Form-2
APPLICATION FOR PRIOR ENVIRONMENTAL CLEARANCE
S. No.Item Details
1.
Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? No
Details of Project:
(a)Name of the project(s) Expansion of Manufacturing Capacity of existing products and manufacturing of new pesticides, intermediate chemicals, proposed by M/s. UPL Limited Unit #1
(b)Name of the Company / Organisation UPL UNIT ONE ANKLESHWAR
(c)Registered Address Plot No. 117/118, Notified Industrial Estate, GIDC, Ankleshwar, District-Bharuch, Gujarat .,,Bharuch,Gujarat-393002
(d)Legal Status of the Company Private
(e)Joint Venture No
2.
Address for the correspondence:
(a)Name of the Applicant Mritunjay Chaubey
(b)Designation (Owner/ Partner/ CEO) GlobalVP
(c)Address UPL Ltd, UPL House, 610/2 Bandra Village, off. Western Express Highway, Bandra East, Mumabai-400051,,Mumbai,Mumbai City,Maharashtra-400051
(d)Pin code 400051
(e)E-mail uplunit01.ank@gmail.com
(f)STD Code. 2646(f)Telephone No. 71528840
(g)Fax No.
(h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . Annexure-Uploaded Copy of documents in support of the competence/authority
3.
Category of the Project/Activity as per Schedule of EIA Notification,2006:
(a.I)Project/Activity5(b) Pesticides industry and pesticide specific intermediates (excluding formulations)
Minor Activity
(b)Category A
(c)Proposal Number IA/GJ/IND2/80387/2017
(d)Master Proposal Number(Single Window) SW/80382/2018
(e)EAC concerned (for category A Projects only) Industrial Projects - 2
(f)Project Type Expansion
4.
Location of the Project:
(a)Plot/Survey/Khasra No. 117/118
(b)Pincode 393002
(c)Bounded Latitudes (North)
From
Degree 213741.63
Minutes
Second
From
Degree 213756.48
Minutes
Second
(d)Bounded Longitudes (East)
From
Degree 730048.57
Minutes
Second
From
Degree 730106.20
Minutes
Second
(e)Survey of India Topo Sheet No. 46C14, 46G2
(f)Uploaded Topo Sheet File Copy of Topo Sheet File
(g)Maximum Elevation Above Means Sea Level(AMSL) 25
(h)Uploaded (kml) File Copy of Kml File      
(i)Distance of Nearest HFL from the project boundary within the study area 10
(j)Seismic Zone 3
5.
(a)Number of States in which Project will be Executed 1
(b)Main State of the project Gujarat
Details of State of the project
S. No. State Name District Name Tehsil Name Village Name
NIL
6.
Details of Terms of Reference (ToR)/EC:
(a)MoEF&CC / SEIAA File Number J-11011/582/2017-IA-II(I)
(c)Date of Issue of TOR 10 Feb 2018
(f)Previous TOR Letter Copy of Previous TOR letter
(b)Date of Apply of EC 18 Dec 2018
(c)Date of Issue of EC 29 Nov 2019
(d)Previous EC Letter Copy of Previous EC letter
7.
Details of Public Consultation:
(a)Whether the Project Exempted from Public Hearing?Yes
(b)Reason Project falls in Notified Industrial Area of Ankle
(c)Supporting Document Copy of Supporting Document
8.
Details of Project Configuration/Product:
Details Not Applicable
9.
In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii):
(a)Details of certified report on compliance of earlier environmental clearance condition
(i)Certified Compliance By Regional
(ii)Details of Regional Office of MoEFCC / Zonal Office of CPCB / SPCB / UTPCC from which certified report on Bhopal
(iii)Letter No. September 19 2018
(iv)Status of Compliance Compiled
(v)Certified report on compliance of earlier environmental clearance conditions (Including Monitoring Report) Copy of Certified Compliance Report
(vi)Date of site visit Jul 18 2018 12:00AM
(b)Details of Capacity Expansion
S. No.Product/Activity (Capacity/Area)Quantity FromQuantity ToTotal UnitOther UnitMode of Transport / Transmission of ProductOther Mode of Transport / Transmission of Product
(1.)Intermediates products11209802100OthersTPMRoad
(2.)Pesticide technical152039605480OthersTPMRoad
(c)Details of Configuration
S. No.Plant / Equipment / Facility Existing ConfigurationProposed ConfigurationFinal configuration after expansionRemarks
(1.)Pesticide and intermediate production264049407580Only those product included which required environment clearance
9.1.
Details of Consent to Operate
(i)Whether Consent to operate obtained ? NA
(ii)Copies of all Consent to operate obtained since inception NA
(iii)Date of Issue 26 Sep 2017
(iv)Valid Upto 12 May 2018
(v)File No. GPCB/ANK/CCA-158(6)/ID-15833
(vi)Application No. H-88493
(vii)Copy of Consent to operate valid as on date Copy of Consent to Operate
10.
Project Cost:
(a)Total Cost of the Project at current price level (in Crores) 353.43
(b) Funds Allocated for Environment Management (Capital) (in Crores) 23.76
(c) Funds Allocated Towards CER (Corporate Environment Responsibility) (in Crores) 7.72
(d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in Crores) 15.43
11.
Whether project attracts the General Condition specified in the Schedule of EIA Notification ? No
12.
Whether project attract the Specific Condition specified in the Schedule of EIA Notification ? No
13.
Raw Material / Fuel Requirement:
(a)Proposed quantity of raw material/fuel 808
(b)Existing quantity of raw material/fuel 432
(c)Total quantity of raw material/fuel 1240
    13.1.        Raw Material / Fuel Profile
S. No.Raw Material / Fuel QuantityUnitOther UnitSource (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received )Mode of TransportOther Mode of TransportDistance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received)Type of Linkage Other Type of Linkage Uploaded Copy of Linkage
(1.)Raw material52691.31OthersMTMIndiaRoad100 Open MarketCopy of Linkage
14.
Baseline Data :
(a)Period of Base Line Data Collection FROM 08 Mar 2018 To 07 Jun 2018
(b)Season Pre-Monsoon
    14.1.     No. of ambient Air Quality (AAQ) monitoring locations : 8
S. No.Criteria Pollutants Other Criteria PollutantsUnitMaximum ValueMinimum Value98 Percentile ValuePrescribed Standard
(1.)PM2.5Micro Gram per Meter Cube53.431.452.460
(2.)NOxMicro Gram per Meter Cube34.812.132.780
(3.)PM10Micro Gram per Meter Cube88.354.587.3100
(4.)SO2Micro Gram per Meter Cube28.57.726.580
    14.2.     No. of Ground Water monitoring locations : 7
S. No.Criteria Pollutants Other Criteria PollutantsHeavy MetalUnitOther UnitMaximum ValueMinimum ValueDesirable LimitMaximum Permissible Limit
(1.)Total Hardnessmg/l555178200600
(2.)TSSNA0000
(3.)Heavy MetalsZincmg/l1.310.001515
(4.)Chloridesmg/l6183922501000
(5.)pHNA7.797.436.58.5
(6.)Fluoridemg/l0.280.0011.01.5
(7.)TDSmg/l186812255002000
    14.3.     No. of Surface Water monitoring locations : 3
S. No.Criteria Pollutants Other Criteria PollutantsUnitOther UnitMaximum ValueMinimum ValueClassification of inland water body
(1.)BODmg/l3.62.1B
(2.)CODmg/l12.77.3B
(3.)DOmg/l7.66.6B
(4.)pHNA8.438.21B
    14.4.     No. of Ambient Noise monitoring locations : 8
S. No.Parameter UnitMaximum ValueMinimum ValuePrescribed Standard
(1.)Leq(Night)A-weighted decibels(dB(A))61.641.765
(2.)Leq(Day)A-weighted decibels(dB(A))67.251.675
    14.5.     No. of Soil Sample Monitored locations : 8
S. No.Parameter UnitOther UnitMaximum ValueMinimum Value
(1.)pHOthersNA8.047.54
(2.)P(Phosphorus)Kilogram per hectare44.327.1
(3.)K(Potassium)Kilogram per hectare428.1327.8
(4.)Electric ConductivityMillisiemens per Centimetre1.921.17
(5.)N(Nitrogen)Kilogram per hectare286231
14.6.
Details of Ground Water Table:
(a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) From 2 To 5
(b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) From 2 To 5
(c)Whether Ground Water Intersection will be there ? No
     15.      Details of Water Requirement (During Operation)
S. No.Source Source Other Required Quantity (Kilolitre per Day (Kld))Distance from SourceCopy of Permission from Competent Authority Mode of TransportOther Mode of TransportMethod of Water WithdrawalOther Method of Water WithdrawalLetter No.Date of IssuePermitted Quantity
(1.)OthersGIDC Ankleshwar47574Copy of Permission LetterPipelineOthersGIDC Supply0022 Dec 20174757
15.1.
(a)Whether Desalination is proposed No
    16.       Waste Water Management(During Operation)
S. No.Type/Source Quantity of Waste Water Generated (Kilolitre per Day)Treatment Capacity (Kilolitre per Day) Treatment MethodMode of DisposalOther Mode of DisposalQuantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day)Quantity of Discharged Water (Kilolitre per Day)
(1.)Process Water12731400ETPDischarge into Seawater Body,Reuse within the Plant & Recycling,Green Belt Renewal Plant01273
16.1.
(a)Total Waste Water Generation (Kilolitre per Day) 1273
(b)Total Discharged Water (Kilolitre per Day) 1273
(c)Total Reused Water (Kilolitre per Day) 0
    17.       Solid Waste Generation/Management
S. No.Name of Waste Item Other ItemQuantity per AnnumUnitDistance from Site(KM)Mode of TransportOther Mode of TransportMode of DisposalOther Mode of Disposal
(1.)Total hazardous WasteIndustrial Waste15920Tons8RoadTreatment, Storage and Disposal Facility(TSDF)
18.
    18.1.     Air Quality Impact Prediction
S. No.Criteria Pollutants Other Criteria PollutantsUnitBaseline ConcentrationDistance GLCIncremental ConcentrationTotal GLCPrescribed Standard
(1.)PM10Microgram per Meter Cube88.30.7072.8691.16100
(2.)PM2.5Microgram per Meter Cube53.40.7072.8656.2660
(3.)NOxMicrogram per Meter Cube34.80.7073.6538.4580
(4.)SO2Microgram per Meter Cube28.50.7072.4930.9980
    18.2.     Stack Details
S. No.Source FuelStack Height(m)Stack Diameter(m)PollutantsOther PollutantsEmission (GLS)
(1.)35 TPH BoilerNG301.35PM100.053
(2.)35 TPH BoilerNG301.35SO20.070
(3.)35 TPH BoilerNG301.35NOx0.126
(4.)30 TPH BoilerNG300.45PM100.006
(5.)30 TPH BoilerNG300.45SO20.007
(6.)30 TPHNG300.45NOx0.013
19.
Power Requirement:
(a)Quantity (Kilo Volt Amps (kVA)) 32653
(b)Source DGVCL
(c)Uploaded Copy of Agreement Not Applicable
(d)Standby Arrangement (Details of DG Sets) 3
(e)Stack Height (in m) 8
20.
Land Ownership Pattern:
(a)Forest Land (ha.) 0
(b)Private Land (ha.) 0
(c)Government Land (ha.) 13.6677
(d)Revenue Land (ha.) 0
(e)Other Land (ha.) 0
    Total Land (ha.) 13.6677
21.
Present Land Use Breakup of the Study Area in Ha:
(a)Agriculture Area (ha.) 16052
(b)Waste/Barren Land (ha.) 2495
(c)Grazing/ Community Land (ha.) 3543
(d)Surface Water Bodies (ha.) 1552
(e)Settlements (ha.) 5242
(f)Industrial (ha.) 2530
(g)Forest (ha.) 0
(h)Mangroves (ha.) 0
(i)Marine Area (ha.) 0
(j)Others (ha.) : 0 0
    Total (ha.) 31414
    22.     Land requirement for various activities
S. No.Description of Activity / Facility / Plant / Others OthersLand Requirement (ha.)Remarks
(1.)Main Plant2.4
(2.)Green belt2.3
(3.)Othersopen area9.0Parking area,Road,open area
Total (ha.) 13.7
23.
Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Sanctuaries; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones :
    23.1.     Details of Ecological Sensitivity :
S. No.Details of Ecological Sensitivity NameDistance from the Project (Km)Remarks
(1.)WLSNA0NA
(2.)NPANA0NA
(3.)ESAsNA0NA
(4.)Wildlife CorridorsNA0NA
(5.)CorridorsNA0NA
(6.)ESZsNA0NA
(7.)Critically Polluted AreaAnkleshwar0Moratorium of CPA is lifted on 25 Nov 2016
    23.2.     Details of Environmental Sensitivity :
S. No.Details of Environmental Sensitivity Other Details of Environmental Sensitivity NameDistance from the Project (Km)Remarks
(1.)Archaeological SitesNA0NA
(2.)Defence InstallationsNA0NA
(3.)ForestNA0NA
23.3.
(a)Whether Noc / Permission from the competent authority is required? No
(b)Whether NBWL recommendation is required? No
24.
Forest Land:
Whether any Forest Land involved? No
25.
Tree Cutting:
(a)No. of Trees Cut for the Project (if Forest Land not Involved) 0
(b)Details of Tree Cutting and Planting of Trees Not Applicable
26.
Land Acquisition Status:
(a)Acquired Land(Ha) 0
(b)Land yet to be acquired(Ha) 0
(c)Status of Land acquisition if not acquired 0
27.
Rehabilitation and Resettlement (R&R):
(a)No. of Villages 0
(b)No. of Households 0
(c)No. of PDFs (Project Displaced Families) 0
(d)No. of PAFs (Project Affected Families) 0
(e)Funds Allocated for R&R(in INR) (in Lacs) 0
(f)Status of R&R Completed
28.
Details of Presence of Schedule-I Species:
(a)Whether there is Presence of Schedule-I Species ? No
(b)Whether conservation plan for Schedule-I Species has been prepared ? No
(c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? No
29.
Details of Presence of Water Bodies in Core Area:
(a)Whether there is Presence of Water Bodies in Core Area ? No
(b)Whether there is Diversion Required ? No
(c)Whether permission has been obtained from competent authority ? No
30.
Details of Presence of Water Bodies in Buffer Area:
(a)Whether there is Presence of Water Bodies in Buffer Area ? Yes
(i)Details of Water Bodies in Buffer Area Narmada River
(ii)Direction of Water Bodies in Buffer Area North
(iii)Distance of Water Bodies in Buffer Area 5.90
31.
Manpower Requirement:
(a)Permanent Employment-During Construction 586
(b)Permanent Employment-During Operation 595
(c)Temporary Employment- During Construction 355
(d)Temporary Employment- During Operation 510
(e)No. of working days 300
(f)Total Manpower 2046
32.
Green Belt in Ha:
(a)Uploaded Green Belt plan Copy of Green Belt Plan
S. No.Description ExistingProposedTotal
(1.)Total Area of Green Belt2.32.34
(2.)Percentage of Total Project Area16.8516.8532
(3.)No. of Plants36667944460
(4.)Funds Allocated30636
    33.         Project Benefits
S. No.Type of Project Benefits Details of Project Benefits
(1.)SocialSocio-economic development, Employment generation
   34.   CRZ Specific Details : Not Applicable
   35.   Sector Specific Details : NOT APPLICABLE
   35.   Sector Specific Details For Industrial Projects - 2
S. No.Item Details
S. No.Item Details
36.
Details of Court Cases:
(a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? No
37.
Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act:
(a)Whether any Direction issued under EPA Act/Air Act/Water Act ? No
38.
Details of EIA Consultant:
(a)Have you hired Consultant for preparing document? Yes
(i)Accreditation No. NABET/EIA/1619/RA0040
(ii)Name of the EIA Consultant Shivalik Solid Waste Management Limited
(iii)Address SCO 20-21, Dhakoli , Zirakpur , Kalka Shimla Highway, Punjab
(iv)Mobile No. 8288079363
(v)Landline No. 0176250949
(vi)Email Id s.brahma@beil.co.in
(vii)Category of Accreditation A
(viii)Sector of Accreditation Industrial Projects - 2
(ix)Validity of Accreditation 16 Feb 2019
(x)Uploaded Certificate of Accreditation certified by QCI/NABET Copy of Certificate of Accreditation
39.
Documents to be Attached:
(a)Uploaded Copy of EIA/EMP Report Copy of EIA/EMP
Copy of EIA/EMP(Annexures)
Copy of EIA/EMP(Plans/Figures)
(b)Uploaded Copy of Risk Assessment Report Copy of Risk Assessment
(c)Uploaded Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan
(d)Uploaded Copy of Final Layout Plan Copy of Final Layout Plan
(e)Uploaded Cover Letter Copy of Cover Letter
(f)Uploaded Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency
(g)Uploaded Additional File Copy of Additional File
(h)Uploaded Proposal Presentation (To be given in EAC meeting) NA
            Essential Detail Sought:
Sno. EDS Letter Remarks Date of EDS
1.NAPlease submit the following:- - Certified compliance report from the Ministry's Regional Office for the existing EC dated 17/7/2003, - Firm commitment from GIDC to meet the additional water requirement of 3718 KLD for the proposed expansion, - Firm commitment of M/s NCT for conveyance and disposal of additional discharge of 790 cum/day. 01 Oct 2018
2.NAThe correction have been made as per the instruction received 20 Oct 2018
3.NAThere is no CCR attached with the RO Bhopal forwarding letter dated 16/10/2018. Also, please clarify as to how the same proposal has been submitted vide another ID No.IA/GJ/IND2/79908/2017. 28 Oct 2018
4.NAThe correction have been made as per the instruction received 30 Oct 2018
5.NAPlease submit complete set of the CCR dated 16/10/2018 (only data sheet available on the portal) for further consideration of the proposal. 07 Nov 2018
6.NAThe correction have been made as per the instruction received 10 Nov 2018
7.NA- Please provide copies of the ECs dated 17/7/2003 & 4/4/2007. - As per the details in the CCR dated 16/10/2018, EC dated 17/7/2003 was for production of pesticides of 1100 TPM. Whereas, the same is reflected as 6910 TPM in Form-2 [para 9(b) & 9(c)]. This is to be clarified. 15 Nov 2018
8.NAThe correction have been made as per the instruction received 24 Nov 2018
9.NAPlease see our earlier observations. Following are yet to be clarified:- - EC dated 17/7/2003 is for total production capacity of pesticides as 1100 TPM. Whereas, CTO dated 6/3/2012 issued by GPCB was for total production of 2640 TPM (Pesticides 1520 TPM, Intermediates 1120 TPM). - The proposal should mention those products only which are covered under the domain of the EIA Notification, 2006 and thus require EC. These details need to be reflected in Form-2. - Present production capacity is to be consistent with that mentioned in the said EC. 06 Dec 2018
10.NAThe correction have been made as per the instruction received 18 Dec 2018
            Additional Detail Sought:
Sno. ADS Letter Remarks Date of ADS
1. ADS Reply LetterDear Sir, Uploading herewith response to ADS. 04 Jul 2019
2. ADS Raise LetterPlease see the attached letter. 03 Jul 2019
Undertaking
I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief. And I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity/ construction/ expansion has since been taken up.
Name of ApplicantMritunjay Chaubey
DesignationGlobalVP
Name of Company (Applicant Name should not be given here)UPL UNIT ONE ANKLESHWAR
AddressPlot No. 117/118, Notified Industrial Estate, GIDC, Ankleshwar, District-Bharuch, Gujarat .
Print