Form-2
APPLICATION FOR PRIOR ENVIRONMENTAL CLEARANCE
S. No.Item Details
1.
Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? No
Details of Project:
(a)Name of the project(s) Enhancement of Ferro Alloys Plant (145000 TPA to 160000 TPA) through process optimization within existing plant premises at Balgopalpur Industrial Estate, Balgopalpur, District- Balasore (Odisha) by B
(b)Name of the Company / Organisation BALASORE ALLOYS LTD
(c)Registered Address AT:NIZIGARH,PO: SUKINDA,,Jajpur,Orissa-755018
(d)Legal Status of the Company Others
(e)Joint Venture No
2.
Address for the correspondence:
(a)Name of the Applicant A Nagendra Kumar
(b)Designation (Owner/ Partner/ CEO) Managing Director
(c)Address Balgopalpur,Balasorea,,,Baleshwar,Orissa-756020
(d)Pin code 756020
(e)E-mail suryakanta.pradhan@balasorealloys.com
(f)STD Code. 674(f)Telephone No. 2301358
(g)Fax No. 06742301639
(h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . Annexure-Uploaded Copy of documents in support of the competence/authority
3.
Category of the Project/Activity as per Schedule of EIA Notification,2006:
(a.I)Project/Activity3(a) Metallurgical industries (ferrous & non ferrous)
Minor Activity
(b)Category A
(c)Proposal Number IA/OR/IND/79886/2018
(d)Master Proposal Number(Single Window) SW/79885/2018
(e)EAC concerned (for category A Projects only) NIL
(f)Project Type Expansion under para 7(ii)
4.
Location of the Project:
(a)Plot/Survey/Khasra No. 287, 288, 289, 290, 291, 300, 301, 304, 305, 306,
(b)Pincode 756020
(c)Bounded Latitudes (North)
From
Degree 21.5283027
Minutes
Second
From
Degree 21.533216
Minutes
Second
(d)Bounded Longitudes (East)
From
Degree 86.8315138
Minutes
Second
From
Degree 86.83699
Minutes
Second
(e)Survey of India Topo Sheet No. F45O10, F45O11, F45O14, F45O15
(f)Uploaded Topo Sheet File Copy of Topo Sheet File
(g)Maximum Elevation Above Means Sea Level(AMSL) 33
(h)Uploaded (kml) File Copy of Kml File      
(i)Distance of Nearest HFL from the project boundary within the study area 2.5
(j)Seismic Zone 2
5.
(a)Number of States in which Project will be Executed 1
(b)Main State of the project Orissa
Details of State of the project
S. No. State Name District Name Tehsil Name Village Name
NIL
6.
Details of Terms of Reference (ToR)/EC: Not Applicable
4.
Whether the Project Exempted from Public Hearing? Details Not Applicable
8.
Details of Project Configuration/Product:
Details Not Applicable
9.
In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii):
(a)Details of certified report on compliance of earlier environmental clearance condition
(i)Certified Compliance By Regional
(ii)Details of Regional Office of MoEFCC / Zonal Office of CPCB / SPCB / UTPCC from which certified report on Bhubaneswar
(iii)Letter No. 101-456/EPI/3485
(iv)Status of Compliance Compiled
(v)Certified report on compliance of earlier environmental clearance conditions (Including Monitoring Report) Copy of Certified Compliance Report
(vi)Date of site visit Dec 7 2017 12:00AM
(b)Details of Capacity Expansion
S. No.Product/Activity (Capacity/Area)Quantity FromQuantity ToTotal UnitOther UnitMode of Transport / Transmission of ProductOther Mode of Transport / Transmission of Product
(1.)Ferro Alloys14500015000160000Tons per Annum(TPA)Road
(c)Details of Configuration
S. No.Plant / Equipment / Facility Existing ConfigurationProposed ConfigurationFinal configuration after expansionRemarks
(1.)Furnace84 MVA (2X15 MVA & 3X18 MVA)084 MVA (2X15 MVA & 3X18 MVA)Effective furnace operation
(2.)Briquetting Plant30000 TPM030000 TPM
(3.)Jigging Plant33 TPH033 TPH
9.1.
Details of Consent to Operate
(i)Whether Consent to operate obtained ? NA
(ii)Copies of all Consent to operate obtained since inception NA
(iii)Date of Issue 31 Oct 2016
(iv)Valid Upto 31 Mar 2021
(v)File No. 15883/IND-I-CON-1616
(vi)Application No. 485
(vii)Copy of Consent to operate valid as on date Copy of Consent to Operate
10.
Project Cost:
(a)Total Cost of the Project at current price level (in Crores) 0
(b) Funds Allocated for Environment Management (Capital) (in Crores) 18.31
(c) Funds Allocated Towards CER (Corporate Environment Responsibility) (in Crores) 6
(d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in Crores) 7
11.
Whether project attracts the General Condition specified in the Schedule of EIA Notification ? No
12.
Whether project attract the Specific Condition specified in the Schedule of EIA Notification ? No
13.
Raw Material / Fuel Requirement:
(a)Proposed quantity of raw material/fuel 0
(b)Existing quantity of raw material/fuel N/A
(c)Total quantity of raw material/fuel 0
    13.1.        Raw Material / Fuel Profile
S. No.Raw Material / Fuel QuantityUnitOther UnitSource (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received )Mode of TransportOther Mode of TransportDistance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received)Type of Linkage Other Type of Linkage Uploaded Copy of Linkage
(1.)Chrome Ore362500Tons per AnnumCaptive Mine & IndigenousRoad170 CaptiveCopy of Linkage
(2.)Magnesite5075Tons per AnnumIndigenousRoad1412 Open MarketCopy of Linkage
(3.)HSD432OthersKLIndigenousRoad220 OthersPOCopy of Linkage
(4.)Electrode Paste2610Tons per AnnumIndigenousRoad1750 Open MarketCopy of Linkage
(5.)FO2640OthersKLIndigenousRoad220 OthersPOCopy of Linkage
(6.)Low Ash Metallurgical Coke85550Tons per AnnumImport and IndigenousRoad220 Open MarketCopy of Linkage
(7.)Quartzite47125Tons per AnnumIndigenousRoad650 OthersOpen MarketCopy of Linkage
(8.)Dolomite32625Tons per AnnumIndigenousRoad400 Open MarketCopy of Linkage
16.
Baseline Data Not Applicable
14.6.
Details of Ground Water Table:
(a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) From 6 To 8
(b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) From 4 To 6
(c)Whether Ground Water Intersection will be there ? NA
     15.      Details of Water Requirement (During Operation)
S. No.Source Source Other Required Quantity (Kilolitre per Day (Kld))Distance from SourceCopy of Permission from Competent Authority Mode of TransportOther Mode of TransportMethod of Water WithdrawalOther Method of Water WithdrawalLetter No.Date of IssuePermitted Quantity
(1.)GroundWater9000Copy of Permission LetterPipelineTube WellCGWA vide letter no 21-4(41)/SER/CGWA/2008-36316 Feb 20171340
15.1.
(a)Whether Desalination is proposed No
    16.       Waste Water Management(During Operation)
S. No.Type/Source Quantity of Waste Water Generated (Kilolitre per Day)Treatment Capacity (Kilolitre per Day) Treatment MethodMode of DisposalOther Mode of DisposalQuantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day)Quantity of Discharged Water (Kilolitre per Day)
(1.)Industrial88100Settling TankReuse within the Plant & Recycling88
(2.)Domestic93100STP (2X50 KL)Reuse within the Plant & Recycling93
16.1.
(a)Total Waste Water Generation (Kilolitre per Day) 181
(b)Total Discharged Water (Kilolitre per Day) 0
(c)Total Reused Water (Kilolitre per Day) 181
    17.       Solid Waste Generation/Management
S. No.Name of Waste Item Other ItemQuantity per AnnumUnitDistance from Site(KM)Mode of TransportOther Mode of TransportMode of DisposalOther Mode of Disposal
(1.)SlagIndustrial Waste165060Tons0.2RoadOthersUsed for road making
(2.)Flue DustIndustrial Waste2352Tons0.5RoadOthersused for briquette making
18.
    18.1.     Air Quality Impact Prediction
S. No.Criteria Pollutants Other Criteria PollutantsUnitBaseline ConcentrationDistance GLCIncremental ConcentrationTotal GLCPrescribed Standard
(1.)SO2Microgram per Meter Cube19.30019.380
(2.)NOxMicrogram per Meter Cube34.30034.380
(3.)PM2.5Microgram per Meter Cube42.380042.3860
(4.)PM10Microgram per Meter Cube63.50063.5100
    18.2.     Stack Details
S. No.Source FuelStack Height(m)Stack Diameter(m)PollutantsOther PollutantsEmission (GLS)
(1.)BoilerCoal502.0PM10100
19.
Power Requirement:
(a)Quantity (Kilo Volt Amps (kVA)) 67000
(b)Source North Eastern Electricity Supply Company of Odisha
(c)Uploaded Copy of Agreement Copy of Agreement
(d)Standby Arrangement (Details of DG Sets) 600 KVA
(e)Stack Height (in m) 30
20.
Land Ownership Pattern:
(a)Forest Land (ha.) 0
(b)Private Land (ha.) 0
(c)Government Land (ha.) 0
(d)Revenue Land (ha.) 0
(e)Other Land (ha.) 18.29
    Total Land (ha.) 18.29
21.
Present Land Use Breakup of the Study Area in Ha:
(a)Agriculture Area (ha.) 0
(b)Waste/Barren Land (ha.) 0
(c)Grazing/ Community Land (ha.) 0
(d)Surface Water Bodies (ha.) 0
(e)Settlements (ha.) 0
(f)Industrial (ha.) 18.29
(g)Forest (ha.) 0
(h)Mangroves (ha.) 0
(i)Marine Area (ha.) 0
(j)Others (ha.) : 18.29 Ha land lies in Industrial Area 0
    Total (ha.) 18.29
    22.     Land requirement for various activities
S. No.Description of Activity / Facility / Plant / Others OthersLand Requirement (ha.)Remarks
(1.)Main Plant11.94Main Plant Storage area Colony
(2.)Green belt6.35
Total (ha.) 18.29
23.
Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Sanctuaries; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones :
    23.1.     Details of Ecological Sensitivity :
S. No.Details of Ecological Sensitivity NameDistance from the Project (Km)Remarks
(1.)ESAsNot Applicable0No ESAs within 10 km radius
(2.)CorridorsNot Applicable0No Corridors within 10 km radius
(3.)Wildlife CorridorsNot Applicable0No Wildlife Corridors within 10 km radius
(4.)WLSNot Applicable0No WLS within 10 km radius
(5.)ESZsNot Applicable0No ESZs within 10 km radius
(6.)NPANot Applicable0No NPA within 10 km radius
(7.)Critically Polluted AreaNot Applicable0No CPA within 10 km radius
    23.2.     Details of Environmental Sensitivity :
S. No.Details of Environmental Sensitivity Other Details of Environmental Sensitivity NameDistance from the Project (Km)Remarks
(1.)Archaeological SitesNot Applicable0No Archaeological sites within 10 km radius
(2.)Defence InstallationsNot Applicable0No Defence installation within 10 km radius
(3.)ForestMitrapur, Swarnachuda and Tinkusia RF3.5Distance of RF 3.5, 5.5 & 8.9 respectively
23.3.
(a)Whether Noc / Permission from the competent authority is required? No
(b)Whether NBWL recommendation is required? No
24.
Forest Land:
Whether any Forest Land involved? No
25.
Tree Cutting:
(a)No. of Trees Cut for the Project (if Forest Land not Involved) 0
(b)Details of Tree Cutting and Planting of Trees Not Applicable
26.
Land Acquisition Status:
(a)Acquired Land(Ha) 18.29
(b)Land yet to be acquired(Ha) 0
(c)Status of Land acquisition if not acquired Already Acquired
27.
Rehabilitation and Resettlement (R&R):
(a)No. of Villages 0
(b)No. of Households 0
(c)No. of PDFs (Project Displaced Families) 0
(d)No. of PAFs (Project Affected Families) 0
(e)Funds Allocated for R&R(in INR) (in Lacs) 0
(f)Status of R&R Completed
28.
Details of Presence of Schedule-I Species:
(a)Whether there is Presence of Schedule-I Species ? No
(b)Whether conservation plan for Schedule-I Species has been prepared ? No
(c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? No
29.
Details of Presence of Water Bodies in Core Area:
(a)Whether there is Presence of Water Bodies in Core Area ? No
(b)Whether there is Diversion Required ? No
(c)Whether permission has been obtained from competent authority ? No
30.
Details of Presence of Water Bodies in Buffer Area:
(a)Whether there is Presence of Water Bodies in Buffer Area ? Yes
(i)Details of Water Bodies in Buffer Area Sunai River
(ii)Direction of Water Bodies in Buffer Area North
(iii)Distance of Water Bodies in Buffer Area 2.5
31.
Manpower Requirement:
(a)Permanent Employment-During Construction 0
(b)Permanent Employment-During Operation 0
(c)Temporary Employment- During Construction 0
(d)Temporary Employment- During Operation 0
(e)No. of working days 342
(f)Total Manpower 0
32.
Green Belt in Ha:
(a)Uploaded Green Belt plan Copy of Green Belt Plan
S. No.Description ExistingProposedTotal
(1.)Total Area of Green Belt6.3406.34
(2.)Percentage of Total Project Area34.7034.7
(3.)No. of Plants17548017548
(4.)Funds Allocated350000200000550000
    33.         Project Benefits
S. No.Type of Project Benefits Details of Project Benefits
(1.)EnvironmentalIncreased manufacturing capacity with no increase in pollution load
(2.)SocialDirect and indirect employment generation
(3.)FinancialImproved Livelihood with improved business opportunities
   34.   CRZ Specific Details : Not Applicable
   35.   Sector Specific Details : NOT APPLICABLE
   35.   Sector Specific Details For Industrial Projects - 1
S. No.Item Details
S. No.Item Details
36.
Details of Court Cases:
(a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? No
37.
Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act:
(a)Whether any Direction issued under EPA Act/Air Act/Water Act ? No
38.
Details of EIA Consultant:
(a)Have you hired Consultant for preparing document? Yes
(i)Accreditation No. NABET/EIA/1619/RA0069
(ii)Name of the EIA Consultant JM EnviroNet Pvt. Ltd.
(iii)Address 202 A, ABW Tower, MG Road, Gurgaon Haryana
(iv)Mobile No. 9015209362
(v)Landline No. 9015209362
(vi)Email Id jmenviron@hotmail.com
(vii)Category of Accreditation A
(viii)Sector of Accreditation Industrial Projects - 1
(ix)Validity of Accreditation 18 May 2019
(x)Uploaded Certificate of Accreditation certified by QCI/NABET Copy of Certificate of Accreditation
39.
Documents to be Attached:
(a)Uploaded Copy of EIA/EMP Report Copy of EIA/EMP
Copy of EIA/EMP(Annexures)
Copy of EIA/EMP(Plans/Figures)
(b)Uploaded Copy of Risk Assessment Report Copy of Risk Assessment
(c)Uploaded Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan
(d)Uploaded Copy of Final Layout Plan Copy of Final Layout Plan
(e)Uploaded Cover Letter Copy of Cover Letter
(f)Uploaded Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency
(g)Uploaded Additional File Copy of Additional File
(h)Uploaded Proposal Presentation (To be given in EAC meeting) NA
      Essential Detail Sought : NIL
      Additional Detail Sought : NIL
Undertaking
I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief. And I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity/ construction/ expansion has since been taken up.
Name of ApplicantA Nagendra Kumar
DesignationManaging Director
Name of Company (Applicant Name should not be given here)BALASORE ALLOYS LTD
AddressAT:NIZIGARH,PO: SUKINDA
Print