Form-2
APPLICATION FOR PRIOR ENVIRONMENTAL CLEARANCE
S. No.Item Details
1.
Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? No
Details of Project:
(a)Name of the project(s) Proposed expansion of existing Molasses Based Distillery (45 to 75 KLPD) & Co-generation Power Plant (1.0 to 5.0 MW) along with the installation of 125 KLPD Grain Based Distillery in Existing Distille
(b)Name of the Company / Organisation SONA SATI ORGANICS PRIVATE LIMITED
(c)Registered Address Village Rajapatti Kothi, P.O. Rajapatti, Tehsil Baikanthpur, District Gopalganj, Bihar,,Gopalganj,Bihar-841420
(d)Legal Status of the Company Private
(e)Joint Venture No
2.
Address for the correspondence:
(a)Name of the Applicant Ramashankar Prasad
(b)Designation (Owner/ Partner/ CEO) Director
(c)Address Sona Sati Organics Pvt. Limited, 503A, N.P. Center, New Dak Bunglow Road, Patna (Bihar),,Patna Rural (a) Patna Rural (b),Patna,Bihar-800001
(d)Pin code 800001
(e)E-mail jaiswalp5@gmail.com
(f)STD Code. 612(f)Telephone No. 2216098
(g)Fax No. 06122214420
(h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . Annexure-Uploaded Copy of documents in support of the competence/authority
3.
Category of the Project/Activity as per Schedule of EIA Notification,2006:
(a.I)Project/Activity5(g) Distilleries
Minor Activity
(b)Category A
(c)Proposal Number IA/BR/IND2/42658/2004
(d)Master Proposal Number(Single Window) SW/80472/2018
(e)EAC concerned (for category A Projects only) Industrial Projects - 2
(f)Project Type Expansion
4.
Location of the Project:
(a)Plot/Survey/Khasra No. 151 152
(b)Pincode 841420
(c)Bounded Latitudes (North)
From
Degree 26.21000000
Minutes
Second
From
Degree 26.21333333
Minutes
Second
(d)Bounded Longitudes (East)
From
Degree 84.79472222
Minutes
Second
From
Degree 84.79916667
Minutes
Second
(e)Survey of India Topo Sheet No. G45G11 G45G12 G45G15 G45G16
(f)Uploaded Topo Sheet File Copy of Topo Sheet File
(g)Maximum Elevation Above Means Sea Level(AMSL) 63
(h)Uploaded (kml) File Copy of Kml File      
(i)Distance of Nearest HFL from the project boundary within the study area 5
(j)Seismic Zone 4
5.
(a)Number of States in which Project will be Executed 1
(b)Main State of the project Bihar
Details of State(s) of the project
S. No. State Name District Name Tehsil Name Village Name
(1.)BiharGopalganjBaikunthpurRajapatti Kothi
6.
Details of Terms of Reference (ToR)/EC:
(a)MoEF&CC / SEIAA File Number J-11011/60/2016-IA-11(I)
(c)Date of Issue of TOR 20 Oct 2004
(f)Previous TOR Letter Copy of Previous TOR letter
(b)Date of Apply of EC 08 Oct 2018
(c)Date of Issue of EC 18 Jan 2019
(d)Previous EC Letter Copy of Previous EC letter
7.
Details of Public Consultation:
(a)Whether the Project Exempted from Public Hearing?No
(b)Whether details of Public Hearing available? Yes
(c)Whether Public hearing was presided over by an officer of the rank of Additional District Magistrate or above Yes
     7.1.       Details of Public Hearing
S. No.Details of Advertisement Details of Public Hearing Venue Location DetailsNo. of People AttendedIssues RaisedDesignation of Presiding OfficerOther Designation of Presiding Officer
(1.)
Date of Advertisement :05 Jul 2018
Copy of advertisement :Copy of Advertisement
Copy of Public Hearing :Copy of Public Hearing
Date :06 Aug 2018
Distance of Public Hearing Venue from the Proposed Project :0
Plant Site
State :Bihar
District :Gopalganj
Tehsil :Baikunthpur
Village :Rajapatti Kothi
119CSR Odour NoiseOthersAdditional District Magistrate
8.
Details of Project Configuration/Product:
Details Not Applicable
9.
In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii):
(a)Details of certified report on compliance of earlier environmental clearance condition
(i)Certified Compliance By Regional
(ii)Details of Regional Office of MoEFCC / Zonal Office of CPCB / SPCB / UTPCC from which certified report on Ranchi
(iii)Letter No. 105-27/07/EPE/1095
(iv)Status of Compliance Compiled
(v)Certified report on compliance of earlier environmental clearance conditions (Including Monitoring Report) Copy of Certified Compliance Report
(vi)Date of site visit Nov 25 2016 12:00AM
(b)Details of Capacity Expansion
S. No.Product/Activity (Capacity/Area)Quantity FromQuantity ToTotal UnitOther UnitMode of Transport / Transmission of ProductOther Mode of Transport / Transmission of Product
(1.)Ethanol45155200Kilo Litre per Day(KLD)Road
(2.)Power145Mega Watt(MW)OthersTransmission lines
(c)Details of Configuration
S. No.Plant / Equipment / Facility Existing ConfigurationProposed ConfigurationFinal configuration after expansionRemarks
(1.)Co-generation Power Plant145MW
(2.)Molasses based Distillery Plant453075KLPD
(3.)Grain Based Distillery Plant0125125KLPD
9.1.
Details of Consent to Operate
(i)Whether Consent to operate obtained ? NA
(ii)Copies of all Consent to operate obtained since inception NA
(iii)Date of Issue 16 Oct 2015
(iv)Valid Upto 30 Sep 2018
(v)File No. PT-461/12/T10636 PT2-71/12/T10637
(vi)Application No. PT-461/12/T10636 PT2-71/12/T10637
(vii)Copy of Consent to operate valid as on date Copy of Consent to Operate
10.
Project Cost:
(a)Total Cost of the Project at current price level (in Crores) 125
(b) Funds Allocated for Environment Management (Capital) (in Crores) 25
(c) Funds Allocated Towards CER (Corporate Environment Responsibility) (in Crores) 0.94
(d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in Crores) 2
11.
Whether project attracts the General Condition specified in the Schedule of EIA Notification ? No
12.
Whether project attract the Specific Condition specified in the Schedule of EIA Notification ? No
13.
Raw Material / Fuel Requirement:
(a)Proposed quantity of raw material/fuel 155050
(b)Existing quantity of raw material/fuel 70000
(c)Total quantity of raw material/fuel 225050
    13.1.        Raw Material / Fuel Profile
S. No.Raw Material / Fuel QuantityUnitOther UnitSource (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received )Mode of TransportOther Mode of TransportDistance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received)Type of Linkage Other Type of Linkage Uploaded Copy of Linkage
(1.)Molasses116550Tons per AnnumNearby Sugar MillsRoad100 OthersExcise and Prohibition DepartmentCopy of Linkage
(2.)Grains – Maize, jowar, broken rice108500Tons per AnnumNearby Area & StatesRoad500 MoUCopy of Linkage
14.
Baseline Data :
(a)Period of Base Line Data Collection FROM 01 Mar 2016 To 31 May 2016
(b)Season Summer
    14.1.     No. of ambient Air Quality (AAQ) monitoring locations : 8
S. No.Criteria Pollutants Other Criteria PollutantsUnitMaximum ValueMinimum Value98 Percentile ValuePrescribed Standard
(1.)PM10Micro Gram per Meter Cube86.758.185.89100
(2.)PM2.5Micro Gram per Meter Cube41.224.540.960
(3.)SO2Micro Gram per Meter Cube12.55.112.2380
(4.)NOxMicro Gram per Meter Cube22.513.722.2980
    14.2.     No. of Ground Water monitoring locations : 8
S. No.Criteria Pollutants Other Criteria PollutantsHeavy MetalUnitOther UnitMaximum ValueMinimum ValueDesirable LimitMaximum Permissible Limit
(1.)pHNA8.027.266.58.5
(2.)Total Hardnessmg/l473.28210.08200600
(3.)Chloridesmg/l101.7613.702501000
(4.)TSSmg/l0000
(5.)Fluoridemg/l0.720.371.01.5
(6.)TDSmg/l5802905002000
    14.3.     No. of Surface Water monitoring locations : 1
S. No.Criteria Pollutants Other Criteria PollutantsUnitOther UnitMaximum ValueMinimum ValueClassification of inland water body
(1.)pHNA7.047.04A
(2.)BODmg/l9.109.10E
(3.)DOmg/l5.65.6A
(4.)CODmg/l3636E
    14.4.     No. of Ambient Noise monitoring locations : 8
S. No.Parameter UnitMaximum ValueMinimum ValuePrescribed Standard
(1.)Leq(Day)A-weighted decibels(dB(A))60.152.475
(2.)Leq(Night)A-weighted decibels(dB(A))54.641.870
    14.5.     No. of Soil Sample Monitored locations : 8
S. No.Parameter UnitOther UnitMaximum ValueMinimum Value
(1.)pHOthersNA7.737.36
(2.)N(Nitrogen)Kilogram per hectare320.10280.10
(3.)P(Phosphorus)Kilogram per hectare18.4012.42
(4.)K(Potassium)Kilogram per hectare505.74238.74
(5.)Electric ConductivityMillisiemens per Centimetre0.320.19
14.6.
Details of Ground Water Table:
(a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) From 3.10 To 7.15
(b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) From 1.85 To 4.20
(c)Whether Ground Water Intersection will be there ? NA
     15.      Details of Water Requirement (During Operation)
S. No.Source Source Other Required Quantity (Kilolitre per Day (Kld))Distance from SourceCopy of Permission from Competent Authority Mode of TransportOther Mode of TransportMethod of Water WithdrawalOther Method of Water WithdrawalLetter No.Date of IssuePermitted Quantity
(1.)GroundWater17000Copy of Permission LetterPipelineTube Well21-4(89)/MER/CGWA/2011-110231 May 20181800
15.1.
(a)Whether Desalination is proposed No
    16.       Waste Water Management(During Operation)
S. No.Type/Source Quantity of Waste Water Generated (Kilolitre per Day)Treatment Capacity (Kilolitre per Day) Treatment MethodMode of DisposalOther Mode of DisposalQuantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day)Quantity of Discharged Water (Kilolitre per Day)
(1.)Grain based operation646800CPU with 2 stage RO System and MEE PlantReuse within the Plant & Recycling646
(2.)Molasses based operation688950CPU with two stage RO System and MEE PlantReuse within the Plant & Recycling688
16.1.
(a)Total Waste Water Generation (Kilolitre per Day) 1334
(b)Total Discharged Water (Kilolitre per Day) 0
(c)Total Reused Water (Kilolitre per Day) 1334
    17.       Solid Waste Generation/Management
S. No.Name of Waste Item Other ItemQuantity per AnnumUnitDistance from Site(KM)Mode of TransportOther Mode of TransportMode of DisposalOther Mode of Disposal
(1.)ETP SludgeIndustrial Waste100Tons100RoadOthersDrying and given to farmers
(2.)DDGSOthersDDGS22050Tons600RoadOthersSold to Vendors
(3.)AshFly Ash19250Tons100RoadOthersGiven to brick manufacturers
18.
    18.1.     Air Quality Impact Prediction
S. No.Criteria Pollutants Other Criteria PollutantsUnitBaseline ConcentrationDistance GLCIncremental ConcentrationTotal GLCPrescribed Standard
(1.)PM10Microgram per Meter Cube86.70.70.1186.81100
(2.)SO2Microgram per Meter Cube12.50.74.0516.5580
(3.)NOxMicrogram per Meter Cube22.50.71.6124.1180
(4.)PM2.5Microgram per Meter Cube41.20041.260
    18.2.     Stack Details
S. No.Source FuelStack Height(m)Stack Diameter(m)PollutantsOther PollutantsEmission (GLS)
(1.)Existing BoilerCon. Spent wash with Biomass/Coal452.0PM1050
(2.)Proposed BoilerBiomass/ Coal511.6PM1050
19.
Power Requirement:
(a)Quantity (Kilo Volt Amps (kVA)) 4000
(b)Source 5 MW Co-generation Power Plant
(c)Uploaded Copy of Agreement Copy of Agreement
(d)Standby Arrangement (Details of DG Sets) 750 KVA 62 KVA 380 KVA 1000 KVA
(e)Stack Height (in m) 15
20.
Land Ownership Pattern:
(a)Forest Land (ha.) 0
(b)Private Land (ha.) 0
(c)Government Land (ha.) 0
(d)Revenue Land (ha.) 0
(e)Other Land (ha.) 12.27
    Total Land (ha.) 12.27
21.
Present Land Use Breakup of the Study Area in Ha:
(a)Agriculture Area (ha.) 0
(b)Waste/Barren Land (ha.) 0
(c)Grazing/ Community Land (ha.) 0
(d)Surface Water Bodies (ha.) 0
(e)Settlements (ha.) 0
(f)Industrial (ha.) 12.27
(g)Forest (ha.) 0
(h)Mangroves (ha.) 0
(i)Marine Area (ha.) 0
(j)Others (ha.) : NA 0
    Total (ha.) 12.27
    22.     Land requirement for various activities
S. No.Description of Activity / Facility / Plant / Others OthersLand Requirement (ha.)Remarks
(1.)Main Plant12.27Existing distillery is constructed in only 8.1 ha
Total (ha.) 12.27
23.
Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Sanctuaries; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones :
    23.1.     Details of Ecological Sensitivity :
S. No.Details of Ecological Sensitivity NameDistance from the Project (Km)Remarks
(1.)Critically Polluted AreaNot Applicable0No CPA within 10 km radius
(2.)NPANot Applicable0No NPA within 10 km radius
(3.)Wildlife CorridorsNot Applicable0No Wildlife Corridors within 10 km radius
(4.)ESAsNot Applicable0No ESAs within 10 km radius
(5.)WLSNot Applicable0No WLS within 10 km radius
(6.)ESZsNot Applicable0No ESZs within 10 km radius
(7.)CorridorsNot Applicable0No Corridors within 10 km radius
    23.2.     Details of Environmental Sensitivity :
S. No.Details of Environmental Sensitivity Other Details of Environmental Sensitivity NameDistance from the Project (Km)Remarks
(1.)ForestNot Applicable0No Forest within 10 km radius
(2.)Archaeological SitesNot Applicable0No Archaeological sites within 10 km radius
(3.)Defence InstallationsNot Applicable0No Defence installation within 10 km radius
23.3.
(a)Whether Noc / Permission from the competent authority is required? No
(b)Whether NBWL recommendation is required? No
24.
Forest Land:
Whether any Forest Land involved? No
25.
Tree Cutting:
(a)No. of Trees Cut for the Project (if Forest Land not Involved) 0
(b)Details of Tree Cutting and Planting of Trees Not Applicable
26.
Land Acquisition Status:
(a)Acquired Land(Ha) 12.27
(b)Land yet to be acquired(Ha) 12.27
(c)Status of Land acquisition if not acquired Already Acquired
27.
Rehabilitation and Resettlement (R&R):
(a)No. of Villages 0
(b)No. of Households 0
(c)No. of PDFs (Project Displaced Families) 0
(d)No. of PAFs (Project Affected Families) 0
(e)Funds Allocated for R&R(in INR) (in Lacs) 0
(f)Status of R&R Completed
28.
Details of Presence of Schedule-I Species:
(a)Whether there is Presence of Schedule-I Species ? No
(b)Whether conservation plan for Schedule-I Species has been prepared ? No
(c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? No
29.
Details of Presence of Water Bodies in Core Area:
(a)Whether there is Presence of Water Bodies in Core Area ? No
(b)Whether there is Diversion Required ? No
(c)Whether permission has been obtained from competent authority ? No
30.
Details of Presence of Water Bodies in Buffer Area:
(a)Whether there is Presence of Water Bodies in Buffer Area ? Yes
(i)Details of Water Bodies in Buffer Area Gandak River
(ii)Direction of Water Bodies in Buffer Area North East
(iii)Distance of Water Bodies in Buffer Area 5
31.
Manpower Requirement:
(a)Permanent Employment-During Construction 0
(b)Permanent Employment-During Operation 60
(c)Temporary Employment- During Construction 0
(d)Temporary Employment- During Operation 40
(e)No. of working days 350
(f)Total Manpower 100
32.
Green Belt in Ha:
(a)Uploaded Green Belt plan Copy of Green Belt Plan
S. No.Description ExistingProposedTotal
(1.)Total Area of Green Belt2.00.72
(2.)Percentage of Total Project Area33033
(3.)No. of Plants405030007050
(4.)Funds Allocated405000300000705000
    33.       Project Benefits
S. No. Type of Project BenefitsDetails of Project Benefits
NIL
   34.   CRZ Specific Details : Not Applicable
   35.   Sector Specific Details : NOT APPLICABLE
   35.   Sector Specific Details For Industrial Projects - 2
S. No.Item Details
S. No.Item Details
36.
Details of Court Cases:
(a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? No
37.
Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act:
(a)Whether any Direction issued under EPA Act/Air Act/Water Act ? No
38.
Details of EIA Consultant:
(a)Have you hired Consultant for preparing document? Yes
(i)Accreditation No. NABET/EIA/1619/RA0069
(ii)Name of the EIA Consultant JM EnviroNet Pvt. Ltd.
(iii)Address 202 A, ABW Tower, MG Road, Gurgaon Haryana
(iv)Mobile No. 9910494521
(v)Landline No. 9015209362
(vi)Email Id jmenviron@hotmail.com
(vii)Category of Accreditation A
(viii)Sector of Accreditation Industrial Projects - 2
(ix)Validity of Accreditation 18 May 2019
(x)Uploaded Certificate of Accreditation certified by QCI/NABET Copy of Certificate of Accreditation
39.
Documents to be Attached:
(a)Uploaded Copy of EIA/EMP Report Copy of EIA/EMP
Copy of EIA/EMP(Annexures)
Copy of EIA/EMP(Plans/Figures)
(b)Uploaded Copy of Risk Assessment Report Copy of Risk Assessment
(c)Uploaded Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan
(d)Uploaded Copy of Final Layout Plan Copy of Final Layout Plan
(e)Uploaded Cover Letter Copy of Cover Letter
(f)Uploaded Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency
(g)Uploaded Additional File Copy of Additional File
(h)Uploaded Proposal Presentation (To be given in EAC meeting) NA
            Essential Detail Sought:
Sno. EDS Letter Remarks Date of EDS
1.NA- Please inform about total fresh water requirement after the proposed expansion (75 KLD molasses based & 125 KLD grain based), and the status of clearances required/obtained for the same. - Please clarify whether the production never exceeded the approved capacity of 45 KLD at any point of time, along with supporting documents. - Inspection done by CPCB, if any, to monitor compliance of their directions issued from time to time including that for installation of continuous online monitoring systems (for air pollutants and the effluent). 02 Oct 2018
2.NAThe correction have been made as per the instruction received 08 Oct 2018
      Additional Detail Sought : NIL
Undertaking
I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief. And I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity/ construction/ expansion has since been taken up.
Name of ApplicantRamashankar Prasad
DesignationDirector
Name of Company (Applicant Name should not be given here)SONA SATI ORGANICS PRIVATE LIMITED
AddressVillage Rajapatti Kothi, P.O. Rajapatti, Tehsil Baikanthpur, District Gopalganj, Bihar
Print