Form-2
APPLICATION FOR PRIOR ENVIRONMENTAL CLEARANCE
S. No.Item Details
1.
Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? No
Details of Project:
(a)Name of the project(s) Expansion in existing plant facility for production of Ammonium Sulphate
(b)Name of the Company / Organisation GUJARAT STATE FERTILIZERS AND CHEMICALS LTD VADODARA UNIT
(c)Registered Address P.O. Fertilizernagar - 391 750,Vadodara, Gujarat,Vadodara,Gujarat-391750
(d)Legal Status of the Company State Government
(e)Joint Venture No
2.
Address for the correspondence:
(a)Name of the Applicant Himatlal D Dalsania
(b)Designation (Owner/ Partner/ CEO) Vice President (U & EC, Instru
(c)Address P.O. Fertilizernagar,Vadodara, Gujarat,Vadodara,Vadodara,Gujarat-391750
(d)Pin code 391750
(e)E-mail hddalsania@gsfcltd.com
(f)STD Code. 265(f)Telephone No. 3092796
(g)Fax No.
(h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . Annexure-Uploaded Copy of documents in support of the competence/authority
3.
Category of the Project/Activity as per Schedule of EIA Notification,2006:
(a.I)Project/Activity5(a) Chemical fertilizers
Minor Activity
(b)Category A
(c)Proposal Number IA/GJ/IND2/80904/2007
(d)Master Proposal Number(Single Window) SW/80900/2018
(e)EAC concerned (for category A Projects only) Industrial Projects - 2
(f)Project Type Expansion
4.
Location of the Project:
(a)Plot/Survey/Khasra No. PO Fertilizer Nagar
(b)Pincode 391750
(c)Bounded Latitudes (North)
From
Degree 22222409
Minutes
Second
From
Degree 222227.3
Minutes
Second
(d)Bounded Longitudes (East)
From
Degree 730902.9
Minutes
Second
From
Degree 730905.3
Minutes
Second
(e)Survey of India Topo Sheet No. F43H3 & F43H7
(f)Uploaded Topo Sheet File Copy of Topo Sheet File
(g)Maximum Elevation Above Means Sea Level(AMSL) 43
(h)Uploaded (kml) File Copy of Kml File      
(i)Distance of Nearest HFL from the project boundary within the study area 8.7
(j)Seismic Zone 3
5.
(a)Number of States in which Project will be Executed 1
(b)Main State of the project Gujarat
Details of State of the project
S. No. State Name District Name Tehsil Name Village Name
NIL
6.
Details of Terms of Reference (ToR)/EC:
(a)MoEF&CC / SEIAA File Number J-11011/123/2018-IA II (I)
(c)Date of Issue of TOR 14 Jun 2007
(f)Previous TOR Letter Copy of Previous TOR letter
(b)Date of Apply of EC 17 Oct 2018
(c)Date of Issue of EC 06 Mar 2019
(d)Previous EC Letter Copy of Previous EC letter
7.
Details of Public Consultation:
(a)Whether the Project Exempted from Public Hearing?Yes
(b)Reason this project is located in Notified Industrial Ar
(c)Supporting Document Copy of Supporting Document
8.
Details of Project Configuration/Product:
Details Not Applicable
9.
In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii):
(a)Details of certified report on compliance of earlier environmental clearance condition
(i)Certified Compliance By Regional
(ii)Details of Regional Office of MoEFCC / Zonal Office of CPCB / SPCB / UTPCC from which certified report on Bhopal
(iii)Letter No. 5/193/2008(ENV)/492
(iv)Status of Compliance Compiled
(v)Certified report on compliance of earlier environmental clearance conditions (Including Monitoring Report) Copy of Certified Compliance Report
(vi)Date of site visit Jul 17 2018 12:00AM
(b)Details of Capacity Expansion
S. No.Product/Activity (Capacity/Area)Quantity FromQuantity ToTotal UnitOther UnitMode of Transport / Transmission of ProductOther Mode of Transport / Transmission of Product
(1.)Ammonium Sulphate0146000146000Tons per Annum(TPA)Road,Rail
(c)Details of Configuration
S. No.Plant / Equipment / Facility Existing ConfigurationProposed ConfigurationFinal configuration after expansionRemarks
(1.)GSFC fertilizer and Chemical Ltd5698585 TPA146000 TPA5844585 TPAExclude CPP- 100MW, Steam Generation- 390 TPH
9.1.
Details of Consent to Operate
(i)Whether Consent to operate obtained ? NA
(ii)Copies of all Consent to operate obtained since inception NA
(iii)Date of Issue 07 Jun 2016
(iv)Valid Upto 31 Dec 2021
(v)File No. AWH-78404
(vi)Application No. 105414 dated 05/03/2016
(vii)Copy of Consent to operate valid as on date Copy of Consent to Operate
10.
Project Cost:
(a)Total Cost of the Project at current price level (in Crores) 8.75
(b) Funds Allocated for Environment Management (Capital) (in Crores) 0.50
(c) Funds Allocated Towards CER (Corporate Environment Responsibility) (in Crores) 0.0875
(d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in Crores) 0.015
11.
Whether project attracts the General Condition specified in the Schedule of EIA Notification ? No
12.
Whether project attract the Specific Condition specified in the Schedule of EIA Notification ? No
13.
Raw Material / Fuel Requirement:
(a)Proposed quantity of raw material/fuel 144288
(b)Existing quantity of raw material/fuel 0
(c)Total quantity of raw material/fuel 144288
    13.1.        Raw Material / Fuel Profile
S. No.Raw Material / Fuel QuantityUnitOther UnitSource (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received )Mode of TransportOther Mode of TransportDistance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received)Type of Linkage Other Type of Linkage Uploaded Copy of Linkage
(1.)ammonia37008Tons per AnnumCaptivePipe Conveyor0.5 CaptiveCaptiveCopy of Linkage
(2.)Sulfuric Acid (98%)107280Tons per AnnumCaptivePipe Conveyor0.5 CaptiveCopy of Linkage
14.
Baseline Data :
(a)Period of Base Line Data Collection FROM 01 Mar 2018 To 31 May 2018
(b)Season Pre-Monsoon
    14.1.     No. of ambient Air Quality (AAQ) monitoring locations : 8
S. No.Criteria Pollutants Other Criteria PollutantsUnitMaximum ValueMinimum Value98 Percentile ValuePrescribed Standard
(1.)PM2.5Micro Gram per Meter Cube46.232.146.260
(2.)NOxMicro Gram per Meter Cube20.813.720.780
(3.)SO2Micro Gram per Meter Cube16.88.516.880
(4.)PM10Micro Gram per Meter Cube86.264.384.9100
    14.2.     No. of Ground Water monitoring locations : 7
S. No.Criteria Pollutants Other Criteria PollutantsHeavy MetalUnitOther UnitMaximum ValueMinimum ValueDesirable LimitMaximum Permissible Limit
(1.)pHNA8.156.726.58.5
(2.)Heavy MetalsBoronmg/l0.10.050.51.0
(3.)TSSmg/l00000000
(4.)Total Hardnessmg/l732258200600
(5.)OthersAlkalinitymg/l440252200600
(6.)Fluoridemg/l0.70.41.01.5
(7.)TDSmg/l12085745002000
(8.)Chloridesmg/l2741552501000
    14.3.     No. of Surface Water monitoring locations : 5
S. No.Criteria Pollutants Other Criteria PollutantsUnitOther UnitMaximum ValueMinimum ValueClassification of inland water body
(1.)pHmg/l8.086.81B
(2.)DOmg/l5.04.6B
(3.)BODmg/l84B
(4.)CODmg/l2212B
(5.)OthersTDSmg/l1112358B
    14.4.     No. of Ambient Noise monitoring locations : 8
S. No.Parameter UnitMaximum ValueMinimum ValuePrescribed Standard
(1.)Leq(Day)A-weighted decibels(dB(A))74.158.475
(2.)Leq(Night)A-weighted decibels(dB(A))68.853.170
    14.5.     No. of Soil Sample Monitored locations : 4
S. No.Parameter UnitOther UnitMaximum ValueMinimum Value
(1.)pHOthersNA8.227.42
(2.)K(Potassium)Milliequivalents per 100 Gram1.20.6
(3.)Electric ConductivityMillisiemens per Centimetre1.40.6
(4.)N(Nitrogen)Percent0.0950.070
(5.)P(Phosphorus)Milligram per Kilogram2.720.412
14.6.
Details of Ground Water Table:
(a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) From 40 To 50
(b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) From 25 To 40
(c)Whether Ground Water Intersection will be there ? No
     15.      Details of Water Requirement (During Operation)
S. No.Source Source Other Required Quantity (Kilolitre per Day (Kld))Distance from SourceCopy of Permission from Competent Authority Mode of TransportOther Mode of TransportMethod of Water WithdrawalOther Method of Water WithdrawalLetter No.Date of IssuePermitted Quantity
(1.)Surface4399Copy of Permission LetterPipelineOthersFrench WellVID/PB-2/IND/REQ.2018-19/GSFC/85321 Mar 201831822
15.1.
(a)Whether Desalination is proposed No
    16.       Waste Water Management(During Operation)
S. No.Type/Source Quantity of Waste Water Generated (Kilolitre per Day)Treatment Capacity (Kilolitre per Day) Treatment MethodMode of DisposalOther Mode of DisposalQuantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day)Quantity of Discharged Water (Kilolitre per Day)
(1.)Industrial732000ReuseReuse within the Plant & Recycling73
(2.)Domestic20Septic Tank/Soak PitOthersSeptic Tank/Soak pit02
16.1.
(a)Total Waste Water Generation (Kilolitre per Day) 75
(b)Total Discharged Water (Kilolitre per Day) 2
(c)Total Reused Water (Kilolitre per Day) 73
    17.       Solid Waste Generation/Management
S. No.Name of Waste Item Other ItemQuantity per AnnumUnitDistance from Site(KM)Mode of TransportOther Mode of TransportMode of DisposalOther Mode of Disposal
(1.)Used OilIndustrial Waste0.64Kilolitre0.5RoadAuthorized Recyclers
18.
    18.1.     Air Quality Impact Prediction
S. No.Criteria Pollutants Other Criteria PollutantsUnitBaseline ConcentrationDistance GLCIncremental ConcentrationTotal GLCPrescribed Standard
(1.)NOxMicrogram per Meter Cube206.00.0120.0180
(2.)PM2.5Microgram per Meter Cube46.25.10046.2080
(3.)PM10Microgram per Meter Cube80.605.10.1480.74100
(4.)SO2Microgram per Meter Cube13.805.10.0113.8180
    18.2.     Stack Details
S. No.Source FuelStack Height(m)Stack Diameter(m)PollutantsOther PollutantsEmission (GLS)
(1.)DrierNG210.56PM10150
19.
Power Requirement:
(a)Quantity (Kilo Volt Amps (kVA)) 500
(b)Source GIPCL
(c)Uploaded Copy of Agreement Not Applicable
(d)Standby Arrangement (Details of DG Sets) 0
(e)Stack Height (in m) 0
20.
Land Ownership Pattern:
(a)Forest Land (ha.) 0.0
(b)Private Land (ha.) 0.0
(c)Government Land (ha.) 0.224
(d)Revenue Land (ha.) 0.0
(e)Other Land (ha.) 0.0
    Total Land (ha.) 0.224
21.
Present Land Use Breakup of the Study Area in Ha:
(a)Agriculture Area (ha.) 13577
(b)Waste/Barren Land (ha.) 3683
(c)Grazing/ Community Land (ha.) 3290
(d)Surface Water Bodies (ha.) 331
(e)Settlements (ha.) 5587
(f)Industrial (ha.) 328
(g)Forest (ha.) 0
(h)Mangroves (ha.) 5157
(i)Marine Area (ha.) 0
(j)Others (ha.) : Grassland 0
    Total (ha.) 31953
    22.     Land requirement for various activities
S. No.Description of Activity / Facility / Plant / Others OthersLand Requirement (ha.)Remarks
(1.)Township34.6GSFC
(2.)Main Plant174.7Processing Area
(3.)Green belt118.7Plant + Township
Total (ha.) 328
23.
Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Sanctuaries; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones :
    23.1.     Details of Ecological Sensitivity :
S. No.Details of Ecological Sensitivity NameDistance from the Project (Km)Remarks
(1.)Wildlife CorridorsNone0None in 10 km radius
(2.)CorridorsNone0None in 10 km radius
(3.)ESAsNone0None in 10 km radius
(4.)NPANone0N
(5.)WLSNone0None in 10 km radius
(6.)ESZsNone0None in 10 km radius
(7.)Critically Polluted AreaNone0None in 10 km radius
    23.2.     Details of Environmental Sensitivity :
S. No.Details of Environmental Sensitivity Other Details of Environmental Sensitivity NameDistance from the Project (Km)Remarks
(1.)Defence InstallationsNone0None in 10 km radius
(2.)OthersNoneNone0None in 10 km radius
(3.)ForestNone0None in 10 km radius
(4.)Archaeological SitesNone0None in 10 km radius
23.3.
(a)Whether Noc / Permission from the competent authority is required? No
(b)Whether NBWL recommendation is required? No
24.
Forest Land:
Whether any Forest Land involved? No
25.
Tree Cutting:
(a)No. of Trees Cut for the Project (if Forest Land not Involved) Not Applicable
(b)Details of Tree Cutting and Planting of Trees Not Applicable
26.
Land Acquisition Status:
(a)Acquired Land(Ha) 328
(b)Land yet to be acquired(Ha) 0
(c)Status of Land acquisition if not acquired 0
27.
Rehabilitation and Resettlement (R&R):
(a)No. of Villages 0
(b)No. of Households 0
(c)No. of PDFs (Project Displaced Families) 0
(d)No. of PAFs (Project Affected Families) 0
(e)Funds Allocated for R&R(in INR) (in Lacs) 0
(f)Status of R&R Completed
28.
Details of Presence of Schedule-I Species:
(a)Whether there is Presence of Schedule-I Species ? No
(b)Whether conservation plan for Schedule-I Species has been prepared ? No
(c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? No
29.
Details of Presence of Water Bodies in Core Area:
(a)Whether there is Presence of Water Bodies in Core Area ? No
(b)Whether there is Diversion Required ? No
(c)Whether permission has been obtained from competent authority ? No
30.
Details of Presence of Water Bodies in Buffer Area:
(a)Whether there is Presence of Water Bodies in Buffer Area ? Yes
(i)Details of Water Bodies in Buffer Area Mahi River
(ii)Direction of Water Bodies in Buffer Area North West
(iii)Distance of Water Bodies in Buffer Area 8.6
31.
Manpower Requirement:
(a)Permanent Employment-During Construction 0
(b)Permanent Employment-During Operation 45
(c)Temporary Employment- During Construction 5
(d)Temporary Employment- During Operation 0
(e)No. of working days 365
(f)Total Manpower 50
32.
Green Belt in Ha:
(a)Uploaded Green Belt plan Copy of Green Belt Plan
S. No.Description ExistingProposedTotal
(1.)Total Area of Green Belt1190119
(2.)Percentage of Total Project Area36036
(3.)No. of Plants1790010179001
(4.)Funds Allocated1.5001
    33.       Project Benefits
S. No. Type of Project BenefitsDetails of Project Benefits
NIL
   34.   CRZ Specific Details : Not Applicable
   35.   Sector Specific Details : NOT APPLICABLE
   35.   Sector Specific Details For Industrial Projects - 2
S. No.Item Details
S. No.Item Details
36.
Details of Court Cases:
(a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? No
37.
Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act:
(a)Whether any Direction issued under EPA Act/Air Act/Water Act ? No
38.
Details of EIA Consultant:
(a)Have you hired Consultant for preparing document? Yes
(i)Accreditation No. NABET/EIA/1720/ RA 051)
(ii)Name of the EIA Consultant ECO CHEM SALES & SERVICES
(iii)Address Office Floor, Ashoka Pavilion, New Civil Road Surat
(iv)Mobile No. 9909968953
(v)Landline No. 0261223163
(vi)Email Id eco@ecoshripad.com
(vii)Category of Accreditation A
(viii)Sector of Accreditation Industrial Projects - 2
(ix)Validity of Accreditation 20 Feb 2020
(x)Uploaded Certificate of Accreditation certified by QCI/NABET Copy of Certificate of Accreditation
39.
Documents to be Attached:
(a)Uploaded Copy of EIA/EMP Report Copy of EIA/EMP
Copy of EIA/EMP(Annexures)
Copy of EIA/EMP(Plans/Figures)
(b)Uploaded Copy of Risk Assessment Report Copy of Risk Assessment
(c)Uploaded Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan
(d)Uploaded Copy of Final Layout Plan Copy of Final Layout Plan
(e)Uploaded Cover Letter Copy of Cover Letter
(f)Uploaded Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency
(g)Uploaded Additional File Copy of Additional File
(h)Uploaded Proposal Presentation (To be given in EAC meeting) NA
            Essential Detail Sought:
Sno. EDS Letter Remarks Date of EDS
1.NA- Please inform about the status of ECs obtained/required for all the products/items listed in the CTO dated 7/6/2016, and the compliance status thereof. - Present status of compliance and the action taken on observations of the Regional Office in their monitoring report dated 17/9/2018. 09 Oct 2018
2.NAThe correction have been made as per the instruction received 17 Oct 2018
      Additional Detail Sought : NIL
Undertaking
I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief. And I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity/ construction/ expansion has since been taken up.
Name of ApplicantHimatlal D Dalsania
DesignationVice President (U & EC, Instru
Name of Company (Applicant Name should not be given here)GUJARAT STATE FERTILIZERS AND CHEMICALS LTD VADODARA UNIT
AddressP.O. Fertilizernagar - 391 750
Print