Form-2
APPLICATION FOR PRIOR ENVIRONMENTAL CLEARANCE
S. No.Item Details
1.
Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? No
Details of Project:
(a)Name of the project(s) Environmental clearance for Expansion of proposed Commercial Colony of area measuring 7.462 Acres in sector-74, Gurgaon, Haryana
(b)Name of the Company / Organisation PROMPT ENGINEERING PVT LTD
(c)Registered Address 4119/6, First Floor, Naya Bazaar, Delhi,,New Delhi,Delhi-110006
(d)Legal Status of the Company Private
(e)Joint Venture No
2.
Address for the correspondence:
(a)Name of the Applicant Satya Pal Singh
(b)Designation (Owner/ Partner/ CEO) SrManager
(c)Address 4119/6, First Floor, Naya Bazaar, Delhi,,Connaught Place,New Delhi,Delhi-110006
(d)Pin code 110006
(e)E-mail promptengineering01@gmail.com
(f)STD Code. 11(f)Telephone No. 27571410
(g)Fax No.
(h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . Annexure-Uploaded Copy of documents in support of the competence/authority
3.
Category of the Project/Activity as per Schedule of EIA Notification,2006:
(a.I)Project/Activity8(b) Townships and Area Development projects.
Minor Activity
(b)Category B1
   Reason for Applying at Ministry SEIAA
(c)Proposal Number IA/HR/MIS/80837/2018
(d)Master Proposal Number(Single Window) SW/80836/2018
(e)EAC concerned (for category A Projects only) INFRA-2
(f)Project Type Expansion
4.
Location of the Project:
(a)Plot/Survey/Khasra No. Killa No. 17,18,23,24, 25/1, 25/2, 20/2, 21, 3/1,
(b)Pincode 122004
(c)Bounded Latitudes (North)
From
Degree 77.007086
Minutes
Second
From
Degree 77.009850
Minutes
Second
(d)Bounded Longitudes (East)
From
Degree 28.401560
Minutes
Second
From
Degree 28.403029
Minutes
Second
(e)Survey of India Topo Sheet No. 53D/15 and 53H/3
(f)Uploaded Topo Sheet File Copy of Topo Sheet File
(g)Maximum Elevation Above Means Sea Level(AMSL) 229
(h)Uploaded (kml) File Copy of Kml File      
(i)Distance of Nearest HFL from the project boundary within the study area 12.26
(j)Seismic Zone 4
5.
(a)Number of States in which Project will be Executed 1
(b)Main State of the project Haryana
Details of State of the project
S. No. State Name District Name Tehsil Name Village Name
NIL
6.
Details of Terms of Reference (ToR)/EC:
(a)MoEF&CC / SEIAA File Number 21-106/2018-IA-III
(c)Date of Issue of TOR 20 Aug 2018
(f)Previous TOR Letter Copy of Previous TOR letter
(b)Date of Apply of EC 01 Oct 2018
(c)Date of Issue of EC 21 Jan 2019
(d)Previous EC Letter Copy of Previous EC letter
7.
Details of Public Consultation:
(a)Whether the Project Exempted from Public Hearing?Yes
(b)Reason It's a commmercial project.
(c)Supporting Document Copy of Supporting Document
8.
Details of Project Configuration/Product:
Details Not Applicable
9.
In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii):
(a)Details of certified report on compliance of earlier environmental clearance condition
(i)Certified Compliance By Regional
(ii)Details of Regional Office of MoEFCC / Zonal Office of CPCB / SPCB / UTPCC from which certified report on Chandigarh
(iii)Letter No. 16-57/2018-RO (NZ)/1121
(iv)Status of Compliance Compiled
(v)Certified report on compliance of earlier environmental clearance conditions (Including Monitoring Report) Copy of Certified Compliance Report
(vi)Date of site visit Jul 25 2018 12:00AM
(b)Details of Capacity Expansion
S. No.Product/Activity (Capacity/Area)Quantity FromQuantity ToTotal UnitOther UnitMode of Transport / Transmission of ProductOther Mode of Transport / Transmission of Product
(1.)Built-up Area76594.1482616.52159210.66OthersSqmOthersNA
(c)Details of Configuration
S. No.Plant / Equipment / Facility Existing ConfigurationProposed ConfigurationFinal configuration after expansionRemarks
(1.)It's a Commercial Colony ProjectIt's a Commercial Colony ProjectIt's a Commercial Colony ProjectIt's a Commercial Colony ProjectIt's a Commercial Colony Project
9.1.
Details of Consent to Operate
(i)Whether Consent to operate obtained ? NA
(ii)Copies of all Consent to operate obtained since inception NA
(iii)Date of Issue 04 Jan 2018
(iv)Valid Upto 29 Nov 2018
(v)File No. NA
(vi)Application No. NA
(vii)Copy of Consent to operate valid as on date Copy of Consent to Operate
10.
Project Cost:
(a)Total Cost of the Project at current price level (in Crores) 320
(b) Funds Allocated for Environment Management (Capital) (in Crores) 1.59
(c) Funds Allocated Towards CER (Corporate Environment Responsibility) (in Crores) 4.8
(d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in Crores) 0.679
11.
Whether project attracts the General Condition specified in the Schedule of EIA Notification ? No
12.
Whether project attract the Specific Condition specified in the Schedule of EIA Notification ? No
13.
Raw Material / Fuel Requirement:
(a)Proposed quantity of raw material/fuel 625
(b)Existing quantity of raw material/fuel 0
(c)Total quantity of raw material/fuel 625
    13.1.        Raw Material / Fuel Profile
S. No.Raw Material / Fuel QuantityUnitOther UnitSource (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received )Mode of TransportOther Mode of TransportDistance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received)Type of Linkage Other Type of Linkage Uploaded Copy of Linkage
(1.)00..Others....Others.... Others..Copy of Linkage
14.
Baseline Data :
(a)Period of Base Line Data Collection FROM 01 Mar 2018 To 31 May 2018
(b)Season Summer
    14.1.     No. of ambient Air Quality (AAQ) monitoring locations : 5
S. No.Criteria Pollutants Other Criteria PollutantsUnitMaximum ValueMinimum Value98 Percentile ValuePrescribed Standard
(1.)PM10Micro Gram per Meter Cube215141213.5100
(2.)OthersCOMili Gram per Meter Cube0.790.530.772
(3.)PM2.5Micro Gram per Meter Cube14878145.560
(4.)SO2Micro Gram per Meter Cube28142780
(5.)NOxMicro Gram per Meter Cube40292780
    14.2.     No. of Ground Water monitoring locations : 1
S. No.Criteria Pollutants Other Criteria PollutantsHeavy MetalUnitOther UnitMaximum ValueMinimum ValueDesirable LimitMaximum Permissible Limit
(1.)pHOthers....8.458.256.58.5
(2.)TSSOthers..........
(3.)TDSmg/l14527745002000
(4.)Chloridesmg/l335852501000
(5.)Total Hardnessmg/l369207200600
(6.)Fluoridemg/l.26.1911.5
(7.)Heavy MetalsZincmg/l0.010.01515
    14.3.     No. of Surface Water monitoring locations : 1
S. No.Criteria Pollutants Other Criteria PollutantsUnitOther UnitMaximum ValueMinimum ValueClassification of inland water body
(1.)pHOthers..8.508.46E
(2.)DOmg/l5.65.4E
(3.)CODmg/l142108E
(4.)BODmg/l2420E
    14.4.     No. of Ambient Noise monitoring locations : 5
S. No.Parameter UnitMaximum ValueMinimum ValuePrescribed Standard
(1.)Leq(Night)A-weighted decibels(dB(A))44.542.255
(2.)Leq(Day)A-weighted decibels(dB(A))54.544.165
    14.5.     No. of Soil Sample Monitored locations : 1
S. No.Parameter UnitOther UnitMaximum ValueMinimum Value
(1.)pHOthers..7.967.88
(2.)P(Phosphorus)Milligram per Kilogram5.24.5
(3.)K(Potassium)Milligram per Kilogram6665
(4.)N(Nitrogen)Milligram per Kilogram10298
(5.)Electric ConductivityOthersµS/cm398382
14.6.
Details of Ground Water Table:
(a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) From 39 To 40
(b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) From 40 To 40
(c)Whether Ground Water Intersection will be there ? No
     15.      Details of Water Requirement (During Operation)
S. No.Source Source Other Required Quantity (Kilolitre per Day (Kld))Distance from SourceCopy of Permission from Competent Authority Mode of TransportOther Mode of TransportMethod of Water WithdrawalOther Method of Water WithdrawalLetter No.Date of IssuePermitted Quantity
(1.)OthersHUDA3030 Not Appliacble PipelineOthersPIPELINEMemo No. 10867214 Jun 2017550
15.1.
(a)Whether Desalination is proposed No
    16.       Waste Water Management(During Operation)
S. No.Type/Source Quantity of Waste Water Generated (Kilolitre per Day)Treatment Capacity (Kilolitre per Day) Treatment MethodMode of DisposalOther Mode of DisposalQuantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day)Quantity of Discharged Water (Kilolitre per Day)
(1.)From Project413500On Site STPReuse within the Plant & Recycling413
16.1.
(a)Total Waste Water Generation (Kilolitre per Day) 413
(b)Total Discharged Water (Kilolitre per Day) 0
(c)Total Reused Water (Kilolitre per Day) 413
    17.       Solid Waste Generation/Management
S. No.Name of Waste Item Other ItemQuantity per AnnumUnitDistance from Site(KM)Mode of TransportOther Mode of TransportMode of DisposalOther Mode of Disposal
(1.)Soild WasteMunicipal Solid Waste3.64Tons0RoadTreatment, Storage and Disposal Facility(TSDF)
18.
    18.1.     Air Quality Impact Prediction
S. No.Criteria Pollutants Other Criteria PollutantsUnitBaseline ConcentrationDistance GLCIncremental ConcentrationTotal GLCPrescribed Standard
(1.)PM10Microgram per Meter Cube171.810.70.118171.928100
(2.)SO2Microgram per Meter Cube21.07.70.9922.0680
(3.)NOxMicrogram per Meter Cube35.190.75.7540.9180
(4.)PM2.5Microgram per Meter Cube111.310.70.059111.36960
    18.2.     Stack Details
S. No.Source FuelStack Height(m)Stack Diameter(m)PollutantsOther PollutantsEmission (GLS)
(1.)DG Sets625 KL/Year60.45PM100.10
19.
Power Requirement:
(a)Quantity (Kilo Volt Amps (kVA)) 10950
(b)Source DHBVN
(c)Uploaded Copy of Agreement Copy of Agreement
(d)Standby Arrangement (Details of DG Sets) 10530
(e)Stack Height (in m) 6
20.
Land Ownership Pattern:
(a)Forest Land (ha.) 0
(b)Private Land (ha.) 3.0197
(c)Government Land (ha.) 0
(d)Revenue Land (ha.) 0
(e)Other Land (ha.) 0
    Total Land (ha.) 3.0197
21.
Present Land Use Breakup of the Study Area in Ha:
(a)Agriculture Area (ha.) .
(b)Waste/Barren Land (ha.) .
(c)Grazing/ Community Land (ha.) .
(d)Surface Water Bodies (ha.) .
(e)Settlements (ha.) .
(f)Industrial (ha.) .
(g)Forest (ha.) .
(h)Mangroves (ha.) .
(i)Marine Area (ha.) .
(j)Others (ha.) : . .
    Total (ha.) NaN
    22.     Land requirement for various activities
S. No.Description of Activity / Facility / Plant / Others OthersLand Requirement (ha.)Remarks
(1.)Green belt0.604Proposed Green Area
Total (ha.) 0.604
23.
Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Sanctuaries; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones :
    23.1.     Details of Ecological Sensitivity :
S. No.Details of Ecological Sensitivity NameDistance from the Project (Km)Remarks
(1.)WLSSultanpur bird Sanctuary12.57NW Direction
(2.)ESAs...
(3.)Corridors...
(4.)Wildlife Corridors...
(5.)ESZsSultanpur bird Sanctuary12.57NW Direction
(6.)NPA...
(7.)Critically Polluted AreaNone.Not Within Study Area
    23.2.     Details of Environmental Sensitivity :
S. No.Details of Environmental Sensitivity Other Details of Environmental Sensitivity NameDistance from the Project (Km)Remarks
(1.)Defence InstallationsAir Force Station approx4.21NE Direction
(2.)Forest...
(3.)Archaeological Sites...
23.3.
(a)Whether Noc / Permission from the competent authority is required? No
(b)Whether NBWL recommendation is required? No
24.
Forest Land:
Whether any Forest Land involved? No
25.
Tree Cutting:
(a)No. of Trees Cut for the Project (if Forest Land not Involved) 0
(b)Details of Tree Cutting and Planting of Trees Copy of Details of Tree Cutting and Planting of Trees
26.
Land Acquisition Status:
(a)Acquired Land(Ha) 3.0197
(b)Land yet to be acquired(Ha) 0
(c)Status of Land acquisition if not acquired 0
27.
Rehabilitation and Resettlement (R&R):
(a)No. of Villages 1
(b)No. of Households 0
(c)No. of PDFs (Project Displaced Families) 0
(d)No. of PAFs (Project Affected Families) 0
(e)Funds Allocated for R&R(in INR) (in Lacs) 0
(f)Status of R&R Completed
28.
Details of Presence of Schedule-I Species:
(a)Whether there is Presence of Schedule-I Species ? No
(b)Whether conservation plan for Schedule-I Species has been prepared ? No
(c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? No
29.
Details of Presence of Water Bodies in Core Area:
(a)Whether there is Presence of Water Bodies in Core Area ? No
(b)Whether there is Diversion Required ? No
(c)Whether permission has been obtained from competent authority ? No
30.
Details of Presence of Water Bodies in Buffer Area:
(a)Whether there is Presence of Water Bodies in Buffer Area ? No
31.
Manpower Requirement:
(a)Permanent Employment-During Construction 230
(b)Permanent Employment-During Operation 7460
(c)Temporary Employment- During Construction 10
(d)Temporary Employment- During Operation 08
(e)No. of working days 365
(f)Total Manpower 7708
32.
Green Belt in Ha:
(a)Uploaded Green Belt plan Copy of Green Belt Plan
S. No.Description ExistingProposedTotal
(1.)Total Area of Green Belt060406040
(2.)Percentage of Total Project Area02020
(3.)No. of Plants0377377
(4.)Funds Allocated01010
    33.         Project Benefits
S. No.Type of Project Benefits Details of Project Benefits
(1.)SocialEmployment will be generated during construction and operation phase both.
(2.)Environmentalwill provide environmental services
   34.   CRZ Specific Details : Not Applicable
   35.   Sector Specific Details For INFRA-2
S. No.Item Details
1.
Details of Building Construction:
(a)Maximum Height of the Building (Meters) 112
(b)Total No. of Flats to be Build 0
(c)No. of Buildings 11
(d)Total plot area (sqm) 30197.59
(e)Total built up area (sqm) 159210.66
2.
Foreshore Facilities and/or Marine Disposal:
(a)Whether Project Involves Foreshore Activities and/or marine Disposal? No
3.
Rain Water Harvesting:
(a)No. of Storage 0
(b)Capacity 0
(c)No. of Recharge Pits 08
(d)Capacity 31
4.
Parking:
(a)Details of 4 Wheeler/ 2 Wheeler Parking 1890
5.
Energy Saving Measures:
(a)Source/Mode Whole Building Performance method
(b)Percentage 13
(c)Quantity 1983380
6.
Other details:
(a)Details of impact on Water Bodies and Drainage patters of catchment area No
(b)Details of Traffic Density Impact Assessment and Modelling Study Copy of Details of Traffic Density Impact Assessment and Modelling Study
(c)In case Underground Tunnel Project below the Forest Land - Subsidence Impact Study report Copy of Underground Tunnel Project below the Forest Land - Subsidence Impact Study report
     7.       Type of Industries to be established with Industrial Estate as per their category A/B
S. No.Type of IndustryNo. of UnitsCategory A/B
NIL
8.
Length of the alignment N/A
9.
Details Bridges/ROB/Interchanges,Flyovers,Vehicle Underpass and Pedestrian Underpass
Details Not Applicable
S. No.Item Details
36.
Details of Court Cases:
(a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? No
37.
Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act:
(a)Whether any Direction issued under EPA Act/Air Act/Water Act ? No
38.
Details of EIA Consultant:
(a)Have you hired Consultant for preparing document? Yes
(i)Accreditation No. 87
(ii)Name of the EIA Consultant Ind Tech House Consult
(iii)Address G 8/6, Ground floor, Rohini Sector 11, New Delhi
(iv)Mobile No. 8860080363
(v)Landline No. 0112757141
(vi)Email Id dubeyakw1@gmail.com
(vii)Category of Accreditation A
(viii)Sector of Accreditation INFRA-2
(ix)Validity of Accreditation 31 Jan 2021
(x)Uploaded Certificate of Accreditation certified by QCI/NABET Copy of Certificate of Accreditation
39.
Documents to be Attached:
(a)Uploaded Copy of EIA/EMP Report Copy of EIA/EMP
Copy of EIA/EMP(Annexures)
Copy of EIA/EMP(Plans/Figures)
(b)Uploaded Copy of Risk Assessment Report Copy of Risk Assessment
(c)Uploaded Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan
(d)Uploaded Copy of Final Layout Plan Copy of Final Layout Plan
(e)Uploaded Cover Letter Copy of Cover Letter
(f)Uploaded Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency
(g)Uploaded Additional File Copy of Additional File
(h)Uploaded Proposal Presentation (To be given in EAC meeting) NA
      Essential Detail Sought : NIL
      Additional Detail Sought : NIL
Undertaking
I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief. And I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity/ construction/ expansion has since been taken up.
Name of ApplicantSatya Pal Singh
DesignationSrManager
Name of Company (Applicant Name should not be given here)PROMPT ENGINEERING PVT LTD
Address4119/6, First Floor, Naya Bazaar, Delhi