Form-2
APPLICATION FOR PRIOR ENVIRONMENTAL CLEARANCE
S. No.Item Details
1.
Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? No
Details of Project:
(a)Name of the project(s) VISAKA INDUSTRIES LIMITED
(b)Name of the Company / Organisation VISAKA IND LTD RAEBARELI
(c)Registered Address Visaka Industries Limited,Survey No 610, Kannawan, Bachhrawan, Maharajgunj - Tehsil, Raebareli, U.P.,Raebareli,Uttar Pradesh-229301
(d)Legal Status of the Company Private
(e)Joint Venture No
2.
Address for the correspondence:
(a)Name of the Applicant RAJNAVNEETHRAO LINGARAO THURPU
(b)Designation (Owner/ Partner/ CEO) VP
(c)Address Visaka Ind Ltd, S.P. Road Begumpet, Secunderabad T.S.,,,Hyderabad,Telangana-500003
(d)Pin code 500003
(e)E-mail csreddyyeddula@gmail.com
(f)STD Code. 40(f)Telephone No. 27813833
(g)Fax No.
(h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . Annexure-Uploaded Copy of documents in support of the competence/authority
3.
Category of the Project/Activity as per Schedule of EIA Notification,2006:
(a.I)Project/Activity4(c) Asbestos milling and asbestos based products
Minor Activity4(c) Asbestos milling and asbestos based products
(b)Category A
(c)Proposal Number IA/UP/IND/80541/2015
(d)Master Proposal Number(Single Window) SW/80510/2018
(e)EAC concerned (for category A Projects only) Industrial Projects - 1
(f)Project Type Expansion
4.
Location of the Project:
(a)Plot/Survey/Khasra No. 668,683-733,739-753,791-793
(b)Pincode 229301
(c)Bounded Latitudes (North)
From
Degree 26.426406
Minutes
Second
From
Degree 26.431086
Minutes
Second
(d)Bounded Longitudes (East)
From
Degree 81.125153
Minutes
Second
From
Degree 81.129358
Minutes
Second
(e)Survey of India Topo Sheet No. G44J3
(f)Uploaded Topo Sheet File Copy of Topo Sheet File
(g)Maximum Elevation Above Means Sea Level(AMSL) 117
(h)Uploaded (kml) File Copy of Kml File      
(i)Distance of Nearest HFL from the project boundary within the study area 10
(j)Seismic Zone 3
5.
(a)Number of States in which Project will be Executed 1
(b)Main State of the project Uttar Pradesh
Details of State of the project
S. No. State Name District Name Tehsil Name Village Name
NIL
6.
Details of Terms of Reference (ToR)/EC:
(a)MoEF&CC / SEIAA File Number J-11011/157/2015-IA.II(I)
(c)Date of Issue of TOR 21 Jun 2016
(f)Previous TOR Letter NA
(b)Date of Apply of EC 23 Nov 2019
(c)Date of Issue of EC 14 Jul 2020
(d)Previous EC Letter Copy of Previous EC letter
7.
Details of Public Consultation:
(a)Whether the Project Exempted from Public Hearing?No
(b)Whether details of Public Hearing available? Yes
(c)Whether Public hearing was presided over by an officer of the rank of Additional District Magistrate or above Yes
     7.1.       Details of Public Hearing
S. No.Details of Advertisement Details of Public Hearing Venue Location DetailsNo. of People AttendedIssues RaisedDesignation of Presiding OfficerOther Designation of Presiding Officer
(1.)
Date of Advertisement :10 May 2018
Copy of advertisement :Copy of Advertisement
Copy of Public Hearing :Copy of Public Hearing
Date :28 Jun 2018
Distance of Public Hearing Venue from the Proposed Project :0
Within project site,Village Kannawan, Tehsil – Maharajganj, Dist.– Raibareli, State- Uttar Pradesh
State :Uttar Pradesh
District :Raebareli
Tehsil :Maharajganj
Village :Kannawan
461.First, Shri A.K. Shukla asked the question as to where and how to throw away the generated waste water from the project due to the expansion of the project. 2.Shri Chandra Kumar Mishra, a residentOthersAdditional District Magistrate, Raibareli
8.
Details of Project Configuration/Product:
Details Not Applicable
9.
In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii):
(a)Details of certified report on compliance of earlier environmental clearance condition
(i)Certified Compliance By Regional
(ii)Details of Regional Office of MoEFCC / Zonal Office of CPCB / SPCB / UTPCC from which certified report on Lucknow
(iii)Letter No. File No.IV/ENV/IND-69/182/2005/14
(iv)Status of Compliance Compiled
(v)Certified report on compliance of earlier environmental clearance conditions (Including Monitoring Report) Copy of Certified Compliance Report
(vi)Date of site visit Apr 22 2019 12:00AM
(b)Details of Capacity Expansion
S. No.Product/Activity (Capacity/Area)Quantity FromQuantity ToTotal UnitOther UnitMode of Transport / Transmission of ProductOther Mode of Transport / Transmission of Product
(1.)ASBESTOS SHEETS & ITS ACCESSORIES120000200000320000Tons per Annum(TPA)Road
(c)Details of Configuration
S. No.Plant / Equipment / Facility Existing ConfigurationProposed ConfigurationFinal configuration after expansionRemarks
(1.)Atmostpheric corrugation Unit112SET
(2.)Motor & Pumps Spare112SET
(3.)Cement Feeding Equipment112SET
(4.)Cotton rag Pulp feeding Equipment112SET
(5.)Hard/wet Waste recycling112SET
(6.)Conveying & Stamping112SET
(7.)Green waste handling system112SET
(8.)Trolley Handling system at ACB112SET
(9.)QC testing Equipments101SET
(10.)QC Measuring Equipments112SET
(11.)Electrical Equipments112SET
(12.)Work Shop Equipments101SET
(13.)Other moulded good mfg section112SET
(14.)Fly ash Feeding Equipment112SET
(15.)Asbestos Fibre Feeding Equipment112SET
(16.)Waste water recycling112SET
(17.)Hatscheck Machine112SET
(18.)De-stacking Unit112SET
(19.)Utilities/ Cranes112SET
(20.)Fresh water arrangement112SET
(21.)Hydraulic & Pneumatic Accessories112SET
(22.)Templates, Trolley & trolley Handling system112SET
(23.)RM Mixing112SET
9.1.
Details of Consent to Operate
(i)Whether Consent to operate obtained ? NA
(ii)Copies of all Consent to operate obtained since inception NA
(iii)Date of Issue 23 Jan 2018
(iv)Valid Upto 31 Dec 2019
(v)File No. 1097/UPPCB/Raebareli(UPPCBRO)/CTO/air/RaeBareli /2
(vi)Application No. 89331
(vii)Copy of Consent to operate valid as on date Copy of Consent to Operate
10.
Project Cost:
(a)Total Cost of the Project at current price level (in Crores) 34
(b) Funds Allocated for Environment Management (Capital) (in Crores) 0.361
(c) Funds Allocated Towards CER (Corporate Environment Responsibility) (in Crores) 0.5275
(d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in Crores) 0.50
11.
Whether project attracts the General Condition specified in the Schedule of EIA Notification ? No
12.
Whether project attract the Specific Condition specified in the Schedule of EIA Notification ? Yes
8.(a) If any Industrial Estate/Complex / Export processing Zones /Special Economic Zones/Biotech Parks / Leather Complex with homogeneous type of industries such as Items 4(d), 4(f), 5(e), 5(f), or those Industrial estates with pre –defined set of activities (not necessarily homogeneous, obtains prior environmental clearance, individual industries including proposed industrial housing within such estates /complexes will not be required to take prior environmental clearance, so long as the Terms and Conditions for the industrial estate/complex are complied with (Such estates/complexes must have a clearly identified management with the legal responsibility of ensuring adherence to the Terms and Conditions of prior environmental clearance, who may be held responsible for violation of the same throughout the life of the complex/estate
13.
Raw Material / Fuel Requirement:
(a)Proposed quantity of raw material/fuel 150768
(b)Existing quantity of raw material/fuel 94176
(c)Total quantity of raw material/fuel 244944
    13.1.        Raw Material / Fuel Profile
S. No.Raw Material / Fuel QuantityUnitOther UnitSource (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received )Mode of TransportOther Mode of TransportDistance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received)Type of Linkage Other Type of Linkage Uploaded Copy of Linkage
(1.)Cement127824Tons per AnnumSatna & Mahihar, MPRoad350 Otherswork orderCopy of Linkage
(2.)Fly ash87408Tons per AnnumFeroz Gandhi Unchahar Thermal Power PlantRoad,Rail70 Otherswork orderCopy of Linkage
(3.)Asbestos Fibre Chrysotile27108Tons per AnnumImported (Russia)Road1450 Otherswork orderCopy of Linkage
(4.)pulp2604Tons per AnnumKanpur- UP &Namakkahl- TN.Road110 Otherswork orderCopy of Linkage
14.
Baseline Data :
(a)Period of Base Line Data Collection FROM 20 May 2019 To 15 Jun 2019
(b)Season Summer
    14.1.     No. of ambient Air Quality (AAQ) monitoring locations : 8
S. No.Criteria Pollutants Other Criteria PollutantsUnitMaximum ValueMinimum Value98 Percentile ValuePrescribed Standard
(1.)NOxMicro Gram per Meter Cube33.616.332.8980
(2.)PM2.5Micro Gram per Meter Cube45.220.345.0360
(3.)PM10Micro Gram per Meter Cube82.254.981.72100
(4.)SO2Micro Gram per Meter Cube15.28.215.1280
    14.2.     No. of Ground Water monitoring locations : 3
S. No.Criteria Pollutants Other Criteria PollutantsHeavy MetalUnitOther UnitMaximum ValueMinimum ValueDesirable LimitMaximum Permissible Limit
(1.)TSSmg/l0000
(2.)Total Hardnessmg/l260180200600
(3.)pHNA7.617.316.58.5
(4.)OthersNitratemg/l11.238.7645100
(5.)TDSmg/l6024525002000
(6.)Chloridesmg/l66342501000
(7.)Fluoridemg/l0.350.2711.5
(8.)Heavy Metalsleadmg/l000.050.05
    14.3.     No. of Surface Water monitoring locations : 1
S. No.Criteria Pollutants Other Criteria PollutantsUnitOther UnitMaximum ValueMinimum ValueClassification of inland water body
(1.)BODmg/l00C
(2.)DOmg/l5.65.6C
(3.)OthersTDSmg/l412412C
(4.)CODmg/l00C
(5.)pHNA7.687.68C
    14.4.     No. of Ambient Noise monitoring locations : 4
S. No.Parameter UnitMaximum ValueMinimum ValuePrescribed Standard
(1.)Leq(Night)A-weighted decibels(dB(A))59.843.770
(2.)Leq(Day)A-weighted decibels(dB(A))6852.975
    14.5.     No. of Soil Sample Monitored locations : 8
S. No.Parameter UnitOther UnitMaximum ValueMinimum Value
(1.)pHOthersNA7.677.39
(2.)K(Potassium)Kilogram per hectare3625
(3.)N(Nitrogen)Percent1.60.93
(4.)Electric ConductivityOthersµmhos715715
(5.)P(Phosphorus)Kilogram per hectare1711
14.6.
Details of Ground Water Table:
(a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) From 2.78 To 3.91
(b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) From 2.06 To 2.76
(c)Whether Ground Water Intersection will be there ? NA
     15.      Details of Water Requirement (During Operation)
S. No.Source Source Other Required Quantity (Kilolitre per Day (Kld))Distance from SourceCopy of Permission from Competent Authority Mode of TransportOther Mode of TransportMethod of Water WithdrawalOther Method of Water WithdrawalLetter No.Date of IssuePermitted Quantity
(1.)GroundWater2600.1 Not Appliacble PipelineTube Well21-4(155)/NR/CGWA/2008-155102 Aug 2016140
15.1.
(a)Whether Desalination is proposed No
    16.       Waste Water Management(During Operation)
S. No.Type/Source Quantity of Waste Water Generated (Kilolitre per Day)Treatment Capacity (Kilolitre per Day) Treatment MethodMode of DisposalOther Mode of DisposalQuantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day)Quantity of Discharged Water (Kilolitre per Day)
(1.)Domestic waste water1010STPGreen Belt Renewal Plant10
16.1.
(a)Total Waste Water Generation (Kilolitre per Day) 10
(b)Total Discharged Water (Kilolitre per Day) 0
(c)Total Reused Water (Kilolitre per Day) 10
    17.       Solid Waste Generation/Management
S. No.Name of Waste Item Other ItemQuantity per AnnumUnitDistance from Site(KM)Mode of TransportOther Mode of TransportMode of DisposalOther Mode of Disposal
(1.)Hard broken piecesOthershard broken pieces from salvaging,damages,rejects2062.08Tons0Road,Conveyor Belt,Pipe ConveyorOthers100 % recycled
(2.)FLY ASHFly Ash19.2Tons0RoadOthers100 % recycled
18.
    18.1.     Air Quality Impact Prediction
S. No.Criteria Pollutants Other Criteria PollutantsUnitBaseline ConcentrationDistance GLCIncremental ConcentrationTotal GLCPrescribed Standard
(1.)SO2Microgram per Meter Cube15.24015.2180
(2.)PM10Microgram per Meter Cube82.2002.8885.081100
(3.)PM2.5Microgram per Meter Cube45.23045.2160
(4.)NOxMicrogram per Meter Cube33.64.5033.6180
    18.2.     Stack Details
S. No.Source FuelStack Height(m)Stack Diameter(m)PollutantsOther PollutantsEmission (GLS)
(1.)stackcement,fly ash,fibre180.3PM102.88
19.
Power Requirement:
(a)Quantity (Kilo Volt Amps (kVA)) 1000
(b)Source UPSEB
(c)Uploaded Copy of Agreement Copy of Agreement
(d)Standby Arrangement (Details of DG Sets) No addl DG sets only existing ( 600 +380 KVA)
(e)Stack Height (in m) 18
20.
Land Ownership Pattern:
(a)Forest Land (ha.) 0
(b)Private Land (ha.) 10
(c)Government Land (ha.) 0
(d)Revenue Land (ha.) 0
(e)Other Land (ha.) 0
    Total Land (ha.) 10
21.
Present Land Use Breakup of the Study Area in Ha:
(a)Agriculture Area (ha.) 14838.1
(b)Waste/Barren Land (ha.) 2628.1
(c)Grazing/ Community Land (ha.) 5883.1
(d)Surface Water Bodies (ha.) 810
(e)Settlements (ha.) 7251.2
(f)Industrial (ha.) 0
(g)Forest (ha.) 0
(h)Mangroves (ha.) 0
(i)Marine Area (ha.) 0
(j)Others (ha.) : 0 0
    Total (ha.) 31410.500000000004
    22.     Land requirement for various activities
S. No.Description of Activity / Facility / Plant / Others OthersLand Requirement (ha.)Remarks
(1.)Main Plant2.8plant/admn
(2.)Built Up Area0.8storage/stock
(3.)Othersinternal roads and open space1.8internal roads and open space
Total (ha.) 5.4
23.
Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Sanctuaries; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones :
    23.1.     Details of Ecological Sensitivity :
S. No.Details of Ecological Sensitivity NameDistance from the Project (Km)Remarks
(1.)Critically Polluted Areanil100NA
(2.)WLSnil100NA
(3.)ESAsnil100NA
(4.)Corridorsnil100NA
(5.)Wildlife Corridorsnil100NA
(6.)ESZsnil100NA
(7.)NPAnil100NA
    23.2.     Details of Environmental Sensitivity :
S. No.Details of Environmental Sensitivity Other Details of Environmental Sensitivity NameDistance from the Project (Km)Remarks
(1.)ForestNA100NA
(2.)Archaeological SitesNA100NA
(3.)Defence InstallationsNA100NA
(4.)OthersDensely populated or builtup areaKannawan0.7NOT APPLICABLE
23.3.
(a)Whether Noc / Permission from the competent authority is required? No
(b)Whether NBWL recommendation is required? No
24.
Forest Land:
Whether any Forest Land involved? No
25.
Tree Cutting:
(a)No. of Trees Cut for the Project (if Forest Land not Involved) 0
(b)Details of Tree Cutting and Planting of Trees Not Applicable
26.
Land Acquisition Status:
(a)Acquired Land(Ha) 10
(b)Land yet to be acquired(Ha) 0
(c)Status of Land acquisition if not acquired 0
27.
Rehabilitation and Resettlement (R&R):
(a)No. of Villages 0
(b)No. of Households 0
(c)No. of PDFs (Project Displaced Families) 0
(d)No. of PAFs (Project Affected Families) 0
(e)Funds Allocated for R&R(in INR) (in Lacs) 0
(f)Status of R&R Completed
28.
Details of Presence of Schedule-I Species:
(a)Whether there is Presence of Schedule-I Species ? No
(b)Whether conservation plan for Schedule-I Species has been prepared ? No
(c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? No
29.
Details of Presence of Water Bodies in Core Area:
(a)Whether there is Presence of Water Bodies in Core Area ? No
(b)Whether there is Diversion Required ? No
(c)Whether permission has been obtained from competent authority ? No
30.
Details of Presence of Water Bodies in Buffer Area:
(a)Whether there is Presence of Water Bodies in Buffer Area ? Yes
(i)Details of Water Bodies in Buffer Area Sharda Canal
(ii)Direction of Water Bodies in Buffer Area North East
(iii)Distance of Water Bodies in Buffer Area 4.3
31.
Manpower Requirement:
(a)Permanent Employment-During Construction 0
(b)Permanent Employment-During Operation 137
(c)Temporary Employment- During Construction 32
(d)Temporary Employment- During Operation 31
(e)No. of working days 322
(f)Total Manpower 200
32.
Green Belt in Ha:
(a)Uploaded Green Belt plan Copy of Green Belt Plan
S. No.Description ExistingProposedTotal
(1.)Total Area of Green Belt4.3.34.6
(2.)Percentage of Total Project Area43346
(3.)No. of Plants3531980036119
(4.)Funds Allocated3.286.59.78
    33.         Project Benefits
S. No.Type of Project Benefits Details of Project Benefits
(1.)FinancialOnce the production capacity of existing plant increases automatically the revenue of the Village will be improved. Due to this, the socio-economic status of the local people will improve and there by the existing infrastructure facilities like Road network, communication systems will further improved
(2.)EnvironmentalVIL strongly believes in the concept of eco friendly industrialization. This has been amply demonstrated in the operation of existing units of VIL as per standards prescribed by the State and Central Pollution Control Boards. Apart from eco -friendly operations, various socio economic development activities have been undertaken to bring about overall socio economic improvements in the areas.
(3.)SocialThe proposed expansion project creates employment to about 50 persons though Direct employment & 50 persons through indirect employment.
   34.   CRZ Specific Details : Not Applicable
   35.   Sector Specific Details : NOT APPLICABLE
   35.   Sector Specific Details For Industrial Projects - 1
S. No.Item Details
S. No.Item Details
36.
Details of Court Cases:
(a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? No
37.
Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act:
(a)Whether any Direction issued under EPA Act/Air Act/Water Act ? No
38.
Details of EIA Consultant:
(a)Have you hired Consultant for preparing document? Yes
(i)Accreditation No. NABET/EIA/RA027/023(Sl.No. 44 Rev. 81, October, 2
(ii)Name of the EIA Consultant Ecomen Laboratories Pvt. Ltd.
(iii)Address Flat No. 8, 2nd Floor , Arif Chamber –V, Sector –H, Aliganj, Lucknow-226024
(iv)Mobile No. 9415410773
(v)Landline No. 5222761885
(vi)Email Id ravi.bhargava@gmail.com
(vii)Category of Accreditation A
(viii)Sector of Accreditation Industrial Projects - 1
(ix)Validity of Accreditation 20 Sep 2020
(x)Uploaded Certificate of Accreditation certified by QCI/NABET Copy of Certificate of Accreditation
39.
Documents to be Attached:
(a)Uploaded Copy of EIA/EMP Report Copy of EIA/EMP
Copy of EIA/EMP(Annexures)
Copy of EIA/EMP(Plans/Figures)
(b)Uploaded Copy of Risk Assessment Report Copy of Risk Assessment
(c)Uploaded Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan
(d)Uploaded Copy of Final Layout Plan Copy of Final Layout Plan
(e)Uploaded Cover Letter Copy of Cover Letter
(f)Uploaded Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency
(g)Uploaded Additional File NA
(h)Uploaded Proposal Presentation (To be given in EAC meeting) NA
            Essential Detail Sought:
Sno. EDS Letter Remarks Date of EDS
1.NAi. EIA report and baseline data has not been re-validated by the QCI accredited consultant. ii. CGWA water abstraction permission is of 3.9.2018 and already expired on 2.9.2010. Renewed water abstraction permission may be furnished. Possibility to use surface water in place of Ground water may also be submitted. 18 Jun 2019
2.NAThe correction have been made as per the instruction received 26 Oct 2019
3.NAThe proposal is returned in the present form due to the following shortcomings: 1. Baseline data is already more than three years old. 2. EIA report has not been re-validated by the new consultant i.e., M/s. Ecomen Laboratories Limited. Further, it is requested to look in above EDS raised and submit accordingly. 19 Nov 2019
4.NAThe correction have been made as per the instruction received 23 Nov 2019
            Additional Detail Sought:
Sno. ADS Letter Remarks Date of ADS
1. ADS Reply LetterSub:Submission of Additional details sought(ADS) for Expansion of Asbestos Cement Sheet Plant (1,20,000 TPA to 3,20,000 TPA) (Phase 1,– 40,000 TPA & Phase 2 – 1,60,000 TPA) project of M/s Visaka Industries Limited, located at Kannawan Village, Bacchranwan Gram Panchayat, Maharajganj Tehsil, Raebareli District, U.P. [Proposal No. IA/UP/IND/80541/2015, File No. J-11011/157/2005-IA.II (I)] Ref: Minutes of 14th Meeting of the Re-Constituted Expert Appraisal Committee on Industry– 1 project held during 23rd- 24th December, 2019 at New Delhi 14 Mar 2020
2.NA

Proposal deferred for want of additional information

09 Jan 2020
Undertaking
I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief. And I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity/ construction/ expansion has since been taken up.
Name of ApplicantRAJNAVNEETHRAO LINGARAO THURPU
DesignationVP
Name of Company (Applicant Name should not be given here)VISAKA IND LTD RAEBARELI
AddressVisaka Industries Limited
Print