1. | Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? | No | Details of Project: | (a)Name of the project(s) | Expansion & Modernization of Existing Project For Manufacturing of Explosives & Defence Products | (b)Name of the Company / Organisation | SOLAR INDUSTRIES INDIA LIMITED | (c)Registered Address | 11, Zade Layout, Bharat Nagar,Nagpur,Nagpur,Maharashtra-440033 | (d)Legal Status of the Company | Private | (e)Joint Venture | No | |
|
2. | Address for the correspondence: | (a)Name of the Applicant | S K Sharma | (b)Designation (Owner/ Partner/ CEO) | AsstGMTechnical | (c)Address | 11, Zade Layout,Bharat Nagar, Nagpur,Nagpur (Urban),Nagpur,Maharashtra-440033 | (d)Pin code | 440033 | (e)E-mail | s.sharma@solargroup.com | (f)STD Code. | 712(f)Telephone No. | 2561000 | (g)Fax No. | | (h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . | Annexure-Uploaded Copy of documents in support of the competence/authority | |
|
3. | Category of the Project/Activity as per Schedule of EIA Notification,2006: | (a.I)Project/Activity | 5(f) Synthetic organic chemicals industry (dyes & dye intermediates; bulk 6(b)Isolated storage & handling of hazardous chemicals (As per threshold planning
| Minor Activity | | (b)Category | A | (c)Proposal Number | IA/MH/IND2/61877/2017 | (d)Master Proposal Number(Single Window) | SW/81122/2018 | (e)EAC concerned (for category A Projects only) | Industrial Projects - 2 | (f)Project Type | Fresh EC |
|
|
4. | Location of the Project: | (a)Plot/Survey/Khasra No. | 37, 38, 39, 40, 70, 71, 72, 73/1, 73/2, 74, 75, 78 | (b)Pincode | 440023 | (c)Bounded Latitudes (North) | | From | | Degree | 21.138280 | Minutes | | Second | | From | | Degree | 21.139688 | Minutes | | Second | | (d)Bounded Longitudes (East) | | From | | Degree | 78.726949 | Minutes | | Second | | From | | Degree | 78.755032 | Minutes | | Second | | (e)Survey of India Topo Sheet No. | 55k_12, 55k_16 | (f)Uploaded Topo Sheet File | Copy of Topo Sheet File | (g)Maximum Elevation Above Means Sea Level(AMSL) | 425 | (h)Uploaded (kml) File | Copy of Kml File | (i)Distance of Nearest HFL from the project boundary within the study area | 0 | (j)Seismic Zone | 2 | |
|
5. | (a)Number of States in which Project will be Executed | 1 | (b)Main State of the project | Maharashtra | |
|
|
Details of State(s) of the project |
---|
S. No. | State Name | District Name | Tehsil Name | Village Name |
---|
(1.) | Maharashtra | Nagpur | Katol | | |
|
6. | Details of Terms of Reference (ToR): | (a)MoEF&CC / SEIAA File Number | IA-J-11011/28/2017-IA-II(I) | (b)Date of Apply of TOR | 23 Jan 2017 | (c)Date of Issue of TOR / Standard ToR | 07 Jul 2017 | (d)Previous TOR Letter | Copy of Previous TOR letter | |
|
7. | Details of Public Consultation: | (a)Whether the Project Exempted from Public Hearing? | No | (b)Whether details of Public Hearing available? | Yes | (c)Whether Public hearing was presided over by an officer of the rank of Additional District Magistrate or above | Yes | |
|
7.1. Details of Public Hearing |
---|
|
S. No. | Details of Advertisement | Details of Public Hearing | Venue | Location Details | No. of People Attended | Issues Raised | Designation of Presiding Officer | Other Designation of Presiding Officer |
---|
(1.) | | Copy of Public Hearing : | Copy of Public Hearing | Date : | 28 Dec 2017 | Distance of Public Hearing Venue from the Proposed Project : | 3.0 |
| Gram Panchayat office premises, Ringanabodi, Tah-Katol, Dist Nagpur, Maharashtra State | State : | Maharashtra | District : | Nagpur | Tehsil : | Katol | Village : | Ringnabodi |
| 100 | Employment and Blasting | Others | ADM | |
8. | Details of Project Configuration/Product: | |
|
8.1. Project Configuration |
---|
S. No. | Plant/Equipment/Facility | Configuration | Remarks |
---|
(1.) | Proposed Bulk Emulsion (SME) | 1,00,000 MTPA | Continuous Process 350 MT/Day @ 280 Days | (2.) | Proposed RDX manufacturing BuildingPP-19) | 3000 MTPA | Batch Size 1000 Kg @ 300 working days=3000 MTPA | (3.) | RDX Compounded Products Granulation Building (GB) | 300 MTPA | @ 1000 Kg batch /day x 300 days = 300 MTPA | (4.) | Drying Building (HD-5) | 3000 MTPA | Capacity 60 kg x 8 vessel | (5.) | Exst.:Slurry mnuf. Building(PP-1,PP-2&PP-3) | 60000 MTPA | 60 MT/day, 80 MT/day, 60 MT/day @ 300 days | (6.) | Proposed:Manufacturing Building ( PP-16) & (PP-20) | 11250 MTPA | 37.5 MT/day @ 300 days PP-20 standby facility | (7.) | Boiler Existing : 2 TPH 3 TPH 6 TPH | 11 TPH | Fuel: Coal / Biofuel fired | (8.) | Boiler Proposed : 12 TPH | 12 TPH | Fuel: Coal fired | (9.) | Propo:TNT manufacturing Building (PP-18) | 3000 MTPA | @ 250 days = 3000 MTPA | (10.) | Existing: HMX manufacturing Building (PP-15) | 237.5 MTPA | Batch Size 950 Kg @ 250 working days = 237.5 MTPA | (11.) | Existing: HMX manufacturing Building (PP-6) | 62.5 MTPA | Batch Size 250 Kg @ 250 working days = 62.5 MTPA | (12.) | Proposed: Manufacturing building (PP-11) | 45000 MTPA | Continuous Process : 150 MT/day @ 300 days | (13.) | Existing Slurry/Emulsion Explosives | 1,00,000 MTPA | 100500 MTPA considering wastage @ 0.5 % | (14.) | Existing: RDX manufacturing Building | NIL | Presently no facility | (15.) | Existing: Emulsion manu. Build. PP-4, 5,7,9,12 | 40500 MTPA | 15,30,30,30,30 MT/day@ 300 days | (16.) | Proposed Slurry + Emulsion Explosives | 56250 MTPA | | (17.) | Proposed: Crystallization building (CB) | 300 MTPA | 1000 Kg batch per day @ 300 days = 300 MTPA | |
8.2. Product |
---|
S. No. | Product/Activity (Capacity/Area) | Quantity | Unit | Other Unit | Mode of Transport / Transmission of Product | Other Mode of Transport / Transmission of Product |
---|
(1.) | RDX & RDX Compounded Products -category: 5(f) 6(b) | 3000 | Others | MTPA | Road | | (2.) | HMX & HMX Compounded Products-category: 5(f) 6(b) | 300 | Others | MTPA | Road | | (3.) | Slurry/Emulsion Explosives -category: 6(b) | 156250 | Others | MTPA | Road | | (4.) | Bulk Emulsion (SME) -category: 6(b) | 100000 | Others | MTPA | Road | | (5.) | TNT (Trinitrotoluene) -category: 5(f) 6(b) | 3000 | Others | MTPA | Road | | |
|
9. | In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii): | Details Not Applicable | |
|
9.1. | Details of Consent to Operate | (i)Whether Consent to operate obtained ? | NA | (ii)Copies of all Consent to operate obtained since inception | NA | (iii)Date of Issue | 30 Dec 2016 | (iv)Valid Upto | 30 Jun 2021 | (v)File No. | UAN No. 0000008004 | (vi)Application No. | UAN No. 0000008004 | (vii)Copy of Consent to operate valid as on date | Copy of Consent to Operate | |
|
|
10. | Project Cost: | (a)Total Cost of the Project at current price level (in Crores) | 184.01 | (b) Funds Allocated for Environment Management (Capital) (in Crores) | 7.0114915 | (c) Funds Allocated Towards CER (Corporate Environment Responsibility) (in Crores) | 4.6 | (d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in Crores) | 3.6168353 | |
|
11. | Whether project attracts the General Condition specified in the Schedule of EIA Notification ? | No | | |
12. | Whether project attract the Specific Condition specified in the Schedule of EIA Notification ? | No | | |
13. | Raw Material / Fuel Requirement: | (a)Proposed quantity of raw material/fuel | 431000 | (b)Existing quantity of raw material/fuel | N/A | (c)Total quantity of raw material/fuel | 431000 | |
|
  13.1. Raw Material / Fuel Profile |
---|
S. No. | Raw Material / Fuel | Quantity | Unit | Other Unit | Source (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received ) | Mode of Transport | Other Mode of Transport | Distance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received) | Type of Linkage | Other Type of Linkage | Uploaded Copy of Linkage |
---|
(1.) | Furnace Oil | 5700 | Others | MTPA | Open Market from India | Road | | 0 | Open Market | | Copy of Linkage | (2.) | Acetic Acid | 3500 | Others | MTPA | Open Market from India | Road | | 0 | Open Market | | Copy of Linkage | (3.) | Acetic anhydride | 8650 | Others | MTPA | Open Market from India | Road | | 0 | Open Market | | Copy of Linkage | (4.) | Solvent | 1500 | Others | MTPA | Open Market from India | Road | | 0 | Open Market | | Copy of Linkage | (5.) | SMO | 1250 | Others | MTPA | Open Market from India | Road | | 0 | Open Market | | Copy of Linkage | (6.) | Sodium Nitrate | 250 | Others | MTPA | Open Market from India | Road | | 0 | Open Market | | Copy of Linkage | (7.) | Nitric Acid (98%) | 1765 | Others | MTPA | Open Market from India | Road | | 0 | Open Market | | Copy of Linkage | (8.) | Coal | 300000 | Others | MTPA | Open Market from India | Road | | 0 | Open Market | | Copy of Linkage | (9.) | Ammonium Nitrate | 82600 | Others | MTPA | Open Market from India | Road | | 500 | Open Market | | Copy of Linkage | (10.) | Calcium Nitrate | 12500 | Others | MTPA | Open Market from India | Road | | 0 | Open Market | | Copy of Linkage | (11.) | Oleum (20%) | 6000 | Others | MTPA | Open Market from India | Road | | 0 | Open Market | | Copy of Linkage | (12.) | Nitric acid | 2450 | Others | MTPA | Open Market from India | Road | | 0 | Open Market | | Copy of Linkage | (13.) | Hexamine | 1300 | Others | MT/A | Open Market from India | Road | | 0 | Open Market | NA | Copy of Linkage | (14.) | Ortho nitrotoluene | 1995 | Others | MTPA | Open Market from India | Road | | 0 | Open Market | | Copy of Linkage | (15.) | Nitric Acid (58%) | 3265 | Others | MTPA | Open Market from India | Road | | 0 | Open Market | | Copy of Linkage | |
|
14. | Baseline Data : | (a)Period of Base Line Data Collection | FROM 01 Dec 2016 To 28 Feb 2017 | (b)Season | Winter | |
|
14.1. No. of ambient Air Quality (AAQ) monitoring locations : 8 |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Unit | Maximum Value | Minimum Value | 98 Percentile Value | Prescribed Standard |
---|
(1.) | SO2 | | Micro Gram per Meter Cube | 16.6 | 3 | 15.6 | 80 (24 HR) | (2.) | NOx | | Micro Gram per Meter Cube | 28.2 | 3.4 | 27.7 | 80 (24 HR) | (3.) | PM10 | | Micro Gram per Meter Cube | 79.2 | 33.7 | 79.2 | 100 (24 HR) | (4.) | PM2.5 | | Micro Gram per Meter Cube | 31.7 | 13.1 | 31.5 | 60 (24 HR) | |
14.2. No. of Ground Water monitoring locations : 8 |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Heavy Metal | Unit | Other Unit | Maximum Value | Minimum Value | Desirable Limit | Maximum Permissible Limit |
---|
(1.) | pH | | | NA | | 7.93 | 7.03 | 6.5 | 8.5 | (2.) | TDS | | | mg/l | | 962 | 348 | 500 | 2000 | (3.) | Total Hardness | | | mg/l | | 460.56 | 209.88 | 200 | 600 | (4.) | Fluoride | | | mg/l | | 1.85 | 0.51 | 1.0 | 1.5 | (5.) | Chlorides | | | mg/l | | 190.74 | 19.85 | 250 | 1000 | (6.) | Heavy Metals | | lead | mg/l | | 0.005 | 0.001 | 0.01 | 0.01 | (7.) | TSS | | | mg/l | | 10 | 10 | 0 | 0 | |
14.3. No. of Surface Water monitoring locations : 3 |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Unit | Other Unit | Maximum Value | Minimum Value | Classification of inland water body |
---|
(1.) | DO | | mg/l | | 5.1 | 4.8 | A | (2.) | pH | | NA | | 7.57 | 7.04 | A | (3.) | BOD | | mg/l | | 82.30 | 62.5 | A | (4.) | COD | | mg/l | | 240.72 | 151.4 | A | |
14.4. No. of Ambient Noise monitoring locations : 8 |
---|
S. No. | Parameter | Unit | Maximum Value | Minimum Value | Prescribed Standard |
---|
(1.) | Leq(Day) | A-weighted decibels(dB(A)) | 66.2 | 56.2 | 75 | (2.) | Leq(Night) | A-weighted decibels(dB(A)) | 49.1 | 42.4 | 70 | |
14.5. No. of Soil Sample Monitored locations : 8 |
---|
S. No. | Parameter | Unit | Other Unit | Maximum Value | Minimum Value |
---|
(1.) | N(Nitrogen) | Kilogram per hectare | | 441 | 190 | (2.) | P(Phosphorus) | Kilogram per hectare | | 22.48 | 11.67 | (3.) | K(Potassium) | Kilogram per hectare | | 982 | 170 | (4.) | Electric Conductivity | Millisiemens per Centimetre | | 300 | 90 | (5.) | pH | Others | NA | 8.16 | 7.18 | |
|
14.6. | Details of Ground Water Table: | (a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) | From 10 To 5 | (b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) | From 2 To 5 | (c)Whether Ground Water Intersection will be there ? | No | |
|
15. Details of Water Requirement (During Operation) |
---|
S. No. | Source | Source Other | Required Quantity (Kilolitre per Day (Kld)) | Distance from Source | Copy of Permission from Competent Authority | Mode of Transport | Other Mode of Transport | Method of Water Withdrawal | Other Method of Water Withdrawal | Letter No. | Date of Issue | Permitted Quantity |
---|
(1.) | GroundWater | | 922 | 0 | Copy of Permission Letter | Pipeline | | Tube Well | | CGWA/NOC/IND/ORIG/2018/3467 | 15 May 2018 | 430 | |
|
15.1. | (a)Whether Desalination is proposed | No | |
|
16. Waste Water Management(During Operation) |
---|
S. No. | Type/Source | Quantity of Waste Water Generated (Kilolitre per Day) | Treatment Capacity (Kilolitre per Day) | Treatment Method | Mode of Disposal | Other Mode of Disposal | Quantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day) | Quantity of Discharged Water (Kilolitre per Day) |
---|
(1.) | Industrial cooling and boiler feed | 67 | 235 | Chemical | Reuse within the Plant & Recycling | | 67 | | (2.) | Gardening | 0 | 0 | NA | Green Belt Renewal Plant | | 0 | | (3.) | Biodegradable Stream | 59 | 235 | Chemical | Reuse within the Plant & Recycling | | 59 | | (4.) | Domestic purposes | 82 | 150 | Biological Method | Reuse within the Plant & Recycling | | 82 | 0 | (5.) | Non Biodegradable | 20 | 235 | Chemical | Reuse within the Plant & Recycling | | 20 | | |
|
16.1. | (a)Total Waste Water Generation (Kilolitre per Day) | 228 | (b)Total Discharged Water (Kilolitre per Day) | 0 | (c)Total Reused Water (Kilolitre per Day) | 228 | |
|
17. Solid Waste Generation/Management |
---|
S. No. | Name of Waste | Item | Other Item | Quantity per Annum | Unit | Distance from Site(KM) | Mode of Transport | Other Mode of Transport | Mode of Disposal | Other Mode of Disposal |
---|
(1.) | Biological Sludge | Others | Biological Sludge | 1.20 | Tons | 50 | Road | | Others | In the gardening | (2.) | Boiler Ash | Others | Boiler Ash | 540 | Tons | 50 | Road | | Others | Brick manufacturing | (3.) | Coal Ash | Others | Coal Ash | 5775 | Tons | 50 | Road | | Others | Sale to Brick manufactures | |
|
|
18.1. Air Quality Impact Prediction |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Unit | Baseline Concentration | Distance GLC | Incremental Concentration | Total GLC | Prescribed Standard |
---|
(1.) | PM10 | | Microgram per Meter Cube | 79.2 | 1.4 | 1.05 | 80.25 | 100 | (2.) | NOx | | Microgram per Meter Cube | 28.2 | 1.4 | 3.2 | 31.4 | 80 | (3.) | SO2 | | Microgram per Meter Cube | 16.6 | 1.4 | 0.32 | 16.92 | 80 | (4.) | PM2.5 | | Microgram per Meter Cube | 31.7 | 0 | 0 | 0 | 60 | |
|
18.2. Stack Details |
---|
S. No. | Source | Fuel | Stack Height(m) | Stack Diameter(m) | Pollutants | Other Pollutants | Emission (GLS) |
---|
(1.) | Boiler | Coal | 33.5 | 1 | PM10 | | 0.79 | (2.) | Boiler | Coal | 33.5 | 1 | NOx | | 0.49 | (3.) | DG Set | HSD | 6 | 0.4 | SO2 | | 0.0005 | (4.) | DG Set | HSD | 6 | 0.4 | NOx | | 0.26 | (5.) | DG Set | HSD | 6 | 0.4 | PM10 | | 0.01 | (6.) | Boiler | Coal | 33.5 | 1 | SO2 | | 0.26 | |
|
19. | Power Requirement: | (a)Quantity (Kilo Volt Amps (kVA)) | 2000 | (b)Source | MSEDCL | (c)Uploaded Copy of Agreement | Copy of Agreement | (d)Standby Arrangement (Details of DG Sets) | Existing 2x 380 KVA, 1x 400 KVA and 1x 600 KVA = 1 | (e)Stack Height (in m) | 8 | |
|
20. | Land Ownership Pattern: | (a)Forest Land (ha.) | 0 | (b)Private Land (ha.) | 110.8474 | (c)Government Land (ha.) | 0 | (d)Revenue Land (ha.) | 0 | (e)Other Land (ha.) | 0 | Total Land (ha.) | 110.8474 | |
|
21. | Present Land Use Breakup of the Study Area in Ha: | (a)Agriculture Area (ha.) | 0 | (b)Waste/Barren Land (ha.) | 0 | (c)Grazing/ Community Land (ha.) | 0 | (d)Surface Water Bodies (ha.) | 0 | (e)Settlements (ha.) | 0 | (f)Industrial (ha.) | 0 | (g)Forest (ha.) | 0 | (h)Mangroves (ha.) | 0 | (i)Marine Area (ha.) | 0 | (j)Others (ha.) : NA | 0 | Total (ha.) | 0 | |
|
22. Land requirement for various activities |
---|
S. No. | Description of Activity / Facility / Plant / Others | Others | Land Requirement (ha.) | Remarks |
---|
(1.) | Main Plant | | 2.909 | | (2.) | Green belt | | 36.579 | | (3.) | Others | Open space and addl grenbelt | 71.3594 | | |
|
|
23. | Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Sanctuaries; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones : | |
|
23.1. Details of Ecological Sensitivity : |
---|
S. No. | Details of Ecological Sensitivity | Name | Distance from the Project (Km) | Remarks |
---|
(1.) | NPA | Nil | 0 | 0 | (2.) | ESAs | Nil | 0 | 0 | (3.) | ESZs | 0 | 0 | 0 | (4.) | Corridors | Nil | 0 | 0 | (5.) | Critically Polluted Area | Nil | 0 | NA | (6.) | Wildlife Corridors | Nil | 0 | 0 | (7.) | WLS | Nil | 0 | 0 | |
23.2. Details of Environmental Sensitivity : |
---|
S. No. | Details of Environmental Sensitivity | Other Details of Environmental Sensitivity | Name | Distance from the Project (Km) | Remarks |
---|
(1.) | Forest | | Kondhali RF | 0 | Adjacent to Project site and other 5 RF are in the 10 km radius area | (2.) | Archaeological Sites | | Nil | 0 | NA | (3.) | Defence Installations | | Nil | 0 | NA | |
|
23.3. | (a)Whether Noc / Permission from the competent authority is required? | No | (b)Whether NBWL recommendation is required? | No | |
|
24. | Forest Land: | Whether any Forest Land involved? | No | |
|
25. | Tree Cutting: | (a)No. of Trees Cut for the Project (if Forest Land not Involved) | 0 | (b)Details of Tree Cutting and Planting of Trees | Not Applicable | |
|
26. | Land Acquisition Status: | (a)Acquired Land(Ha) | 110.8474 | (b)Land yet to be acquired(Ha) | 0 | (c)Status of Land acquisition if not acquired | Acquired | |
|
27. | Rehabilitation and Resettlement (R&R): | (a)No. of Villages | 0 | (b)No. of Households | 0 | (c)No. of PDFs (Project Displaced Families) | 0 | (d)No. of PAFs (Project Affected Families) | 0 | (e)Funds Allocated for R&R(in INR) (in Lacs) | 0 | (f)Status of R&R | Yet To Start | |
|
28. | Details of Presence of Schedule-I Species: | (a)Whether there is Presence of Schedule-I Species ? | No | (b)Whether conservation plan for Schedule-I Species has been prepared ? | No | (c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? | No | |
|
29. | Details of Presence of Water Bodies in Core Area: | (a)Whether there is Presence of Water Bodies in Core Area ? | No | (b)Whether there is Diversion Required ? | No | (c)Whether permission has been obtained from competent authority ? | No | |
|
30. | Details of Presence of Water Bodies in Buffer Area: | (a)Whether there is Presence of Water Bodies in Buffer Area ? | Yes | (i)Details of Water Bodies in Buffer Area | Bor Nalla | (ii)Direction of Water Bodies in Buffer Area | South West | (iii)Distance of Water Bodies in Buffer Area | 1 | |
|
31. | Manpower Requirement: | (a)Permanent Employment-During Construction | 97 | (b)Permanent Employment-During Operation | 1513 | (c)Temporary Employment- During Construction | 100 | (d)Temporary Employment- During Operation | 100 | (e)No. of working days | 300 | (f)Total Manpower | 1810 | |
|
32. | Green Belt in Ha: | (a)Total Area of Green Belt | 36.5795 | (b)Percentage of Total Project Area | 33.00 | (c)No. of Plants to be Planted | 25050 | (d)Funds Allocated for Plantation | 2020122 | (e)Uploaded Green Belt plan | Copy of Green Belt Plan | |
|
33. Project Benefits |
---|
S. No. | Type of Project Benefits | Details of Project Benefits |
---|
(1.) | Social | 1. During construction phase employment generation will be ~100 persons for short time.
2. SIIL will provide necessary facilities like drinking water supply during summer season, sanitation and medical facilities etc. to the project personnel and their families during the construction phase.
3. The company has developed transportation facility for import of raw material required for the plant and also for the export of the finished products. The site has very good connectivity with road, rail, a | (2.) | Financial | 1. The products that will be manufactured by M/s. SIIL will have a high market potential. Due to increasing demand, the plant has own economic importance.
Solar is the largest exporter of Explosives and Initiating Systems from India. Soar’s products and services have successfully met the needs and discerning expectations of its valuable customers not only in India but also overseas. In fact, SIIL, export products to more than 42 countries across the Middle-East, Africa, and the South East Asia i | |
|
34. CRZ Specific Details : Not Applicable |
35. Sector Specific Details : NOT APPLICABLE |
35. Sector Specific Details For Industrial Projects - 2 |
|
|
36. | Details of Court Cases: | (a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? | No | |
|
37. | Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act: | (a)Whether any Direction issued under EPA Act/Air Act/Water Act ? | No | |
|
38. | Details of EIA Consultant: | (a)Have you hired Consultant for preparing document? | Yes | (i)Accreditation No. | NABET/EIA/1619/RA 0059 | (ii)Name of the EIA Consultant | ANACON LABORATORIES PRIVATE LIMITED | (iii)Address | 60, Bajiprabhu Nagar, Nagpur -440033 | (iv)Mobile No. | 9372960077 | (v)Landline No. | 7104265854 | (vi)Email Id | project@anacon.in | (vii)Category of Accreditation | A | (viii)Sector of Accreditation | Industrial Projects - 2 | (ix)Validity of Accreditation | 01 Oct 2019 | (x)Uploaded Certificate of Accreditation certified by QCI/NABET | Copy of Certificate of Accreditation | |
|
|
Essential Detail Sought: |
---|
Sno. | EDS Letter | Remarks | Date of EDS |
---|
1. | NA | Please refer our earlier observations on the proposal. Following are reiterated:-
- Please confirm categorization of different products (mentioned at item 8.2 of Form-2) vis-a-vis the projects/activities listed in the schedule to the EIA Notification, 2006.
- Details against item 8.1 & 8.2 should not be the same.
- Details of ECs for the present industrial operations/products and the compliance status thereof.
- Only those products, actually requiring EC in terms of the said Notification, need to be mentioned in the proposal. | 10 Oct 2018 | 2. | NA | The correction have been made as per the instruction received | 22 Oct 2018 | |
Additional Detail Sought: |
---|
Sno. | ADS Letter | Remarks | Date of ADS |
---|
1. | ADS Reply Letter | Response to ADS vide: Minutes of the 1st Expert Appraisal Committee (Industry-2) held on 19-20 Dec,2018
[IA/MH/IND2/61877/2017,IA-J-11011/28/2017-IA-II(I)]. | 12 Jan 2019 | 2. | NA | Deferred | 02 Jan 2019 | |
| Undertaking |
| I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief. And I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity/ construction/ expansion has since been taken up. |
| Name of Applicant | S K Sharma | Designation | AsstGMTechnical | Name of Company (Applicant Name should not be given here) | SOLAR INDUSTRIES INDIA LIMITED | Address | 11, Zade Layout, Bharat Nagar |
|