Form-2
APPLICATION FOR PRIOR ENVIRONMENTAL CLEARANCE
S. No.Item Details
1.
Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? No
Details of Project:
(a)Name of the project(s) Expansion & Modernization of Existing Project For Manufacturing of Explosives & Defence Products
(b)Name of the Company / Organisation SOLAR INDUSTRIES INDIA LIMITED
(c)Registered Address 11, Zade Layout, Bharat Nagar,Nagpur,Nagpur,Maharashtra-440033
(d)Legal Status of the Company Private
(e)Joint Venture No
2.
Address for the correspondence:
(a)Name of the Applicant S K Sharma
(b)Designation (Owner/ Partner/ CEO) AsstGMTechnical
(c)Address 11, Zade Layout,Bharat Nagar, Nagpur,Nagpur (Urban),Nagpur,Maharashtra-440033
(d)Pin code 440033
(e)E-mail s.sharma@solargroup.com
(f)STD Code. 712(f)Telephone No. 2561000
(g)Fax No.
(h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . Annexure-Uploaded Copy of documents in support of the competence/authority
3.
Category of the Project/Activity as per Schedule of EIA Notification,2006:
(a.I)Project/Activity5(f) Synthetic organic chemicals industry (dyes & dye intermediates; bulk
6(b)Isolated storage & handling of hazardous chemicals (As per threshold planning
Minor Activity
(b)Category A
(c)Proposal Number IA/MH/IND2/61877/2017
(d)Master Proposal Number(Single Window) SW/81122/2018
(e)EAC concerned (for category A Projects only) Industrial Projects - 2
(f)Project Type Fresh EC
4.
Location of the Project:
(a)Plot/Survey/Khasra No. 37, 38, 39, 40, 70, 71, 72, 73/1, 73/2, 74, 75, 78
(b)Pincode 440023
(c)Bounded Latitudes (North)
From
Degree 21.138280
Minutes
Second
From
Degree 21.139688
Minutes
Second
(d)Bounded Longitudes (East)
From
Degree 78.726949
Minutes
Second
From
Degree 78.755032
Minutes
Second
(e)Survey of India Topo Sheet No. 55k_12, 55k_16
(f)Uploaded Topo Sheet File Copy of Topo Sheet File
(g)Maximum Elevation Above Means Sea Level(AMSL) 425
(h)Uploaded (kml) File Copy of Kml File      
(i)Distance of Nearest HFL from the project boundary within the study area 0
(j)Seismic Zone 2
5.
(a)Number of States in which Project will be Executed 1
(b)Main State of the project Maharashtra
Details of State(s) of the project
S. No. State Name District Name Tehsil Name Village Name
(1.)MaharashtraNagpurKatol
6.
Details of Terms of Reference (ToR):
(a)MoEF&CC / SEIAA File Number IA-J-11011/28/2017-IA-II(I)
(b)Date of Apply of TOR 23 Jan 2017
(c)Date of Issue of TOR / Standard ToR 07 Jul 2017
(d)Previous TOR Letter Copy of Previous TOR letter
7.
Details of Public Consultation:
(a)Whether the Project Exempted from Public Hearing?No
(b)Whether details of Public Hearing available? Yes
(c)Whether Public hearing was presided over by an officer of the rank of Additional District Magistrate or above Yes
     7.1.       Details of Public Hearing
S. No.Details of Advertisement Details of Public Hearing Venue Location DetailsNo. of People AttendedIssues RaisedDesignation of Presiding OfficerOther Designation of Presiding Officer
(1.)
Date of Advertisement :26 Nov 2017
Copy of advertisement :Copy of Advertisement
Copy of Public Hearing :Copy of Public Hearing
Date :28 Dec 2017
Distance of Public Hearing Venue from the Proposed Project :3.0
Gram Panchayat office premises, Ringanabodi, Tah-Katol, Dist Nagpur, Maharashtra State
State :Maharashtra
District :Nagpur
Tehsil :Katol
Village :Ringnabodi
100Employment and BlastingOthersADM
8.
Details of Project Configuration/Product:
     8.1.       Project Configuration
S. No.Plant/Equipment/FacilityConfigurationRemarks
(1.)Proposed Bulk Emulsion (SME)1,00,000 MTPAContinuous Process 350 MT/Day @ 280 Days
(2.)Proposed RDX manufacturing BuildingPP-19)3000 MTPABatch Size 1000 Kg @ 300 working days=3000 MTPA
(3.)RDX Compounded Products Granulation Building (GB)300 MTPA@ 1000 Kg batch /day x 300 days = 300 MTPA
(4.)Drying Building (HD-5)3000 MTPACapacity 60 kg x 8 vessel
(5.)Exst.:Slurry mnuf. Building(PP-1,PP-2&PP-3)60000 MTPA60 MT/day, 80 MT/day, 60 MT/day @ 300 days
(6.)Proposed:Manufacturing Building ( PP-16) & (PP-20)11250 MTPA37.5 MT/day @ 300 days PP-20 standby facility
(7.)Boiler Existing : 2 TPH 3 TPH 6 TPH11 TPHFuel: Coal / Biofuel fired
(8.)Boiler Proposed : 12 TPH12 TPHFuel: Coal fired
(9.)Propo:TNT manufacturing Building (PP-18)3000 MTPA@ 250 days = 3000 MTPA
(10.)Existing: HMX manufacturing Building (PP-15)237.5 MTPABatch Size 950 Kg @ 250 working days = 237.5 MTPA
(11.)Existing: HMX manufacturing Building (PP-6)62.5 MTPABatch Size 250 Kg @ 250 working days = 62.5 MTPA
(12.)Proposed: Manufacturing building (PP-11)45000 MTPAContinuous Process : 150 MT/day @ 300 days
(13.)Existing Slurry/Emulsion Explosives1,00,000 MTPA100500 MTPA considering wastage @ 0.5 %
(14.)Existing: RDX manufacturing BuildingNILPresently no facility
(15.)Existing: Emulsion manu. Build. PP-4, 5,7,9,1240500 MTPA15,30,30,30,30 MT/day@ 300 days
(16.)Proposed Slurry + Emulsion Explosives56250 MTPA
(17.)Proposed: Crystallization building (CB)300 MTPA1000 Kg batch per day @ 300 days = 300 MTPA
     8.2.       Product
S. No.Product/Activity (Capacity/Area)QuantityUnitOther UnitMode of Transport / Transmission of ProductOther Mode of Transport / Transmission of Product
(1.)RDX & RDX Compounded Products -category: 5(f) 6(b)3000OthersMTPARoad
(2.)HMX & HMX Compounded Products-category: 5(f) 6(b)300OthersMTPARoad
(3.)Slurry/Emulsion Explosives -category: 6(b)156250OthersMTPARoad
(4.)Bulk Emulsion (SME) -category: 6(b)100000OthersMTPARoad
(5.)TNT (Trinitrotoluene) -category: 5(f) 6(b)3000OthersMTPARoad
9.
In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii):
Details Not Applicable
9.1.
Details of Consent to Operate
(i)Whether Consent to operate obtained ? NA
(ii)Copies of all Consent to operate obtained since inception NA
(iii)Date of Issue 30 Dec 2016
(iv)Valid Upto 30 Jun 2021
(v)File No. UAN No. 0000008004
(vi)Application No. UAN No. 0000008004
(vii)Copy of Consent to operate valid as on date Copy of Consent to Operate
10.
Project Cost:
(a)Total Cost of the Project at current price level (in Crores) 184.01
(b) Funds Allocated for Environment Management (Capital) (in Crores) 7.0114915
(c) Funds Allocated Towards CER (Corporate Environment Responsibility) (in Crores) 4.6
(d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in Crores) 3.6168353
11.
Whether project attracts the General Condition specified in the Schedule of EIA Notification ? No
12.
Whether project attract the Specific Condition specified in the Schedule of EIA Notification ? No
13.
Raw Material / Fuel Requirement:
(a)Proposed quantity of raw material/fuel 431000
(b)Existing quantity of raw material/fuel N/A
(c)Total quantity of raw material/fuel 431000
    13.1.        Raw Material / Fuel Profile
S. No.Raw Material / Fuel QuantityUnitOther UnitSource (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received )Mode of TransportOther Mode of TransportDistance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received)Type of Linkage Other Type of Linkage Uploaded Copy of Linkage
(1.)Furnace Oil5700OthersMTPAOpen Market from IndiaRoad0 Open MarketCopy of Linkage
(2.)Acetic Acid3500OthersMTPAOpen Market from IndiaRoad0 Open MarketCopy of Linkage
(3.)Acetic anhydride8650OthersMTPAOpen Market from IndiaRoad0 Open MarketCopy of Linkage
(4.)Solvent1500OthersMTPAOpen Market from IndiaRoad0 Open MarketCopy of Linkage
(5.)SMO1250OthersMTPAOpen Market from IndiaRoad0 Open MarketCopy of Linkage
(6.)Sodium Nitrate250OthersMTPAOpen Market from IndiaRoad0 Open MarketCopy of Linkage
(7.)Nitric Acid (98%)1765OthersMTPAOpen Market from IndiaRoad0 Open MarketCopy of Linkage
(8.)Coal300000OthersMTPAOpen Market from IndiaRoad0 Open MarketCopy of Linkage
(9.)Ammonium Nitrate82600OthersMTPAOpen Market from IndiaRoad500 Open MarketCopy of Linkage
(10.)Calcium Nitrate12500OthersMTPAOpen Market from IndiaRoad0 Open MarketCopy of Linkage
(11.)Oleum (20%)6000OthersMTPAOpen Market from IndiaRoad0 Open MarketCopy of Linkage
(12.)Nitric acid2450OthersMTPAOpen Market from IndiaRoad0 Open MarketCopy of Linkage
(13.)Hexamine1300OthersMT/AOpen Market from IndiaRoad0 Open MarketNACopy of Linkage
(14.)Ortho nitrotoluene1995OthersMTPAOpen Market from IndiaRoad0 Open MarketCopy of Linkage
(15.)Nitric Acid (58%)3265OthersMTPAOpen Market from IndiaRoad0 Open MarketCopy of Linkage
14.
Baseline Data :
(a)Period of Base Line Data Collection FROM 01 Dec 2016 To 28 Feb 2017
(b)Season Winter
    14.1.     No. of ambient Air Quality (AAQ) monitoring locations : 8
S. No.Criteria Pollutants Other Criteria PollutantsUnitMaximum ValueMinimum Value98 Percentile ValuePrescribed Standard
(1.)SO2Micro Gram per Meter Cube16.6315.680 (24 HR)
(2.)NOxMicro Gram per Meter Cube28.23.427.780 (24 HR)
(3.)PM10Micro Gram per Meter Cube79.233.779.2100 (24 HR)
(4.)PM2.5Micro Gram per Meter Cube31.713.131.560 (24 HR)
    14.2.     No. of Ground Water monitoring locations : 8
S. No.Criteria Pollutants Other Criteria PollutantsHeavy MetalUnitOther UnitMaximum ValueMinimum ValueDesirable LimitMaximum Permissible Limit
(1.)pHNA7.937.036.58.5
(2.)TDSmg/l9623485002000
(3.)Total Hardnessmg/l460.56209.88200600
(4.)Fluoridemg/l1.850.511.01.5
(5.)Chloridesmg/l190.7419.852501000
(6.)Heavy Metalsleadmg/l0.0050.0010.010.01
(7.)TSSmg/l101000
    14.3.     No. of Surface Water monitoring locations : 3
S. No.Criteria Pollutants Other Criteria PollutantsUnitOther UnitMaximum ValueMinimum ValueClassification of inland water body
(1.)DOmg/l5.14.8A
(2.)pHNA7.577.04A
(3.)BODmg/l82.3062.5A
(4.)CODmg/l240.72151.4A
    14.4.     No. of Ambient Noise monitoring locations : 8
S. No.Parameter UnitMaximum ValueMinimum ValuePrescribed Standard
(1.)Leq(Day)A-weighted decibels(dB(A))66.256.275
(2.)Leq(Night)A-weighted decibels(dB(A))49.142.470
    14.5.     No. of Soil Sample Monitored locations : 8
S. No.Parameter UnitOther UnitMaximum ValueMinimum Value
(1.)N(Nitrogen)Kilogram per hectare441190
(2.)P(Phosphorus)Kilogram per hectare22.4811.67
(3.)K(Potassium)Kilogram per hectare982170
(4.)Electric ConductivityMillisiemens per Centimetre30090
(5.)pHOthersNA8.167.18
14.6.
Details of Ground Water Table:
(a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) From 10 To 5
(b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) From 2 To 5
(c)Whether Ground Water Intersection will be there ? No
     15.      Details of Water Requirement (During Operation)
S. No.Source Source Other Required Quantity (Kilolitre per Day (Kld))Distance from SourceCopy of Permission from Competent Authority Mode of TransportOther Mode of TransportMethod of Water WithdrawalOther Method of Water WithdrawalLetter No.Date of IssuePermitted Quantity
(1.)GroundWater9220Copy of Permission LetterPipelineTube WellCGWA/NOC/IND/ORIG/2018/346715 May 2018430
15.1.
(a)Whether Desalination is proposed No
    16.       Waste Water Management(During Operation)
S. No.Type/Source Quantity of Waste Water Generated (Kilolitre per Day)Treatment Capacity (Kilolitre per Day) Treatment MethodMode of DisposalOther Mode of DisposalQuantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day)Quantity of Discharged Water (Kilolitre per Day)
(1.)Industrial cooling and boiler feed67235ChemicalReuse within the Plant & Recycling67
(2.)Gardening00NAGreen Belt Renewal Plant0
(3.)Biodegradable Stream59235ChemicalReuse within the Plant & Recycling59
(4.)Domestic purposes82150Biological MethodReuse within the Plant & Recycling820
(5.)Non Biodegradable20235ChemicalReuse within the Plant & Recycling20
16.1.
(a)Total Waste Water Generation (Kilolitre per Day) 228
(b)Total Discharged Water (Kilolitre per Day) 0
(c)Total Reused Water (Kilolitre per Day) 228
    17.       Solid Waste Generation/Management
S. No.Name of Waste Item Other ItemQuantity per AnnumUnitDistance from Site(KM)Mode of TransportOther Mode of TransportMode of DisposalOther Mode of Disposal
(1.)Biological SludgeOthersBiological Sludge1.20Tons50RoadOthersIn the gardening
(2.)Boiler AshOthersBoiler Ash540Tons50RoadOthersBrick manufacturing
(3.)Coal AshOthersCoal Ash5775Tons50RoadOthersSale to Brick manufactures
18.
    18.1.     Air Quality Impact Prediction
S. No.Criteria Pollutants Other Criteria PollutantsUnitBaseline ConcentrationDistance GLCIncremental ConcentrationTotal GLCPrescribed Standard
(1.)PM10Microgram per Meter Cube79.21.41.0580.25100
(2.)NOxMicrogram per Meter Cube28.21.43.231.480
(3.)SO2Microgram per Meter Cube16.61.40.3216.9280
(4.)PM2.5Microgram per Meter Cube31.700060
    18.2.     Stack Details
S. No.Source FuelStack Height(m)Stack Diameter(m)PollutantsOther PollutantsEmission (GLS)
(1.)BoilerCoal33.51PM100.79
(2.)BoilerCoal33.51NOx0.49
(3.)DG SetHSD60.4SO20.0005
(4.)DG SetHSD60.4NOx0.26
(5.)DG SetHSD60.4PM100.01
(6.)BoilerCoal33.51SO20.26
19.
Power Requirement:
(a)Quantity (Kilo Volt Amps (kVA)) 2000
(b)Source MSEDCL
(c)Uploaded Copy of Agreement Copy of Agreement
(d)Standby Arrangement (Details of DG Sets) Existing 2x 380 KVA, 1x 400 KVA and 1x 600 KVA = 1
(e)Stack Height (in m) 8
20.
Land Ownership Pattern:
(a)Forest Land (ha.) 0
(b)Private Land (ha.) 110.8474
(c)Government Land (ha.) 0
(d)Revenue Land (ha.) 0
(e)Other Land (ha.) 0
    Total Land (ha.) 110.8474
21.
Present Land Use Breakup of the Study Area in Ha:
(a)Agriculture Area (ha.) 0
(b)Waste/Barren Land (ha.) 0
(c)Grazing/ Community Land (ha.) 0
(d)Surface Water Bodies (ha.) 0
(e)Settlements (ha.) 0
(f)Industrial (ha.) 0
(g)Forest (ha.) 0
(h)Mangroves (ha.) 0
(i)Marine Area (ha.) 0
(j)Others (ha.) : NA 0
    Total (ha.) 0
    22.     Land requirement for various activities
S. No.Description of Activity / Facility / Plant / Others OthersLand Requirement (ha.)Remarks
(1.)Main Plant2.909
(2.)Green belt36.579
(3.)OthersOpen space and addl grenbelt71.3594
Total (ha.) 110.8474
23.
Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Sanctuaries; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones :
    23.1.     Details of Ecological Sensitivity :
S. No.Details of Ecological Sensitivity NameDistance from the Project (Km)Remarks
(1.)NPANil00
(2.)ESAsNil00
(3.)ESZs000
(4.)CorridorsNil00
(5.)Critically Polluted AreaNil0NA
(6.)Wildlife CorridorsNil00
(7.)WLSNil00
    23.2.     Details of Environmental Sensitivity :
S. No.Details of Environmental Sensitivity Other Details of Environmental Sensitivity NameDistance from the Project (Km)Remarks
(1.)ForestKondhali RF0Adjacent to Project site and other 5 RF are in the 10 km radius area
(2.)Archaeological SitesNil0NA
(3.)Defence InstallationsNil0NA
23.3.
(a)Whether Noc / Permission from the competent authority is required? No
(b)Whether NBWL recommendation is required? No
24.
Forest Land:
Whether any Forest Land involved? No
25.
Tree Cutting:
(a)No. of Trees Cut for the Project (if Forest Land not Involved) 0
(b)Details of Tree Cutting and Planting of Trees Not Applicable
26.
Land Acquisition Status:
(a)Acquired Land(Ha) 110.8474
(b)Land yet to be acquired(Ha) 0
(c)Status of Land acquisition if not acquired Acquired
27.
Rehabilitation and Resettlement (R&R):
(a)No. of Villages 0
(b)No. of Households 0
(c)No. of PDFs (Project Displaced Families) 0
(d)No. of PAFs (Project Affected Families) 0
(e)Funds Allocated for R&R(in INR) (in Lacs) 0
(f)Status of R&R Yet To Start
28.
Details of Presence of Schedule-I Species:
(a)Whether there is Presence of Schedule-I Species ? No
(b)Whether conservation plan for Schedule-I Species has been prepared ? No
(c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? No
29.
Details of Presence of Water Bodies in Core Area:
(a)Whether there is Presence of Water Bodies in Core Area ? No
(b)Whether there is Diversion Required ? No
(c)Whether permission has been obtained from competent authority ? No
30.
Details of Presence of Water Bodies in Buffer Area:
(a)Whether there is Presence of Water Bodies in Buffer Area ? Yes
(i)Details of Water Bodies in Buffer Area Bor Nalla
(ii)Direction of Water Bodies in Buffer Area South West
(iii)Distance of Water Bodies in Buffer Area 1
31.
Manpower Requirement:
(a)Permanent Employment-During Construction 97
(b)Permanent Employment-During Operation 1513
(c)Temporary Employment- During Construction 100
(d)Temporary Employment- During Operation 100
(e)No. of working days 300
(f)Total Manpower 1810
32.
Green Belt in Ha:
(a)Total Area of Green Belt 36.5795
(b)Percentage of Total Project Area 33.00
(c)No. of Plants to be Planted 25050
(d)Funds Allocated for Plantation 2020122
(e)Uploaded Green Belt plan Copy of Green Belt Plan
    33.         Project Benefits
S. No.Type of Project Benefits Details of Project Benefits
(1.)Social1. During construction phase employment generation will be ~100 persons for short time. 2. SIIL will provide necessary facilities like drinking water supply during summer season, sanitation and medical facilities etc. to the project personnel and their families during the construction phase. 3. The company has developed transportation facility for import of raw material required for the plant and also for the export of the finished products. The site has very good connectivity with road, rail, a
(2.)Financial1. The products that will be manufactured by M/s. SIIL will have a high market potential. Due to increasing demand, the plant has own economic importance. Solar is the largest exporter of Explosives and Initiating Systems from India. Soar’s products and services have successfully met the needs and discerning expectations of its valuable customers not only in India but also overseas. In fact, SIIL, export products to more than 42 countries across the Middle-East, Africa, and the South East Asia i
   34.   CRZ Specific Details : Not Applicable
   35.   Sector Specific Details : NOT APPLICABLE
   35.   Sector Specific Details For Industrial Projects - 2
S. No.Item Details
S. No.Item Details
36.
Details of Court Cases:
(a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? No
37.
Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act:
(a)Whether any Direction issued under EPA Act/Air Act/Water Act ? No
38.
Details of EIA Consultant:
(a)Have you hired Consultant for preparing document? Yes
(i)Accreditation No. NABET/EIA/1619/RA 0059
(ii)Name of the EIA Consultant ANACON LABORATORIES PRIVATE LIMITED
(iii)Address 60, Bajiprabhu Nagar, Nagpur -440033
(iv)Mobile No. 9372960077
(v)Landline No. 7104265854
(vi)Email Id project@anacon.in
(vii)Category of Accreditation A
(viii)Sector of Accreditation Industrial Projects - 2
(ix)Validity of Accreditation 01 Oct 2019
(x)Uploaded Certificate of Accreditation certified by QCI/NABET Copy of Certificate of Accreditation
39.
Documents to be Attached:
(a)Uploaded Copy of EIA/EMP Report Copy of EIA/EMP
Copy of EIA/EMP(Annexures)
Copy of EIA/EMP(Plans/Figures)
(b)Uploaded Copy of Risk Assessment Report Copy of Risk Assessment
(c)Uploaded Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan
(d)Uploaded Copy of Final Layout Plan Copy of Final Layout Plan
(e)Uploaded Cover Letter Copy of Cover Letter
(f)Uploaded Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency
(g)Uploaded Additional File Copy of Additional File
(h)Uploaded Proposal Presentation (To be given in EAC meeting) NA
            Essential Detail Sought:
Sno. EDS Letter Remarks Date of EDS
1.NAPlease refer our earlier observations on the proposal. Following are reiterated:- - Please confirm categorization of different products (mentioned at item 8.2 of Form-2) vis-a-vis the projects/activities listed in the schedule to the EIA Notification, 2006. - Details against item 8.1 & 8.2 should not be the same. - Details of ECs for the present industrial operations/products and the compliance status thereof. - Only those products, actually requiring EC in terms of the said Notification, need to be mentioned in the proposal. 10 Oct 2018
2.NAThe correction have been made as per the instruction received 22 Oct 2018
            Additional Detail Sought:
Sno. ADS Letter Remarks Date of ADS
1. ADS Reply LetterResponse to ADS vide: Minutes of the 1st Expert Appraisal Committee (Industry-2) held on 19-20 Dec,2018 [IA/MH/IND2/61877/2017,IA-J-11011/28/2017-IA-II(I)]. 12 Jan 2019
2.NADeferred 02 Jan 2019
Undertaking
I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief. And I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity/ construction/ expansion has since been taken up.
Name of ApplicantS K Sharma
DesignationAsstGMTechnical
Name of Company (Applicant Name should not be given here)SOLAR INDUSTRIES INDIA LIMITED
Address11, Zade Layout, Bharat Nagar
Print