1. | Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? | No | Details of Project: | (a)Name of the project(s) | Hermes Distillery Pvt. Ltd. | (b)Name of the Company / Organisation | HERMES DISTILLERY PRIVATE LIMITED | (c)Registered Address | Village - Yadrav, Taluka - Raibag, Dist.-Belgaum,,Belgaum,Karnataka-591317 | (d)Legal Status of the Company | Private | (e)Joint Venture | No | |
|
2. | Address for the correspondence: | (a)Name of the Applicant | Amit Prabhakar Kore | (b)Designation (Owner/ Partner/ CEO) | Chairman | (c)Address | Village - Yadrav, Taluka - Raibag, Dist. - Belgaum,,Raybag,Belgaum,Karnataka-591317 | (d)Pin code | 591317 | (e)E-mail | gm@hermesdistil.com | (f)STD Code. | 831(f)Telephone No. | 2465577 | (g)Fax No. | | (h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . | Annexure-Uploaded Copy of documents in support of the competence/authority | |
|
3. | Category of the Project/Activity as per Schedule of EIA Notification,2006: | (a.I)Project/Activity | 5(g) Distilleries
| Minor Activity | | (b)Category | A | (c)Proposal Number | IA/KA/IND2/57292/2014 | (d)Master Proposal Number(Single Window) | SW/80098/2018 | (e)EAC concerned (for category A Projects only) | Industrial Projects - 2 | (f)Project Type | Expansion |
|
|
4. | Location of the Project: | (a)Plot/Survey/Khasra No. | Gat No.: 96/5A, 96/5B, 96/5C, 96/3A/2, 98/1B/3, 98 | (b)Pincode | 591317 | (c)Bounded Latitudes (North) | | From | | Degree | 16.522963 | Minutes | | Second | | From | | Degree | 16.526198 | Minutes | | Second | | (d)Bounded Longitudes (East) | | From | | Degree | 74.719918 | Minutes | | Second | | From | | Degree | 74.722720 | Minutes | | Second | | (e)Survey of India Topo Sheet No. | 47L10, 47L11, 47L14, 47L15 | (f)Uploaded Topo Sheet File | Copy of Topo Sheet File | (g)Maximum Elevation Above Means Sea Level(AMSL) | 560 | (h)Uploaded (kml) File | Copy of Kml File | (i)Distance of Nearest HFL from the project boundary within the study area | 4 | (j)Seismic Zone | 3 | |
|
5. | (a)Number of States in which Project will be Executed | 1 | (b)Main State of the project | Karnataka | |
|
|
Details of State(s) of the project |
---|
S. No. | State Name | District Name | Tehsil Name | Village Name |
---|
(1.) | Karnataka | Belgaum | Raybag | | |
|
6. | Details of Terms of Reference (ToR)/EC: | (a)MoEF&CC / SEIAA File Number | J-11011/143/2014-1A II (I) | (c)Date of Issue of TOR | 22 Sep 2014 | (f)Previous TOR Letter | Copy of Previous TOR letter | (b)Date of Apply of EC | 09 Jul 2016 | (c)Date of Issue of EC | 31 Jan 2017 | (d)Previous EC Letter | Copy of Previous EC letter | |
|
7. | Details of Public Consultation: | (a)Whether the Project Exempted from Public Hearing? | No | (b)Whether details of Public Hearing available? | Yes | (c)Whether Public hearing was presided over by an officer of the rank of Additional District Magistrate or above | Yes | |
|
7.1. Details of Public Hearing |
---|
|
S. No. | Details of Advertisement | Details of Public Hearing | Venue | Location Details | No. of People Attended | Issues Raised | Designation of Presiding Officer | Other Designation of Presiding Officer |
---|
(1.) | | Copy of Public Hearing : | Copy of Public Hearing | Date : | 11 Jul 2018 | Distance of Public Hearing Venue from the Proposed Project : | 0 |
| At the Factory site - Hermes Distillery Pvt. Ltd (HDPL) S. No. 96/5A, 96/5B, 96/5C, 96/3A/2, 98/1B/4 and 98/1A/5, Village Yadrav, Tal.: Raibag, Dist.: Belgavi, State: Karnataka | State : | Karnataka | District : | Belgaum | Tehsil : | Raybag | Village : | Yadrav |
| 185 | There was no any major issues raised during Public hearing. Few issues raised they are as ā provision of health care facilities, employment to local people, supply of boiler ash in subsidiary rate, tr | Others | Additional District Magistrate | |
8. | Details of Project Configuration/Product: | Details Not Applicable | |
|
9. | In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii): | (a)Details of certified report on compliance of earlier environmental clearance condition | (i)Certified Compliance By | Regional | (ii)Details of Regional Office of MoEFCC / Zonal Office of CPCB / SPCB / UTPCC from which certified report on | Bangalore | (iii)Letter No. | EP/12.1/2016-2017/10/KAR 436 | (iv)Status of Compliance | Compiled | (v)Certified report on compliance of earlier environmental clearance conditions (Including Monitoring Report) | Copy of Certified Compliance Report | (vi)Date of site visit | May 29 2018 12:00AM | (b)Details of Capacity Expansion | |
|
S. No. | Product/Activity (Capacity/Area) | Quantity From | Quantity To | Total | Unit | Other Unit | Mode of Transport / Transmission of Product | Other Mode of Transport / Transmission of Product |
---|
(1.) | Ethanol | 100 | 200 | 300 | Kilo Litre per Day(KLD) | | Road | | (2.) | Extra Neutral Alcohol | 100 | 200 | 300 | Kilo Litre per Day(KLD) | | Road | | (3.) | IMFL Bottling Plant | 86.4 | 130 | 216 | Kilo Litre per Day(KLD) | | Road | | (4.) | Rectified Spirit (RS) | 100 | 200 | 300 | Kilo Litre per Day(KLD) | | Road | | |
| (c)Details of Configuration | |
|
S. No. | Plant / Equipment / Facility | Existing Configuration | Proposed Configuration | Final configuration after expansion | Remarks |
---|
(1.) | IMFL Bottling Plant | 86.4 KLPD | 130 KLPD | 216 KLPD | | (2.) | Distillery | 100 KLPD | 200 KLPD | 300 KLPD | After expansion-200 KLPD molasses based & 100 KLPD grain based distillery | |
9.1. | Details of Consent to Operate | (i)Whether Consent to operate obtained ? | NA | (ii)Copies of all Consent to operate obtained since inception | NA | (iii)Date of Issue | 01 Dec 2016 | (iv)Valid Upto | 30 Jun 2021 | (v)File No. | AW-302203 | (vi)Application No. | 31631 | (vii)Copy of Consent to operate valid as on date | Copy of Consent to Operate | |
|
|
10. | Project Cost: | (a)Total Cost of the Project at current price level (in Crores) | 153 | (b) Funds Allocated for Environment Management (Capital) (in Crores) | 82.05 | (c) Funds Allocated Towards CER (Corporate Environment Responsibility) (in Crores) | 4.4 | (d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in Crores) | 7.2 | |
|
11. | Whether project attracts the General Condition specified in the Schedule of EIA Notification ? | No | | |
12. | Whether project attract the Specific Condition specified in the Schedule of EIA Notification ? | No | | |
13. | Raw Material / Fuel Requirement: | (a)Proposed quantity of raw material/fuel | 10800 | (b)Existing quantity of raw material/fuel | 10800 | (c)Total quantity of raw material/fuel | 21600 | |
|
  13.1. Raw Material / Fuel Profile |
---|
S. No. | Raw Material / Fuel | Quantity | Unit | Other Unit | Source (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received ) | Mode of Transport | Other Mode of Transport | Distance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received) | Type of Linkage | Other Type of Linkage | Uploaded Copy of Linkage |
---|
(1.) | Molasses | 118800 | Tons per Annum | | Nearby sugar Factories | Road | | 50 | Others | Tender | Copy of Linkage | (2.) | Coal | 95040 | Tons per Annum | | Vendors | Road | | 780 | Open Market | | Copy of Linkage | (3.) | Grains ā Maize, jowar, broken rice | 891000 | Tons per Annum | | nearby farm lands | Road | | 30 | Open Market | | Copy of Linkage | |
|
14. | Baseline Data : | (a)Period of Base Line Data Collection | FROM 02 Oct 2017 To 31 Dec 2017 | (b)Season | Post-Monsoon | |
|
14.1. No. of ambient Air Quality (AAQ) monitoring locations : 8 |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Unit | Maximum Value | Minimum Value | 98 Percentile Value | Prescribed Standard |
---|
(1.) | PM10 | | Micro Gram per Meter Cube | 70.45 | 41.68 | 58.76 | 100 | (2.) | PM2.5 | | Micro Gram per Meter Cube | 25.98 | 14.85 | 22.30 | 60 | (3.) | NOx | | Micro Gram per Meter Cube | 56.97 | 35.50 | 50.10 | 80 | (4.) | SO2 | | Micro Gram per Meter Cube | 39.68 | 25.20 | 35.47 | 80 | |
14.2. No. of Ground Water monitoring locations : 5 |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Heavy Metal | Unit | Other Unit | Maximum Value | Minimum Value | Desirable Limit | Maximum Permissible Limit |
---|
(1.) | Total Hardness | | | mg/l | | 393.83 | 186.53 | 200 | 200 | (2.) | Chlorides | | | mg/l | | 255.74 | 181.20 | 250 | 250 | (3.) | pH | | | NA | | 7.36 | 7.07 | 6.5 | 8.5 | (4.) | Fluoride | | | mg/l | | 0.35 | 0.17 | 1 | 1 | (5.) | TSS | | | mg/l | | 50 | 42 | 100 | 100 | (6.) | TDS | | | mg/l | | 1044.22 | 680.80 | 500 | 500 | |
14.3. No. of Surface Water monitoring locations : 8 |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Unit | Other Unit | Maximum Value | Minimum Value | Classification of inland water body |
---|
(1.) | pH | | NA | | 7.86 | 7.07 | E | (2.) | COD | | mg/l | | 264.21 | 22.6 | E | (3.) | BOD | | mg/l | | 95.51 | 8.7 | E | (4.) | DO | | mg/l | | 4.7 | 1.2 | E | |
14.4. No. of Ambient Noise monitoring locations : 8 |
---|
S. No. | Parameter | Unit | Maximum Value | Minimum Value | Prescribed Standard |
---|
(1.) | Leq(Day) | A-weighted decibels(dB(A)) | 73.2 | 43.2 | 75 | (2.) | Leq(Night) | A-weighted decibels(dB(A)) | 64.3 | 34.4 | 70 | |
14.5. No. of Soil Sample Monitored locations : 8 |
---|
S. No. | Parameter | Unit | Other Unit | Maximum Value | Minimum Value |
---|
(1.) | pH | Others | NA | 8.34 | 7.41 | (2.) | P(Phosphorus) | Milligram per Kilogram | | 4.17 | 2.14 | (3.) | K(Potassium) | Milligram per Kilogram | | 91.64 | 51.80 | (4.) | Electric Conductivity | Millisiemens per Centimetre | | 0.27 | 0.13 | (5.) | N(Nitrogen) | Kilogram per hectare | | 62.59 | 25.16 | |
|
14.6. | Details of Ground Water Table: | (a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) | From 16.75 To 4.9 | (b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) | From 12.42 To 2.08 | (c)Whether Ground Water Intersection will be there ? | No | |
|
15. Details of Water Requirement (During Operation) |
---|
S. No. | Source | Source Other | Required Quantity (Kilolitre per Day (Kld)) | Distance from Source | Copy of Permission from Competent Authority | Mode of Transport | Other Mode of Transport | Method of Water Withdrawal | Other Method of Water Withdrawal | Letter No. | Date of Issue | Permitted Quantity |
---|
(1.) | Surface | | 1181 | 5 | Copy of Permission Letter | Pipeline | | Jack Well | | J.S.E.IIH.A.Y. 2016 | 27 Dec 2016 | 575757 | |
|
15.1. | (a)Whether Desalination is proposed | No | |
|
16. Waste Water Management(During Operation) |
---|
S. No. | Type/Source | Quantity of Waste Water Generated (Kilolitre per Day) | Treatment Capacity (Kilolitre per Day) | Treatment Method | Mode of Disposal | Other Mode of Disposal | Quantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day) | Quantity of Discharged Water (Kilolitre per Day) |
---|
(1.) | Domestic Effluent | 2 | 20 | Proposed STP | Green Belt Renewal Plant | | 2 | | (2.) | Industrial effluent | 790 | 880 | CPU comprises of Primary-secondary and tertiary treatment | Reuse within the Plant & Recycling | | 790 | | |
|
16.1. | (a)Total Waste Water Generation (Kilolitre per Day) | 792 | (b)Total Discharged Water (Kilolitre per Day) | 0 | (c)Total Reused Water (Kilolitre per Day) | 792 | |
|
17. Solid Waste Generation/Management |
---|
S. No. | Name of Waste | Item | Other Item | Quantity per Annum | Unit | Distance from Site(KM) | Mode of Transport | Other Mode of Transport | Mode of Disposal | Other Mode of Disposal |
---|
(1.) | Yeast Sludge | Industrial Waste | | 6600 | Tons | 0 | Conveyor Belt | | Co-Processing | | (2.) | Boiler Ash | Bottom Ash | | 34089 | Tons | 30 | Road | | Authorized Recyclers | | (3.) | CPU sludge | Industrial Waste | | 330 | Tons | 30 | Road | | Others | used as mannure | |
|
|
18.1. Air Quality Impact Prediction |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Unit | Baseline Concentration | Distance GLC | Incremental Concentration | Total GLC | Prescribed Standard |
---|
(1.) | NOx | | Microgram per Meter Cube | 56.97 | 14.5 | 0.004 | 56.974 | 80 | (2.) | PM10 | | Microgram per Meter Cube | 58.76 | 14.5 | 0.006 | 58.766 | 100 | (3.) | PM2.5 | | Microgram per Meter Cube | 22.30 | 14.5 | 0.0014 | 22.3014 | 60 | (4.) | SO2 | | Microgram per Meter Cube | 35.47 | 14.5 | 0.07 | 35.54 | 80 | |
|
18.2. Stack Details |
---|
S. No. | Source | Fuel | Stack Height(m) | Stack Diameter(m) | Pollutants | Other Pollutants | Emission (GLS) |
---|
(1.) | 35 TPH Boiler | Coal+Spentwash | 90 | 1.5 | SO2 | | 60.87 | |
|
19. | Power Requirement: | (a)Quantity (Kilo Volt Amps (kVA)) | 7000 | (b)Source | own Co-gen plant | (c)Uploaded Copy of Agreement | Copy of Agreement | (d)Standby Arrangement (Details of DG Sets) | 625 KVA | (e)Stack Height (in m) | 7 | |
|
20. | Land Ownership Pattern: | (a)Forest Land (ha.) | 0 | (b)Private Land (ha.) | 7.22 | (c)Government Land (ha.) | 0 | (d)Revenue Land (ha.) | 0 | (e)Other Land (ha.) | 0 | Total Land (ha.) | 7.22 | |
|
21. | Present Land Use Breakup of the Study Area in Ha: | (a)Agriculture Area (ha.) | 12672 | (b)Waste/Barren Land (ha.) | 4103 | (c)Grazing/ Community Land (ha.) | 0 | (d)Surface Water Bodies (ha.) | 448 | (e)Settlements (ha.) | 1828 | (f)Industrial (ha.) | 0 | (g)Forest (ha.) | 2998 | (h)Mangroves (ha.) | 0 | (i)Marine Area (ha.) | 0 | (j)Others (ha.) : Fallow land | 9367 | Total (ha.) | 31416 | |
|
22. Land requirement for various activities |
---|
S. No. | Description of Activity / Facility / Plant / Others | Others | Land Requirement (ha.) | Remarks |
---|
(1.) | Built Up Area | | 4.86 | | (2.) | Green belt | | 2.57 | | |
|
|
23. | Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Sanctuaries; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones : | |
|
23.1. Details of Ecological Sensitivity : |
---|
S. No. | Details of Ecological Sensitivity | Name | Distance from the Project (Km) | Remarks |
---|
(1.) | ESAs | Nil | 0 | There is no presence of any CPA, WLS, NPA, ESAs, ESZs, Corridors & wildlife corridors in 10 Km radius of project. | (2.) | Critically Polluted Area | Nil | 0 | There is no presence of any CPA, WLS, NPA, ESAs, ESZs, Corridors & wildlife corridors in 10 Km radius of project. | (3.) | WLS | Nil | 0 | There is no presence of any CPA, WLS, NPA, ESAs, ESZs, Corridors & wildlife corridors in 10 Km radius of project. | (4.) | ESZs | Nil | 0 | There is no presence of any CPA, WLS, NPA, ESAs, ESZs, Corridors & wildlife corridors in 10 Km radius of project. | (5.) | NPA | Nil | 0 | There is no presence of any CPA, WLS, NPA, ESAs, ESZs, Corridors & wildlife corridors in 10 Km radius of project. | (6.) | Corridors | Nil | 0 | There is no presence of any CPA, WLS, NPA, ESAs, ESZs, Corridors & wildlife corridors in 10 Km radius of project. | (7.) | Wildlife Corridors | Nil | 0 | There is no presence of any CPA, WLS, NPA, ESAs, ESZs, Corridors & wildlife corridors in 10 Km radius of project. | |
23.2. Details of Environmental Sensitivity : |
---|
S. No. | Details of Environmental Sensitivity | Other Details of Environmental Sensitivity | Name | Distance from the Project (Km) | Remarks |
---|
(1.) | Archaeological Sites | | Raibag Palace | 8 | Not notified by Archaeological department | (2.) | Defence Installations | | Nil | 0 | There is no presence of defence installation in 10 Km radius of project. | (3.) | Forest | | Shivaji Park reserve forest | 2.2 | Its an scrub land | |
|
23.3. | (a)Whether Noc / Permission from the competent authority is required? | No | (b)Whether NBWL recommendation is required? | No | |
|
24. | Forest Land: | Whether any Forest Land involved? | No | |
|
25. | Tree Cutting: | (a)No. of Trees Cut for the Project (if Forest Land not Involved) | 0 | (b)Details of Tree Cutting and Planting of Trees | Not Applicable | |
|
26. | Land Acquisition Status: | (a)Acquired Land(Ha) | 0 | (b)Land yet to be acquired(Ha) | 0 | (c)Status of Land acquisition if not acquired | Nil | |
|
27. | Rehabilitation and Resettlement (R&R): | (a)No. of Villages | 0 | (b)No. of Households | 0 | (c)No. of PDFs (Project Displaced Families) | 0 | (d)No. of PAFs (Project Affected Families) | 0 | (e)Funds Allocated for R&R(in INR) (in Lacs) | 0 | (f)Status of R&R | Completed | |
|
28. | Details of Presence of Schedule-I Species: | (a)Whether there is Presence of Schedule-I Species ? | No | (b)Whether conservation plan for Schedule-I Species has been prepared ? | No | (c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? | No | |
|
29. | Details of Presence of Water Bodies in Core Area: | (a)Whether there is Presence of Water Bodies in Core Area ? | No | (b)Whether there is Diversion Required ? | No | (c)Whether permission has been obtained from competent authority ? | No | |
|
30. | Details of Presence of Water Bodies in Buffer Area: | (a)Whether there is Presence of Water Bodies in Buffer Area ? | No | |
|
31. | Manpower Requirement: | (a)Permanent Employment-During Construction | 0 | (b)Permanent Employment-During Operation | 123 | (c)Temporary Employment- During Construction | 30 | (d)Temporary Employment- During Operation | 0 | (e)No. of working days | 330 | (f)Total Manpower | 153 | |
|
|
S. No. | Description | Existing | Proposed | Total |
---|
(1.) | Total Area of Green Belt | 9550 | 16187 | 25737 | (2.) | Percentage of Total Project Area | 13 | 23.4 | 36 | (3.) | No. of Plants | 6000 | 10300 | 16300 | (4.) | Funds Allocated | 1500000 | 1000000 | 2500000 | |
|
33. Project Benefits |
---|
S. No. | Type of Project Benefits | Details of Project Benefits |
---|
(1.) | Social | Activities under proposed expansion project of HDPL would improve socio-economic status of people in the study area in terms of local employment and contract basis jobs by providing employment opportunities to the skilled and semi-skilled local populace, especially in small-scale business and other related services. | |
|
34. CRZ Specific Details : Not Applicable |
35. Sector Specific Details : NOT APPLICABLE |
35. Sector Specific Details For Industrial Projects - 2 |
|
|
36. | Details of Court Cases: | (a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? | No | |
|
37. | Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act: | (a)Whether any Direction issued under EPA Act/Air Act/Water Act ? | No | |
|
38. | Details of EIA Consultant: | (a)Have you hired Consultant for preparing document? | Yes | (i)Accreditation No. | NABET/EIA/1518/SA 063 dated 01.06.2018 | (ii)Name of the EIA Consultant | Equinox Environmets (I) Pvt. Ltd. | (iii)Address | F-11, Namdev Nest, 1160 āEā ward, Opp. Kamala College, Sykes Extension, Kolhapur | (iv)Mobile No. | 9657865122 | (v)Landline No. | 0231253123 | (vi)Email Id | projects@equinoxenvi.com | (vii)Category of Accreditation | A | (viii)Sector of Accreditation | Industrial Projects - 2 | (ix)Validity of Accreditation | 21 Oct 2018 | (x)Uploaded Certificate of Accreditation certified by QCI/NABET | Copy of Certificate of Accreditation | |
|
|
Essential Detail Sought: |
---|
Sno. | EDS Letter | Remarks | Date of EDS |
---|
1. | NA | Please clarify the following:-
- Production of RS/ENA/AA and IMFL Bottling Plant never exceeded the approved capacity of 100 KLPD & 86.4 KLPD respectively along with the supporting documents,
- Additional water requirement for the proposed expansion and the firm commitment of the concerned regulatory authority to supply the same,
- Neither the ToR details are given against item No.6, nor copy of the EC is submitted. | 01 Oct 2018 | 2. | NA | The correction have been made as per the instruction received | 11 Oct 2018 | |
Additional Detail Sought : NIL |
| Undertaking |
| I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief. And I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity/ construction/ expansion has since been taken up. |
| Name of Applicant | Amit Prabhakar Kore | Designation | Chairman | Name of Company (Applicant Name should not be given here) | HERMES DISTILLERY PRIVATE LIMITED | Address | Village - Yadrav, Taluka - Raibag, Dist.-Belgaum |
|