Form-2
APPLICATION FOR PRIOR ENVIRONMENTAL CLEARANCE
S. No.Item Details
1.
Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? No
Details of Project:
(a)Name of the project(s) Navpad Pigments Pvt. Ltd
(b)Name of the Company / Organisation NAVPAD PIGMENTS PVT LTD
(c)Registered Address Plot No. 1196, Rajpur village, Kadi Tauka, Mehsana District,,Mahesana,Gujarat-382715
(d)Legal Status of the Company Private
(e)Joint Venture No
2.
Address for the correspondence:
(a)Name of the Applicant Jinen Kothari
(b)Designation (Owner/ Partner/ CEO) ManagingDirector
(c)Address Plot No. 1196/1/A,B, Rajpur village,,,Kadi,Mahesana,Gujarat-382715
(d)Pin code 382715
(e)E-mail navpadp@gmail.com
(f)STD Code. 40(f)Telephone No. 23070602
(g)Fax No.
(h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . Annexure-Uploaded Copy of documents in support of the competence/authority
3.
Category of the Project/Activity as per Schedule of EIA Notification,2006:
(a.I)Project/Activity5(f) Synthetic organic chemicals industry (dyes & dye intermediates; bulk
Minor Activity5(f) Synthetic organic chemicals industry (dyes & dye intermediates; bulk
(b)Category A
(c)Proposal Number IA/GJ/IND2/80246/2017
(d)Master Proposal Number(Single Window) SW/80156/2018
(e)EAC concerned (for category A Projects only) Industrial Projects - 2
(f)Project Type Expansion
4.
Location of the Project:
(a)Plot/Survey/Khasra No. Plot No. 1196/1/A & B, Rajpur Village, Ghumasan -
(b)Pincode 382715
(c)Bounded Latitudes (North)
From
Degree 23
Minutes
Second
From
Degree 23
Minutes
Second
(d)Bounded Longitudes (East)
From
Degree 72
Minutes
Second
From
Degree 72
Minutes
Second
(e)Survey of India Topo Sheet No. 46 A/7,8,11,12
(f)Uploaded Topo Sheet File Copy of Topo Sheet File
(g)Maximum Elevation Above Means Sea Level(AMSL) 280
(h)Uploaded (kml) File Copy of Kml File      
(i)Distance of Nearest HFL from the project boundary within the study area 25
(j)Seismic Zone 3
5.
(a)Number of States in which Project will be Executed 1
(b)Main State of the project Gujarat
Details of State of the project
S. No. State Name District Name Tehsil Name Village Name
NIL
6.
Details of Terms of Reference (ToR)/EC:
(a)MoEF&CC / SEIAA File Number F. No: J-11011/151/2017-IA II (I)
(c)Date of Issue of TOR 31 May 2017
(f)Previous TOR Letter Copy of Previous TOR letter
(b)Date of Apply of EC 11 Jan 2019
(c)Date of Issue of EC 17 Jun 2019
(d)Previous EC Letter Copy of Previous EC letter
7.
Details of Public Consultation:
(a)Whether the Project Exempted from Public Hearing?No
(b)Whether details of Public Hearing available? Yes
(c)Whether Public hearing was presided over by an officer of the rank of Additional District Magistrate or above Yes
     7.1.       Details of Public Hearing
S. No.Details of Advertisement Details of Public Hearing Venue Location DetailsNo. of People AttendedIssues RaisedDesignation of Presiding OfficerOther Designation of Presiding Officer
(1.)
Date of Advertisement :07 May 2018
Copy of advertisement :Copy of Advertisement
Copy of Public Hearing :Copy of Public Hearing
Date :13 Jun 2018
Distance of Public Hearing Venue from the Proposed Project :10.8
Champaben Ratilal Patel Town Hall, Kadi
State :Gujarat
District :Mahesana
Tehsil :Kadi
Village :Champaben Ratilal Patel Town Hall, Kadi
61The main issues raised during public hearing Employment , CSR Activities , type of trees used for Green belt & any environmental issues due to this project.District Magistrate
8.
Details of Project Configuration/Product:
Details Not Applicable
9.
In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii):
(a)Details of certified report on compliance of earlier environmental clearance condition
(i)Certified Compliance By Regional
(ii)Details of Regional Office of MoEFCC / Zonal Office of CPCB / SPCB / UTPCC from which certified report on Bhopal
(iii)Letter No. 1939
(iv)Status of Compliance Compiled
(v)Certified report on compliance of earlier environmental clearance conditions (Including Monitoring Report) Copy of Certified Compliance Report
(vi)Date of site visit Aug 18 2017 12:00AM
(b)Details of Capacity Expansion
S. No.Product/Activity (Capacity/Area)Quantity FromQuantity ToTotal UnitOther UnitMode of Transport / Transmission of ProductOther Mode of Transport / Transmission of Product
(1.)Pigment Violet 1902525OthersMT/MonthRoad
(2.)Solsperse 500005050OthersMT/MonthRoad
(3.)Pigment Violet 2334750OthersMT/MonthRoad
(4.)Pigment Red 12202525OthersMT/MonthRoad
(5.)Pigment Beta Blue (15:3)07575OthersMT/MonthRoad
(6.)Pigment Beta Blue (15:4)07575OthersMT/MonthRoad
(7.)Carbazole05050OthersMT/MonthRoad
(c)Details of Configuration
S. No.Plant / Equipment / Facility Existing ConfigurationProposed ConfigurationFinal configuration after expansionRemarks
(1.)Steam Boiler0.8 TPHNoneDropped
(2.)DG Set-1000 KVA1000 KVA Proposed
(3.)Coal Fired BoilerNone5 TPH5 TPH Proposed
(4.)Thermic Fluid Heater2 lakh K CalNoneContinued
9.1.
Details of Consent to Operate
(i)Whether Consent to operate obtained ? NA
(ii)Copies of all Consent to operate obtained since inception NA
(iii)Date of Issue 18 Aug 2017
(iv)Valid Upto 31 Mar 2022
(v)File No. AWH-87748
(vi)Application No. AWH-87748
(vii)Copy of Consent to operate valid as on date Copy of Consent to Operate
10.
Project Cost:
(a)Total Cost of the Project at current price level (in Crores) 15
(b) Funds Allocated for Environment Management (Capital) (in Crores) 2.25
(c) Funds Allocated Towards CER (Corporate Environment Responsibility) (in Crores) 0.75
(d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in Crores) 0.40
11.
Whether project attracts the General Condition specified in the Schedule of EIA Notification ? No
12.
Whether project attract the Specific Condition specified in the Schedule of EIA Notification ? No
13.
Raw Material / Fuel Requirement:
(a)Proposed quantity of raw material/fuel 20
(b)Existing quantity of raw material/fuel 0
(c)Total quantity of raw material/fuel 20
    13.1.        Raw Material / Fuel Profile
S. No.Raw Material / Fuel QuantityUnitOther UnitSource (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received )Mode of TransportOther Mode of TransportDistance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received)Type of Linkage Other Type of Linkage Uploaded Copy of Linkage
(1.)Carbazole1666.50Otherskg/dayWithin the countryRoad50 Open MarketCopy of Linkage
14.
Baseline Data :
(a)Period of Base Line Data Collection FROM 01 Oct 2017 To 31 Dec 2017
(b)Season Post-Monsoon
    14.1.     No. of ambient Air Quality (AAQ) monitoring locations : 8
S. No.Criteria Pollutants Other Criteria PollutantsUnitMaximum ValueMinimum Value98 Percentile ValuePrescribed Standard
(1.)PM10Micro Gram per Meter Cube74.544.574.1100
(2.)NOxMicro Gram per Meter Cube30.514.630.580
(3.)PM2.5Micro Gram per Meter Cube34.516.333.160
(4.)SO2Micro Gram per Meter Cube21.410.32180
(5.)OthersNH3Micro Gram per Meter Cube57.321.657.1400
    14.2.     No. of Ground Water monitoring locations : 8
S. No.Criteria Pollutants Other Criteria PollutantsHeavy MetalUnitOther UnitMaximum ValueMinimum ValueDesirable LimitMaximum Permissible Limit
(1.)TDSmg/l6544955002000
(2.)pHOthersnone8.337.398.50
(3.)Total Hardnessmg/l230170200600
(4.)TSSmg/l0000
(5.)Chloridesmg/l185.2115.72501000
(6.)Fluoridemg/l0.40.311.5
    14.3.     No. of Surface Water monitoring locations : 8
S. No.Criteria Pollutants Other Criteria PollutantsUnitOther UnitMaximum ValueMinimum ValueClassification of inland water body
(1.)CODmg/l3216E
(2.)BODmg/l7.64.5E
(3.)pHNA8.37.25E
(4.)DOmg/l5.55E
    14.4.     No. of Ambient Noise monitoring locations : 8
S. No.Parameter UnitMaximum ValueMinimum ValuePrescribed Standard
(1.)Leq(Day)A-weighted decibels(dB(A))65.851.775
(2.)Leq(Night)A-weighted decibels(dB(A))52.141.470
    14.5.     No. of Soil Sample Monitored locations : 8
S. No.Parameter UnitOther UnitMaximum ValueMinimum Value
(1.)N(Nitrogen)Milligram per Kilogram1.51.35
(2.)Electric ConductivityOthersµ mhos250155
(3.)pHOthers-7.927.25
(4.)K(Potassium)Milligram per Kilogram14.512.4
(5.)P(Phosphorus)Milligram per Kilogram11.310.2
14.6.
Details of Ground Water Table:
(a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) From 2.15 To 34.35
(b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) From 1.10 To 33.77
(c)Whether Ground Water Intersection will be there ? Yes
(d)Upload Copy of Central Ground Water Authority Letter Copy of Central Ground Water Authority Letter
(e)Letter No. 21-4/3460/GJ/IND/2018
(f)Date of Issue 31 Jan 2018
     15.      Details of Water Requirement (During Operation)
S. No.Source Source Other Required Quantity (Kilolitre per Day (Kld))Distance from SourceCopy of Permission from Competent Authority Mode of TransportOther Mode of TransportMethod of Water WithdrawalOther Method of Water WithdrawalLetter No.Date of IssuePermitted Quantity
(1.)OthersBore Well2890.1Copy of Permission LetterPipelineOthersBorewell21-4/3460/GJ/IND/201831 Jan 201880
15.1.
(a)Whether Desalination is proposed No
    16.       Waste Water Management(During Operation)
S. No.Type/Source Quantity of Waste Water Generated (Kilolitre per Day)Treatment Capacity (Kilolitre per Day) Treatment MethodMode of DisposalOther Mode of DisposalQuantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day)Quantity of Discharged Water (Kilolitre per Day)
(1.)Process, Domestic288.5600ZLD SystemReuse within the Plant & Recycling,Green Belt Renewal Plant288.5
16.1.
(a)Total Waste Water Generation (Kilolitre per Day) 288.5
(b)Total Discharged Water (Kilolitre per Day) 0
(c)Total Reused Water (Kilolitre per Day) 288.5
    17.       Solid Waste Generation/Management
S. No.Name of Waste Item Other ItemQuantity per AnnumUnitDistance from Site(KM)Mode of TransportOther Mode of TransportMode of DisposalOther Mode of Disposal
(1.)Organic Waste (Process)Hazardous Waste (as per Hazardous and Other Waste Management rules 2016)826.668Tons132RoadOthersSent to CHWIF Industries
(2.)Solvent Distillation ResidueHazardous Waste (as per Hazardous and Other Waste Management rules 2016)672.627Tons132RoadOthersSent to CHWIF Industries
(3.)Ash from BoilerFly Ash2520Tons29RoadOthersBrick Manufacturers
(4.)Used OilsHazardous Waste (as per Hazardous and Other Waste Management rules 2016)300Kilolitre29RoadAuthorized Recyclers
(5.)MEE SaltsHazardous Waste (as per Hazardous and Other Waste Management rules 2016)2810Tons29RoadTreatment, Storage and Disposal Facility(TSDF)
18.
    18.1.     Air Quality Impact Prediction
S. No.Criteria Pollutants Other Criteria PollutantsUnitBaseline ConcentrationDistance GLCIncremental ConcentrationTotal GLCPrescribed Standard
(1.)NOxMicrogram per Meter Cube30.50.53.5934.0980
(2.)SO2Microgram per Meter Cube210.52.1523.1580
(3.)PM2.5Microgram per Meter Cube33.10.50.62833.72860
(4.)PM10Microgram per Meter Cube74.10.50.94275.042100
    18.2.     Stack Details
S. No.Source FuelStack Height(m)Stack Diameter(m)PollutantsOther PollutantsEmission (GLS)
(1.)Coal Fired BoilerCoal320.5SO21.30 gm/sec
(2.)Coal Fired BoilerCoal320.5NOx3.42 gm/sec
(3.)Coal Fired BoilerCoal320.5PM100.43 gm/sec
19.
Power Requirement:
(a)Quantity (Kilo Volt Amps (kVA)) 1500
(b)Source GEB
(c)Uploaded Copy of Agreement Not Applicable
(d)Standby Arrangement (Details of DG Sets) 1000
(e)Stack Height (in m) 11
20.
Land Ownership Pattern:
(a)Forest Land (ha.) 0
(b)Private Land (ha.) 1.04
(c)Government Land (ha.) 0
(d)Revenue Land (ha.) 0
(e)Other Land (ha.) 0
    Total Land (ha.) 1.04
21.
Present Land Use Breakup of the Study Area in Ha:
(a)Agriculture Area (ha.) 0
(b)Waste/Barren Land (ha.) 0
(c)Grazing/ Community Land (ha.) 0
(d)Surface Water Bodies (ha.) 0
(e)Settlements (ha.) 0
(f)Industrial (ha.) 1.04
(g)Forest (ha.) 0
(h)Mangroves (ha.) 0
(i)Marine Area (ha.) 0
(j)Others (ha.) : none 0
    Total (ha.) 1.04
    22.     Land requirement for various activities
S. No.Description of Activity / Facility / Plant / Others OthersLand Requirement (ha.)Remarks
(1.)Main Plant1.04
Total (ha.) 1.04
23.
Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Sanctuaries; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones :
    23.1.     Details of Ecological Sensitivity :
S. No.Details of Ecological Sensitivity NameDistance from the Project (Km)Remarks
(1.)Critically Polluted AreaNA0NA
(2.)WLSNA0NA
(3.)NPANA0NA
(4.)ESAsNA0NA
(5.)ESZsNA0NA
(6.)CorridorsNA0NA
(7.)Wildlife CorridorsNA0NA
    23.2.     Details of Environmental Sensitivity :
S. No.Details of Environmental Sensitivity Other Details of Environmental Sensitivity NameDistance from the Project (Km)Remarks
(1.)OthersNoneNone0NA
(2.)ForestNone0NA
(3.)Archaeological SitesNone0NA
(4.)Defence InstallationsNone0NA
23.3.
(a)Whether Noc / Permission from the competent authority is required? No
(b)Whether NBWL recommendation is required? No
24.
Forest Land:
Whether any Forest Land involved? No
25.
Tree Cutting:
(a)No. of Trees Cut for the Project (if Forest Land not Involved) 0
(b)Details of Tree Cutting and Planting of Trees Not Applicable
26.
Land Acquisition Status:
(a)Acquired Land(Ha) 1.04
(b)Land yet to be acquired(Ha) 0
(c)Status of Land acquisition if not acquired NA
27.
Rehabilitation and Resettlement (R&R):
(a)No. of Villages 0
(b)No. of Households 0
(c)No. of PDFs (Project Displaced Families) 0
(d)No. of PAFs (Project Affected Families) 0
(e)Funds Allocated for R&R(in INR) (in Lacs) 0
(f)Status of R&R Yet To Start
28.
Details of Presence of Schedule-I Species:
(a)Whether there is Presence of Schedule-I Species ? No
(b)Whether conservation plan for Schedule-I Species has been prepared ? No
(c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? No
29.
Details of Presence of Water Bodies in Core Area:
(a)Whether there is Presence of Water Bodies in Core Area ? No
(b)Whether there is Diversion Required ? No
(c)Whether permission has been obtained from competent authority ? No
30.
Details of Presence of Water Bodies in Buffer Area:
(a)Whether there is Presence of Water Bodies in Buffer Area ? Yes
(i)Details of Water Bodies in Buffer Area Pond near Chadasan
(ii)Direction of Water Bodies in Buffer Area South East
(iii)Distance of Water Bodies in Buffer Area 3.83
31.
Manpower Requirement:
(a)Permanent Employment-During Construction 0
(b)Permanent Employment-During Operation 180
(c)Temporary Employment- During Construction 0
(d)Temporary Employment- During Operation 0
(e)No. of working days 360
(f)Total Manpower 180
32.
Green Belt in Ha:
(a)Uploaded Green Belt plan Copy of Green Belt Plan
S. No.Description ExistingProposedTotal
(1.)Total Area of Green Belt01.0231
(2.)Percentage of Total Project Area04040
(3.)No. of Plants30570600
(4.)Funds Allocated044
    33.         Project Benefits
S. No.Type of Project Benefits Details of Project Benefits
(1.)SocialProposed expansion project will result in considerable growth and upliftment of local community in the nearby villages by providing the employment. The project will generate direct and indirect employment to the nearby villages and the unavailable technical persons will be recruited from outside.
   34.   CRZ Specific Details : Not Applicable
   35.   Sector Specific Details : NOT APPLICABLE
   35.   Sector Specific Details For Industrial Projects - 2
S. No.Item Details
S. No.Item Details
36.
Details of Court Cases:
(a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? No
37.
Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act:
(a)Whether any Direction issued under EPA Act/Air Act/Water Act ? No
38.
Details of EIA Consultant:
(a)Have you hired Consultant for preparing document? Yes
(i)Accreditation No. NABET/EIA/1821/RA 0100
(ii)Name of the EIA Consultant Rightsource Industrial Solutions Pvt. Ltd.
(iii)Address Plot No: 203, H.No:5-36/203, Prashanthi Nagar, IDA, Kukatpally, Hyderabad – 500072
(iv)Mobile No. 9885560011
(v)Landline No. 23070602
(vi)Email Id info@rightsource.co.in
(vii)Category of Accreditation A
(viii)Sector of Accreditation Industrial Projects - 2
(ix)Validity of Accreditation 25 Feb 2021
(x)Uploaded Certificate of Accreditation certified by QCI/NABET Copy of Certificate of Accreditation
39.
Documents to be Attached:
(a)Uploaded Copy of EIA/EMP Report Copy of EIA/EMP
Copy of EIA/EMP(Annexures)
Copy of EIA/EMP(Plans/Figures)
(b)Uploaded Copy of Risk Assessment Report Copy of Risk Assessment
(c)Uploaded Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan
(d)Uploaded Copy of Final Layout Plan Copy of Final Layout Plan
(e)Uploaded Cover Letter Copy of Cover Letter
(f)Uploaded Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency
(g)Uploaded Additional File Copy of Additional File
(h)Uploaded Proposal Presentation (To be given in EAC meeting) NA
            Essential Detail Sought:
Sno. EDS Letter Remarks Date of EDS
1.NA- Please submit consent to establish/operate issued by GPCB in your name prior to inception of the EIA Notification, 2006 to ascertain the requirement of EC for the present industrial operations. - Present status of clearance for ground water withdrawal. 06 Oct 2018
2.NAThe correction have been made as per the instruction received 29 Nov 2018
3.NA- Carbazole is shown as one of the proposed product (50 TPM), and raw material also to be procured from open market. This needs to be clarified. - Given the quantum of ground water withdrawal, there has to be some in-principle commitment or acceptance of the proposal submitted to CGWA. 07 Dec 2018
4.NAThe correction have been made as per the instruction received 11 Jan 2019
      Additional Detail Sought : NIL
Undertaking
I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief. And I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity/ construction/ expansion has since been taken up.
Name of ApplicantJinen Kothari
DesignationManagingDirector
Name of Company (Applicant Name should not be given here)NAVPAD PIGMENTS PVT LTD
AddressPlot No. 1196, Rajpur village, Kadi Tauka, Mehsana District
Print