Form-2
APPLICATION FOR PRIOR ENVIRONMENTAL CLEARANCE
S. No.Item Details
1.
Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? No
Details of Project:
(a)Name of the project(s) Proposed augmentation in LPG Bulk Storage capacity at LPG Bottling Plant at Village Raipur Sahoran, Mehatpur, Una, Himachal Pradesh by M/s Indian Oil Corporation Ltd.
(b)Name of the Company / Organisation INDIAN OIL CORPORATION LIMITED
(c)Registered Address Indian Oil Bhawan SCO 3A, MADHYA MARG sector 19 A lis ,Chandigarh,Chandigarh,Chandigarh-160019
(d)Legal Status of the Company Central PSU
(e)Joint Venture No
2.
Address for the correspondence:
(a)Name of the Applicant Jyotiprakash Chakraborti
(b)Designation (Owner/ Partner/ CEO) Sr Manager LPG Engg PSO
(c)Address Indian Oil Bhawan, sector 19 A SCO 3A, Madhya MARG,,Chandigarh,Chandigarh,Chandigarh-160019
(d)Pin code 160019
(e)E-mail jyotipchakraborty@indianoil.in
(f)STD Code. 172(f)Telephone No. 2775510
(g)Fax No.
(h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . Annexure-Uploaded Copy of documents in support of the competence/authority
3.
Category of the Project/Activity as per Schedule of EIA Notification,2006:
(a.I)Project/Activity6(b)Isolated storage & handling of hazardous chemicals (As per threshold planning
Minor Activity6(b)Isolated storage & handling of hazardous chemicals (As per threshold planning
(b)Category A
(c)Proposal Number IA/HP/IND2/80411/2017
(d)Master Proposal Number(Single Window) SW/79207/2018
(e)EAC concerned (for category A Projects only) Industrial Projects - 2
(f)Project Type Expansion
4.
Location of the Project:
(a)Plot/Survey/Khasra No. 2009,2690/2010,2681/2010,2011 to 2023, 2025, 2025/
(b)Pincode 174301
(c)Bounded Latitudes (North)
From
Degree 31.393250
Minutes
Second
From
Degree 31.397069
Minutes
Second
(d)Bounded Longitudes (East)
From
Degree 76.326561
Minutes
Second
From
Degree 76.328394
Minutes
Second
(e)Survey of India Topo Sheet No. 53 A/3 & 53 A/7
(f)Uploaded Topo Sheet File Copy of Topo Sheet File
(g)Maximum Elevation Above Means Sea Level(AMSL) 1220
(h)Uploaded (kml) File Copy of Kml File      
(i)Distance of Nearest HFL from the project boundary within the study area 3.5
(j)Seismic Zone 4
5.
(a)Number of States in which Project will be Executed 1
(b)Main State of the project Himachal Pradesh
Details of State of the project
S. No. State Name District Name Tehsil Name Village Name
NIL
6.
Details of Terms of Reference (ToR)/EC:
(a)MoEF&CC / SEIAA File Number IA-J11011/ 80/2017-IA-II(I)
(c)Date of Issue of TOR 31 May 2017
(f)Previous TOR Letter Copy of Previous TOR letter
(b)Date of Apply of EC 06 Dec 2018
(c)Date of Issue of EC 17 May 2019
(d)Previous EC Letter Copy of Previous EC letter
7.
Details of Public Consultation:
(a)Whether the Project Exempted from Public Hearing?No
(b)Whether details of Public Hearing available? Yes
(c)Whether Public hearing was presided over by an officer of the rank of Additional District Magistrate or above Yes
     7.1.       Details of Public Hearing
S. No.Details of Advertisement Details of Public Hearing Venue Location DetailsNo. of People AttendedIssues RaisedDesignation of Presiding OfficerOther Designation of Presiding Officer
(1.)
Date of Advertisement :28 Dec 2017
Copy of advertisement :Copy of Advertisement
Copy of Public Hearing :Copy of Public Hearing
Date :30 Jan 2018
Distance of Public Hearing Venue from the Proposed Project :0.7
nearby vacant land in Village Raipur Sahoran
State :Himachal Pradesh
District :Una
Tehsil :Una(T)
Village :Raipur Sahoran
90Provision of road between project boundary and railway track, Tree plantation and other miscellaneous issuesDistrict Magistrate
8.
Details of Project Configuration/Product:
Details Not Applicable
9.
In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii):
(a)Details of certified report on compliance of earlier environmental clearance condition
(i)Certified Compliance By SPCB
(ii)Details of Regional Office of MoEFCC / Zonal Office of CPCB / SPCB / UTPCC from which certified report on
(iii)Letter No. NA
(iv)Status of Compliance Compiled
(v)Certified report on compliance of earlier environmental clearance conditions (Including Monitoring Report) Copy of Certified Compliance Report
(vi)Date of site visit Dec 26 2016 12:00AM
(b)Details of Capacity Expansion
S. No.Product/Activity (Capacity/Area)Quantity FromQuantity ToTotal UnitOther UnitMode of Transport / Transmission of ProductOther Mode of Transport / Transmission of Product
(1.)Storage of LPG90012002100OthersMTRoad
(c)Details of Configuration
S. No.Plant / Equipment / Facility Existing ConfigurationProposed ConfigurationFinal configuration after expansionRemarks
(1.)Mounded Bullets3 nos x 300 MT = 900 MT2 nos x 600 MT = 1200 MT5 No Mounded Bullet total storage capacity 2100 MT
9.1.
Details of Consent to Operate
(i)Whether Consent to operate obtained ? NA
(ii)Copies of all Consent to operate obtained since inception NA
(iii)Date of Issue 25 Nov 2003
(iv)Valid Upto 31 Mar 2018
(v)File No. HPSPCB/PCB-ID10018
(vi)Application No. HPSPCB/PCB-ID10018
(vii)Copy of Consent to operate valid as on date Copy of Consent to Operate
10.
Project Cost:
(a)Total Cost of the Project at current price level (in Crores) 21.70
(b) Funds Allocated for Environment Management (Capital) (in Crores) 3
(c) Funds Allocated Towards CER (Corporate Environment Responsibility) (in Crores) 0.71
(d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in Crores) 0.005
11.
Whether project attracts the General Condition specified in the Schedule of EIA Notification ? Yes
d)Inter-State boundaries and international boundaries Yes
12.
Whether project attract the Specific Condition specified in the Schedule of EIA Notification ? No
13.
Raw Material / Fuel Requirement:
(a)Proposed quantity of raw material/fuel 0
(b)Existing quantity of raw material/fuel 0
(c)Total quantity of raw material/fuel 0
    13.1.        Raw Material / Fuel Profile
S. No.Raw Material / Fuel QuantityUnitOther UnitSource (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received )Mode of TransportOther Mode of TransportDistance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received)Type of Linkage Other Type of Linkage Uploaded Copy of Linkage
(1.)No raw material is required0OthersMTNAOthersNA0 OthersNACopy of Linkage
14.
Baseline Data :
(a)Period of Base Line Data Collection FROM 02 Jan 2017 To 28 Mar 2017
(b)Season Winter
    14.1.     No. of ambient Air Quality (AAQ) monitoring locations : 10
S. No.Criteria Pollutants Other Criteria PollutantsUnitMaximum ValueMinimum Value98 Percentile ValuePrescribed Standard
(1.)PM2.5Micro Gram per Meter Cube48184660
(2.)NOxMicro Gram per Meter Cube1049.580
(3.)PM10Micro Gram per Meter Cube967294.9100
(4.)SO2Micro Gram per Meter Cube827.980
    14.2.     No. of Ground Water monitoring locations : 6
S. No.Criteria Pollutants Other Criteria PollutantsHeavy MetalUnitOther UnitMaximum ValueMinimum ValueDesirable LimitMaximum Permissible Limit
(1.)TDSmg/l3201505002000
(2.)Total Hardnessmg/l26090200600
(3.)Chloridesmg/l2872501000
(4.)Fluoridemg/l0.50.311.5
(5.)Heavy MetalsCadmium as Cdmg/l000.0030.003
(6.)pHNA7.67.26.58.5
(7.)TSSmg/l21100100
(8.)OthersZinc as Znmg/l2.41.6515
    14.3.     No. of Surface Water monitoring locations : 2
S. No.Criteria Pollutants Other Criteria PollutantsUnitOther UnitMaximum ValueMinimum ValueClassification of inland water body
(1.)pHNA7.27.1C
(2.)DOmg/l54.2C
(3.)CODmg/l20.111C
(4.)BODmg/l2.42C
    14.4.     No. of Ambient Noise monitoring locations : 10
S. No.Parameter UnitMaximum ValueMinimum ValuePrescribed Standard
(1.)Leq(Day)A-weighted decibels(dB(A))645355
(2.)Leq(Night)A-weighted decibels(dB(A))524445
    14.5.     No. of Soil Sample Monitored locations : 6
S. No.Parameter UnitOther UnitMaximum ValueMinimum Value
(1.)pHOthersNA8.27.1
(2.)N(Nitrogen)Kilogram per hectare11885
(3.)Electric ConductivityOthersMicromhos/cm420370
(4.)P(Phosphorus)Kilogram per hectare1.160.18
(5.)K(Potassium)Kilogram per hectare184132
14.6.
Details of Ground Water Table:
(a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) From 10 To 5
(b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) From 3 To 9
(c)Whether Ground Water Intersection will be there ? Yes
(d)Upload Copy of Central Ground Water Authority Letter Copy of Central Ground Water Authority Letter
(e)Letter No. UBP/GWA/TW-Reg
(f)Date of Issue 29 Mar 2017
     15.      Details of Water Requirement (During Operation)
S. No.Source Source Other Required Quantity (Kilolitre per Day (Kld))Distance from SourceCopy of Permission from Competent Authority Mode of TransportOther Mode of TransportMethod of Water WithdrawalOther Method of Water WithdrawalLetter No.Date of IssuePermitted Quantity
(1.)GroundWater150Copy of Permission LettermodeOthersNATube WellUBP/GWA/TW-Reg29 Mar 201720
15.1.
(a)Whether Desalination is proposed No
    16.       Waste Water Management(During Operation)
S. No.Type/Source Quantity of Waste Water Generated (Kilolitre per Day)Treatment Capacity (Kilolitre per Day) Treatment MethodMode of DisposalOther Mode of DisposalQuantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day)Quantity of Discharged Water (Kilolitre per Day)
(1.)Domestic4.510STPReuse within the Plant & Recycling,Green Belt Renewal Plant,OthersLoss40.5
(2.)Cylinder Washing33ETPReuse within the Plant & Recycling3
16.1.
(a)Total Waste Water Generation (Kilolitre per Day) 7.5
(b)Total Discharged Water (Kilolitre per Day) 0.5
(c)Total Reused Water (Kilolitre per Day) 7
    17.       Solid Waste Generation/Management
S. No.Name of Waste Item Other ItemQuantity per AnnumUnitDistance from Site(KM)Mode of TransportOther Mode of TransportMode of DisposalOther Mode of Disposal
(1.)Dry GarbageMunicipal Solid Waste1.5Tons0Others--Authorized Recyclers
(2.)Wet GarbageMunicipal Solid Waste0.8Tons0Others--OthersVermi composting and manure for gardening
18.
    18.1.     Air Quality Impact Prediction
S. No.Criteria Pollutants Other Criteria PollutantsUnitBaseline ConcentrationDistance GLCIncremental ConcentrationTotal GLCPrescribed Standard
(1.)SO2Microgram per Meter Cube00000
(2.)NOxMicrogram per Meter Cube00000
(3.)PM10Microgram per Meter Cube00000
(4.)PM2.5Microgram per Meter Cube00000
    18.2.     Stack Details
S. No.Source FuelStack Height(m)Stack Diameter(m)PollutantsOther PollutantsEmission (GLS)
(1.)NANA00PM100
19.
Power Requirement:
(a)Quantity (Kilo Volt Amps (kVA)) 450
(b)Source Himachal Pradesh State Electricity Board
(c)Uploaded Copy of Agreement Copy of Agreement
(d)Standby Arrangement (Details of DG Sets) 1x250 kVA, 1x400 kVA and 1x500 kVA
(e)Stack Height (in m) 4.5
20.
Land Ownership Pattern:
(a)Forest Land (ha.) 0
(b)Private Land (ha.) 0
(c)Government Land (ha.) 0
(d)Revenue Land (ha.) 0
(e)Other Land (ha.) 13.18
    Total Land (ha.) 13.18
21.
Present Land Use Breakup of the Study Area in Ha:
(a)Agriculture Area (ha.) 6236.78
(b)Waste/Barren Land (ha.) 5821.13
(c)Grazing/ Community Land (ha.) 0
(d)Surface Water Bodies (ha.) 589.06
(e)Settlements (ha.) 5451.80
(f)Industrial (ha.) 0
(g)Forest (ha.) 6805.22
(h)Mangroves (ha.) 0
(i)Marine Area (ha.) 0
(j)Others (ha.) : Open scrub and rockey region 6491.26
    Total (ha.) 31395.25
    22.     Land requirement for various activities
S. No.Description of Activity / Facility / Plant / Others OthersLand Requirement (ha.)Remarks
(1.)Green belt4.35
(2.)Main Plant0.75Plant Area, Office Area and all covered area
(3.)OthersMiscellaneous8.08
Total (ha.) 13.18
23.
Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Sanctuaries; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones :
    23.1.     Details of Ecological Sensitivity :
S. No.Details of Ecological Sensitivity NameDistance from the Project (Km)Remarks
(1.)Critically Polluted AreaNone Within 10 Km0--
(2.)WLSNone Within 10 Km0--
(3.)ESZsNone Within 10 Km0--
(4.)ESAsNone Within 10 Km0--
(5.)NPANone Within 10 Km0--
(6.)CorridorsNone Within 10 Km0--
(7.)Wildlife CorridorsNone Within 10 Km0--
    23.2.     Details of Environmental Sensitivity :
S. No.Details of Environmental Sensitivity Other Details of Environmental Sensitivity NameDistance from the Project (Km)Remarks
(1.)Archaeological SitesNone Within 10Km0--
(2.)ForestNone Within 10Km0--
(3.)Defence InstallationsNone Within 10Km0--
23.3.
(a)Whether Noc / Permission from the competent authority is required? No
(b)Whether NBWL recommendation is required? No
24.
Forest Land:
Whether any Forest Land involved? No
25.
Tree Cutting:
(a)No. of Trees Cut for the Project (if Forest Land not Involved) 0
(b)Details of Tree Cutting and Planting of Trees Not Applicable
26.
Land Acquisition Status:
(a)Acquired Land(Ha) 13.18
(b)Land yet to be acquired(Ha) 0
(c)Status of Land acquisition if not acquired NA
27.
Rehabilitation and Resettlement (R&R):
(a)No. of Villages 0
(b)No. of Households 0
(c)No. of PDFs (Project Displaced Families) 0
(d)No. of PAFs (Project Affected Families) 0
(e)Funds Allocated for R&R(in INR) (in Lacs) 0
(f)Status of R&R Completed
28.
Details of Presence of Schedule-I Species:
(a)Whether there is Presence of Schedule-I Species ? No
(b)Whether conservation plan for Schedule-I Species has been prepared ? No
(c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? No
29.
Details of Presence of Water Bodies in Core Area:
(a)Whether there is Presence of Water Bodies in Core Area ? No
(b)Whether there is Diversion Required ? No
(c)Whether permission has been obtained from competent authority ? No
30.
Details of Presence of Water Bodies in Buffer Area:
(a)Whether there is Presence of Water Bodies in Buffer Area ? Yes
(i)Details of Water Bodies in Buffer Area Satluj River
(ii)Direction of Water Bodies in Buffer Area East
(iii)Distance of Water Bodies in Buffer Area 3.5
31.
Manpower Requirement:
(a)Permanent Employment-During Construction 0
(b)Permanent Employment-During Operation 43
(c)Temporary Employment- During Construction 0
(d)Temporary Employment- During Operation 41
(e)No. of working days 300
(f)Total Manpower 84
32.
Green Belt in Ha:
(a)Uploaded Green Belt plan Copy of Green Belt Plan
S. No.Description ExistingProposedTotal
(1.)Total Area of Green Belt4.3504
(2.)Percentage of Total Project Area33.02033
(3.)No. of Plants480004800
(4.)Funds Allocated3000000300000
    33.         Project Benefits
S. No.Type of Project Benefits Details of Project Benefits
(1.)SocialSecondary Employment, Easy availability of LPG
   34.   CRZ Specific Details : Not Applicable
   35.   Sector Specific Details : NOT APPLICABLE
   35.   Sector Specific Details For Industrial Projects - 2
S. No.Item Details
S. No.Item Details
36.
Details of Court Cases:
(a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? No
37.
Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act:
(a)Whether any Direction issued under EPA Act/Air Act/Water Act ? No
38.
Details of EIA Consultant:
(a)Have you hired Consultant for preparing document? Yes
(i)Accreditation No. NABET/EIA/1720/RA 0094
(ii)Name of the EIA Consultant ULTRA TECH
(iii)Address Unit No. 224,225, Jai Commercial Complex, 463, Eastern Express Highway, Opp. Cadbury Factory, Khopat, Thane (W) - 400 601., Maharashtra, India
(iv)Mobile No. 9674488198
(v)Landline No. 0222534277
(vi)Email Id debasish@ultratech.in, kolkata@ultratech.in, sales@ultratech.in
(vii)Category of Accreditation B
(viii)Sector of Accreditation Industrial Projects - 2
(ix)Validity of Accreditation 10 Mar 2020
(x)Uploaded Certificate of Accreditation certified by QCI/NABET Copy of Certificate of Accreditation
39.
Documents to be Attached:
(a)Uploaded Copy of EIA/EMP Report Copy of EIA/EMP
Copy of EIA/EMP(Annexures)
Copy of EIA/EMP(Plans/Figures)
(b)Uploaded Copy of Risk Assessment Report Copy of Risk Assessment
(c)Uploaded Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan
(d)Uploaded Copy of Final Layout Plan Copy of Final Layout Plan
(e)Uploaded Cover Letter Copy of Cover Letter
(f)Uploaded Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency
(g)Uploaded Additional File Copy of Additional File
(h)Uploaded Proposal Presentation (To be given in EAC meeting) NA
            Essential Detail Sought:
Sno. EDS Letter Remarks Date of EDS
1.NA- Please inform/clarify the present LPG storage capacity (3x300 MT) permitted by SPCB while granting consent to establish on 5/8/2003 and consent to operate on 25/11/2003 along with the supporting documents. - As per condition No.3 of the CTO dated 25/11/2003, project site was to be notified for the designated use. Please inform the status of compliance. 06 Oct 2018
2.NAThe correction have been made as per the instruction received 20 Oct 2018
3.NAPlease submit the desired clarification regarding present storage capacity of 3x300 MT from the SPCB. CTE/CTO needs to be corrected accordingly. 28 Oct 2018
4.NAThe correction have been made as per the instruction received 06 Dec 2018
      Additional Detail Sought : NIL
Undertaking
I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief. And I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity/ construction/ expansion has since been taken up.
Name of ApplicantJyotiprakash Chakraborti
DesignationSr Manager LPG Engg PSO
Name of Company (Applicant Name should not be given here)INDIAN OIL CORPORATION LIMITED
AddressIndian Oil Bhawan SCO 3A, MADHYA MARG sector 19 A