Form-2
APPLICATION FOR PRIOR ENVIRONMENTAL CLEARANCE
S. No.Item Details
1.
Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? No
Details of Project:
(a)Name of the project(s) Expansion of Integrated Cement Project - Clinker (1.48 to 4.38 MTPA), Cement (2.28 to 6.14 MTPA), CPP (25 to 60 MW) and WHRB (4.7 to 15 MW) at Villages - Nimbol and Sinla, Tehsil - Jaitaran, District
(b)Name of the Company / Organisation NIRMA LIMITED
(c)Registered Address Nirma Ltd., Nirma House, near Income Tax Office, Ashram Road, Ahmedabad.,,Ahmedabad,Gujarat-380009
(d)Legal Status of the Company Private
(e)Joint Venture No
2.
Address for the correspondence:
(a)Name of the Applicant Ashish Desai
(b)Designation (Owner/ Partner/ CEO) Project Coordinator
(c)Address Nirma Ltd., Nirma House, Near Income Tax Office, Ashram Road, Ahmedabad.,,Ahmedabad City,Ahmedabad,Gujarat-380009
(d)Pin code 380009
(e)E-mail opmoondra@nirma.co.in
(f)STD Code. 79(f)Telephone No. 27549319
(g)Fax No.
(h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . Annexure-Uploaded Copy of documents in support of the competence/authority
3.
Category of the Project/Activity as per Schedule of EIA Notification,2006:
(a.I)Project/Activity3(b) Cement plants
Minor Activity
(b)Category A
(c)Proposal Number IA/RJ/IND/80954/2009
(d)Master Proposal Number(Single Window) SW/80825/2018
(e)EAC concerned (for category A Projects only) Industrial Projects - 1
(f)Project Type Expansion
4.
Location of the Project:
(a)Plot/Survey/Khasra No. Khasra Map along with Khasra list is enclosed with
(b)Pincode 306308
(c)Bounded Latitudes (North)
From
Degree 261931.29
Minutes
Second
From
Degree 262011.25
Minutes
Second
(d)Bounded Longitudes (East)
From
Degree 735018.94
Minutes
Second
From
Degree 735117.78
Minutes
Second
(e)Survey of India Topo Sheet No. 45F/11 & 45F/15
(f)Uploaded Topo Sheet File Copy of Topo Sheet File
(g)Maximum Elevation Above Means Sea Level(AMSL) 208
(h)Uploaded (kml) File Copy of Kml File      
(i)Distance of Nearest HFL from the project boundary within the study area 3.0
(j)Seismic Zone 2
5.
(a)Number of States in which Project will be Executed 1
(b)Main State of the project Rajasthan
Details of State of the project
S. No. State Name District Name Tehsil Name Village Name
NIL
6.
Details of Terms of Reference (ToR)/EC:
(a)MoEF&CC / SEIAA File Number J-11011/01/2010-IA II(I)
(b)Date of Apply of TOR 28 Dec 2009
(c)Date of Issue of TOR / Standard ToR 03 May 2010
(d)Date of Apply of EC 26 Nov 2010
(e)Date of Issue of EC 29 Mar 2011
(f)Previous TOR Letter Copy of Previous TOR letter
(g)Previous EC Letter Copy of Previous EC letter
7.
Details of Public Consultation:
(a)Whether the Project Exempted from Public Hearing?No
(b)Whether details of Public Hearing available? Yes
(c)Whether Public hearing was presided over by an officer of the rank of Additional District Magistrate or above Yes
     7.1.       Details of Public Hearing
S. No.Details of Advertisement Details of Public Hearing Venue Location DetailsNo. of People AttendedIssues RaisedDesignation of Presiding OfficerOther Designation of Presiding Officer
(1.)
Date of Advertisement :04 May 2018
Copy of advertisement :Copy of Advertisement
Copy of Public Hearing :Copy of Public Hearing
Date :08 Jun 2018
Distance of Public Hearing Venue from the Proposed Project :1
Government Upper Primary School
State :Rajasthan
District :Pali
Tehsil :Jaitaran
Village :Sinla
73Issues related to Employment, Environment & Pollution, Education, Health, Plantation and CSR activities etc. were raised during Public Hearing.District Collector
8.
Details of Project Configuration/Product:
Details Not Applicable
9.
In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii):
(a)Details of certified report on compliance of earlier environmental clearance condition
(i)Certified Compliance By Regional
(ii)Details of Regional Office of MoEFCC / Zonal Office of CPCB / SPCB / UTPCC from which certified report on Lucknow
(iii)Letter No. IV/ENV/R/ind-130/820/2011/285
(iv)Status of Compliance Compiled
(v)Certified report on compliance of earlier environmental clearance conditions (Including Monitoring Report) Copy of Certified Compliance Report
(vi)Date of site visit Jul 13 2017 12:00AM
(b)Details of Capacity Expansion
S. No.Product/Activity (Capacity/Area)Quantity FromQuantity ToTotal UnitOther UnitMode of Transport / Transmission of ProductOther Mode of Transport / Transmission of Product
(1.)Cement2.283.866.14OthersMTPARoad
(2.)Clinker1.482.94.38OthersMTPARoad
(3.)CPP253560Mega Watt(MW)OthersCaptive Use
(4.)WHRS4.710.315Mega Watt(MW)OthersCaptive Use
(c)Details of Configuration
S. No.Plant / Equipment / Facility Existing ConfigurationProposed ConfigurationFinal configuration after expansionRemarks
(1.)Raw Mill350 TPH600 TPH350 + 600 TPH
(2.)Coal & Petcoke Mill38 TPH70 TPH38 + 70 TPH
(3.)Kiln4100 TPD6000 TPD4100 + 6000 TPD
(4.)Cement Mill355 TPH350 TPH355 + 350 TPH
(5.)CPP Boiler140 TPH170 TPH140 + 170 TPH
9.1.
Details of Consent to Operate
(i)Whether Consent to operate obtained ? NA
(ii)Copies of all Consent to operate obtained since inception NA
(iii)Date of Issue 04 Oct 2017
(iv)Valid Upto 31 Aug 2022
(v)File No. F(CPM)/Pali(Jaitaran)/2683(1)/2016-2017/6226-6228
(vi)Application No. 181182
(vii)Copy of Consent to operate valid as on date Copy of Consent to Operate
10.
Project Cost:
(a)Total Cost of the Project at current price level (in Crores) 900
(b) Funds Allocated for Environment Management (Capital) (in Crores) 40
(c) Funds Allocated Towards CER (Corporate Environment Responsibility) (in Crores) 4.74
(d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in Crores) 5
11.
Whether project attracts the General Condition specified in the Schedule of EIA Notification ? No
12.
Whether project attract the Specific Condition specified in the Schedule of EIA Notification ? No
13.
Raw Material / Fuel Requirement:
(a)Proposed quantity of raw material/fuel 6.415
(b)Existing quantity of raw material/fuel 3.375
(c)Total quantity of raw material/fuel 9.79
    13.1.        Raw Material / Fuel Profile
S. No.Raw Material / Fuel QuantityUnitOther UnitSource (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received )Mode of TransportOther Mode of TransportDistance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received)Type of Linkage Other Type of Linkage Uploaded Copy of Linkage
(1.)Clay0.37OthersMTPANearby marketRoad10 Open MarketCopy of Linkage
(2.)Red Ochre/Iron Ore0.44OthersMTPAChhoti Sadri, Bhilwara, ChittorgarhRoad375 LOACopy of Linkage
(3.)Lignite0.91OthersMTPABarmer, Nagaur, RajasthanRoad140 Open MarketCopy of Linkage
(4.)Coal1.43OthersMTPABhavnagar Port & Kandla Port (Imported)Road670 OthersFuel Supply Agreement & LOACopy of Linkage
(5.)Petcoke0.97OthersMTPABhavnagar & Kandla Port (Imported)Road670 LOACopy of Linkage
(6.)GYPSUM0.3OthersMTPABhavnagar, Gujarat; RSSM & FCI, RajasthanRoad670 OthersCaptive & LOACopy of Linkage
(7.)Fly ash1.84OthersMTPACPP, Suratgarh, Kota & Barmer (JSW)Road370 LOACopy of Linkage
(8.)Limestone6.57OthersMTPALimestone MinesRoad10 OthersCaptive & MoUCopy of Linkage
(9.)Silica Sand0.27OthersMTPANearby marketRoad10 Open MarketCopy of Linkage
14.
Baseline Data :
(a)Period of Base Line Data Collection FROM 01 Dec 2016 To 28 Feb 2017
(b)Season Winter
    14.1.     No. of ambient Air Quality (AAQ) monitoring locations : 9
S. No.Criteria Pollutants Other Criteria PollutantsUnitMaximum ValueMinimum Value98 Percentile ValuePrescribed Standard
(1.)PM10Micro Gram per Meter Cube89.359.488.7100
(2.)PM2.5Micro Gram per Meter Cube48.427.347.960
(3.)SO2Micro Gram per Meter Cube12.97.112.880
(4.)NOxMicro Gram per Meter Cube26.914.326.680
    14.2.     No. of Ground Water monitoring locations : 8
S. No.Criteria Pollutants Other Criteria PollutantsHeavy MetalUnitOther UnitMaximum ValueMinimum ValueDesirable LimitMaximum Permissible Limit
(1.)pHNA7.317.068.58.5
(2.)Chloridesmg/l428.35272.262501000
(3.)Total Hardnessmg/l480.70288.0200600
(4.)TSSmg/l0.00.000
(5.)TDSmg/l14808105002000
(6.)Fluoridemg/l0.850.581.01.5
    14.3.     No. of Surface Water monitoring locations : 0
S. No.Criteria Pollutants Other Criteria PollutantsUnitOther UnitMaximum ValueMinimum ValueClassification of inland water body
(1.)pHNA00E
(2.)CODmg/l00E
(3.)DOmg/l00E
(4.)BODmg/l00E
    14.4.     No. of Ambient Noise monitoring locations : 9
S. No.Parameter UnitMaximum ValueMinimum ValuePrescribed Standard
(1.)Leq(Day)A-weighted decibels(dB(A))67.152.175
(2.)Leq(Night)A-weighted decibels(dB(A))57.342.270
    14.5.     No. of Soil Sample Monitored locations : 8
S. No.Parameter UnitOther UnitMaximum ValueMinimum Value
(1.)pHOthersNA7.647.41
(2.)P(Phosphorus)Kilogram per hectare17.748.02
(3.)Electric ConductivityMillisiemens per Centimetre0.240.20
(4.)K(Potassium)Kilogram per hectare192.46124.45
(5.)N(Nitrogen)Kilogram per hectare292.74173.95
14.6.
Details of Ground Water Table:
(a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) From 80 To 90
(b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) From 60 To 70
(c)Whether Ground Water Intersection will be there ? NA
     15.      Details of Water Requirement (During Operation)
S. No.Source Source Other Required Quantity (Kilolitre per Day (Kld))Distance from SourceCopy of Permission from Competent Authority Mode of TransportOther Mode of TransportMethod of Water WithdrawalOther Method of Water WithdrawalLetter No.Date of IssuePermitted Quantity
(1.)GroundWater25000Copy of Permission LetterPipelineTube Well21-4(493)/WR/CGWA/2011-495210 Dec 20121123
15.1.
(a)Whether Desalination is proposed No
    16.       Waste Water Management(During Operation)
S. No.Type/Source Quantity of Waste Water Generated (Kilolitre per Day)Treatment Capacity (Kilolitre per Day) Treatment MethodMode of DisposalOther Mode of DisposalQuantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day)Quantity of Discharged Water (Kilolitre per Day)
(1.)Boiler Blowdown250NAOthersDust Suppression250
(2.)RO Reject2750NAOthersDust Suppression2750
16.1.
(a)Total Waste Water Generation (Kilolitre per Day) 300
(b)Total Discharged Water (Kilolitre per Day) 0
(c)Total Reused Water (Kilolitre per Day) 300
    17.       Solid Waste Generation/Management
S. No.Name of Waste Item Other ItemQuantity per AnnumUnitDistance from Site(KM)Mode of TransportOther Mode of TransportMode of DisposalOther Mode of Disposal
(1.)Used OilHazardous Waste (as per Hazardous and Other Waste Management rules 2016)30.9Kilolitre480RoadAuthorized Recyclers
(2.)Fly ashFly Ash140000Tons0OthersClosed BulkerOthersUtilized for manufacturing Cement (PPC)
18.
    18.1.     Air Quality Impact Prediction
S. No.Criteria Pollutants Other Criteria PollutantsUnitBaseline ConcentrationDistance GLCIncremental ConcentrationTotal GLCPrescribed Standard
(1.)NOxMicrogram per Meter Cube26.920.7127.6180
(2.)PM2.5Microgram per Meter Cube48.40048.460
(3.)PM10Microgram per Meter Cube89.30.981.5290.82100
(4.)SO2Microgram per Meter Cube12.920.6513.5580
    18.2.     Stack Details
S. No.Source FuelStack Height(m)Stack Diameter(m)PollutantsOther PollutantsEmission (GLS)
(1.)Raw Mill & KilnCoal, Petcoke & Lignite14013.6PM107.10
(2.)Raw Mill & KilnCoal, Petcoke & Lignite14013.6SO214.53
(3.)Raw Mill & KilnCoal, Petcoke & Lignite14013.6NOx40.36
(4.)Clinker CoolerNA604.5PM104.27
(5.)Cement MillNA512.4PM105.39
(6.)CPP BoilerCoal & Lignite1016.8SO222.69
(7.)CPP BoilerCoal & Lignite1016.8NOx15.12
(8.)CPP BoilerCoal & Lignite1016.8PM103.77
(9.)Coal MillNA89.52.4PM102.45
19.
Power Requirement:
(a)Quantity (Kilo Volt Amps (kVA)) 69500
(b)Source CPP, RSEB, WHRB & DG Set (for backup)
(c)Uploaded Copy of Agreement Not Applicable
(d)Standby Arrangement (Details of DG Sets) 4.8 MW
(e)Stack Height (in m) 32
20.
Land Ownership Pattern:
(a)Forest Land (ha.) 0
(b)Private Land (ha.) 0
(c)Government Land (ha.) 0
(d)Revenue Land (ha.) 0
(e)Other Land (ha.) 95.764
    Total Land (ha.) 95.764
21.
Present Land Use Breakup of the Study Area in Ha:
(a)Agriculture Area (ha.) 0
(b)Waste/Barren Land (ha.) 0
(c)Grazing/ Community Land (ha.) 0
(d)Surface Water Bodies (ha.) 0
(e)Settlements (ha.) 0
(f)Industrial (ha.) 95.764
(g)Forest (ha.) 0
(h)Mangroves (ha.) 0
(i)Marine Area (ha.) 0
(j)Others (ha.) : Scrub Land 0
    Total (ha.) 95.764
    22.     Land requirement for various activities
S. No.Description of Activity / Facility / Plant / Others OthersLand Requirement (ha.)Remarks
(1.)Main Plant26.5
(2.)Township1.4
(3.)Green belt31.6
(4.)OthersOpen Area36.264
Total (ha.) 95.764
23.
Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Sanctuaries; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones :
    23.1.     Details of Ecological Sensitivity :
S. No.Details of Ecological Sensitivity NameDistance from the Project (Km)Remarks
(1.)WLSNot applicable0No WLS within 10 km radius
(2.)ESZsNot applicable0No ESZ within 10 km radius
(3.)CorridorsNot applicable0No Corridor within 10 km radius
(4.)NPANot applicable0No NPA within 10 km radius
(5.)ESAsNot applicable0No ESA within 10 km radius
(6.)Critically Polluted AreaNot applicable0No Critically Polluted Area within 10 km radius
(7.)Wildlife CorridorsNot applicable0No wildlife corridor within 10 km radius
    23.2.     Details of Environmental Sensitivity :
S. No.Details of Environmental Sensitivity Other Details of Environmental Sensitivity NameDistance from the Project (Km)Remarks
(1.)ForestNot applicable0No Forest within 10 km radius
(2.)Defence InstallationsNot applicable0No Defense Installation within 10 km radius
(3.)Archaeological SitesNot applicable0No Archaeological Site within 10 km radius
23.3.
(a)Whether Noc / Permission from the competent authority is required? No
(b)Whether NBWL recommendation is required? No
24.
Forest Land:
Whether any Forest Land involved? No
25.
Tree Cutting:
(a)No. of Trees Cut for the Project (if Forest Land not Involved) 0
(b)Details of Tree Cutting and Planting of Trees Not Applicable
26.
Land Acquisition Status:
(a)Acquired Land(Ha) 95.764
(b)Land yet to be acquired(Ha) 0
(c)Status of Land acquisition if not acquired NA
27.
Rehabilitation and Resettlement (R&R):
(a)No. of Villages 0
(b)No. of Households 0
(c)No. of PDFs (Project Displaced Families) 0
(d)No. of PAFs (Project Affected Families) 0
(e)Funds Allocated for R&R(in INR) (in Lacs) 0
(f)Status of R&R Completed
28.
Details of Presence of Schedule-I Species:
(a)Whether there is Presence of Schedule-I Species ? Yes
(i)Details of Schedule-I Species Peafowl & Monitor Lizard
(b)Whether conservation plan for Schedule-I Species has been prepared ? Yes
(i)Uploaded copy of conservation plan Copy of conservation plan
(ii)Fund Provision made 30 Lacs
(iii)Period of Implementation 10 Years
(c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? No
29.
Details of Presence of Water Bodies in Core Area:
(a)Whether there is Presence of Water Bodies in Core Area ? No
(b)Whether there is Diversion Required ? No
(c)Whether permission has been obtained from competent authority ? No
30.
Details of Presence of Water Bodies in Buffer Area:
(a)Whether there is Presence of Water Bodies in Buffer Area ? Yes
(i)Details of Water Bodies in Buffer Area Luni Nadi
(ii)Direction of Water Bodies in Buffer Area South East
(iii)Distance of Water Bodies in Buffer Area 3.0
31.
Manpower Requirement:
(a)Permanent Employment-During Construction 125
(b)Permanent Employment-During Operation 125
(c)Temporary Employment- During Construction 1500
(d)Temporary Employment- During Operation 250
(e)No. of working days 26
(f)Total Manpower 2000
32.
Green Belt in Ha:
(a)Uploaded Green Belt plan Copy of Green Belt Plan
S. No.Description ExistingProposedTotal
(1.)Percentage of Total Project Area231033
(2.)No. of Plants370001425051250
(3.)Funds Allocated7400000300000010400000
(4.)Total Area of Green Belt22.19.531.6
    33.         Project Benefits
S. No.Type of Project Benefits Details of Project Benefits
(1.)EnvironmentalGreenery of the area will be increased
(2.)FinancialRevenue generation for State and Centre in terms of taxes etc.
(3.)SocialEmployment generation and upliftment of the nearby villagers through CER
   34.   CRZ Specific Details : Not Applicable
   35.   Sector Specific Details : NOT APPLICABLE
   35.   Sector Specific Details For Industrial Projects - 1
S. No.Item Details
S. No.Item Details
36.
Details of Court Cases:
(a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? No
37.
Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act:
(a)Whether any Direction issued under EPA Act/Air Act/Water Act ? No
38.
Details of EIA Consultant:
(a)Have you hired Consultant for preparing document? Yes
(i)Accreditation No. NABET/EIA/1619/RA 0069
(ii)Name of the EIA Consultant J.M. EnviroNet Pvt. Ltd.
(iii)Address 202-A, ABW Tower, MG Road, IFFCO Chowk, Gurugram (Haryana)
(iv)Mobile No. 9015209362
(v)Landline No. 9015209362
(vi)Email Id jmenviron@hotmail.com
(vii)Category of Accreditation A
(viii)Sector of Accreditation Industrial Projects - 1
(ix)Validity of Accreditation 18 May 2019
(x)Uploaded Certificate of Accreditation certified by QCI/NABET Copy of Certificate of Accreditation
39.
Documents to be Attached:
(a)Uploaded Copy of EIA/EMP Report Copy of EIA/EMP
Copy of EIA/EMP(Annexures)
Copy of EIA/EMP(Plans/Figures)
(b)Uploaded Copy of Risk Assessment Report Copy of Risk Assessment
(c)Uploaded Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan
(d)Uploaded Copy of Final Layout Plan Copy of Final Layout Plan
(e)Uploaded Cover Letter Copy of Cover Letter
(f)Uploaded Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency
(g)Uploaded Additional File NA
(h)Uploaded Proposal Presentation (To be given in EAC meeting) NA
      Essential Detail Sought : NIL
      Additional Detail Sought : NIL
Undertaking
I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief. And I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity/ construction/ expansion has since been taken up.
Name of ApplicantAshish Desai
DesignationProject Coordinator
Name of Company (Applicant Name should not be given here)NIRMA LIMITED
AddressNirma Ltd., Nirma House, near Income Tax Office, Ashram Road, Ahmedabad.
Print