode of TransportOther Mode of TransportMethod of Water WithdrawalOther Method of Water WithdrawalLetter No.Date of IssuePermitted Quantity
(1.)OthersFertilizer Corporation of India (FCI)2850.5Copy of Permission LetterPipelineOthersPipelineAgreement on 5-1-195405 Jan 19541137.5
15.1.
(a)Whether Desalination is proposed No
    16.       Waste Water Management(During Operation)
S. No.Type/Source Quantity of Waste Water Generated (Kilolitre per Day)Treatment Capacity (Kilolitre per Day) Treatment MethodMode of DisposalOther Mode of DisposalQuantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day)Quantity of Discharged Water (Kilolitre per Day)
(1.)Domestic98230STPReuse within the Plant & Recycling98
16.1.
(a)Total Waste Water Generation (Kilolitre per Day) 98
(b)Total Discharged Water (Kilolitre per Day) 0
(c)Total Reused Water (Kilolitre per Day) 98
    17.       Solid Waste Generation/Management
S. No.Name of Waste Item Other ItemQuantity per AnnumUnitDistance from Site(KM)Mode of TransportOther Mode of TransportMode of DisposalOther Mode of Disposal
(1.)Acid batteries- 16 in nubersHazardous Waste (as per Hazardous and Other Waste Management rules 2016)16Kilolitre30RoadAuthorized Recyclers
(2.)Haz waste bottles -200litsHazardous Waste (as per Hazardous and Other Waste Management rules 2016)20Kilolitre30RoadAuthorized Recyclers
(3.)Bag filters 480 NumberHazardous Waste (as per Hazardous and Other Waste Management rules 2016)480Kilolitre0OthersWithin the Plant siteCo-Processing
(4.)Used Cotton clothsOthersUsed cotton cloth0.3Tons0Othersused as fuelOthersused as fuel in the burner of Hot air Generator
(5.)Spent OilHazardous Waste (as per Hazardous and Other Waste Management rules 2016)2000Kilolitre30RoadAuthorized Recyclers
18.
    18.1.     Air Quality Impact Prediction
S. No.Criteria Pollutants Other Criteria PollutantsUnitBaseline ConcentrationDistance GLCIncremental ConcentrationTotal GLCPrescribed Standard
(1.)SO2Microgram per Meter Cube16.30.27.3123.6180
(2.)PM10Microgram per Meter Cube67.40.43.0970.49100
(3.)NOxMicrogram per Meter Cube18.30.210.3028.680
(4.)PM2.5Microgram per Meter Cube00000
    18.2.     Stack Details
S. No.Source FuelStack Height(m)Stack Diameter(m)PollutantsOther PollutantsEmission (GLS)
(1.)VRM1Coal332.0SO211.2 gm/s
(2.)Cement mill 1NA11.50.4OthersParticulate Matter0.10 gm/s
(3.)Cement Mill 2NA11.50.4OthersParticulate Matter0.10 gm/s
(4.)Cement Mill 4NA150.7OthersParticulate Matter0.14 gm/s
(5.)VRM 3Coal723.0NOx56.8 gm/s
(6.)VRM1Coal332.0NOx24 gm/s
(7.)VRM2NA723.0OthersParticulate Matter3.40 gm/s
(8.)VRM 3Coal723SO210.1 gm/s
(9.)VRM1Coal332.0OthersParticulate Matter1.47 gm/s
(10.)Cement mill 3NA150.7OthersParticulate Matter0.14 gm/s
(11.)VRM 3Coal723.0OthersParticulate Matter2.84 gm/s
19.
Power Requirement:
(a)Quantity (Kilo Volt Amps (kVA)) 29000
(b)Source Grid
(c)Uploaded Copy of Agreement Not Applicable
(d)Standby Arrangement (Details of DG Sets) 2000 kVA
(e)Stack Height (in m) 15
20.
Land Ownership Pattern:
(a)Forest Land (ha.) 0
(b)Private Land (ha.) 26.51
(c)Government Land (ha.) 0
(d)Revenue Land (ha.) 0
(e)Other Land (ha.) 0
    Total Land (ha.) 26.51
21.
Present Land Use Breakup of the Study Area in Ha:
(a)Agriculture Area (ha.) 0
(b)Waste/Barren Land (ha.) 0
(c)Grazing/ Community Land (ha.) 0
(d)Surface Water Bodies (ha.) 0
(e)Settlements (ha.) 0
(f)Industrial (ha.) 0
(g)Forest (ha.) 0
(h)Mangroves (ha.) 0
(i)Marine Area (ha.) 0
(j)Others (ha.) : Occupied by Plant 26.51
    Total (ha.) 26.51
    22.     Land requirement for various activities
S. No.Description of Activity / Facility / Plant / Others OthersLand Requirement (ha.)Remarks
(1.)Green belt9.1
(2.)OthersPaved area/Road area and open land9.28
(3.)Main Plant8.13
Total (ha.) 26.51
23.
Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Sanctuaries; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones :
    23.1.     Details of Ecological Sensitivity :
S. No.Details of Ecological Sensitivity NameDistance from the Project (Km)Remarks
(1.)WLSNot Applicable0None in 10 KM Radius
(2.)NPANot Applicable0None in 10 KM Radius
(3.)ESAsNot Applicable0None in 10 KM Radius
(4.)Critically Polluted AreaNot Applicable0None in 10 KM Radius
(5.)ESZsNot Applicable0None in 10 KM Radius
(6.)Wildlife CorridorsNot Applicable0None in 10 KM Radius
(7.)CorridorsNot Applicable0None in 10 KM Radius
    23.2.     Details of Environmental Sensitivity :
S. No.Details of Environmental Sensitivity Other Details of Environmental Sensitivity NameDistance from the Project (Km)Remarks
(1.)ForestProtected forest near Sagarka village8.6SSE
(2.)Archaeological SitesNone in 10 KM Radius0NA
(3.)Defence InstallationsNone in 10 KM Radius0NA
23.3.
(a)Whether Noc / Permission from the competent authority is required? No
(b)Whether NBWL recommendation is required? No
24.
Forest Land:
Whether any Forest Land involved? No
25.
Tree Cutting:
(a)No. of Trees Cut for the Project (if Forest Land not Involved) 0
(b)Details of Tree Cutting and Planting of Trees Not Applicable
26.
Land Acquisition Status:
(a)Acquired Land(Ha) 26.51
(b)Land yet to be acquired(Ha) 0
(c)Status of Land acquisition if not acquired NA
27.
Rehabilitation and Resettlement (R&R):
(a)No. of Villages 0
(b)No. of Households 0
(c)No. of PDFs (Project Displaced Families) 0
(d)No. of PAFs (Project Affected Families) 0
(e)Funds Allocated for R&R(in INR) (in Lacs) 0
(f)Status of R&R Completed
28.
Details of Presence of Schedule-I Species:
(a)Whether there is Presence of Schedule-I Species ? No
(b)Whether conservation plan for Schedule-I Species has been prepared ? No
(c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? No
29.
Details of Presence of Water Bodies in Core Area:
(a)Whether there is Presence of Water Bodies in Core Area ? No
(b)Whether there is Diversion Required ? No
(c)Whether permission has been obtained from competent authority ? No
30.
Details of Presence of Water Bodies in Buffer Area:
(a)Whether there is Presence of Water Bodies in Buffer Area ? Yes
(i)Details of Water Bodies in Buffer Area Damodar River
(ii)Direction of Water Bodies in Buffer Area South West
(iii)Distance of Water Bodies in Buffer Area 1.2
31.
Manpower Requirement:
(a)Permanent Employment-During Construction 0
(b)Permanent Employment-During Operation 539
(c)Temporary Employment- During Construction 0
(d)Temporary Employment- During Operation 0
(e)No. of working days 330
(f)Total Manpower 539
32.
Green Belt in Ha:
(a)Uploaded Green Belt plan Copy of Green Belt Plan
S. No.Description ExistingProposedTotal
(1.)Total Area of Green Belt6.682.429.1
(2.)Percentage of Total Project Area25.29.1634.36
(3.)No. of Plants10000400014000
(4.)Funds Allocated020000002000000
    33.         Project Benefits
S. No.Type of Project Benefits Details of Project Benefits
(1.)SocialEmployment to additional 60
(2.)FinancialUtilisation of Existing infrastructure for new unit
(3.)EnvironmentalNo additional land requirement. Expansion is within existing land
   34.   CRZ Specific Details : Not Applicable
   35.   Sector Specific Details : NOT APPLICABLE
   35.   Sector Specific Details For Industrial Projects - 1
S. No.Item Details
S. No.Item Details
36.
Details of Court Cases:
(a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? No
37.
Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act:
(a)Whether any Direction issued under EPA Act/Air Act/Water Act ? No
38.
Details of EIA Consultant:
(a)Have you hired Consultant for preparing document? Yes
(i)Accreditation No. NABET/EIA/1619/SA 064
(ii)Name of the EIA Consultant B.S. ENVI - TECH PVT. LTD.
(iii)Address 12-13-1270/71/73, Amity Ville, 4th Floor, St. Annas Road, Tarnaka, Secunderabad - 500017
(iv)Mobile No. 9848053012
(v)Landline No. 0404978306
(vi)Email Id info@bsenvitech.com
(vii)Category of Accreditation A
(viii)Sector of Accreditation Industrial Projects - 1
(ix)Validity of Accreditation 12 Nov 2019
(x)Uploaded Certificate of Accreditation certified by QCI/NABET Copy of Certificate of Accreditation
39.
Documents to be Attached:
(a)Uploaded Copy of EIA/EMP Report Copy of EIA/EMP
Copy of EIA/EMP(Annexures)
Copy of EIA/EMP(Plans/Figures)
(b)Uploaded Copy of Risk Assessment Report Copy of Risk Assessment
(c)Uploaded Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan
(d)Uploaded Copy of Final Layout Plan Copy of Final Layout Plan
(e)Uploaded Cover Letter Copy of Cover Letter
(f)Uploaded Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency
(g)Uploaded Additional File Copy of Additional File
(h)Uploaded Proposal Presentation (To be given in EAC meeting) NA
            Essential Detail Sought:
Sno. EDS Letter Remarks Date of EDS
1.NAMay kindly see the certificate of compliance issued by the Regional officer, Ranchi. There are several conditions observed as partial compliance of EC conditions. You are requested to rectify the same and get the closure report for consideration of the proposal. 05 Oct 2018
2.NAThe correction have been made as per the instruction received 11 Oct 2018
      Additional Detail Sought : NIL
Undertaking
I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief. And I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity/ construction/ expansion has since been taken up.
Name of ApplicantAtul Dutta
DesignationPlantHead
Name of Company (Applicant Name should not be given here)ACCLIMITED
AddressACC Limited Sindri Cement Works, P.O.ACC Colony – 828124. Gender* Male