1. | Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? | No | Details of Project: | (a)Name of the project(s) | Expansion of Manufacturing Capacity of existing products and manufacturing of new pesticides, intermediate chemicals, proposed by M/s. UPL Limited Unit #1 | (b)Name of the Company / Organisation | UPL UNIT ONE ANKLESHWAR | (c)Registered Address | Plot No. 117/118, Notified Industrial Estate, GIDC, Ankleshwar, District-Bharuch, Gujarat .,,Bharuch,Gujarat-393002 | (d)Legal Status of the Company | Private | (e)Joint Venture | No | |
|
2. | Address for the correspondence: | (a)Name of the Applicant | Mritunjay Chaubey | (b)Designation (Owner/ Partner/ CEO) | GlobalVP | (c)Address | UPL Ltd, UPL House, 610/2 Bandra Village, off. Western Express Highway, Bandra East, Mumabai-400051,,Mumbai,Mumbai City,Maharashtra-400051 | (d)Pin code | 400051 | (e)E-mail | uplunit01.ank@gmail.com | (f)STD Code. | 2646(f)Telephone No. | 71528840 | (g)Fax No. | | (h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . | Annexure-Uploaded Copy of documents in support of the competence/authority | |
|
3. | Category of the Project/Activity as per Schedule of EIA Notification,2006: | (a.I)Project/Activity | 5(b) Pesticides industry and pesticide specific intermediates (excluding formulations)
| Minor Activity | | (b)Category | A | (c)Proposal Number | IA/GJ/IND2/80387/2017 | (d)Master Proposal Number(Single Window) | SW/80382/2018 | (e)EAC concerned (for category A Projects only) | Industrial Projects - 2 | (f)Project Type | Expansion |
|
|
4. | Location of the Project: | (a)Plot/Survey/Khasra No. | 117/118 | (b)Pincode | 393002 | (c)Bounded Latitudes (North) | | From | | Degree | 213741.63 | Minutes | | Second | | From | | Degree | 213756.48 | Minutes | | Second | | (d)Bounded Longitudes (East) | | From | | Degree | 730048.57 | Minutes | | Second | | From | | Degree | 730106.20 | Minutes | | Second | | (e)Survey of India Topo Sheet No. | 46C14, 46G2 | (f)Uploaded Topo Sheet File | Copy of Topo Sheet File | (g)Maximum Elevation Above Means Sea Level(AMSL) | 25 | (h)Uploaded (kml) File | Copy of Kml File | (i)Distance of Nearest HFL from the project boundary within the study area | 10 | (j)Seismic Zone | 3 | |
|
5. | (a)Number of States in which Project will be Executed | 1 | (b)Main State of the project | Gujarat | |
|
|
Details of State of the project |
---|
S. No. | State Name | District Name | Tehsil Name | Village Name |
---|
NIL | |
|
6. | Details of Terms of Reference (ToR)/EC: | (a)MoEF&CC / SEIAA File Number | J-11011/582/2017-IA-II(I) | (c)Date of Issue of TOR | 10 Feb 2018 | (f)Previous TOR Letter | Copy of Previous TOR letter | (b)Date of Apply of EC | 18 Dec 2018 | (c)Date of Issue of EC | 29 Nov 2019 | (d)Previous EC Letter | Copy of Previous EC letter | |
|
7. | Details of Public Consultation: | (a)Whether the Project Exempted from Public Hearing? | Yes | (b)Reason | Project falls in Notified Industrial Area of Ankle | (c)Supporting Document | Copy of Supporting Document | |
|
8. | Details of Project Configuration/Product: | Details Not Applicable | |
|
9. | In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii): | (a)Details of certified report on compliance of earlier environmental clearance condition | (i)Certified Compliance By | Regional | (ii)Details of Regional Office of MoEFCC / Zonal Office of CPCB / SPCB / UTPCC from which certified report on | Bhopal | (iii)Letter No. | September 19 2018 | (iv)Status of Compliance | Compiled | (v)Certified report on compliance of earlier environmental clearance conditions (Including Monitoring Report) | Copy of Certified Compliance Report | (vi)Date of site visit | Jul 18 2018 12:00AM | (b)Details of Capacity Expansion | |
|
S. No. | Product/Activity (Capacity/Area) | Quantity From | Quantity To | Total | Unit | Other Unit | Mode of Transport / Transmission of Product | Other Mode of Transport / Transmission of Product |
---|
(1.) | Intermediates products | 1120 | 980 | 2100 | Others | TPM | Road | | (2.) | Pesticide technical | 1520 | 3960 | 5480 | Others | TPM | Road | | |
| (c)Details of Configuration | |
|
S. No. | Plant / Equipment / Facility | Existing Configuration | Proposed Configuration | Final configuration after expansion | Remarks |
---|
(1.) | Pesticide and intermediate production | 2640 | 4940 | 7580 | Only those product included which required environment clearance | |
9.1. | Details of Consent to Operate | (i)Whether Consent to operate obtained ? | NA | (ii)Copies of all Consent to operate obtained since inception | NA | (iii)Date of Issue | 26 Sep 2017 | (iv)Valid Upto | 12 May 2018 | (v)File No. | GPCB/ANK/CCA-158(6)/ID-15833 | (vi)Application No. | H-88493 | (vii)Copy of Consent to operate valid as on date | Copy of Consent to Operate | |
|
|
10. | Project Cost: | (a)Total Cost of the Project at current price level (in Crores) | 353.43 | (b) Funds Allocated for Environment Management (Capital) (in Crores) | 23.76 | (c) Funds Allocated Towards CER (Corporate Environment Responsibility) (in Crores) | 7.72 | (d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in Crores) | 15.43 | |
|
11. | Whether project attracts the General Condition specified in the Schedule of EIA Notification ? | No | | |
12. | Whether project attract the Specific Condition specified in the Schedule of EIA Notification ? | No | | |
13. | Raw Material / Fuel Requirement: | (a)Proposed quantity of raw material/fuel | 808 | (b)Existing quantity of raw material/fuel | 432 | (c)Total quantity of raw material/fuel | 1240 | |
|
  13.1. Raw Material / Fuel Profile |
---|
S. No. | Raw Material / Fuel | Quantity | Unit | Other Unit | Source (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received ) | Mode of Transport | Other Mode of Transport | Distance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received) | Type of Linkage | Other Type of Linkage | Uploaded Copy of Linkage |
---|
(1.) | Raw material | 52691.31 | Others | MTM | India | Road | | 100 | Open Market | | Copy of Linkage | |
|
14. | Baseline Data : | (a)Period of Base Line Data Collection | FROM 08 Mar 2018 To 07 Jun 2018 | (b)Season | Pre-Monsoon | |
|
14.1. No. of ambient Air Quality (AAQ) monitoring locations : 8 |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Unit | Maximum Value | Minimum Value | 98 Percentile Value | Prescribed Standard |
---|
(1.) | PM2.5 | | Micro Gram per Meter Cube | 53.4 | 31.4 | 52.4 | 60 | (2.) | NOx | | Micro Gram per Meter Cube | 34.8 | 12.1 | 32.7 | 80 | (3.) | PM10 | | Micro Gram per Meter Cube | 88.3 | 54.5 | 87.3 | 100 | (4.) | SO2 | | Micro Gram per Meter Cube | 28.5 | 7.7 | 26.5 | 80 | |
14.2. No. of Ground Water monitoring locations : 7 |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Heavy Metal | Unit | Other Unit | Maximum Value | Minimum Value | Desirable Limit | Maximum Permissible Limit |
---|
(1.) | Total Hardness | | | mg/l | | 555 | 178 | 200 | 600 | (2.) | TSS | | | NA | | 0 | 0 | 0 | 0 | (3.) | Heavy Metals | | Zinc | mg/l | | 1.31 | 0.001 | 5 | 15 | (4.) | Chlorides | | | mg/l | | 618 | 392 | 250 | 1000 | (5.) | pH | | | NA | | 7.79 | 7.43 | 6.5 | 8.5 | (6.) | Fluoride | | | mg/l | | 0.28 | 0.001 | 1.0 | 1.5 | (7.) | TDS | | | mg/l | | 1868 | 1225 | 500 | 2000 | |
14.3. No. of Surface Water monitoring locations : 3 |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Unit | Other Unit | Maximum Value | Minimum Value | Classification of inland water body |
---|
(1.) | BOD | | mg/l | | 3.6 | 2.1 | B | (2.) | COD | | mg/l | | 12.7 | 7.3 | B | (3.) | DO | | mg/l | | 7.6 | 6.6 | B | (4.) | pH | | NA | | 8.43 | 8.21 | B | |
14.4. No. of Ambient Noise monitoring locations : 8 |
---|
S. No. | Parameter | Unit | Maximum Value | Minimum Value | Prescribed Standard |
---|
(1.) | Leq(Night) | A-weighted decibels(dB(A)) | 61.6 | 41.7 | 65 | (2.) | Leq(Day) | A-weighted decibels(dB(A)) | 67.2 | 51.6 | 75 | |
14.5. No. of Soil Sample Monitored locations : 8 |
---|
S. No. | Parameter | Unit | Other Unit | Maximum Value | Minimum Value |
---|
(1.) | pH | Others | NA | 8.04 | 7.54 | (2.) | P(Phosphorus) | Kilogram per hectare | | 44.3 | 27.1 | (3.) | K(Potassium) | Kilogram per hectare | | 428.1 | 327.8 | (4.) | Electric Conductivity | Millisiemens per Centimetre | | 1.92 | 1.17 | (5.) | N(Nitrogen) | Kilogram per hectare | | 286 | 231 | |
|
14.6. | Details of Ground Water Table: | (a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) | From 2 To 5 | (b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) | From 2 To 5 | (c)Whether Ground Water Intersection will be there ? | No | |
|
15. Details of Water Requirement (During Operation) |
---|
S. No. | Source | Source Other | Required Quantity (Kilolitre per Day (Kld)) | Distance from Source | Copy of Permission from Competent Authority | Mode of Transport | Other Mode of Transport | Method of Water Withdrawal | Other Method of Water Withdrawal | Letter No. | Date of Issue | Permitted Quantity |
---|
(1.) | Others | GIDC Ankleshwar | 4757 | 4 | Copy of Permission Letter | Pipeline | | Others | GIDC Supply | 00 | 22 Dec 2017 | 4757 | |
|
15.1. | (a)Whether Desalination is proposed | No | |
|
16. Waste Water Management(During Operation) |
---|
S. No. | Type/Source | Quantity of Waste Water Generated (Kilolitre per Day) | Treatment Capacity (Kilolitre per Day) | Treatment Method | Mode of Disposal | Other Mode of Disposal | Quantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day) | Quantity of Discharged Water (Kilolitre per Day) |
---|
(1.) | Process Water | 1273 | 1400 | ETP | Discharge into Seawater Body,Reuse within the Plant & Recycling,Green Belt Renewal Plant | | 0 | 1273 | |
|
16.1. | (a)Total Waste Water Generation (Kilolitre per Day) | 1273 | (b)Total Discharged Water (Kilolitre per Day) | 1273 | (c)Total Reused Water (Kilolitre per Day) | 0 | |
|
17. Solid Waste Generation/Management |
---|
S. No. | Name of Waste | Item | Other Item | Quantity per Annum | Unit | Distance from Site(KM) | Mode of Transport | Other Mode of Transport | Mode of Disposal | Other Mode of Disposal |
---|
(1.) | Total hazardous Waste | Industrial Waste | | 15920 | Tons | 8 | Road | | Treatment, Storage and Disposal Facility(TSDF) | | |
|
|
18.1. Air Quality Impact Prediction |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Unit | Baseline Concentration | Distance GLC | Incremental Concentration | Total GLC | Prescribed Standard |
---|
(1.) | PM10 | | Microgram per Meter Cube | 88.3 | 0.707 | 2.86 | 91.16 | 100 | (2.) | PM2.5 | | Microgram per Meter Cube | 53.4 | 0.707 | 2.86 | 56.26 | 60 | (3.) | NOx | | Microgram per Meter Cube | 34.8 | 0.707 | 3.65 | 38.45 | 80 | (4.) | SO2 | | Microgram per Meter Cube | 28.5 | 0.707 | 2.49 | 30.99 | 80 | |
|
18.2. Stack Details |
---|
S. No. | Source | Fuel | Stack Height(m) | Stack Diameter(m) | Pollutants | Other Pollutants | Emission (GLS) |
---|
(1.) | 35 TPH Boiler | NG | 30 | 1.35 | PM10 | | 0.053 | (2.) | 35 TPH Boiler | NG | 30 | 1.35 | SO2 | | 0.070 | (3.) | 35 TPH Boiler | NG | 30 | 1.35 | NOx | | 0.126 | (4.) | 30 TPH Boiler | NG | 30 | 0.45 | PM10 | | 0.006 | (5.) | 30 TPH Boiler | NG | 30 | 0.45 | SO2 | | 0.007 | (6.) | 30 TPH | NG | 30 | 0.45 | NOx | | 0.013 | |
|
19. | Power Requirement: | (a)Quantity (Kilo Volt Amps (kVA)) | 32653 | (b)Source | DGVCL | (c)Uploaded Copy of Agreement | Not Applicable | (d)Standby Arrangement (Details of DG Sets) | 3 | (e)Stack Height (in m) | 8 | |
|
20. | Land Ownership Pattern: | (a)Forest Land (ha.) | 0 | (b)Private Land (ha.) | 0 | (c)Government Land (ha.) | 13.6677 | (d)Revenue Land (ha.) | 0 | (e)Other Land (ha.) | 0 | Total Land (ha.) | 13.6677 | |
|
21. | Present Land Use Breakup of the Study Area in Ha: | (a)Agriculture Area (ha.) | 16052 | (b)Waste/Barren Land (ha.) | 2495 | (c)Grazing/ Community Land (ha.) | 3543 | (d)Surface Water Bodies (ha.) | 1552 | (e)Settlements (ha.) | 5242 | (f)Industrial (ha.) | 2530 | (g)Forest (ha.) | 0 | (h)Mangroves (ha.) | 0 | (i)Marine Area (ha.) | 0 | (j)Others (ha.) : 0 | 0 | Total (ha.) | 31414 | |
|
22. Land requirement for various activities |
---|
S. No. | Description of Activity / Facility / Plant / Others | Others | Land Requirement (ha.) | Remarks |
---|
(1.) | Main Plant | | 2.4 | | (2.) | Green belt | | 2.3 | | (3.) | Others | open area | 9.0 | Parking area,Road,open area | |
|
|
23. | Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Sanctuaries; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones : | |
|
23.1. Details of Ecological Sensitivity : |
---|
S. No. | Details of Ecological Sensitivity | Name | Distance from the Project (Km) | Remarks |
---|
(1.) | WLS | NA | 0 | NA | (2.) | NPA | NA | 0 | NA | (3.) | ESAs | NA | 0 | NA | (4.) | Wildlife Corridors | NA | 0 | NA | (5.) | Corridors | NA | 0 | NA | (6.) | ESZs | NA | 0 | NA | (7.) | Critically Polluted Area | Ankleshwar | 0 | Moratorium of CPA is lifted on 25 Nov 2016 | |
23.2. Details of Environmental Sensitivity : |
---|
S. No. | Details of Environmental Sensitivity | Other Details of Environmental Sensitivity | Name | Distance from the Project (Km) | Remarks |
---|
(1.) | Archaeological Sites | | NA | 0 | NA | (2.) | Defence Installations | | NA | 0 | NA | (3.) | Forest | | NA | 0 | NA | |
|
23.3. | (a)Whether Noc / Permission from the competent authority is required? | No | (b)Whether NBWL recommendation is required? | No | |
|
24. | Forest Land: | Whether any Forest Land involved? | No | |
|
25. | Tree Cutting: | (a)No. of Trees Cut for the Project (if Forest Land not Involved) | 0 | (b)Details of Tree Cutting and Planting of Trees | Not Applicable | |
|
26. | Land Acquisition Status: | (a)Acquired Land(Ha) | 0 | (b)Land yet to be acquired(Ha) | 0 | (c)Status of Land acquisition if not acquired | 0 | |
|
27. | Rehabilitation and Resettlement (R&R): | (a)No. of Villages | 0 | (b)No. of Households | 0 | (c)No. of PDFs (Project Displaced Families) | 0 | (d)No. of PAFs (Project Affected Families) | 0 | (e)Funds Allocated for R&R(in INR) (in Lacs) | 0 | (f)Status of R&R | Completed | |
|
28. | Details of Presence of Schedule-I Species: | (a)Whether there is Presence of Schedule-I Species ? | No | (b)Whether conservation plan for Schedule-I Species has been prepared ? | No | (c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? | No | |
|
29. | Details of Presence of Water Bodies in Core Area: | (a)Whether there is Presence of Water Bodies in Core Area ? | No | (b)Whether there is Diversion Required ? | No | (c)Whether permission has been obtained from competent authority ? | No | |
|
30. | Details of Presence of Water Bodies in Buffer Area: | (a)Whether there is Presence of Water Bodies in Buffer Area ? | Yes | (i)Details of Water Bodies in Buffer Area | Narmada River | (ii)Direction of Water Bodies in Buffer Area | North | (iii)Distance of Water Bodies in Buffer Area | 5.90 | |
|
31. | Manpower Requirement: | (a)Permanent Employment-During Construction | 586 | (b)Permanent Employment-During Operation | 595 | (c)Temporary Employment- During Construction | 355 | (d)Temporary Employment- During Operation | 510 | (e)No. of working days | 300 | (f)Total Manpower | 2046 | |
|
|
S. No. | Description | Existing | Proposed | Total |
---|
(1.) | Total Area of Green Belt | 2.3 | 2.3 | 4 | (2.) | Percentage of Total Project Area | 16.85 | 16.85 | 32 | (3.) | No. of Plants | 3666 | 794 | 4460 | (4.) | Funds Allocated | 30 | 6 | 36 | |
|
33. Project Benefits |
---|
S. No. | Type of Project Benefits | Details of Project Benefits |
---|
(1.) | Social | Socio-economic development, Employment generation | |
|
34. CRZ Specific Details : Not Applicable |
35. Sector Specific Details : NOT APPLICABLE |
35. Sector Specific Details For Industrial Projects - 2 |
|
|
36. | Details of Court Cases: | (a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? | No | |
|
37. | Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act: | (a)Whether any Direction issued under EPA Act/Air Act/Water Act ? | No | |
|
38. | Details of EIA Consultant: | (a)Have you hired Consultant for preparing document? | Yes | (i)Accreditation No. | NABET/EIA/1619/RA0040 | (ii)Name of the EIA Consultant | Shivalik Solid Waste Management Limited | (iii)Address | SCO 20-21, Dhakoli , Zirakpur , Kalka Shimla Highway, Punjab | (iv)Mobile No. | 8288079363 | (v)Landline No. | 0176250949 | (vi)Email Id | s.brahma@beil.co.in | (vii)Category of Accreditation | A | (viii)Sector of Accreditation | Industrial Projects - 2 | (ix)Validity of Accreditation | 16 Feb 2019 | (x)Uploaded Certificate of Accreditation certified by QCI/NABET | Copy of Certificate of Accreditation | |
|
|
Essential Detail Sought: |
---|
Sno. | EDS Letter | Remarks | Date of EDS |
---|
1. | NA | Please submit the following:-
- Certified compliance report from the Ministry's Regional Office for the existing EC dated 17/7/2003,
- Firm commitment from GIDC to meet the additional water requirement of 3718 KLD for the proposed expansion,
- Firm commitment of M/s NCT for conveyance and disposal of additional discharge of 790 cum/day. | 01 Oct 2018 | 2. | NA | The correction have been made as per the instruction received | 20 Oct 2018 | 3. | NA | There is no CCR attached with the RO Bhopal forwarding letter dated 16/10/2018.
Also, please clarify as to how the same proposal has been submitted vide another ID No.IA/GJ/IND2/79908/2017. | 28 Oct 2018 | 4. | NA | The correction have been made as per the instruction received | 30 Oct 2018 | 5. | NA | Please submit complete set of the CCR dated 16/10/2018 (only data sheet available on the portal) for further consideration of the proposal. | 07 Nov 2018 | 6. | NA | The correction have been made as per the instruction received | 10 Nov 2018 | 7. | NA | - Please provide copies of the ECs dated 17/7/2003 & 4/4/2007.
- As per the details in the CCR dated 16/10/2018, EC dated 17/7/2003 was for production of pesticides of 1100 TPM. Whereas, the same is reflected as 6910 TPM in Form-2 [para 9(b) & 9(c)]. This is to be clarified. | 15 Nov 2018 | 8. | NA | The correction have been made as per the instruction received | 24 Nov 2018 | 9. | NA | Please see our earlier observations. Following are yet to be clarified:-
- EC dated 17/7/2003 is for total production capacity of pesticides as 1100 TPM. Whereas, CTO dated 6/3/2012 issued by GPCB was for total production of 2640 TPM (Pesticides 1520 TPM, Intermediates 1120 TPM).
- The proposal should mention those products only which are covered under the domain of the EIA Notification, 2006 and thus require EC. These details need to be reflected in Form-2.
- Present production capacity is to be consistent with that mentioned in the said EC. | 06 Dec 2018 | 10. | NA | The correction have been made as per the instruction received | 18 Dec 2018 | |
Additional Detail Sought: |
---|
Sno. | ADS Letter | Remarks | Date of ADS |
---|
1. | ADS Reply Letter | Dear Sir,
Uploading herewith response to ADS. | 04 Jul 2019 | 2. | ADS Raise Letter | Please see the attached letter. | 03 Jul 2019 | |
| Undertaking |
| I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief. And I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity/ construction/ expansion has since been taken up. |
| Name of Applicant | Mritunjay Chaubey | Designation | GlobalVP | Name of Company (Applicant Name should not be given here) | UPL UNIT ONE ANKLESHWAR | Address | Plot No. 117/118, Notified Industrial Estate, GIDC, Ankleshwar, District-Bharuch, Gujarat . |
|