Form-2
APPLICATION FOR PRIOR ENVIRONMENTAL CLEARANCE
S. No.Item Details
1.
Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? No
Details of Project:
(a)Name of the project(s) Jamrani Dam Multipurpose Project
(b)Name of the Company / Organisation Irrigation Department
(c)Registered Address Jamrani Dam Construction Division 2, Dumwadhunga, Haldwani,,Nainital,Uttarakhand-263139
(d)Legal Status of the Company State Government
(e)Joint Venture No
2.
Address for the correspondence:
(a)Name of the Applicant Javed Anwar
(b)Designation (Owner/ Partner/ CEO) EXECUTIVE ENGINEER
(c)Address NIL
(d)Pin code 263139
(e)E-mail eejdcd3@gmail.com
(f)STD Code. 5946(f)Telephone No. 222315
(g)Fax No.
(h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . Annexure-Uploaded Copy of documents in support of the competence/authority
3.
Category of the Project/Activity as per Schedule of EIA Notification,2006:
(a.I)Project/Activity1(c) River Valley projects
Minor Activity
(b)Category A
(c)Proposal Number IA/UK/RIV/80127/2006
(d)Master Proposal Number(Single Window) SW/79928/2018
(e)EAC concerned (for category A Projects only) River Valley and Hydroelectric Projects
(f)Project Type Fresh EC
4.
Location of the Project:
(a)Plot/Survey/Khasra No. 53O/11
(b)Pincode 263139
(c)Bounded Latitudes (North)
From
Degree 3238722.99
Minutes
Second
From
Degree 3238793.23
Minutes
Second
(d)Bounded Longitudes (East)
From
Degree 364939.13
Minutes
Second
From
Degree 364961.56
Minutes
Second
(e)Survey of India Topo Sheet No. 53O/11
(f)Uploaded Topo Sheet File Copy of Topo Sheet File
(g)Maximum Elevation Above Means Sea Level(AMSL) 765.60
(h)Uploaded (kml) File Copy of Kml File      
(i)Distance of Nearest HFL from the project boundary within the study area 0.0014
(j)Seismic Zone 4
5.
(a)Number of States in which Project will be Executed 1
(b)Main State of the project Uttarakhand
Details of State of the project
S. No. State Name District Name Tehsil Name Village Name
NIL
6.
Details of Terms of Reference (ToR):
(a)MoEF&CC / SEIAA File Number J-12011/4/2007-IA-I
(b)Date of Apply of TOR 27 Nov 2006
(c)Date of Issue of TOR / Standard ToR 23 Apr 2007
(d)Previous TOR Letter Copy of Previous TOR letter
7.
Details of Public Consultation:
(a)Whether the Project Exempted from Public Hearing?No
(b)Whether details of Public Hearing available? Yes
(c)Whether Public hearing was presided over by an officer of the rank of Additional District Magistrate or above Yes
     7.1.       Details of Public Hearing
S. No.Details of Advertisement Details of Public Hearing Venue Location DetailsNo. of People AttendedIssues RaisedDesignation of Presiding OfficerOther Designation of Presiding Officer
(1.)
Date of Advertisement :10 Apr 2008
Copy of advertisement :Copy of Advertisement
Copy of Public Hearing :Copy of Public Hearing
Date :12 May 2008
Distance of Public Hearing Venue from the Proposed Project :0.8
Damuadunga
State :Uttarakhand
District :Nainital
Tehsil :Haldwani
Village :Damuadunga
124Compensation against land acquisition and supply of clear waterOthers
8.
Details of Project Configuration/Product:
     8.1.       Project Configuration
S. No.Plant/Equipment/FacilityConfigurationRemarks
(1.)Irrigation150027 haCCA
     8.2.       Product
S. No.Product/Activity (Capacity/Area)QuantityUnitOther UnitMode of Transport / Transmission of ProductOther Mode of Transport / Transmission of Product
(1.)Irrigation150027HectaresOthersPIpeline
(2.)Hydro power generation14Mega Watt(MW)OthersTurbine
9.
In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii):
Details Not Applicable
9.1.
Details of Consent to Operate
(i)Whether Consent to operate obtained ? NA
(ii)Copies of all Consent to operate obtained since inception NA
(iii)Date of Issue N/A
(iv)Valid Upto N/A
(v)File No. NA
(vi)Application No. NA
(vii)Copy of Consent to operate valid as on date NA
10.
Project Cost:
(a)Total Cost of the Project at current price level (in Crores) 2600.20
(b) Funds Allocated for Environment Management (Capital) (in Crores) 82.56
(c) Funds Allocated Towards CER (Corporate Environment Responsibility) (in Crores) 0.0
(d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in Crores) 8.25
11.
Whether project attracts the General Condition specified in the Schedule of EIA Notification ? No
12.
Whether project attract the Specific Condition specified in the Schedule of EIA Notification ? No
13.
Raw Material / Fuel Requirement:
(a)Proposed quantity of raw material/fuel 4900000
(b)Existing quantity of raw material/fuel N/A
(c)Total quantity of raw material/fuel 4900000
    13.1.        Raw Material / Fuel Profile
S. No.Raw Material / Fuel QuantityUnitOther UnitSource (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received )Mode of TransportOther Mode of TransportDistance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received)Type of Linkage Other Type of Linkage Uploaded Copy of Linkage
(1.)Coarse aggregate, sand, fly ash and cement4900000Tons per AnnumLocalRoad5 Othersriverbed materialCopy of Linkage
14.
Baseline Data :
(a)Period of Base Line Data Collection FROM 01 Apr 2009 To 30 Apr 2009
(b)Season Pre-Monsoon
    14.1.     No. of ambient Air Quality (AAQ) monitoring locations : 5
S. No.Criteria Pollutants Other Criteria PollutantsUnitMaximum ValueMinimum Value98 Percentile ValuePrescribed Standard
(1.)OthersSPMMicro Gram per Meter Cube235108226.5200
(2.)SO2Micro Gram per Meter Cube231221.980
(3.)PM10NA0000
(4.)PM2.5NA0000
(5.)NOxMicro Gram per Meter Cube361634.280
    14.2.     No. of Ground Water monitoring locations : 0
S. No.Criteria Pollutants Other Criteria PollutantsHeavy MetalUnitOther UnitMaximum ValueMinimum ValueDesirable LimitMaximum Permissible Limit
(1.)FluorideNA00000
(2.)pHNA0000
(3.)TSSNA0000
(4.)Total HardnessNA0000
(5.)ChloridesNA0000
(6.)OthersNot ApplicabeNA0000
(7.)TDSNA0000
    14.3.     No. of Surface Water monitoring locations : 5
S. No.Criteria Pollutants Other Criteria PollutantsUnitOther UnitMaximum ValueMinimum ValueClassification of inland water body
(1.)CODmg/l4.74A
(2.)BODmg/l00A
(3.)OthersTotal ColiformOthersMPN/10000A
(4.)DONA00A
(5.)pHNA7.977.17A
    14.4.     No. of Ambient Noise monitoring locations : 5
S. No.Parameter UnitMaximum ValueMinimum ValuePrescribed Standard
(1.)Leq(Day)A-weighted decibels(dB(A))69.8260.6965
(2.)Leq(Night)A-weighted decibels(dB(A))65.0644.6855
    14.5.     No. of Soil Sample Monitored locations : 5
S. No.Parameter UnitOther UnitMaximum ValueMinimum Value
(1.)N(Nitrogen)Kilogram per hectare2123.93773.36
(2.)pHOthersNA7.847.03
(3.)P(Phosphorus)Kilogram per hectare374.87211.34
(4.)K(Potassium)Milliequivalents per 100 Gram0.990.11
(5.)Electric ConductivityMillisiemens per Centimetre12992.1
14.6.
Details of Ground Water Table:
(a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) From 3.92 To 69.61
(b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) From 0 To 0
(c)Whether Ground Water Intersection will be there ? No
     15.      Details of Water Requirement (During Operation)
S. No.Source Source Other Required Quantity (Kilolitre per Day (Kld))Distance from SourceCopy of Permission from Competent Authority Mode of TransportOther Mode of TransportMethod of Water WithdrawalOther Method of Water WithdrawalLetter No.Date of IssuePermitted Quantity
(1.)Surface1257534.240Copy of Permission LetterPipelineBarrage165/Jamrani-3/V-8/H08 Feb 20111257534.24
15.1.
(a)Whether Desalination is proposed No
    16.       Waste Water Management(During Operation)
S. No.Type/Source Quantity of Waste Water Generated (Kilolitre per Day)Treatment Capacity (Kilolitre per Day) Treatment MethodMode of DisposalOther Mode of DisposalQuantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day)Quantity of Discharged Water (Kilolitre per Day)
(1.)Residential Colony4860058320STPReuse within the Plant & Recycling48600
16.1.
(a)Total Waste Water Generation (Kilolitre per Day) 48600
(b)Total Discharged Water (Kilolitre per Day) 0
(c)Total Reused Water (Kilolitre per Day) 48600
    17.       Solid Waste Generation/Management
S. No.Name of Waste Item Other ItemQuantity per AnnumUnitDistance from Site(KM)Mode of TransportOther Mode of TransportMode of DisposalOther Mode of Disposal
(1.)coarse aggregateConstruction & Demolition Waste0Tons0RoadOthersreuse in Construction
18.
    18.1.     Air Quality Impact Prediction
S. No.Criteria Pollutants Other Criteria PollutantsUnitBaseline ConcentrationDistance GLCIncremental ConcentrationTotal GLCPrescribed Standard
(1.)NOxMicrogram per Meter Cube23.6200080
(2.)PM2.5NA00000
(3.)SO2Microgram per Meter Cube13.9200080
(4.)PM10NA00000
    18.2.     Stack Details
S. No.Source FuelStack Height(m)Stack Diameter(m)PollutantsOther PollutantsEmission (GLS)
(1.)NANA00SO20
(2.)NANA00NOx0
(3.)NANA00PM100
19.
Power Requirement:
(a)Quantity (Kilo Volt Amps (kVA)) 1875
(b)Source State Power Grid
(c)Uploaded Copy of Agreement Not Applicable
(d)Standby Arrangement (Details of DG Sets) 1500 KW
(e)Stack Height (in m) 0
20.
Land Ownership Pattern:
(a)Forest Land (ha.) 351.55
(b)Private Land (ha.) 76.49
(c)Government Land (ha.) 0
(d)Revenue Land (ha.) 0
(e)Other Land (ha.) 0
    Total Land (ha.) 428.04
21.
Present Land Use Breakup of the Study Area in Ha:
(a)Agriculture Area (ha.) 396.87
(b)Waste/Barren Land (ha.) 34.46
(c)Grazing/ Community Land (ha.) 0
(d)Surface Water Bodies (ha.) 1.68
(e)Settlements (ha.) 38.87
(f)Industrial (ha.) 0
(g)Forest (ha.) 1473.52
(h)Mangroves (ha.) 0
(i)Marine Area (ha.) 0
(j)Others (ha.) : Degraded Area and scrub 229.61
    Total (ha.) 2175.0099999999998
    22.     Land requirement for various activities
S. No.Description of Activity / Facility / Plant / Others OthersLand Requirement (ha.)Remarks
(1.)Water Reservoir398.94
Total (ha.) 398.94
23.
Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Sanctuaries; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones :
    23.1.     Details of Ecological Sensitivity :
S. No.Details of Ecological Sensitivity NameDistance from the Project (Km)Remarks
(1.)NPANA0Not applicable
(2.)CorridorsNA0Not applicable
(3.)Wildlife CorridorsNA0Not applicable
(4.)Critically Polluted AreaNA0Not applicable
(5.)ESZsNA0Not applicable
(6.)WLSNA0Not applicable
(7.)ESAsNA0Not applicable
    23.2.     Details of Environmental Sensitivity :
S. No.Details of Environmental Sensitivity Other Details of Environmental Sensitivity NameDistance from the Project (Km)Remarks
(1.)Archaeological SitesNA0Does not exist
(2.)Defence InstallationsNA0Does not exist
(3.)ForestNA0Does not exist
23.3.
(a)Whether Noc / Permission from the competent authority is required? No
(b)Whether NBWL recommendation is required? No
24.
Forest Land:
Whether any Forest Land involved? No
25.
Tree Cutting:
(a)No. of Trees Cut for the Project (if Forest Land not Involved) Not Applicable
(b)Details of Tree Cutting and Planting of Trees Not Applicable
26.
Land Acquisition Status:
(a)Acquired Land(Ha) 351.55
(b)Land yet to be acquired(Ha) 84.64
(c)Status of Land acquisition if not acquired yet to start
27.
Rehabilitation and Resettlement (R&R):
(a)No. of Villages 15
(b)No. of Households 199
(c)No. of PDFs (Project Displaced Families) 120
(d)No. of PAFs (Project Affected Families) 199
(e)Funds Allocated for R&R(in INR) (in Lacs) 27931
(f)Status of R&R Yet To Start
28.
Details of Presence of Schedule-I Species:
(a)Whether there is Presence of Schedule-I Species ? No
(b)Whether conservation plan for Schedule-I Species has been prepared ? No
(c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? No
29.
Details of Presence of Water Bodies in Core Area:
(a)Whether there is Presence of Water Bodies in Core Area ? No
(b)Whether there is Diversion Required ? No
(c)Whether permission has been obtained from competent authority ? No
30.
Details of Presence of Water Bodies in Buffer Area:
(a)Whether there is Presence of Water Bodies in Buffer Area ? No
31.
Manpower Requirement:
(a)Permanent Employment-During Construction 90
(b)Permanent Employment-During Operation 30
(c)Temporary Employment- During Construction 220
(d)Temporary Employment- During Operation 10
(e)No. of working days 1820
(f)Total Manpower 350
32.
Green Belt in Ha:
(a)Total Area of Green Belt 9
(b)Percentage of Total Project Area 2.10
(c)No. of Plants to be Planted 9000
(d)Funds Allocated for Plantation 40000000
(e)Uploaded Green Belt plan Copy of Green Belt Plan
    33.         Project Benefits
S. No.Type of Project Benefits Details of Project Benefits
(1.)EnvironmentalImplementation of Catchment area treatment plan will reduce soil erosion in the catchment
(2.)Socialemployment generation during construction phase
(3.)Financial57065 ha additional irrigated area, drinking water supply for Haldwani and nearby areas and 14 MW hydro power generation
   34.   CRZ Specific Details : Not Applicable
   35.   Sector Specific Details For River Valley and Hydroelectric Projects
S. No.Item Details
1. Project Sub Sector Multipurpose Project
2. Name of the River GOLA
3.
Whether Cumulative Impact Assessment and Carrying Capacity Study of River Basin is Carried Out? No
     4.      Type of Project: (Construction of Dam/ Barrage/ Run of the River/ Lift Irrigation Scheme)
S. No.Project TypeDam Height (in meters)Dam Length (in meters)Total Submergence Area (in hectare)Gross Command Area (GCA) (in hectare)Irrigable Command Area (ICA) (in hectare)Culturable Command Area (CCA) (in hectare)Total Command Area (in hectare)
(1.)Construction of Dam130.6480428.57187534150027295382187534
5.
Powerhouse Installed Capacity No
(a) Type of Powerhouse Surface
(b) Capacity (in megawatts) 14
(c) No. of Tunnels 0
(d) No. of Units 4
(e) Bank of River Right
6.
Generation of Electricity Annually.
(a) Quantity of Generation of Electricity Annually (in giga watt hours) 63.4
(b) Water Availability at Various percentage
S. No.PercentageWater availability (in cusecs)Dependable yearRemarks
(1.)75 %316.976875Annual average value 75% dependable year
(2.)50 %440.437150Annual average value 50% dependable year
(3.)90 %283.586090Annual average value 90% dependable year
(c) Machine Availability (in percent) 95
(d) Cost of Electricity Generation (in INR) 1038778000
(e) Internal Rate of Return (in percent) 20
(f) Year of achievement of Internal Rate of Return 5
7. Catchment Area Treatment Plan Copy of Catchment Plan
8.
Muck Management Plan
(a)Muck Management Plan Copy of Muck Management Plan
(b) Total Excavation Muck (in cubic meter) 1200000
(c) Utilized for Construction (in cubic meter)0
(d) No. of Muck Disposal sites1
(e) Total Muck Disposal Area (in hectare)10
9.
Fishery Development and Management Plan
(a)Fishery Development and Management Plan Copy of Fishery Development and Management Plan
(b) No. of Fish Species 8
(c) Name of the umbrella Fish Species (Scientific Name)Barilius sp. and Garra sp.
10.
Status of Environmental Flow
S. No.SeasonAverage Inflow (in cumec)Percent of Flow
(1.)Monsoon3.269430
(2.)Lean0.270620
(3.)Non-Lean Non-Monsoon0.580625
11. Free Flow Stretch (in km) 30
12.
Approval of Central Water Commission Yes
(a)Approval Reference No. 165/Jamrani-3/P-8/H
(a)Date of Approval 08 Feb 2011
(a)Copy of Approval Copy of approval
13.
Approval of Central Electricity Authority Yes
(a)Approval Reference No. 207/14/2004/HPA 1031
(a)Date of Approval 06 Nov 2018
(a)Copy of Approval Copy of approval
14.
Details of Coffer Dam (Upstream) Yes
(a) Quantity of the material (in cubic meter). 38025
(b) Length of the dam (in meter) 139
(c) Decommissioning Plan Copy of Decommissioning Plan
15.
Details of Coffer Dam (Downstream) Yes
(a) Quantity of the material (in cubic meter). 7910
(b) Length of the dam (in meter) 92
(c) Decommissioning Plan Copy of Decommissioning Plan
S. No.Item Details
36.
Details of Court Cases:
(a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? No
37.
Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act:
(a)Whether any Direction issued under EPA Act/Air Act/Water Act ? No
38.
Details of EIA Consultant:
(a)Have you hired Consultant for preparing document? Yes
(i)Accreditation No. NABET/EIA/1518/SA 026
(ii)Name of the EIA Consultant VoyantsSolutions Pvt. Ltd.
(iii)Address 403, 4th Floor, Park Centra, Sector 30, NH-8, GUrugram, Haryana
(iv)Mobile No. 9599757300
(v)Landline No. 0124459820
(vi)Email Id info@voyants.in
(vii)Category of Accreditation A
(viii)Sector of Accreditation River Valley and Hydroelectric Projects
(ix)Validity of Accreditation 07 Jun 2018
(x)Uploaded Certificate of Accreditation certified by QCI/NABET Copy of Certificate of Accreditation
39.
Documents to be Attached:
(a)Uploaded Copy of EIA/EMP Report Copy of EIA/EMP
Copy of EIA/EMP(Annexures)
Copy of EIA/EMP(Plans/Figures)
(b)Uploaded Copy of Risk Assessment Report Copy of Risk Assessment
(c)Uploaded Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan
(d)Uploaded Copy of Final Layout Plan Copy of Final Layout Plan
(e)Uploaded Cover Letter Copy of Cover Letter
(f)Uploaded Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency
(g)Uploaded Additional File Copy of Additional File
(h)Uploaded Proposal Presentation (To be given in EAC meeting) NA
      Essential Detail Sought : NIL
            Additional Detail Sought:
Sno. ADS Letter Remarks Date of ADS
1. ADS Reply LetterFew of the monitoring report could not be uploaded due to file size. 23 Aug 2019
2. ADS Reply LetterFew of the monitoring report could not be uploaded due to file size. 23 Aug 2019
3.NAok 21 Aug 2019
Undertaking
I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief. And I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity/ construction/ expansion has since been taken up.
Name of ApplicantJaved Anwar
DesignationEXECUTIVE ENGINEER
Name of Company (Applicant Name should not be given here)Irrigation Department
AddressJamrani Dam Construction Division 2, Dumwadhunga, Haldwani
Print