Form-2
APPLICATION FOR PRIOR ENVIRONMENTAL CLEARANCE
S. No.Item Details
1.
Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? No
Details of Project:
(a)Name of the project(s) M/s. Sun Particle Board Pvt. Ltd.
(b)Name of the Company / Organisation SUN PARTICLE BOARD PVT LTD
(c)Registered Address Survey no.441/P1&2, Haripar-Kerala Road, Village-Bela (Rangpar), Bela(Rangpar)-363642, Tal.Dist- Morbi,,Morbi,Gujarat-363642
(d)Legal Status of the Company State Government
(e)Joint Venture No
2.
Address for the correspondence:
(a)Name of the Applicant Deep Patel
(b)Designation (Owner/ Partner/ CEO) Director
(c)Address Survey No.441/P1Haripar-Kerala Road,Village-Bela-Rangpar, BEla -rangpar, Dist.-Morbi -363642,,Morbi,Morbi,Gujarat-363642
(d)Pin code 363642
(e)E-mail sunpartical2014@gmail.com
(f)STD Code. 0(f)Telephone No. 00000000
(g)Fax No. 000000
(h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . Annexure-Uploaded Copy of documents in support of the competence/authority
3.
Category of the Project/Activity as per Schedule of EIA Notification,2006:
(a.I)Project/Activity5(f) Synthetic organic chemicals industry (dyes & dye intermediates; bulk
Minor Activity
(b)Category B1
   Reason for Applying at Ministry Specific
(c)Proposal Number IA/GJ/IND2/80288/2017
(d)Master Proposal Number(Single Window) SW/80059/2018
(e)EAC concerned (for category A Projects only) Industrial Projects - 2
(f)Project Type Expansion
4.
Location of the Project:
(a)Plot/Survey/Khasra No. Survey. No. : 441/P 1 & 2, Haripar-Kerala Road
(b)Pincode 363642
(c)Bounded Latitudes (North)
From
Degree 2536523.00
Minutes
Second
From
Degree 2536982.00
Minutes
Second
(d)Bounded Longitudes (East)
From
Degree 688811.00
Minutes
Second
From
Degree 688958.00
Minutes
Second
(e)Survey of India Topo Sheet No. F42E16(41I/116)&F42K13(41J/13)
(f)Uploaded Topo Sheet File Copy of Topo Sheet File
(g)Maximum Elevation Above Means Sea Level(AMSL) 36
(h)Uploaded (kml) File Copy of Kml File      
(i)Distance of Nearest HFL from the project boundary within the study area 1.30
(j)Seismic Zone 4
5.
(a)Number of States in which Project will be Executed 1
(b)Main State of the project Gujarat
Details of State of the project
S. No. State Name District Name Tehsil Name Village Name
NIL
6.
Details of Terms of Reference (ToR)/EC:
(a)MoEF&CC / SEIAA File Number J-11011/284/2017-IA II (I)
(c)Date of Issue of TOR 25 Sep 2017
(f)Previous TOR Letter Copy of Previous TOR letter
(b)Date of Apply of EC 12 Jan 2019
(c)Date of Issue of EC 03 Sep 2019
(d)Previous EC Letter Copy of Previous EC letter
7.
Details of Public Consultation:
(a)Whether the Project Exempted from Public Hearing?No
(b)Whether details of Public Hearing available? Yes
(c)Whether Public hearing was presided over by an officer of the rank of Additional District Magistrate or above Yes
     7.1.       Details of Public Hearing
S. No.Details of Advertisement Details of Public Hearing Venue Location DetailsNo. of People AttendedIssues RaisedDesignation of Presiding OfficerOther Designation of Presiding Officer
(1.)
Date of Advertisement :22 May 2018
Copy of advertisement :Copy of Advertisement
Copy of Public Hearing :Copy of Public Hearing
Date :26 Jun 2018
Distance of Public Hearing Venue from the Proposed Project :0
M/s. Sun Particle Board Pvt. Ltd., Survey. No. : 441/P 1 & 2, Haripar-Kerala Road
State :Gujarat
District :Morbi
Tehsil :Morbi
Village :Bela (Rangpar)
96Due to the use of hazardous chemicals there is a possibility of depletion of fertility of the nearby land and human and animal health will be affected. Also it may affect the environment and contaminaOthersResident Additional Collector & Additional District Magistrate , Morbi
8.
Details of Project Configuration/Product:
Details Not Applicable
9.
In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii):
(a)Details of certified report on compliance of earlier environmental clearance condition
(i)Certified Compliance By SPCB
(ii)Details of Regional Office of MoEFCC / Zonal Office of CPCB / SPCB / UTPCC from which certified report on
(iii)Letter No. AWH-79106
(iv)Status of Compliance Compiled
(v)Certified report on compliance of earlier environmental clearance conditions (Including Monitoring Report) Copy of Certified Compliance Report
(vi)Date of site visit Sep 26 2018 12:00AM
(b)Details of Capacity Expansion
S. No.Product/Activity (Capacity/Area)Quantity FromQuantity ToTotal UnitOther UnitMode of Transport / Transmission of ProductOther Mode of Transport / Transmission of Product
(1.)Urea Formaldehyde Resin0.0060006000Tons per Annum(TPA)Road
(2.)Melamine Formaldehyde Resin0.036003600Tons per Annum(TPA)Road
(3.)Paraffin Wax Emulsion0.00600600Tons per Annum(TPA)Road
(4.)Plain and Pre-Laminated Particle Boards180001080028800Tons per Annum(TPA)Road
(c)Details of Configuration
S. No.Plant / Equipment / Facility Existing ConfigurationProposed ConfigurationFinal configuration after expansionRemarks
(1.)DUST COLLECTOR101
(2.)CHIP CRUSHER101
(3.)FORMER101
(4.)CUTTER101
(5.)SANDING M/C (POLISHING AND GRINDING)101
(6.)DRYER101
(7.)D G SET112
(8.)COMPRESSOR101
(9.)U.F.Reaction Vessel011
(10.)RING MILL CRUSHER101
(11.)Thermopack101
(12.)M.F.Reaction Vessel011
(13.)PRESS101
9.1.
Details of Consent to Operate
(i)Whether Consent to operate obtained ? NA
(ii)Copies of all Consent to operate obtained since inception NA
(iii)Date of Issue 22 May 2016
(iv)Valid Upto 31 Dec 2020
(v)File No. AWH-79106
(vi)Application No. 105974
(vii)Copy of Consent to operate valid as on date Copy of Consent to Operate
10.
Project Cost:
(a)Total Cost of the Project at current price level (in Crores) 13.1
(b) Funds Allocated for Environment Management (Capital) (in Crores) 1.3
(c) Funds Allocated Towards CER (Corporate Environment Responsibility) (in Crores) 0.075
(d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in Crores) 0.097
11.
Whether project attracts the General Condition specified in the Schedule of EIA Notification ? No
12.
Whether project attract the Specific Condition specified in the Schedule of EIA Notification ? Yes
8.(a) If any Industrial Estate/Complex / Export processing Zones /Special Economic Zones/Biotech Parks / Leather Complex with homogeneous type of industries such as Items 4(d), 4(f), 5(e), 5(f), or those Industrial estates with pre –defined set of activities (not necessarily homogeneous, obtains prior environmental clearance, individual industries including proposed industrial housing within such estates /complexes will not be required to take prior environmental clearance, so long as the Terms and Conditions for the industrial estate/complex are complied with (Such estates/complexes must have a clearly identified management with the legal responsibility of ensuring adherence to the Terms and Conditions of prior environmental clearance, who may be held responsible for violation of the same throughout the life of the complex/estate
13.
Raw Material / Fuel Requirement:
(a)Proposed quantity of raw material/fuel 29191.68
(b)Existing quantity of raw material/fuel 34506
(c)Total quantity of raw material/fuel 63697.68
    13.1.        Raw Material / Fuel Profile
S. No.Raw Material / Fuel QuantityUnitOther UnitSource (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received )Mode of TransportOther Mode of TransportDistance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received)Type of Linkage Other Type of Linkage Uploaded Copy of Linkage
(1.)Bonding Glue5846.4Tons per AnnumCaptiveOthersInternal transfer0 CaptiveCopy of Linkage
(2.)Formaldehyde4998Tons per AnnumIndigenousRoad250 Open MarketCopy of Linkage
(3.)Urea1626Tons per AnnumIndigenousRoad250 Open MarketCopy of Linkage
(4.)Caustic Soda1.44Tons per AnnumIndigenousRoad250 Open MarketCopy of Linkage
(5.)Formic Acid1.44Tons per AnnumIndigenousRoad250 Open MarketCopy of Linkage
(6.)Melamine1368Tons per AnnumIndigenousRoad250 Open MarketCopy of Linkage
(7.)Mono Ethylene Glycol (MEG)/DEG172.8Tons per AnnumIndigenousRoad250 Open MarketCopy of Linkage
(8.)Paraformaldehyde25.2Tons per AnnumIndigenousRoad250 Open MarketCopy of Linkage
(9.)Paraffin Wax163.2Tons per AnnumIndigenousRoad250 Open MarketCopy of Linkage
(10.)Aqueous Ammonia5.4Tons per AnnumIndigenousRoad250 Open MarketCopy of Linkage
(11.)Stearic Acid21.6Tons per AnnumIndigenousRoad250 Open MarketCopy of Linkage
(12.)Decorative Paper403.2Tons per AnnumIndigenousRoad250 Open MarketCopy of Linkage
(13.)Borax Powder5.4Tons per AnnumIndigenousRoad250 Open MarketCopy of Linkage
(14.)wood saw Dust5760Tons per AnnumIndigenousRoad120 Open MarketCopy of Linkage
(15.)Strips of Pine woods43200Tons per AnnumIndigenousRoad120 Open MarketCopy of Linkage
(16.)Sodium pentachlorophenate6Tons per AnnumIndigenousRoad250 Open MarketCopy of Linkage
(17.)n-Butyl Alcohol93.6Tons per AnnumIndigenousRoad250 Open MarketCopy of Linkage
14.
Baseline Data :
(a)Period of Base Line Data Collection FROM 01 Oct 2017 To 31 Dec 2017
(b)Season Winter
    14.1.     No. of ambient Air Quality (AAQ) monitoring locations : 8
S. No.Criteria Pollutants Other Criteria PollutantsUnitMaximum ValueMinimum Value98 Percentile ValuePrescribed Standard
(1.)PM10Micro Gram per Meter Cube98.0060.0094.00100 per 24 Hr
(2.)PM2.5Micro Gram per Meter Cube47.0015.0043.3260 per 24 Hr
(3.)SO2Micro Gram per Meter Cube24.0012.0022.0080 per 24 Hr
(4.)NOxMicro Gram per Meter Cube30.0018.0029.0080 per 24 Hr
    14.2.     No. of Ground Water monitoring locations : 8
S. No.Criteria Pollutants Other Criteria PollutantsHeavy MetalUnitOther UnitMaximum ValueMinimum ValueDesirable LimitMaximum Permissible Limit
(1.)TDSmg/l5166.001094.005002000
(2.)pHNA8.317.086.58.5
(3.)Chloridesmg/l2910.80398.002501000
(4.)Fluoridemg/l20.101.401.01.5
(5.)TSSOthersNTU0.10.115
(6.)Heavy MetalsLeadmg/l0000.1
(7.)Total Hardnessmg/l2400.90400.70200600
    14.3.     No. of Surface Water monitoring locations : 4
S. No.Criteria Pollutants Other Criteria PollutantsUnitOther UnitMaximum ValueMinimum ValueClassification of inland water body
(1.)pHNA8.488.13A
(2.)DOmg/l6.803.80E
(3.)BODmg/l108.008.00E
(4.)CODmg/l306.022.4E
    14.4.     No. of Ambient Noise monitoring locations : 8
S. No.Parameter UnitMaximum ValueMinimum ValuePrescribed Standard
(1.)Leq(Night)A-weighted decibels(dB(A))42.9033.1070
(2.)Leq(Day)A-weighted decibels(dB(A))61.6048.5075
    14.5.     No. of Soil Sample Monitored locations : 8
S. No.Parameter UnitOther UnitMaximum ValueMinimum Value
(1.)pHOthers-8.317.08
(2.)Electric ConductivityMillisiemens per Centimetre7.711.63
(3.)P(Phosphorus)Milligram per Kilogram0.060.02
(4.)K(Potassium)Milligram per Kilogram3.603.00
(5.)N(Nitrogen)Milligram per Kilogram19.003.10
14.6.
Details of Ground Water Table:
(a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) From 3 To 5
(b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) From 6 To 8
(c)Whether Ground Water Intersection will be there ? No
     15.      Details of Water Requirement (During Operation)
S. No.Source Source Other Required Quantity (Kilolitre per Day (Kld))Distance from SourceCopy of Permission from Competent Authority Mode of TransportOther Mode of TransportMethod of Water WithdrawalOther Method of Water WithdrawalLetter No.Date of IssuePermitted Quantity
(1.)GroundWater14.50Copy of Permission LetterPipelineOpen Well21-4/3522/GJ/IND/201816 Feb 201814.5
15.1.
(a)Whether Desalination is proposed No
    16.       Waste Water Management(During Operation)
S. No.Type/Source Quantity of Waste Water Generated (Kilolitre per Day)Treatment Capacity (Kilolitre per Day) Treatment MethodMode of DisposalOther Mode of DisposalQuantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day)Quantity of Discharged Water (Kilolitre per Day)
(1.)Industrial0.500RecyclingReuse within the Plant & Recycling0.5
(2.)Domestic1.500N/AOthersSeptic Tank01.50
16.1.
(a)Total Waste Water Generation (Kilolitre per Day) 2
(b)Total Discharged Water (Kilolitre per Day) 1.5
(c)Total Reused Water (Kilolitre per Day) 0.5
    17.       Solid Waste Generation/Management
S. No.Name of Waste Item Other ItemQuantity per AnnumUnitDistance from Site(KM)Mode of TransportOther Mode of TransportMode of DisposalOther Mode of Disposal
(1.)Resin ResidueHazardous Waste (as per Hazardous and Other Waste Management rules 2016)2.4Tons0OthersIn House TransferOthersTo be reused in next batch preparation.
(2.)Discarded Empty Bags, Drums, Carboys & PaperHazardous Waste (as per Hazardous and Other Waste Management rules 2016)312Tons20RoadAuthorized Recyclers
(3.)Used OilHazardous Waste (as per Hazardous and Other Waste Management rules 2016)0.05Kilolitre20RoadAuthorized Recyclers
18.
    18.1.     Air Quality Impact Prediction
S. No.Criteria Pollutants Other Criteria PollutantsUnitBaseline ConcentrationDistance GLCIncremental ConcentrationTotal GLCPrescribed Standard
(1.)PM10Microgram per Meter Cube88.3801.6890.06100 /24hr
(2.)SO2Microgram per Meter Cube20.0400.9921.0380 /24hr
(3.)NOxMicrogram per Meter Cube27.2507.5134.7680 /24hr
(4.)PM2.5Microgram per Meter Cube39.3300.4239.7560 /24hr
    18.2.     Stack Details
S. No.Source FuelStack Height(m)Stack Diameter(m)PollutantsOther PollutantsEmission (GLS)
(1.)DG Set IDiesel90.2SO20.139
(2.)DG set IDiesel90.2PM100.149
(3.)Trimming Machine-150.2PM100.039
(4.)DG Set IDiesel90.2NOx1.048
(5.)Foaming-150.2PM100.024
(6.)TFHAgro Waste300.4NOx0.310
(7.)Sanding Machine-150.2PM100.039
(8.)DG Set IIDiesel90.2PM100.037
(9.)DG Set IIDiesel90.2SO20.035
(10.)DG Set IISiesel90.2NOx0.261
(11.)TFHAgro Waste300.4SO20.035
(12.)TFHAgro Waste300.4PM100.104
19.
Power Requirement:
(a)Quantity (Kilo Volt Amps (kVA)) 1200
(b)Source PGVCL
(c)Uploaded Copy of Agreement Copy of Agreement
(d)Standby Arrangement (Details of DG Sets) 2 Nos. D.G. Set: Existing : 500 KVA, Proposed: 12
(e)Stack Height (in m) 9
20.
Land Ownership Pattern:
(a)Forest Land (ha.) 0
(b)Private Land (ha.) 2.5
(c)Government Land (ha.) 0
(d)Revenue Land (ha.) 0
(e)Other Land (ha.) 0
    Total Land (ha.) 2.5
21.
Present Land Use Breakup of the Study Area in Ha:
(a)Agriculture Area (ha.) 25052.00
(b)Waste/Barren Land (ha.) 523.00
(c)Grazing/ Community Land (ha.) 0
(d)Surface Water Bodies (ha.) 1360.00
(e)Settlements (ha.) 1440.00
(f)Industrial (ha.) 805.00
(g)Forest (ha.) 0
(h)Mangroves (ha.) 0
(i)Marine Area (ha.) 0
(j)Others (ha.) : Land with scrub 2235.00
    Total (ha.) 31415
    22.     Land requirement for various activities
S. No.Description of Activity / Facility / Plant / Others OthersLand Requirement (ha.)Remarks
(1.)Built Up Area1.0
(2.)OthersOpen Land Internal Road Area0.68
(3.)Green belt0.83
Total (ha.) 2.51
23.
Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Sanctuaries; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones :
    23.1.     Details of Ecological Sensitivity :
S. No.Details of Ecological Sensitivity NameDistance from the Project (Km)Remarks
(1.)WLSNot within the study area..
(2.)NPANot within the study area..
(3.)ESAsNot within the study area..
(4.)Critically Polluted AreaNot within the study area..
(5.)ESZsNot within the study area..
(6.)Wildlife CorridorsNot within the study area..
(7.)CorridorsNot within the study area..
    23.2.     Details of Environmental Sensitivity :
S. No.Details of Environmental Sensitivity Other Details of Environmental Sensitivity NameDistance from the Project (Km)Remarks
(1.)ForestNot within the study area..
(2.)Archaeological SitesNot within the study area..
(3.)Defence InstallationsNot within the study area..
23.3.
(a)Whether Noc / Permission from the competent authority is required? No
(b)Whether NBWL recommendation is required? No
24.
Forest Land:
Whether any Forest Land involved? No
25.
Tree Cutting:
(a)No. of Trees Cut for the Project (if Forest Land not Involved) Not Applicable
(b)Details of Tree Cutting and Planting of Trees Not Applicable
26.
Land Acquisition Status:
(a)Acquired Land(Ha) 2.5
(b)Land yet to be acquired(Ha) 0
(c)Status of Land acquisition if not acquired -
27.
Rehabilitation and Resettlement (R&R):
(a)No. of Villages 0
(b)No. of Households 0
(c)No. of PDFs (Project Displaced Families) 0
(d)No. of PAFs (Project Affected Families) 0
(e)Funds Allocated for R&R(in INR) (in Lacs) 0
(f)Status of R&R Yet To Start
28.
Details of Presence of Schedule-I Species:
(a)Whether there is Presence of Schedule-I Species ? Yes
(i)Details of Schedule-I Species Indian Peafowl (Pavo cristatus), Lissemys punctata - Indian Flapshell Turtle
(b)Whether conservation plan for Schedule-I Species has been prepared ? Yes
(i)Uploaded copy of conservation plan Copy of conservation plan
(ii)Fund Provision made 2 Lakhs
(iii)Period of Implementation Continuous
(c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? No
29.
Details of Presence of Water Bodies in Core Area:
(a)Whether there is Presence of Water Bodies in Core Area ? No
(b)Whether there is Diversion Required ? No
(c)Whether permission has been obtained from competent authority ? No
30.
Details of Presence of Water Bodies in Buffer Area:
(a)Whether there is Presence of Water Bodies in Buffer Area ? Yes
(i)Details of Water Bodies in Buffer Area Khetarkhadi(Tributary Godadhar Nadi)
(ii)Direction of Water Bodies in Buffer Area North East
(iii)Distance of Water Bodies in Buffer Area 1.87
31.
Manpower Requirement:
(a)Permanent Employment-During Construction 0
(b)Permanent Employment-During Operation 85
(c)Temporary Employment- During Construction 5
(d)Temporary Employment- During Operation 11
(e)No. of working days 300
(f)Total Manpower 101
32.
Green Belt in Ha:
(a)Uploaded Green Belt plan Copy of Green Belt Plan
S. No.Description ExistingProposedTotal
(1.)Total Area of Green Belt0.830.00
(2.)Percentage of Total Project Area33.2033
(3.)No. of Plants124501245
(4.)Funds Allocated1.50.251
    33.         Project Benefits
S. No.Type of Project Benefits Details of Project Benefits
(1.)SocialCompany has planned to spend Rs.0.30 Lakhs/Annum for CSR activities. Which will result in development or improvement of many public amenities/facilities of the area. This CSR activities will also be helpful to improve quality of life as well as improvement of Health, Education and skill of local people. Employment to 46 people in addition to 50 person in existing unit. In addition to this, indirect employment will also have similar benefits. These together will be considerably helpful in increas
(2.)FinancialCompany has planned to increase its capacity by 2 times which will result in 2 times higher payment of taxes & other levies, which will be considerably beneficial to the Government Exchequer.
   34.   CRZ Specific Details : Not Applicable
   35.   Sector Specific Details : NOT APPLICABLE
   35.   Sector Specific Details For Industrial Projects - 2
S. No.Item Details
S. No.Item Details
36.
Details of Court Cases:
(a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? No
37.
Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act:
(a)Whether any Direction issued under EPA Act/Air Act/Water Act ? No
38.
Details of EIA Consultant:
(a)Have you hired Consultant for preparing document? Yes
(i)Accreditation No. 153
(ii)Name of the EIA Consultant Unistar Environment & Research Labs Pvt. Ltd.
(iii)Address 215, Royal Arcade, Near GIDC Office, Vapi –396195
(iv)Mobile No. 9909946373
(v)Landline No. 0260243561
(vi)Email Id unistar@uerl.in
(vii)Category of Accreditation A
(viii)Sector of Accreditation Industrial Projects - 2
(ix)Validity of Accreditation 30 Jan 2020
(x)Uploaded Certificate of Accreditation certified by QCI/NABET Copy of Certificate of Accreditation
39.
Documents to be Attached:
(a)Uploaded Copy of EIA/EMP Report Copy of EIA/EMP
Copy of EIA/EMP(Annexures)
Copy of EIA/EMP(Plans/Figures)
(b)Uploaded Copy of Risk Assessment Report Copy of Risk Assessment
(c)Uploaded Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan
(d)Uploaded Copy of Final Layout Plan Copy of Final Layout Plan
(e)Uploaded Cover Letter Copy of Cover Letter
(f)Uploaded Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency
(g)Uploaded Additional File Copy of Additional File
(h)Uploaded Proposal Presentation (To be given in EAC meeting) NA
            Essential Detail Sought:
Sno. EDS Letter Remarks Date of EDS
1.NAPlease inform/clarify the following:- - Consent of SPCB to allow the proposed resin mfg unit of capacity 12200 TPA at the given site, - Present status of clearance for ground water withdrawal, - Daily fuel consumption along with the undertaking in this regard, - Expansion of particle board mfg from the present of 18000 TPA to 10800 TPA is not justified. 01 Oct 2018
2.NAThe correction have been made as per the instruction received 02 Oct 2018
3.NAPlease provide the details as desired vide query dated 1/10/2018 for further consideration of the proposal. 02 Oct 2018
4.NAThe correction have been made as per the instruction received 18 Dec 2018
5.NA- No certificate of Accreditation has been attached against column 38 of Form-2. - Given the water and fuel consumption, the project would be covered under small units and thus requires appraisal/approval applicable for category B i.e. at the state level. 28 Dec 2018
6.NAThe correction have been made as per the instruction received 01 Jan 2019
7.NAIn view of your last submissions, please inform whether any permission would be required under the MSIHC Rules, 1989 and/or the approval from PESO for the proposed site plan or storage of hazardous chemicals.Present status of the application for ground water withdrawal may also be informed. 11 Jan 2019
8.NAThe correction have been made as per the instruction received 12 Jan 2019
      Additional Detail Sought : NIL
Undertaking
I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief. And I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity/ construction/ expansion has since been taken up.
Name of ApplicantDeep Patel
DesignationDirector
Name of Company (Applicant Name should not be given here)SUN PARTICLE BOARD PVT LTD
AddressSurvey no.441/P1&2, Haripar-Kerala Road, Village-Bela (Rangpar), Bela(Rangpar)-363642, Tal.Dist- Morbi