1. | Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? | No | Details of Project: | (a)Name of the project(s) | Balaji Amines Ltd. (Unit IV) | (b)Name of the Company / Organisation | BALAJI AMINES LTD.(UNIT IV) | (c)Registered Address | Plot No. F-104,Chincholi MIDC, Tal:Mohol, Dist: Solapur,,Solapur,Maharashtra-413255 | (d)Legal Status of the Company | Private | (e)Joint Venture | No | |
|
2. | Address for the correspondence: | (a)Name of the Applicant | N Rajeshwer Reddy Reddy | (b)Designation (Owner/ Partner/ CEO) | JointMD | (c)Address | Plot No. F-104,Chincholi MIDC,Tal. Mohol, Dist. Solapur,,Mohol,Solapur,Maharashtra-413224 | (d)Pin code | 413224 | (e)E-mail | ram@balajiamines.com | (f)STD Code. | 217(f)Telephone No. | 2310824 | (g)Fax No. | 2172451521 | (h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . | Annexure-Uploaded Copy of documents in support of the competence/authority | |
|
3. | Category of the Project/Activity as per Schedule of EIA Notification,2006: | (a.I)Project/Activity | 5(f) Synthetic organic chemicals industry (dyes & dye intermediates; bulk
| Minor Activity | | (b)Category | A | (c)Proposal Number | IA/MH/IND2/75223/2018 | (d)Master Proposal Number(Single Window) | SW/80555/2018 | (e)EAC concerned (for category A Projects only) | Industrial Projects - 2 | (f)Project Type | Fresh EC |
|
|
4. | Location of the Project: | (a)Plot/Survey/Khasra No. | F – 104, MIDC Chincholi, Tal.: Mohol, Dist.: Solap | (b)Pincode | 413224 | (c)Bounded Latitudes (North) | | From | | Degree | 17.766635 | Minutes | | Second | | From | | Degree | 17.772064 | Minutes | | Second | | (d)Bounded Longitudes (East) | | From | | Degree | 75.788130 | Minutes | | Second | | From | | Degree | 75.793729 | Minutes | | Second | | (e)Survey of India Topo Sheet No. | 47O9, 47O10, 47O13, 47O14 | (f)Uploaded Topo Sheet File | Copy of Topo Sheet File | (g)Maximum Elevation Above Means Sea Level(AMSL) | 477 | (h)Uploaded (kml) File | Copy of Kml File | (i)Distance of Nearest HFL from the project boundary within the study area | 4.5 | (j)Seismic Zone | 3 | |
|
5. | (a)Number of States in which Project will be Executed | 1 | (b)Main State of the project | Maharashtra | |
|
|
Details of State(s) of the project |
---|
S. No. | State Name | District Name | Tehsil Name | Village Name |
---|
(1.) | Maharashtra | Solapur | Mohol | | |
|
6. | Details of Terms of Reference (ToR): | (a)MoEF&CC / SEIAA File Number | IA-J-11011/189/2018-IA-II(I) | (b)Date of Apply of TOR | 07 Jul 2018 | (c)Date of Issue of TOR / Standard ToR | 09 Aug 2018 | (d)Previous TOR Letter | Copy of Previous TOR letter | |
|
7. | Details of Public Consultation: | (a)Whether the Project Exempted from Public Hearing? | Yes | (b)Reason | Proposed project would be located in notified indu | (c)Supporting Document | Copy of Supporting Document | |
|
8. | Details of Project Configuration/Product: | |
|
8.1. Project Configuration |
---|
S. No. | Plant/Equipment/Facility | Configuration | Remarks |
---|
(1.) | 900 TPD | Organic & speciality chemicals | Organic & speciality chemicals manufacturibg unit | |
8.2. Product |
---|
S. No. | Product/Activity (Capacity/Area) | Quantity | Unit | Other Unit | Mode of Transport / Transmission of Product | Other Mode of Transport / Transmission of Product |
---|
(1.) | Mono Iso Propyl Amine | 18250 | Tons per Annum | | Road | | (2.) | MIBK | 36500 | Tons per Annum | | Road | | (3.) | Di Phynel Amine (DPA) | 12775 | Tons per Annum | | Road | | (4.) | Di-isopropyl ether | 2409 | Tons per Annum | | Road | | (5.) | Di Metyal Carbonate | 20148 | Tons per Annum | | Road | | (6.) | Propylene Carbonate | 5256 | Tons per Annum | | Road | | (7.) | Propylene Glycol | 20148 | Tons per Annum | | Road | | (8.) | Choline Chloride 60% | 18250 | Tons per Annum | | Road | | (9.) | Hydrogen | 5475 | Tons per Annum | | Road | | (10.) | 2,6 Dimetyal-4-Hptanone | 438 | Tons per Annum | | Road | | (11.) | Iso Propyl Alcohol (IPA) | 60444 | Tons per Annum | | Road | | (12.) | Spent Caustic Solution | 876 | Tons per Annum | | Road | | (13.) | Propane | 11753 | Tons per Annum | | Road | | (14.) | N Butyl Thiophosphoric Triamide (NBPT) | 3650 | Tons per Annum | | Road | | (15.) | Methyl Amine | 43800 | Tons per Annum | | Road | | (16.) | Ethyal Amine | 36500 | Tons per Annum | | Road | | (17.) | Choline Chloride 75 % | 25550 | Tons per Annum | | Road | | (18.) | Choline Chloride 98% | 3650 | Tons per Annum | | Road | | (19.) | Hydrochloric acid | 2325.05 | Tons per Annum | | Road | | |
|
9. | In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii): | Details Not Applicable | |
|
9.1. | Details of Consent to Operate | (i)Whether Consent to operate obtained ? | NA | (ii)Copies of all Consent to operate obtained since inception | NA | (iii)Date of Issue | N/A | (iv)Valid Upto | N/A | (v)File No. | NA | (vi)Application No. | NA | (vii)Copy of Consent to operate valid as on date | NA | |
|
|
10. | Project Cost: | (a)Total Cost of the Project at current price level (in Crores) | 400 | (b) Funds Allocated for Environment Management (Capital) (in Crores) | 48.2 | (c) Funds Allocated Towards CER (Corporate Environment Responsibility) (in Crores) | 6.8 | (d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in Crores) | 7.4 | |
|
11. | Whether project attracts the General Condition specified in the Schedule of EIA Notification ? | Yes | a)Protected areas notified under the wildlife (Protection) Act, 1972 | Yes | | |
12. | Whether project attract the Specific Condition specified in the Schedule of EIA Notification ? | No | | |
13. | Raw Material / Fuel Requirement: | (a)Proposed quantity of raw material/fuel | 535155.7 | (b)Existing quantity of raw material/fuel | N/A | (c)Total quantity of raw material/fuel | 535155.7 | |
|
  13.1. Raw Material / Fuel Profile |
---|
S. No. | Raw Material / Fuel | Quantity | Unit | Other Unit | Source (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received ) | Mode of Transport | Other Mode of Transport | Distance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received) | Type of Linkage | Other Type of Linkage | Uploaded Copy of Linkage |
---|
(1.) | Acetone | 66065 | Tons per Annum | | Prasol Chemicals Pvt. Ltd. | Road | | 402 | Open Market | | Copy of Linkage | (2.) | ammonia | 54122.2 | Tons per Annum | | ) Rashtriya Chemicals & Fertilisers Limited | Road | | 400 | Open Market | | Copy of Linkage | (3.) | Aniline | 15330 | Tons per Annum | | OC Specialities Pvt. Ltd. | Road | | 0.5 | Open Market | | Copy of Linkage | (4.) | Thiophosphoryl trichloride | 4745 | Tons per Annum | | Excel Industries Limited | Road | | 400 | Open Market | | Copy of Linkage | (5.) | n-Butanol | 4380 | Tons per Annum | | Ree Atharva Life Science Pvt. Ltd. | Road | | 710 | Open Market | | Copy of Linkage | (6.) | PO | 19710 | Tons per Annum | | Trupti Gases Pvt. Ltd. | Road | | 400 | Open Market | | Copy of Linkage | (7.) | CO2 | 15330 | Tons per Annum | | Trupti Gases Pvt. Ltd. | Road | | 400 | Open Market | | Copy of Linkage | (8.) | Water | 48545 | Tons per Annum | | MIDC Water Supply Scheme | Others | pipeiine | 5 | LOA | | Copy of Linkage | (9.) | Nitrogen | 9490 | Tons per Annum | | Krishak Bharati Co-operative Limited | Road | | 670 | Open Market | | Copy of Linkage | (10.) | Propylene | 58400 | Tons per Annum | | Bharat Petroleum Corporation Limited | Road | | 253 | Open Market | | Copy of Linkage | (11.) | Hydrogen | 50698.5 | Tons per Annum | | Captive | Others | Captive | 0 | Captive | | Copy of Linkage | (12.) | Ethanol | 102565 | Tons per Annum | | Shree Siddheshwar Sahakari Sakhar Karkhana Limited | Road | | 40 | Open Market | | Copy of Linkage | |
|
14. | Baseline Data : | (a)Period of Base Line Data Collection | FROM 01 Feb 2018 To 30 Apr 2018 | (b)Season | Summer | |
|
14.1. No. of ambient Air Quality (AAQ) monitoring locations : 8 |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Unit | Maximum Value | Minimum Value | 98 Percentile Value | Prescribed Standard |
---|
(1.) | PM10 | | Micro Gram per Meter Cube | 71.6 | 39.3 | 60.28 | 100 | (2.) | PM2.5 | | Micro Gram per Meter Cube | 23.5 | 9.5 | 17.27 | 60 | (3.) | SO2 | | Micro Gram per Meter Cube | 35.7 | 8.3 | 29.54 | 80 | (4.) | NOx | | Micro Gram per Meter Cube | 41.5 | 13.4 | 39.52 | 80 | (5.) | Others | NH3 | Micro Gram per Meter Cube | 25.5 | 8.8 | 23.56 | 400 | |
14.2. No. of Ground Water monitoring locations : 5 |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Heavy Metal | Unit | Other Unit | Maximum Value | Minimum Value | Desirable Limit | Maximum Permissible Limit |
---|
(1.) | TDS | | | mg/l | | 1672.56 | 877.8 | 500 | 500 | (2.) | Total Hardness | | | mg/l | | 346.01 | 221.17 | 200 | 200 | (3.) | Fluoride | | | mg/l | | 0.75 | 0.066 | 1 | 1 | (4.) | Heavy Metals | | Zink as Zn | mg/l | | 3.98 | 2.11 | 5 | 5 | (5.) | Chlorides | | | mg/l | | 384.5 | 240.4 | 250 | 250 | (6.) | pH | | | NA | | 7.58 | 7.28 | 6.5 | 8.5 | (7.) | TSS | | | mg/l | | 83.14 | 55.4 | 100 | 200 | |
14.3. No. of Surface Water monitoring locations : 2 |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Unit | Other Unit | Maximum Value | Minimum Value | Classification of inland water body |
---|
(1.) | pH | | NA | | 7.43 | 7.35 | E | (2.) | BOD | | mg/l | | 10.46 | 8.23 | E | (3.) | Others | Total Coli form | Others | No./100ml | 133 | 90 | B | (4.) | COD | | mg/l | | 28.47 | 21.83 | E | (5.) | DO | | mg/l | | 4.8 | 3.7 | E | |
14.4. No. of Ambient Noise monitoring locations : 8 |
---|
S. No. | Parameter | Unit | Maximum Value | Minimum Value | Prescribed Standard |
---|
(1.) | Leq(Night) | A-weighted decibels(dB(A)) | 61.54 | 33.92 | 70 | (2.) | Leq(Day) | A-weighted decibels(dB(A)) | 68.8 | 45.21 | 75 | |
14.5. No. of Soil Sample Monitored locations : 9 |
---|
S. No. | Parameter | Unit | Other Unit | Maximum Value | Minimum Value |
---|
(1.) | N(Nitrogen) | Milligram per Kilogram | | 463.65 | 194.4 | (2.) | P(Phosphorus) | Milligram per Kilogram | | 319.64 | 124.78 | (3.) | K(Potassium) | Milligram per Kilogram | | 202.8 | 115.8 | (4.) | pH | Others | NA | 7.54 | 7.0 | (5.) | Electric Conductivity | Others | MS/cm | 0.29 | 0.17 | |
|
14.6. | Details of Ground Water Table: | (a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) | From 0.5 To 12.8 | (b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) | From 0.0041 To 4.0 | (c)Whether Ground Water Intersection will be there ? | No | |
|
15. Details of Water Requirement (During Operation) |
---|
S. No. | Source | Source Other | Required Quantity (Kilolitre per Day (Kld)) | Distance from Source | Copy of Permission from Competent Authority | Mode of Transport | Other Mode of Transport | Method of Water Withdrawal | Other Method of Water Withdrawal | Letter No. | Date of Issue | Permitted Quantity |
---|
(1.) | Others | MIDC water supply scheme | 4076 | 8 | Copy of Permission Letter | Pipeline | | Jack Well | | MIDC/RO(ROS)/CHN/1812000747 | 06 Mar 2018 | 25 | (2.) | Others | MIDC water supply scheme | 4076 | 8 | Copy of Permission Letter | Pipeline | | Jack Well | | MIDC/RO(ROS)/CHN/1812000747 | 06 Mar 2018 | 25 | |
|
15.1. | (a)Whether Desalination is proposed | No | |
|
16. Waste Water Management(During Operation) |
---|
S. No. | Type/Source | Quantity of Waste Water Generated (Kilolitre per Day) | Treatment Capacity (Kilolitre per Day) | Treatment Method | Mode of Disposal | Other Mode of Disposal | Quantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day) | Quantity of Discharged Water (Kilolitre per Day) |
---|
(1.) | Stream I | 278.93 | 285 | Evaporation in MEE, Condensate forwarded to CPU | Reuse within the Plant & Recycling | | 278.93 | | (2.) | Stream II | 740 | 800 | Treated in neutralization tank & RO permeate tank. Reject forwarded to evaporator & salts forwarded to CHWTSDF | Reuse within the Plant & Recycling,Others | Salts forwarded to CHWTSDF | 720 | 20 | |
|
16.1. | (a)Total Waste Water Generation (Kilolitre per Day) | 1018.93 | (b)Total Discharged Water (Kilolitre per Day) | 20 | (c)Total Reused Water (Kilolitre per Day) | 998.93 | |
|
17. Solid Waste Generation/Management |
---|
S. No. | Name of Waste | Item | Other Item | Quantity per Annum | Unit | Distance from Site(KM) | Mode of Transport | Other Mode of Transport | Mode of Disposal | Other Mode of Disposal |
---|
(1.) | corn cob waste | Industrial Waste | fuel | 10220 | Tons | 50 | Road | | Others | briquettes manufacturers | (2.) | scrap material | Others | scrap | 50 | Tons | 25 | Road | | Others | to sale | (3.) | office paper waste | Others | paper waste | 2 | Tons | 5 | Road | | Others | to sale | (4.) | coal ash | Bottom Ash | | 34675 | Tons | 50 | Road | | Others | brick manufacturers | (5.) | wood pallets | Industrial Waste | | 6 | Tons | 15 | Road | | Others | to sale | (6.) | woven sack bag | Plastic Waste | | 2 | Tons | 10 | Road | | Others | to sale | |
|
|
18.1. Air Quality Impact Prediction |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Unit | Baseline Concentration | Distance GLC | Incremental Concentration | Total GLC | Prescribed Standard |
---|
(1.) | SO2 | | Microgram per Meter Cube | 29.54 | 0.5 | 3 | 32.54 | 80 | (2.) | NOx | | Microgram per Meter Cube | 39.52 | 0.5 | 1 | 40.52 | 80 | (3.) | PM2.5 | | Microgram per Meter Cube | 19.98 | 0.5 | 0.1 | 20.08 | 60 | (4.) | PM10 | | Microgram per Meter Cube | 73.15 | 0.5 | 1 | 74.15 | 100 | |
|
18.2. Stack Details |
---|
S. No. | Source | Fuel | Stack Height(m) | Stack Diameter(m) | Pollutants | Other Pollutants | Emission (GLS) |
---|
(1.) | 60 TPH Boiler (3) | 192 TPD each | 50 | 2 | SO2 | | 860 | (2.) | DS Set (5) - 2000 KVA each | HSD - 350 lit./hr | 5 | 0.5 | SO2 | | 20 | (3.) | TFH (2) | Coal/FO/HSD- 1063 kg/hr | 35 | 1 | SO2 | | 600 | |
|
19. | Power Requirement: | (a)Quantity (Kilo Volt Amps (kVA)) | 10000 | (b)Source | Captive power plant | (c)Uploaded Copy of Agreement | Copy of Agreement | (d)Standby Arrangement (Details of DG Sets) | 2000 KVA (5) | (e)Stack Height (in m) | 5 | |
|
20. | Land Ownership Pattern: | (a)Forest Land (ha.) | 0 | (b)Private Land (ha.) | 36 | (c)Government Land (ha.) | 0 | (d)Revenue Land (ha.) | 0 | (e)Other Land (ha.) | 0 | Total Land (ha.) | 36 | |
|
21. | Present Land Use Breakup of the Study Area in Ha: | (a)Agriculture Area (ha.) | 15625 | (b)Waste/Barren Land (ha.) | 1510 | (c)Grazing/ Community Land (ha.) | 4632 | (d)Surface Water Bodies (ha.) | 275 | (e)Settlements (ha.) | 1250 | (f)Industrial (ha.) | 0 | (g)Forest (ha.) | 0 | (h)Mangroves (ha.) | 0 | (i)Marine Area (ha.) | 0 | (j)Others (ha.) : Fallow land | 8123 | Total (ha.) | 31415 | |
|
22. Land requirement for various activities |
---|
S. No. | Description of Activity / Facility / Plant / Others | Others | Land Requirement (ha.) | Remarks |
---|
(1.) | Built Up Area | | 13.59 | | |
|
|
23. | Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Sanctuaries; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones : | |
|
23.1. Details of Ecological Sensitivity : |
---|
S. No. | Details of Ecological Sensitivity | Name | Distance from the Project (Km) | Remarks |
---|
(1.) | Critically Polluted Area | NA | 0 | There is no presence of any CPA, NPA, ESAs, ESZs, Corridors & wildlife corridors in 10 Km radius of project | (2.) | NPA | NA | 0 | There is no presence of any CPA, NPA, ESAs, ESZs, Corridors & wildlife corridors in 10 Km radius of project | (3.) | Corridors | NA | 0 | There is no presence of any CPA, NPA, ESAs, ESZs, Corridors & wildlife corridors in 10 Km radius of project | (4.) | Wildlife Corridors | NA | 0 | There is no presence of any CPA, NPA, ESAs, ESZs, Corridors & wildlife corridors in 10 Km radius of project | (5.) | ESZs | NA | 0 | There is no presence of any CPA, NPA, ESAs, ESZs, Corridors & wildlife corridors in 10 Km radius of project | (6.) | ESAs | NA | 0 | There is no presence of any CPA, NPA, ESAs, ESZs, Corridors & wildlife corridors in 10 Km radius of project | (7.) | WLS | Great Indian Bustard Sanctuary | 3.3 | Letter w.r.t. distance of project site from Great Indian Bustard Bird Sanctuary iis received from forest department , Solapur. Same was appended in Form 1 application submitted to MoEFCC, New Delhi | |
23.2. Details of Environmental Sensitivity : |
---|
S. No. | Details of Environmental Sensitivity | Other Details of Environmental Sensitivity | Name | Distance from the Project (Km) | Remarks |
---|
(1.) | Forest | | NA | 0 | There is no forest land within 10 km from project site | (2.) | Defence Installations | | NA | 0 | There are no any defence installations within 10 km from project site | (3.) | Archaeological Sites | | NA | 0 | There are no archealogical sites within 10 km from project site | |
|
|
24. | Forest Land: | Whether any Forest Land involved? | No | |
|
25. | Tree Cutting: | (a)No. of Trees Cut for the Project (if Forest Land not Involved) | 0 | (b)Details of Tree Cutting and Planting of Trees | Not Applicable | |
|
26. | Land Acquisition Status: | (a)Acquired Land(Ha) | 36 | (b)Land yet to be acquired(Ha) | 0 | (c)Status of Land acquisition if not acquired | 0 | |
|
27. | Rehabilitation and Resettlement (R&R): | (a)No. of Villages | 0 | (b)No. of Households | 0 | (c)No. of PDFs (Project Displaced Families) | 0 | (d)No. of PAFs (Project Affected Families) | 0 | (e)Funds Allocated for R&R(in INR) (in Lacs) | 0 | (f)Status of R&R | Completed | |
|
28. | Details of Presence of Schedule-I Species: | (a)Whether there is Presence of Schedule-I Species ? | No | (b)Whether conservation plan for Schedule-I Species has been prepared ? | No | (c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? | No | |
|
29. | Details of Presence of Water Bodies in Core Area: | (a)Whether there is Presence of Water Bodies in Core Area ? | Yes | (i)Details of Water Bodies in Core Area | Sina river | (b)Whether there is Diversion Required ? | No | (c)Whether permission has been obtained from competent authority ? | No | |
|
30. | Details of Presence of Water Bodies in Buffer Area: | (a)Whether there is Presence of Water Bodies in Buffer Area ? | No | |
|
31. | Manpower Requirement: | (a)Permanent Employment-During Construction | 100 | (b)Permanent Employment-During Operation | 500 | (c)Temporary Employment- During Construction | 50 | (d)Temporary Employment- During Operation | 50 | (e)No. of working days | 365 | (f)Total Manpower | 700 | |
|
32. | Green Belt in Ha: | (a)Total Area of Green Belt | 11.87 | (b)Percentage of Total Project Area | 32.97 | (c)No. of Plants to be Planted | 9500 | (d)Funds Allocated for Plantation | 12000000 | (e)Uploaded Green Belt plan | Copy of Green Belt Plan | |
|
33. Project Benefits |
---|
S. No. | Type of Project Benefits | Details of Project Benefits |
---|
(1.) | Environmental | • No any land from GIB Sanctuary will be utilized for industrial purpose. All project activities will be limited to MIDC land only.
• Protection of GIB habitat i.e. Grassland habitat.
• No any untreated effluent shall be let out into nearby water body or land.
• Nature conservation and environmental protection activities involving local youth and local schools shall be planned on priority under industry’s CSR activity.
• Activities like slide shows or expert’s lectures on GIB shall be arranged f | (2.) | Social | The skilled labours and unskilled labours would be required under the proposed project. Thereunder, total 700 workers shall be required.Preference would be given, for the job opportunities, to those labors who are residing nearby. Thus, there would be marginal increase in the employment at local level. Secondary employment in the form of contract jobs would also be a positive impact of the proposed project activities. | (3.) | Financial | There is a good demand of products manufactured from proposed industrial unit in national and international markets. Organic Chemicals with wide range of application in various industries such as Pesticides, Fungicides, Rubber Chemicals, Dyestuffs, Drugs, Acrylic Fibers, Ion Exchange Resins, Corrosion Inhibitors, Catalysts etc. Based on growth of these user industries the demand for Ethyl & Methyl Amines is also steadily increasing | |
|
34. CRZ Specific Details : Not Applicable |
35. Sector Specific Details : NOT APPLICABLE |
35. Sector Specific Details For Industrial Projects - 2 |
|
|
36. | Details of Court Cases: | (a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? | No | |
|
37. | Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act: | (a)Whether any Direction issued under EPA Act/Air Act/Water Act ? | No | |
|
38. | Details of EIA Consultant: | (a)Have you hired Consultant for preparing document? | Yes | (i)Accreditation No. | 1518 063 | (ii)Name of the EIA Consultant | Equinox Environments India Pvt. Ltd. | (iii)Address | F 11, Namdev Nest, Opposite Kamala College, Kolhapur | (iv)Mobile No. | 9657865122 | (v)Landline No. | 0231253123 | (vi)Email Id | eia@equinoxenvi.com | (vii)Category of Accreditation | A | (viii)Sector of Accreditation | Industrial Projects - 2 | (ix)Validity of Accreditation | 21 Oct 2018 | (x)Uploaded Certificate of Accreditation certified by QCI/NABET | Copy of Certificate of Accreditation | |
|
|
Essential Detail Sought: |
---|
Sno. | EDS Letter | Remarks | Date of EDS |
---|
1. | NA | Please see our earlier observations vide query dated 12/6/2018 for the needful. | 02 Oct 2018 | 2. | NA | The correction have been made as per the instruction received | 03 Oct 2018 | 3. | NA | - Please clarify location of the unit from the nearest boundary of Maldhok WLS as notified by the Central/State Government to confirm applicability of general condition.
- ESZ status of the WLS.
- Present status of Wildlife clearance. | 06 Oct 2018 | 4. | NA | The correction have been made as per the instruction received | 11 Oct 2018 | 5. | NA | Please submit your reply in response to the observations dated 6/10/2018 for further clarification and to take the proposal forward. | 16 Oct 2018 | 6. | NA | The correction have been made as per the instruction received | 30 Oct 2018 | 7. | NA | The project/activity is covered under category B of item 5(f) of the schedule to the EIA Notification, 2006. Please confirm whether the EIA consultant is accredited by QCI/NABET for preparation of EIA/EMP report for the said project. | 07 Nov 2018 | 8. | NA | The correction have been made as per the instruction received | 28 Nov 2018 | |
Additional Detail Sought: |
---|
Sno. | ADS Letter | Remarks | Date of ADS |
---|
1. | ADS Reply Letter | Additional Details Sought by MS on 9th EAC Meeting dated 26.06.2019 for Balaji Amines Ltd. (Unit IV) | 26 Jul 2019 | 2. | NA | |
|