1. | Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? | No | Details of Project: | (a)Name of the project(s) | Jamrani Dam Multipurpose Project | (b)Name of the Company / Organisation | Irrigation Department | (c)Registered Address | Jamrani Dam Construction Division 2, Dumwadhunga, Haldwani,,Nainital,Uttarakhand-263139 | (d)Legal Status of the Company | State Government | (e)Joint Venture | No | |
|
2. | Address for the correspondence: | (a)Name of the Applicant | Javed Anwar | (b)Designation (Owner/ Partner/ CEO) | EXECUTIVE ENGINEER | (c)Address | NIL | (d)Pin code | 263139 | (e)E-mail | eejdcd3@gmail.com | (f)STD Code. | 5946(f)Telephone No. | 222315 | (g)Fax No. | | (h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . | Annexure-Uploaded Copy of documents in support of the competence/authority | |
|
3. | Category of the Project/Activity as per Schedule of EIA Notification,2006: | (a.I)Project/Activity | 1(c) River Valley projects
| Minor Activity | | (b)Category | A | (c)Proposal Number | IA/UK/RIV/80127/2006 | (d)Master Proposal Number(Single Window) | SW/79928/2018 | (e)EAC concerned (for category A Projects only) | River Valley and Hydroelectric Projects | (f)Project Type | Fresh EC |
|
|
4. | Location of the Project: | (a)Plot/Survey/Khasra No. | 53O/11 | (b)Pincode | 263139 | (c)Bounded Latitudes (North) | | From | | Degree | 3238722.99 | Minutes | | Second | | From | | Degree | 3238793.23 | Minutes | | Second | | (d)Bounded Longitudes (East) | | From | | Degree | 364939.13 | Minutes | | Second | | From | | Degree | 364961.56 | Minutes | | Second | | (e)Survey of India Topo Sheet No. | 53O/11 | (f)Uploaded Topo Sheet File | Copy of Topo Sheet File | (g)Maximum Elevation Above Means Sea Level(AMSL) | 765.60 | (h)Uploaded (kml) File | Copy of Kml File | (i)Distance of Nearest HFL from the project boundary within the study area | 0.0014 | (j)Seismic Zone | 4 | |
|
5. | (a)Number of States in which Project will be Executed | 1 | (b)Main State of the project | Uttarakhand | |
|
|
Details of State of the project |
---|
S. No. | State Name | District Name | Tehsil Name | Village Name |
---|
NIL | |
|
6. | Details of Terms of Reference (ToR): | (a)MoEF&CC / SEIAA File Number | J-12011/4/2007-IA-I | (b)Date of Apply of TOR | 27 Nov 2006 | (c)Date of Issue of TOR / Standard ToR | 23 Apr 2007 | (d)Previous TOR Letter | Copy of Previous TOR letter | |
|
7. | Details of Public Consultation: | (a)Whether the Project Exempted from Public Hearing? | No | (b)Whether details of Public Hearing available? | Yes | (c)Whether Public hearing was presided over by an officer of the rank of Additional District Magistrate or above | Yes | |
|
7.1. Details of Public Hearing |
---|
|
S. No. | Details of Advertisement | Details of Public Hearing | Venue | Location Details | No. of People Attended | Issues Raised | Designation of Presiding Officer | Other Designation of Presiding Officer |
---|
(1.) | | Copy of Public Hearing : | Copy of Public Hearing | Date : | 12 May 2008 | Distance of Public Hearing Venue from the Proposed Project : | 0.8 |
| Damuadunga | State : | Uttarakhand | District : | Nainital | Tehsil : | Haldwani | Village : | Damuadunga |
| 124 | Compensation against land acquisition and supply of clear water | Others | | |
8. | Details of Project Configuration/Product: | |
|
8.1. Project Configuration |
---|
S. No. | Plant/Equipment/Facility | Configuration | Remarks |
---|
(1.) | Irrigation | 150027 ha | CCA | |
8.2. Product |
---|
S. No. | Product/Activity (Capacity/Area) | Quantity | Unit | Other Unit | Mode of Transport / Transmission of Product | Other Mode of Transport / Transmission of Product |
---|
(1.) | Irrigation | 150027 | Hectares | | Others | PIpeline | (2.) | Hydro power generation | 14 | Mega Watt(MW) | | Others | Turbine | |
|
9. | In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii): | Details Not Applicable | |
|
9.1. | Details of Consent to Operate | (i)Whether Consent to operate obtained ? | NA | (ii)Copies of all Consent to operate obtained since inception | NA | (iii)Date of Issue | N/A | (iv)Valid Upto | N/A | (v)File No. | NA | (vi)Application No. | NA | (vii)Copy of Consent to operate valid as on date | NA | |
|
|
10. | Project Cost: | (a)Total Cost of the Project at current price level (in Crores) | 2600.20 | (b) Funds Allocated for Environment Management (Capital) (in Crores) | 82.56 | (c) Funds Allocated Towards CER (Corporate Environment Responsibility) (in Crores) | 0.0 | (d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in Crores) | 8.25 | |
|
11. | Whether project attracts the General Condition specified in the Schedule of EIA Notification ? | No | | |
12. | Whether project attract the Specific Condition specified in the Schedule of EIA Notification ? | No | | |
13. | Raw Material / Fuel Requirement: | (a)Proposed quantity of raw material/fuel | 4900000 | (b)Existing quantity of raw material/fuel | N/A | (c)Total quantity of raw material/fuel | 4900000 | |
|
  13.1. Raw Material / Fuel Profile |
---|
S. No. | Raw Material / Fuel | Quantity | Unit | Other Unit | Source (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received ) | Mode of Transport | Other Mode of Transport | Distance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received) | Type of Linkage | Other Type of Linkage | Uploaded Copy of Linkage |
---|
(1.) | Coarse aggregate, sand, fly ash and cement | 4900000 | Tons per Annum | | Local | Road | | 5 | Others | riverbed material | Copy of Linkage | |
|
14. | Baseline Data : | (a)Period of Base Line Data Collection | FROM 01 Apr 2009 To 30 Apr 2009 | (b)Season | Pre-Monsoon | |
|
14.1. No. of ambient Air Quality (AAQ) monitoring locations : 5 |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Unit | Maximum Value | Minimum Value | 98 Percentile Value | Prescribed Standard |
---|
(1.) | Others | SPM | Micro Gram per Meter Cube | 235 | 108 | 226.5 | 200 | (2.) | SO2 | | Micro Gram per Meter Cube | 23 | 12 | 21.9 | 80 | (3.) | PM10 | | NA | 0 | 0 | 0 | 0 | (4.) | PM2.5 | | NA | 0 | 0 | 0 | 0 | (5.) | NOx | | Micro Gram per Meter Cube | 36 | 16 | 34.2 | 80 | |
14.2. No. of Ground Water monitoring locations : 0 |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Heavy Metal | Unit | Other Unit | Maximum Value | Minimum Value | Desirable Limit | Maximum Permissible Limit |
---|
(1.) | Fluoride | | | NA | | 0 | 0 | 0 | 00 | (2.) | pH | | | NA | | 0 | 0 | 0 | 0 | (3.) | TSS | | | NA | | 0 | 0 | 0 | 0 | (4.) | Total Hardness | | | NA | | 0 | 0 | 0 | 0 | (5.) | Chlorides | | | NA | | 0 | 0 | 0 | 0 | (6.) | Others | Not Applicabe | | NA | | 0 | 0 | 0 | 0 | (7.) | TDS | | | NA | | 0 | 0 | 0 | 0 | |
14.3. No. of Surface Water monitoring locations : 5 |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Unit | Other Unit | Maximum Value | Minimum Value | Classification of inland water body |
---|
(1.) | COD | | mg/l | | 4.7 | 4 | A | (2.) | BOD | | mg/l | | 0 | 0 | A | (3.) | Others | Total Coliform | Others | MPN/100 | 0 | 0 | A | (4.) | DO | | NA | | 0 | 0 | A | (5.) | pH | | NA | | 7.97 | 7.17 | A | |
14.4. No. of Ambient Noise monitoring locations : 5 |
---|
S. No. | Parameter | Unit | Maximum Value | Minimum Value | Prescribed Standard |
---|
(1.) | Leq(Day) | A-weighted decibels(dB(A)) | 69.82 | 60.69 | 65 | (2.) | Leq(Night) | A-weighted decibels(dB(A)) | 65.06 | 44.68 | 55 | |
14.5. No. of Soil Sample Monitored locations : 5 |
---|
S. No. | Parameter | Unit | Other Unit | Maximum Value | Minimum Value |
---|
(1.) | N(Nitrogen) | Kilogram per hectare | | 2123.93 | 773.36 | (2.) | pH | Others | NA | 7.84 | 7.03 | (3.) | P(Phosphorus) | Kilogram per hectare | | 374.87 | 211.34 | (4.) | K(Potassium) | Milliequivalents per 100 Gram | | 0.99 | 0.11 | (5.) | Electric Conductivity | Millisiemens per Centimetre | | 129 | 92.1 | |
|
14.6. | Details of Ground Water Table: | (a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) | From 3.92 To 69.61 | (b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) | From 0 To 0 | (c)Whether Ground Water Intersection will be there ? | No | |
|
15. Details of Water Requirement (During Operation) |
---|
S. No. | Source | Source Other | Required Quantity (Kilolitre per Day (Kld)) | Distance from Source | Copy of Permission from Competent Authority | Mode of Transport | Other Mode of Transport | Method of Water Withdrawal | Other Method of Water Withdrawal | Letter No. | Date of Issue | Permitted Quantity |
---|
(1.) | Surface | | 1257534.24 | 0 | Copy of Permission Letter | Pipeline | | Barrage | | 165/Jamrani-3/V-8/H | 08 Feb 2011 | 1257534.24 | |
|
15.1. | (a)Whether Desalination is proposed | No | |
|
16. Waste Water Management(During Operation) |
---|
S. No. | Type/Source | Quantity of Waste Water Generated (Kilolitre per Day) | Treatment Capacity (Kilolitre per Day) | Treatment Method | Mode of Disposal | Other Mode of Disposal | Quantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day) | Quantity of Discharged Water (Kilolitre per Day) |
---|
(1.) | Residential Colony | 48600 | 58320 | STP | Reuse within the Plant & Recycling | | 48600 | | |
|
16.1. | (a)Total Waste Water Generation (Kilolitre per Day) | 48600 | (b)Total Discharged Water (Kilolitre per Day) | 0 | (c)Total Reused Water (Kilolitre per Day) | 48600 | |
|
17. Solid Waste Generation/Management |
---|
S. No. | Name of Waste | Item | Other Item | Quantity per Annum | Unit | Distance from Site(KM) | Mode of Transport | Other Mode of Transport | Mode of Disposal | Other Mode of Disposal |
---|
(1.) | coarse aggregate | Construction & Demolition Waste | | 0 | Tons | 0 | Road | | Others | reuse in Construction | |
|
|
18.1. Air Quality Impact Prediction |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Unit | Baseline Concentration | Distance GLC | Incremental Concentration | Total GLC | Prescribed Standard |
---|
(1.) | NOx | | Microgram per Meter Cube | 23.62 | 0 | 0 | 0 | 80 | (2.) | PM2.5 | | NA | 0 | 0 | 0 | 0 | 0 | (3.) | SO2 | | Microgram per Meter Cube | 13.92 | 0 | 0 | 0 | 80 | (4.) | PM10 | | NA | 0 | 0 | 0 | 0 | 0 | |
|
18.2. Stack Details |
---|
S. No. | Source | Fuel | Stack Height(m) | Stack Diameter(m) | Pollutants | Other Pollutants | Emission (GLS) |
---|
(1.) | NA | NA | 0 | 0 | SO2 | | 0 | (2.) | NA | NA | 0 | 0 | NOx | | 0 | (3.) | NA | NA | 0 | 0 | PM10 | | 0 | |
|
19. | Power Requirement: | (a)Quantity (Kilo Volt Amps (kVA)) | 1875 | (b)Source | State Power Grid | (c)Uploaded Copy of Agreement | Not Applicable | (d)Standby Arrangement (Details of DG Sets) | 1500 KW | (e)Stack Height (in m) | 0 | |
|
20. | Land Ownership Pattern: | (a)Forest Land (ha.) | 351.55 | (b)Private Land (ha.) | 76.49 | (c)Government Land (ha.) | 0 | (d)Revenue Land (ha.) | 0 | (e)Other Land (ha.) | 0 | Total Land (ha.) | 428.04 | |
|
21. | Present Land Use Breakup of the Study Area in Ha: | (a)Agriculture Area (ha.) | 396.87 | (b)Waste/Barren Land (ha.) | 34.46 | (c)Grazing/ Community Land (ha.) | 0 | (d)Surface Water Bodies (ha.) | 1.68 | (e)Settlements (ha.) | 38.87 | (f)Industrial (ha.) | 0 | (g)Forest (ha.) | 1473.52 | (h)Mangroves (ha.) | 0 | (i)Marine Area (ha.) | 0 | (j)Others (ha.) : Degraded Area and scrub | 229.61 | Total (ha.) | 2175.0099999999998 | |
|
22. Land requirement for various activities |
---|
S. No. | Description of Activity / Facility / Plant / Others | Others | Land Requirement (ha.) | Remarks |
---|
(1.) | Water Reservoir | | 398.94 | | |
|
|
23. | Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Sanctuaries; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones : | |
|
23.1. Details of Ecological Sensitivity : |
---|
S. No. | Details of Ecological Sensitivity | Name | Distance from the Project (Km) | Remarks |
---|
(1.) | NPA | NA | 0 | Not applicable | (2.) | Corridors | NA | 0 | Not applicable | (3.) | Wildlife Corridors | NA | 0 | Not applicable | (4.) | Critically Polluted Area | NA | 0 | Not applicable | (5.) | ESZs | NA | 0 | Not applicable | (6.) | WLS | NA | 0 | Not applicable | (7.) | ESAs | NA | 0 | Not applicable | |
23.2. Details of Environmental Sensitivity : |
---|
S. No. | Details of Environmental Sensitivity | Other Details of Environmental Sensitivity | Name | Distance from the Project (Km) | Remarks |
---|
(1.) | Archaeological Sites | | NA | 0 | Does not exist | (2.) | Defence Installations | | NA | 0 | Does not exist | (3.) | Forest | | NA | 0 | Does not exist | |
|
23.3. | (a)Whether Noc / Permission from the competent authority is required? | No | (b)Whether NBWL recommendation is required? | No | |
|
24. | Forest Land: | Whether any Forest Land involved? | No | |
|
25. | Tree Cutting: | (a)No. of Trees Cut for the Project (if Forest Land not Involved) | Not Applicable | (b)Details of Tree Cutting and Planting of Trees | Not Applicable | |
|
26. | Land Acquisition Status: | (a)Acquired Land(Ha) | 351.55 | (b)Land yet to be acquired(Ha) | 84.64 | (c)Status of Land acquisition if not acquired | yet to start | |
|
27. | Rehabilitation and Resettlement (R&R): | (a)No. of Villages | 15 | (b)No. of Households | 199 | (c)No. of PDFs (Project Displaced Families) | 120 | (d)No. of PAFs (Project Affected Families) | 199 | (e)Funds Allocated for R&R(in INR) (in Lacs) | 27931 | (f)Status of R&R | Yet To Start | |
|
28. | Details of Presence of Schedule-I Species: | (a)Whether there is Presence of Schedule-I Species ? | No | (b)Whether conservation plan for Schedule-I Species has been prepared ? | No | (c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? | No | |
|
29. | Details of Presence of Water Bodies in Core Area: | (a)Whether there is Presence of Water Bodies in Core Area ? | No | (b)Whether there is Diversion Required ? | No | (c)Whether permission has been obtained from competent authority ? | No | |
|
30. | Details of Presence of Water Bodies in Buffer Area: | (a)Whether there is Presence of Water Bodies in Buffer Area ? | No | |
|
31. | Manpower Requirement: | (a)Permanent Employment-During Construction | 90 | (b)Permanent Employment-During Operation | 30 | (c)Temporary Employment- During Construction | 220 | (d)Temporary Employment- During Operation | 10 | (e)No. of working days | 1820 | (f)Total Manpower | 350 | |
|
32. | Green Belt in Ha: | (a)Total Area of Green Belt | 9 | (b)Percentage of Total Project Area | 2.10 | (c)No. of Plants to be Planted | 9000 | (d)Funds Allocated for Plantation | 40000000 | (e)Uploaded Green Belt plan | Copy of Green Belt Plan | |
|
33. Project Benefits |
---|
S. No. | Type of Project Benefits | Details of Project Benefits |
---|
(1.) | Environmental | Implementation of Catchment area treatment plan will reduce soil erosion in the catchment | (2.) | Social | employment generation during construction phase | (3.) | Financial | 57065 ha additional irrigated area, drinking water supply for Haldwani and nearby areas and 14 MW hydro power generation | |
|
34. CRZ Specific Details : Not Applicable |
35. Sector Specific Details For River Valley and Hydroelectric Projects |
|
1. | Project Sub Sector | Multipurpose Project | 2. | Name of the River | GOLA | 3. | Whether Cumulative Impact Assessment and Carrying Capacity Study of River Basin is Carried Out? | No |
|
|
4. Type of Project: (Construction of Dam/ Barrage/ Run of the River/ Lift Irrigation Scheme) |
---|
S. No. | Project Type | Dam Height (in meters) | Dam Length (in meters) | Total Submergence Area (in hectare) | Gross Command Area (GCA) (in hectare) | Irrigable Command Area (ICA) (in hectare) | Culturable Command Area (CCA) (in hectare) | Total Command Area (in hectare) |
---|
(1.) | Construction of Dam | 130.6 | 480 | 428.57 | 187534 | 150027 | 295382 | 187534 | |
5. | Powerhouse Installed Capacity | No | (a) Type of Powerhouse | Surface | (b) Capacity (in megawatts) | 14 | (c) No. of Tunnels | 0 | (d) No. of Units | 4 | (e) Bank of River | Right |
|
|
6. | Generation of Electricity Annually. | (a) Quantity of Generation of Electricity Annually (in giga watt hours) | 63.4 | (b) Water Availability at Various percentage | S. No. | Percentage | Water availability (in cusecs) | Dependable year | Remarks |
---|
(1.) | 75 % | 316.9768 | 75 | Annual average value 75% dependable year | (2.) | 50 % | 440.4371 | 50 | Annual average value 50% dependable year | (3.) | 90 % | 283.5860 | 90 | Annual average value 90% dependable year | | (c) Machine Availability (in percent) | 95 | (d) Cost of Electricity Generation (in INR) | 1038778000 | (e) Internal Rate of Return (in percent) | 20 | (f) Year of achievement of Internal Rate of Return | 5 |
| 7. | Catchment Area Treatment Plan | Copy of Catchment Plan | 8. | Muck Management Plan | (a)Muck Management Plan | Copy of Muck Management Plan | (b) Total Excavation Muck (in cubic meter) | 1200000 | (c) Utilized for Construction (in cubic meter) | 0 | (d) No. of Muck Disposal sites | 1 | (e) Total Muck Disposal Area (in hectare) | 10 |
| 9. | Fishery Development and Management Plan | (a)Fishery Development and Management Plan | Copy of Fishery Development and Management Plan | (b) No. of Fish Species | 8 | (c) Name of the umbrella Fish Species (Scientific Name) | Barilius sp. and Garra sp. |
| 10. | Status of Environmental Flow | S. No. | Season | Average Inflow (in cumec) | Percent of Flow |
---|
(1.) | Monsoon | 3.2694 | 30 | (2.) | Lean | 0.2706 | 20 | (3.) | Non-Lean Non-Monsoon | 0.5806 | 25 | |
| 11. | Free Flow Stretch (in km) | 30 | 12. | Approval of Central Water Commission | Yes | (a)Approval Reference No. | 165/Jamrani-3/P-8/H | (a)Date of Approval | 08 Feb 2011 | (a)Copy of Approval | Copy of approval |
| 13. | Approval of Central Electricity Authority | Yes | (a)Approval Reference No. | 207/14/2004/HPA 1031 | (a)Date of Approval | 06 Nov 2018 | (a)Copy of Approval | Copy of approval |
| 14. | Details of Coffer Dam (Upstream) | Yes | (a) Quantity of the material (in cubic meter). | 38025 | (b) Length of the dam (in meter) | 139 | (c) Decommissioning Plan | Copy of Decommissioning Plan |
| 15. | Details of Coffer Dam (Downstream) | Yes | (a) Quantity of the material (in cubic meter). | 7910 | (b) Length of the dam (in meter) | 92 | (c) Decommissioning Plan | Copy of Decommissioning Plan |
| |
|
36. | Details of Court Cases: | (a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? | No | |
|
37. | Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act: | (a)Whether any Direction issued under EPA Act/Air Act/Water Act ? | No | |
|
38. | Details of EIA Consultant: | (a)Have you hired Consultant for preparing document? | Yes | (i)Accreditation No. | NABET/EIA/1518/SA 026 | (ii)Name of the EIA Consultant | VoyantsSolutions Pvt. Ltd. | (iii)Address | 403, 4th Floor, Park Centra, Sector 30, NH-8, GUrugram, Haryana | (iv)Mobile No. | 9599757300 | (v)Landline No. | 0124459820 | (vi)Email Id | info@voyants.in | (vii)Category of Accreditation | A | (viii)Sector of Accreditation | River Valley and Hydroelectric Projects | (ix)Validity of Accreditation | 07 Jun 2018 | (x)Uploaded Certificate of Accreditation certified by QCI/NABET | Copy of Certificate of Accreditation | |
|
|
Essential Detail Sought : NIL |
Additional Detail Sought: |
---|
Sno. | ADS Letter | Remarks | Date of ADS |
---|
1. | ADS Reply Letter | Few of the monitoring report could not be uploaded due to file size. | 23 Aug 2019 | 2. | ADS Reply Letter | Few of the monitoring report could not be uploaded due to file size. | 23 Aug 2019 | 3. | NA | ok | 21 Aug 2019 | |
| Undertaking |
| I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief. And I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity/ construction/ expansion has since been taken up. |
| Name of Applicant | Javed Anwar | Designation | EXECUTIVE ENGINEER | Name of Company (Applicant Name should not be given here) | Irrigation Department | Address | Jamrani Dam Construction Division 2, Dumwadhunga, Haldwani |
|