Form-2
APPLICATION FOR PRIOR ENVIRONMENTAL CLEARANCE
S. No.Item Details
1.
Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? No
Details of Project:
(a)Name of the project(s) Hermes Distillery Pvt. Ltd.
(b)Name of the Company / Organisation HERMES DISTILLERY PRIVATE LIMITED
(c)Registered Address Village - Yadrav, Taluka - Raibag, Dist.-Belgaum,,Belgaum,Karnataka-591317
(d)Legal Status of the Company Private
(e)Joint Venture No
2.
Address for the correspondence:
(a)Name of the Applicant Amit Prabhakar Kore
(b)Designation (Owner/ Partner/ CEO) Chairman
(c)Address Village - Yadrav, Taluka - Raibag, Dist. - Belgaum,,Raybag,Belgaum,Karnataka-591317
(d)Pin code 591317
(e)E-mail gm@hermesdistil.com
(f)STD Code. 831(f)Telephone No. 2465577
(g)Fax No.
(h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . Annexure-Uploaded Copy of documents in support of the competence/authority
3.
Category of the Project/Activity as per Schedule of EIA Notification,2006:
(a.I)Project/Activity5(g) Distilleries
Minor Activity
(b)Category A
(c)Proposal Number IA/KA/IND2/57292/2014
(d)Master Proposal Number(Single Window) SW/80098/2018
(e)EAC concerned (for category A Projects only) Industrial Projects - 2
(f)Project Type Expansion
4.
Location of the Project:
(a)Plot/Survey/Khasra No. Gat No.: 96/5A, 96/5B, 96/5C, 96/3A/2, 98/1B/3, 98
(b)Pincode 591317
(c)Bounded Latitudes (North)
From
Degree 16.522963
Minutes
Second
From
Degree 16.526198
Minutes
Second
(d)Bounded Longitudes (East)
From
Degree 74.719918
Minutes
Second
From
Degree 74.722720
Minutes
Second
(e)Survey of India Topo Sheet No. 47L10, 47L11, 47L14, 47L15
(f)Uploaded Topo Sheet File Copy of Topo Sheet File
(g)Maximum Elevation Above Means Sea Level(AMSL) 560
(h)Uploaded (kml) File Copy of Kml File      
(i)Distance of Nearest HFL from the project boundary within the study area 4
(j)Seismic Zone 3
5.
(a)Number of States in which Project will be Executed 1
(b)Main State of the project Karnataka
Details of State(s) of the project
S. No. State Name District Name Tehsil Name Village Name
(1.)KarnatakaBelgaumRaybag
6.
Details of Terms of Reference (ToR)/EC:
(a)MoEF&CC / SEIAA File Number J-11011/143/2014-1A II (I)
(c)Date of Issue of TOR 22 Sep 2014
(f)Previous TOR Letter Copy of Previous TOR letter
(b)Date of Apply of EC 09 Jul 2016
(c)Date of Issue of EC 31 Jan 2017
(d)Previous EC Letter Copy of Previous EC letter
7.
Details of Public Consultation:
(a)Whether the Project Exempted from Public Hearing?No
(b)Whether details of Public Hearing available? Yes
(c)Whether Public hearing was presided over by an officer of the rank of Additional District Magistrate or above Yes
     7.1.       Details of Public Hearing
S. No.Details of Advertisement Details of Public Hearing Venue Location DetailsNo. of People AttendedIssues RaisedDesignation of Presiding OfficerOther Designation of Presiding Officer
(1.)
Date of Advertisement :10 Jun 2018
Copy of advertisement :Copy of Advertisement
Copy of Public Hearing :Copy of Public Hearing
Date :11 Jul 2018
Distance of Public Hearing Venue from the Proposed Project :0
At the Factory site - Hermes Distillery Pvt. Ltd (HDPL) S. No. 96/5A, 96/5B, 96/5C, 96/3A/2, 98/1B/4 and 98/1A/5, Village Yadrav, Tal.: Raibag, Dist.: Belgavi, State: Karnataka
State :Karnataka
District :Belgaum
Tehsil :Raybag
Village :Yadrav
185There was no any major issues raised during Public hearing. Few issues raised they are as ā€“ provision of health care facilities, employment to local people, supply of boiler ash in subsidiary rate, trOthersAdditional District Magistrate
8.
Details of Project Configuration/Product:
Details Not Applicable
9.
In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii):
(a)Details of certified report on compliance of earlier environmental clearance condition
(i)Certified Compliance By Regional
(ii)Details of Regional Office of MoEFCC / Zonal Office of CPCB / SPCB / UTPCC from which certified report on Bangalore
(iii)Letter No. EP/12.1/2016-2017/10/KAR 436
(iv)Status of Compliance Compiled
(v)Certified report on compliance of earlier environmental clearance conditions (Including Monitoring Report) Copy of Certified Compliance Report
(vi)Date of site visit May 29 2018 12:00AM
(b)Details of Capacity Expansion
S. No.Product/Activity (Capacity/Area)Quantity FromQuantity ToTotal UnitOther UnitMode of Transport / Transmission of ProductOther Mode of Transport / Transmission of Product
(1.)Ethanol100200300Kilo Litre per Day(KLD)Road
(2.)Extra Neutral Alcohol100200300Kilo Litre per Day(KLD)Road
(3.)IMFL Bottling Plant86.4130216Kilo Litre per Day(KLD)Road
(4.)Rectified Spirit (RS)100200300Kilo Litre per Day(KLD)Road
(c)Details of Configuration
S. No.Plant / Equipment / Facility Existing ConfigurationProposed ConfigurationFinal configuration after expansionRemarks
(1.)IMFL Bottling Plant86.4 KLPD130 KLPD216 KLPD
(2.)Distillery100 KLPD200 KLPD300 KLPDAfter expansion-200 KLPD molasses based & 100 KLPD grain based distillery
9.1.
Details of Consent to Operate
(i)Whether Consent to operate obtained ? NA
(ii)Copies of all Consent to operate obtained since inception NA
(iii)Date of Issue 01 Dec 2016
(iv)Valid Upto 30 Jun 2021
(v)File No. AW-302203
(vi)Application No. 31631
(vii)Copy of Consent to operate valid as on date Copy of Consent to Operate
10.
Project Cost:
(a)Total Cost of the Project at current price level (in Crores) 153
(b) Funds Allocated for Environment Management (Capital) (in Crores) 82.05
(c) Funds Allocated Towards CER (Corporate Environment Responsibility) (in Crores) 4.4
(d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in Crores) 7.2
11.
Whether project attracts the General Condition specified in the Schedule of EIA Notification ? No
12.
Whether project attract the Specific Condition specified in the Schedule of EIA Notification ? No
13.
Raw Material / Fuel Requirement:
(a)Proposed quantity of raw material/fuel 10800
(b)Existing quantity of raw material/fuel 10800
(c)Total quantity of raw material/fuel 21600
    13.1.        Raw Material / Fuel Profile
S. No.Raw Material / Fuel QuantityUnitOther UnitSource (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received )Mode of TransportOther Mode of TransportDistance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received)Type of Linkage Other Type of Linkage Uploaded Copy of Linkage
(1.)Molasses118800Tons per AnnumNearby sugar FactoriesRoad50 OthersTenderCopy of Linkage
(2.)Coal95040Tons per AnnumVendorsRoad780 Open MarketCopy of Linkage
(3.)Grains ā€“ Maize, jowar, broken rice891000Tons per Annumnearby farm landsRoad30 Open MarketCopy of Linkage
14.
Baseline Data :
(a)Period of Base Line Data Collection FROM 02 Oct 2017 To 31 Dec 2017
(b)Season Post-Monsoon
    14.1.     No. of ambient Air Quality (AAQ) monitoring locations : 8
S. No.Criteria Pollutants Other Criteria PollutantsUnitMaximum ValueMinimum Value98 Percentile ValuePrescribed Standard
(1.)PM10Micro Gram per Meter Cube70.4541.6858.76100
(2.)PM2.5Micro Gram per Meter Cube25.9814.8522.3060
(3.)NOxMicro Gram per Meter Cube56.9735.5050.1080
(4.)SO2Micro Gram per Meter Cube39.6825.2035.4780
    14.2.     No. of Ground Water monitoring locations : 5
S. No.Criteria Pollutants Other Criteria PollutantsHeavy MetalUnitOther UnitMaximum ValueMinimum ValueDesirable LimitMaximum Permissible Limit
(1.)Total Hardnessmg/l393.83186.53200200
(2.)Chloridesmg/l255.74181.20250250
(3.)pHNA7.367.076.58.5
(4.)Fluoridemg/l0.350.1711
(5.)TSSmg/l5042100100
(6.)TDSmg/l1044.22680.80500500
    14.3.     No. of Surface Water monitoring locations : 8
S. No.Criteria Pollutants Other Criteria PollutantsUnitOther UnitMaximum ValueMinimum ValueClassification of inland water body
(1.)pHNA7.867.07E
(2.)CODmg/l264.2122.6E
(3.)BODmg/l95.518.7E
(4.)DOmg/l4.71.2E
    14.4.     No. of Ambient Noise monitoring locations : 8
S. No.Parameter UnitMaximum ValueMinimum ValuePrescribed Standard
(1.)Leq(Day)A-weighted decibels(dB(A))73.243.275
(2.)Leq(Night)A-weighted decibels(dB(A))64.334.470
    14.5.     No. of Soil Sample Monitored locations : 8
S. No.Parameter UnitOther UnitMaximum ValueMinimum Value
(1.)pHOthersNA8.347.41
(2.)P(Phosphorus)Milligram per Kilogram4.172.14
(3.)K(Potassium)Milligram per Kilogram91.6451.80
(4.)Electric ConductivityMillisiemens per Centimetre0.270.13
(5.)N(Nitrogen)Kilogram per hectare62.5925.16
14.6.
Details of Ground Water Table:
(a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) From 16.75 To 4.9
(b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) From 12.42 To 2.08
(c)Whether Ground Water Intersection will be there ? No
     15.      Details of Water Requirement (During Operation)
S. No.Source Source Other Required Quantity (Kilolitre per Day (Kld))Distance from SourceCopy of Permission from Competent Authority Mode of TransportOther Mode of TransportMethod of Water WithdrawalOther Method of Water WithdrawalLetter No.Date of IssuePermitted Quantity
(1.)Surface11815Copy of Permission LetterPipelineJack WellJ.S.E.IIH.A.Y. 201627 Dec 2016575757
15.1.
(a)Whether Desalination is proposed No
    16.       Waste Water Management(During Operation)
S. No.Type/Source Quantity of Waste Water Generated (Kilolitre per Day)Treatment Capacity (Kilolitre per Day) Treatment MethodMode of DisposalOther Mode of DisposalQuantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day)Quantity of Discharged Water (Kilolitre per Day)
(1.)Domestic Effluent220Proposed STPGreen Belt Renewal Plant2
(2.)Industrial effluent790880CPU comprises of Primary-secondary and tertiary treatmentReuse within the Plant & Recycling790
16.1.
(a)Total Waste Water Generation (Kilolitre per Day) 792
(b)Total Discharged Water (Kilolitre per Day) 0
(c)Total Reused Water (Kilolitre per Day) 792
    17.       Solid Waste Generation/Management
S. No.Name of Waste Item Other ItemQuantity per AnnumUnitDistance from Site(KM)Mode of TransportOther Mode of TransportMode of DisposalOther Mode of Disposal
(1.)Yeast SludgeIndustrial Waste6600Tons0Conveyor BeltCo-Processing
(2.)Boiler AshBottom Ash34089Tons30RoadAuthorized Recyclers
(3.)CPU sludgeIndustrial Waste330Tons30RoadOthersused as mannure
18.
    18.1.     Air Quality Impact Prediction
S. No.Criteria Pollutants Other Criteria PollutantsUnitBaseline ConcentrationDistance GLCIncremental ConcentrationTotal GLCPrescribed Standard
(1.)NOxMicrogram per Meter Cube56.9714.50.00456.97480
(2.)PM10Microgram per Meter Cube58.7614.50.00658.766100
(3.)PM2.5Microgram per Meter Cube22.3014.50.001422.301460
(4.)SO2Microgram per Meter Cube35.4714.50.0735.5480
    18.2.     Stack Details
S. No.Source FuelStack Height(m)Stack Diameter(m)PollutantsOther PollutantsEmission (GLS)
(1.)35 TPH BoilerCoal+Spentwash901.5SO260.87
19.
Power Requirement:
(a)Quantity (Kilo Volt Amps (kVA)) 7000
(b)Source own Co-gen plant
(c)Uploaded Copy of Agreement Copy of Agreement
(d)Standby Arrangement (Details of DG Sets) 625 KVA
(e)Stack Height (in m) 7
20.
Land Ownership Pattern:
(a)Forest Land (ha.) 0
(b)Private Land (ha.) 7.22
(c)Government Land (ha.) 0
(d)Revenue Land (ha.) 0
(e)Other Land (ha.) 0
    Total Land (ha.) 7.22
21.
Present Land Use Breakup of the Study Area in Ha:
(a)Agriculture Area (ha.) 12672
(b)Waste/Barren Land (ha.) 4103
(c)Grazing/ Community Land (ha.) 0
(d)Surface Water Bodies (ha.) 448
(e)Settlements (ha.) 1828
(f)Industrial (ha.) 0
(g)Forest (ha.) 2998
(h)Mangroves (ha.) 0
(i)Marine Area (ha.) 0
(j)Others (ha.) : Fallow land 9367
    Total (ha.) 31416
    22.     Land requirement for various activities
S. No.Description of Activity / Facility / Plant / Others OthersLand Requirement (ha.)Remarks
(1.)Built Up Area4.86
(2.)Green belt2.57
Total (ha.) 7.43
23.
Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Sanctuaries; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones :
    23.1.     Details of Ecological Sensitivity :
S. No.Details of Ecological Sensitivity NameDistance from the Project (Km)Remarks
(1.)ESAsNil0There is no presence of any CPA, WLS, NPA, ESAs, ESZs, Corridors & wildlife corridors in 10 Km radius of project.
(2.)Critically Polluted AreaNil0There is no presence of any CPA, WLS, NPA, ESAs, ESZs, Corridors & wildlife corridors in 10 Km radius of project.
(3.)WLSNil0There is no presence of any CPA, WLS, NPA, ESAs, ESZs, Corridors & wildlife corridors in 10 Km radius of project.
(4.)ESZsNil0There is no presence of any CPA, WLS, NPA, ESAs, ESZs, Corridors & wildlife corridors in 10 Km radius of project.
(5.)NPANil0There is no presence of any CPA, WLS, NPA, ESAs, ESZs, Corridors & wildlife corridors in 10 Km radius of project.
(6.)CorridorsNil0There is no presence of any CPA, WLS, NPA, ESAs, ESZs, Corridors & wildlife corridors in 10 Km radius of project.
(7.)Wildlife CorridorsNil0There is no presence of any CPA, WLS, NPA, ESAs, ESZs, Corridors & wildlife corridors in 10 Km radius of project.
    23.2.     Details of Environmental Sensitivity :
S. No.Details of Environmental Sensitivity Other Details of Environmental Sensitivity NameDistance from the Project (Km)Remarks
(1.)Archaeological SitesRaibag Palace8Not notified by Archaeological department
(2.)Defence InstallationsNil0There is no presence of defence installation in 10 Km radius of project.
(3.)ForestShivaji Park reserve forest2.2Its an scrub land
23.3.
(a)Whether Noc / Permission from the competent authority is required? No
(b)Whether NBWL recommendation is required? No
24.
Forest Land:
Whether any Forest Land involved? No
25.
Tree Cutting:
(a)No. of Trees Cut for the Project (if Forest Land not Involved) 0
(b)Details of Tree Cutting and Planting of Trees Not Applicable
26.
Land Acquisition Status:
(a)Acquired Land(Ha) 0
(b)Land yet to be acquired(Ha) 0
(c)Status of Land acquisition if not acquired Nil
27.
Rehabilitation and Resettlement (R&R):
(a)No. of Villages 0
(b)No. of Households 0
(c)No. of PDFs (Project Displaced Families) 0
(d)No. of PAFs (Project Affected Families) 0
(e)Funds Allocated for R&R(in INR) (in Lacs) 0
(f)Status of R&R Completed
28.
Details of Presence of Schedule-I Species:
(a)Whether there is Presence of Schedule-I Species ? No
(b)Whether conservation plan for Schedule-I Species has been prepared ? No
(c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? No
29.
Details of Presence of Water Bodies in Core Area:
(a)Whether there is Presence of Water Bodies in Core Area ? No
(b)Whether there is Diversion Required ? No
(c)Whether permission has been obtained from competent authority ? No
30.
Details of Presence of Water Bodies in Buffer Area:
(a)Whether there is Presence of Water Bodies in Buffer Area ? No
31.
Manpower Requirement:
(a)Permanent Employment-During Construction 0
(b)Permanent Employment-During Operation 123
(c)Temporary Employment- During Construction 30
(d)Temporary Employment- During Operation 0
(e)No. of working days 330
(f)Total Manpower 153
32.
Green Belt in Ha:
(a)Uploaded Green Belt plan Copy of Green Belt Plan
S. No.Description ExistingProposedTotal
(1.)Total Area of Green Belt95501618725737
(2.)Percentage of Total Project Area1323.436
(3.)No. of Plants60001030016300
(4.)Funds Allocated150000010000002500000
    33.         Project Benefits
S. No.Type of Project Benefits Details of Project Benefits
(1.)SocialActivities under proposed expansion project of HDPL would improve socio-economic status of people in the study area in terms of local employment and contract basis jobs by providing employment opportunities to the skilled and semi-skilled local populace, especially in small-scale business and other related services.
   34.   CRZ Specific Details : Not Applicable
   35.   Sector Specific Details : NOT APPLICABLE
   35.   Sector Specific Details For Industrial Projects - 2
S. No.Item Details
S. No.Item Details
36.
Details of Court Cases:
(a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? No
37.
Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act:
(a)Whether any Direction issued under EPA Act/Air Act/Water Act ? No
38.
Details of EIA Consultant:
(a)Have you hired Consultant for preparing document? Yes
(i)Accreditation No. NABET/EIA/1518/SA 063 dated 01.06.2018
(ii)Name of the EIA Consultant Equinox Environmets (I) Pvt. Ltd.
(iii)Address F-11, Namdev Nest, 1160 ā€˜Eā€™ ward, Opp. Kamala College, Sykes Extension, Kolhapur
(iv)Mobile No. 9657865122
(v)Landline No. 0231253123
(vi)Email Id projects@equinoxenvi.com
(vii)Category of Accreditation A
(viii)Sector of Accreditation Industrial Projects - 2
(ix)Validity of Accreditation 21 Oct 2018
(x)Uploaded Certificate of Accreditation certified by QCI/NABET Copy of Certificate of Accreditation
39.
Documents to be Attached:
(a)Uploaded Copy of EIA/EMP Report Copy of EIA/EMP
Copy of EIA/EMP(Annexures)
Copy of EIA/EMP(Plans/Figures)
(b)Uploaded Copy of Risk Assessment Report Copy of Risk Assessment
(c)Uploaded Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan
(d)Uploaded Copy of Final Layout Plan Copy of Final Layout Plan
(e)Uploaded Cover Letter Copy of Cover Letter
(f)Uploaded Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency
(g)Uploaded Additional File Copy of Additional File
(h)Uploaded Proposal Presentation (To be given in EAC meeting) NA
            Essential Detail Sought:
Sno. EDS Letter Remarks Date of EDS
1.NAPlease clarify the following:- - Production of RS/ENA/AA and IMFL Bottling Plant never exceeded the approved capacity of 100 KLPD & 86.4 KLPD respectively along with the supporting documents, - Additional water requirement for the proposed expansion and the firm commitment of the concerned regulatory authority to supply the same, - Neither the ToR details are given against item No.6, nor copy of the EC is submitted. 01 Oct 2018
2.NAThe correction have been made as per the instruction received 11 Oct 2018
      Additional Detail Sought : NIL
Undertaking
I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief. And I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity/ construction/ expansion has since been taken up.
Name of ApplicantAmit Prabhakar Kore
DesignationChairman
Name of Company (Applicant Name should not be given here)HERMES DISTILLERY PRIVATE LIMITED
AddressVillage - Yadrav, Taluka - Raibag, Dist.-Belgaum
Print