Form-2
APPLICATION FOR PRIOR ENVIRONMENTAL CLEARANCE
S. No.Item Details
1.
Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? No
Details of Project:
(a)Name of the project(s) Expansion of group housing "The Melia"
(b)Name of the Company / Organisation DSS BUILDTECH PRIVATE LIMITED
(c)Registered Address Village- Mohammadpur Gujjar, Sector - 35, Sohna Gurgaon, Haryana,,Gurgaon,Haryana-122103
(d)Legal Status of the Company Private
(e)Joint Venture No
2.
Address for the correspondence:
(a)Name of the Applicant Paras Kumar Jain
(b)Designation (Owner/ Partner/ CEO) Director
(c)Address 506, Time Square Building, B block, Shushant Lok, Phase - 1, Gurgaon,,Sohna,Gurgaon,Haryana-122103
(d)Pin code 122103
(e)E-mail dssbuildtechprivatelimited@gmail.com
(f)STD Code. 120(f)Telephone No. 4044630
(g)Fax No.
(h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . Annexure-Uploaded Copy of documents in support of the competence/authority
3.
Category of the Project/Activity as per Schedule of EIA Notification,2006:
(a.I)Project/Activity8(a) Building and Construction projects
Minor Activity8(a) Building and Construction projects
(b)Category B2
   Reason for Applying at Ministry SEIAA
(c)Proposal Number IA/HR/MIS/80191/2015
(d)Master Proposal Number(Single Window) SW/80183/2018
(e)EAC concerned (for category A Projects only) INFRA-2
(f)Project Type Expansion
4.
Location of the Project:
(a)Plot/Survey/Khasra No. VILLAGE MOHAMMADPUR GUJJAR, SECTOR-35, SOHNA, DIST
(b)Pincode 122004
(c)Bounded Latitudes (North)
From
Degree 281651.44
Minutes
Second
From
Degree 28171.86
Minutes
Second
(d)Bounded Longitudes (East)
From
Degree 77322.69
Minutes
Second
From
Degree 77337.38
Minutes
Second
(e)Survey of India Topo Sheet No. H43X3
(f)Uploaded Topo Sheet File Copy of Topo Sheet File
(g)Maximum Elevation Above Means Sea Level(AMSL) 214
(h)Uploaded (kml) File Copy of Kml File      
(i)Distance of Nearest HFL from the project boundary within the study area 38
(j)Seismic Zone 4
5.
(a)Number of States in which Project will be Executed 1
(b)Main State of the project Haryana
Details of State of the project
S. No. State Name District Name Tehsil Name Village Name
NIL
6.
Details of Terms of Reference (ToR)/EC:
(a)MoEF&CC / SEIAA File Number 21-86/2018-IA-III
(c)Date of Issue of TOR 01 Oct 2015
(f)Previous TOR Letter Copy of Previous TOR letter
(b)Date of Apply of EC 26 Sep 2018
(c)Date of Issue of EC 28 Jan 2019
(d)Previous EC Letter Copy of Previous EC letter
7.
Details of Public Consultation:
(a)Whether the Project Exempted from Public Hearing?Yes
(b)Reason It is a 8(a) building and construction project. Pu
(c)Supporting Document Copy of Supporting Document
8.
Details of Project Configuration/Product:
Details Not Applicable
9.
In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii):
(a)Details of certified report on compliance of earlier environmental clearance condition
(i)Certified Compliance By Regional
(ii)Details of Regional Office of MoEFCC / Zonal Office of CPCB / SPCB / UTPCC from which certified report on Chandigarh
(iii)Letter No. 16-58/2016-RO(NZ)/1024
(iv)Status of Compliance Compiled
(v)Certified report on compliance of earlier environmental clearance conditions (Including Monitoring Report) Copy of Certified Compliance Report
(vi)Date of site visit Jul 25 2018 12:00AM
(b)Details of Capacity Expansion
S. No.Product/Activity (Capacity/Area)Quantity FromQuantity ToTotal UnitOther UnitMode of Transport / Transmission of ProductOther Mode of Transport / Transmission of Product
(1.)Built up Area000Tons per Annum(TPA)Road
(c)Details of Configuration
S. No.Plant / Equipment / Facility Existing ConfigurationProposed ConfigurationFinal configuration after expansionRemarks
(1.)00000
9.1.
Details of Consent to Operate
(i)Whether Consent to operate obtained ? NA
(ii)Copies of all Consent to operate obtained since inception NA
(iii)Date of Issue 26 Sep 2018
(iv)Valid Upto 26 Sep 2018
(v)File No. 0
(vi)Application No. 0
(vii)Copy of Consent to operate valid as on date Copy of Consent to Operate
10.
Project Cost:
(a)Total Cost of the Project at current price level (in Crores) 430
(b) Funds Allocated for Environment Management (Capital) (in Crores) 1.53
(c) Funds Allocated Towards CER (Corporate Environment Responsibility) (in Crores) 8.6
(d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in Crores) 0.45
11.
Whether project attracts the General Condition specified in the Schedule of EIA Notification ? No
12.
Whether project attract the Specific Condition specified in the Schedule of EIA Notification ? No
13.
Raw Material / Fuel Requirement:
(a)Proposed quantity of raw material/fuel 0
(b)Existing quantity of raw material/fuel 0
(c)Total quantity of raw material/fuel 0
    13.1.        Raw Material / Fuel Profile
S. No.Raw Material / Fuel QuantityUnitOther UnitSource (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received )Mode of TransportOther Mode of TransportDistance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received)Type of Linkage Other Type of Linkage Uploaded Copy of Linkage
(1.)Not Applicable0Hectares0Road0 e-auctionCopy of Linkage
14.
Baseline Data :
(a)Period of Base Line Data Collection FROM 01 Oct 2015 To 01 Nov 2015
(b)Season Post-Monsoon
    14.1.     No. of ambient Air Quality (AAQ) monitoring locations : 6
S. No.Criteria Pollutants Other Criteria PollutantsUnitMaximum ValueMinimum Value98 Percentile ValuePrescribed Standard
(1.)OthersCOMicro Gram per Meter Cube0002
(2.)PM2.5Micro Gram per Meter Cube48.3145.7446.3160
(3.)SO2Micro Gram per Meter Cube15.069.1412.9180
(4.)PM10Micro Gram per Meter Cube97.9495.9497.08100
(5.)NOxMicro Gram per Meter Cube31.721.327.480
    14.2.     No. of Ground Water monitoring locations : 6
S. No.Criteria Pollutants Other Criteria PollutantsHeavy MetalUnitOther UnitMaximum ValueMinimum ValueDesirable LimitMaximum Permissible Limit
(1.)TSSNA0000
(2.)TDSNA6905305002000
(3.)Total HardnessOthersas CaCo3401.5382.18200600
(4.)ChloridesOthersas Cl90.362.52501000
(5.)OthersCadmiumOthersas Cd0000.003
(6.)pHNA7.517.286.58.5
(7.)FluorideOthersas F0.820.6411.5
(8.)Heavy MetalsLeadOthersas Pb00515
    14.3.     No. of Surface Water monitoring locations : 0
S. No.Criteria Pollutants Other Criteria PollutantsUnitOther UnitMaximum ValueMinimum ValueClassification of inland water body
(1.)pHNA00E
(2.)BODmg/l00E
(3.)CODmg/l00E
(4.)DOmg/l00E
    14.4.     No. of Ambient Noise monitoring locations : 6
S. No.Parameter UnitMaximum ValueMinimum ValuePrescribed Standard
(1.)Leq(Night)A-weighted decibels(dB(A))43.941.645
(2.)Leq(Day)A-weighted decibels(dB(A))54.152.455
    14.5.     No. of Soil Sample Monitored locations : 6
S. No.Parameter UnitOther UnitMaximum ValueMinimum Value
(1.)N(Nitrogen)Percent271.83231.15
(2.)P(Phosphorus)Kilogram per hectare45.3736.41
(3.)Electric ConductivityOthersseimens0.7480.731
(4.)K(Potassium)Kilogram per hectare91.7387.91
(5.)pHOthersNA7.637.52
14.6.
Details of Ground Water Table:
(a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) From 3.3 To 79.70
(b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) From 3.05 To 77.5
(c)Whether Ground Water Intersection will be there ? No
     15.      Details of Water Requirement (During Operation)
S. No.Source Source Other Required Quantity (Kilolitre per Day (Kld))Distance from SourceCopy of Permission from Competent Authority Mode of TransportOther Mode of TransportMethod of Water WithdrawalOther Method of Water WithdrawalLetter No.Date of IssuePermitted Quantity
(1.)OthersHUDA70716.30Copy of Permission LetterPipelineOthersHUDA910,141321 Feb 2016860
15.1.
(a)Whether Desalination is proposed No
    16.       Waste Water Management(During Operation)
S. No.Type/Source Quantity of Waste Water Generated (Kilolitre per Day)Treatment Capacity (Kilolitre per Day) Treatment MethodMode of DisposalOther Mode of DisposalQuantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day)Quantity of Discharged Water (Kilolitre per Day)
(1.)Waste Water418875MBBROthersDischarge into External sewage37642
16.1.
(a)Total Waste Water Generation (Kilolitre per Day) 418
(b)Total Discharged Water (Kilolitre per Day) 42
(c)Total Reused Water (Kilolitre per Day) 376
    17.       Solid Waste Generation/Management
S. No.Name of Waste Item Other ItemQuantity per AnnumUnitDistance from Site(KM)Mode of TransportOther Mode of TransportMode of DisposalOther Mode of Disposal
(1.)Solid WasteMunicipal Solid Waste1423.73Tons0RoadTreatment, Storage and Disposal Facility(TSDF)
18.
    18.1.     Air Quality Impact Prediction
S. No.Criteria Pollutants Other Criteria PollutantsUnitBaseline ConcentrationDistance GLCIncremental ConcentrationTotal GLCPrescribed Standard
(1.)NOxMicrogram per Meter Cube27.418001.8329.2480
(2.)PM2.5Microgram per Meter Cube000060
(3.)PM10Microgram per Meter Cube47.858000.0747.92100
(4.)SO2Microgram per Meter Cube15.068000.2615.3280
    18.2.     Stack Details
S. No.Source FuelStack Height(m)Stack Diameter(m)PollutantsOther PollutantsEmission (GLS)
(1.)D.G setlow sulphur diesal50.90.412PM100.07
(2.)D.G setlow sulphur Diesal50.90.412NOx1.83
(3.)D.G SetLow sulphur Diesal50.90.412SO20.26
19.
Power Requirement:
(a)Quantity (Kilo Volt Amps (kVA)) 6063
(b)Source DHBVN
(c)Uploaded Copy of Agreement Copy of Agreement
(d)Standby Arrangement (Details of DG Sets) 2 no. of DG sets of total capacity 1635 kVA (1
(e)Stack Height (in m) 50.9
20.
Land Ownership Pattern:
(a)Forest Land (ha.) 0
(b)Private Land (ha.) 0
(c)Government Land (ha.) 0
(d)Revenue Land (ha.) 0
(e)Other Land (ha.) 7.046
    Total Land (ha.) 7.046
21.
Present Land Use Breakup of the Study Area in Ha:
(a)Agriculture Area (ha.) 0
(b)Waste/Barren Land (ha.) 0
(c)Grazing/ Community Land (ha.) 0
(d)Surface Water Bodies (ha.) 0
(e)Settlements (ha.) 0
(f)Industrial (ha.) 0
(g)Forest (ha.) 0
(h)Mangroves (ha.) 0
(i)Marine Area (ha.) 0
(j)Others (ha.) : Residential land 7.046
    Total (ha.) 7.046
    22.     Land requirement for various activities
S. No.Description of Activity / Facility / Plant / Others OthersLand Requirement (ha.)Remarks
(1.)OthersPlot Area7.046
Total (ha.) 7.046
23.
Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Sanctuaries; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones :
    23.1.     Details of Ecological Sensitivity :
S. No.Details of Ecological Sensitivity NameDistance from the Project (Km)Remarks
(1.)Critically Polluted AreaNot applicable0NA
(2.)NPANot applicable0NA
(3.)CorridorsNot Applicable0NA
(4.)ESZsNot applicable0NA
(5.)ESAsNot Applicable0NA
(6.)WLSNOT applicable0NA
(7.)Wildlife CorridorsNot applicable0NA
    23.2.     Details of Environmental Sensitivity :
S. No.Details of Environmental Sensitivity Other Details of Environmental Sensitivity NameDistance from the Project (Km)Remarks
(1.)Defence InstallationsNONE0Not Applicable
(2.)ForestNONE0Not Applicable
(3.)Archaeological SitesNONE0Not Applicable
23.3.
(a)Whether Noc / Permission from the competent authority is required? No
(b)Whether NBWL recommendation is required? No
24.
Forest Land:
Whether any Forest Land involved? No
25.
Tree Cutting:
(a)No. of Trees Cut for the Project (if Forest Land not Involved) 0
(b)Details of Tree Cutting and Planting of Trees Copy of Details of Tree Cutting and Planting of Trees
26.
Land Acquisition Status:
(a)Acquired Land(Ha) 7.046
(b)Land yet to be acquired(Ha) 0
(c)Status of Land acquisition if not acquired 0
27.
Rehabilitation and Resettlement (R&R):
(a)No. of Villages 0
(b)No. of Households 0
(c)No. of PDFs (Project Displaced Families) 0
(d)No. of PAFs (Project Affected Families) 0
(e)Funds Allocated for R&R(in INR) (in Lacs) 0
(f)Status of R&R Completed
28.
Details of Presence of Schedule-I Species:
(a)Whether there is Presence of Schedule-I Species ? No
(b)Whether conservation plan for Schedule-I Species has been prepared ? No
(c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? No
29.
Details of Presence of Water Bodies in Core Area:
(a)Whether there is Presence of Water Bodies in Core Area ? No
(b)Whether there is Diversion Required ? No
(c)Whether permission has been obtained from competent authority ? No
30.
Details of Presence of Water Bodies in Buffer Area:
(a)Whether there is Presence of Water Bodies in Buffer Area ? Yes
(i)Details of Water Bodies in Buffer Area Damdama lake, Mahendwari Nadi
(ii)Direction of Water Bodies in Buffer Area East
(iii)Distance of Water Bodies in Buffer Area 5
31.
Manpower Requirement:
(a)Permanent Employment-During Construction 75
(b)Permanent Employment-During Operation 75
(c)Temporary Employment- During Construction 75
(d)Temporary Employment- During Operation 75
(e)No. of working days 275
(f)Total Manpower 300
32.
Green Belt in Ha:
(a)Uploaded Green Belt plan Copy of Green Belt Plan
S. No.Description ExistingProposedTotal
(1.)Total Area of Green Belt18882.141612.5220494
(2.)Percentage of Total Project Area26430
(3.)No. of Plants453159612
(4.)Funds Allocated9261153
    33.       Project Benefits
S. No. Type of Project BenefitsDetails of Project Benefits
NIL
   34.   CRZ Specific Details : Not Applicable
   35.   Sector Specific Details For INFRA-2
S. No.Item Details
1.
Details of Building Construction:
(a)Maximum Height of the Building (Meters) 44.9
(b)Total No. of Flats to be Build 1271
(c)No. of Buildings 12
(d)Total plot area (sqm) 70455.77
(e)Total built up area (sqm) 157562.486
2.
Foreshore Facilities and/or Marine Disposal:
(a)Whether Project Involves Foreshore Activities and/or marine Disposal? No
3.
Rain Water Harvesting:
(a)No. of Storage 0
(b)Capacity 0
(c)No. of Recharge Pits 18
(d)Capacity 78.5
4.
Parking:
(a)Details of 4 Wheeler/ 2 Wheeler Parking 1760
5.
Energy Saving Measures:
(a)Source/Mode Solar lamps, LED
(b)Percentage 1
(c)Quantity 61
6.
Other details:
(a)Details of impact on Water Bodies and Drainage patters of catchment area No impact
(b)Details of Traffic Density Impact Assessment and Modelling Study Copy of Details of Traffic Density Impact Assessment and Modelling Study
(c)In case Underground Tunnel Project below the Forest Land - Subsidence Impact Study report Copy of Underground Tunnel Project below the Forest Land - Subsidence Impact Study report
     7.       Type of Industries to be established with Industrial Estate as per their category A/B
S. No.Type of IndustryNo. of UnitsCategory A/B
NIL
8.
Length of the alignment N/A
9.
Details Bridges/ROB/Interchanges,Flyovers,Vehicle Underpass and Pedestrian Underpass
Details Not Applicable
S. No.Item Details
36.
Details of Court Cases:
(a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? No
37.
Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act:
(a)Whether any Direction issued under EPA Act/Air Act/Water Act ? No
38.
Details of EIA Consultant:
(a)Have you hired Consultant for preparing document? Yes
(i)Accreditation No. NABET/EIA/1619/RA0064
(ii)Name of the EIA Consultant GRC India Pvt. Ltd.
(iii)Address F-374,375, F block, Sector 62, Noida, Uttar Pradesh
(iv)Mobile No. 8377904041
(v)Landline No. 0120404463
(vi)Email Id eia@grc-india.com
(vii)Category of Accreditation A
(viii)Sector of Accreditation INFRA-2
(ix)Validity of Accreditation 04 Dec 2019
(x)Uploaded Certificate of Accreditation certified by QCI/NABET Copy of Certificate of Accreditation
39.
Documents to be Attached:
(a)Uploaded Copy of EIA/EMP Report Copy of EIA/EMP
Copy of EIA/EMP(Annexures)
Copy of EIA/EMP(Plans/Figures)
(b)Uploaded Copy of Risk Assessment Report Copy of Risk Assessment
(c)Uploaded Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan
(d)Uploaded Copy of Final Layout Plan Copy of Final Layout Plan
(e)Uploaded Cover Letter Copy of Cover Letter
(f)Uploaded Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency
(g)Uploaded Additional File Copy of Additional File
(h)Uploaded Proposal Presentation (To be given in EAC meeting) NA
      Essential Detail Sought : NIL
      Additional Detail Sought : NIL
Undertaking
I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief. And I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity/ construction/ expansion has since been taken up.
Name of ApplicantParas Kumar Jain
DesignationDirector
Name of Company (Applicant Name should not be given here)DSS BUILDTECH PRIVATE LIMITED
AddressVillage- Mohammadpur Gujjar, Sector - 35, Sohna Gurgaon, Haryana
Print