Form-2
APPLICATION FOR PRIOR ENVIRONMENTAL CLEARANCE
S. No.Item Details
1.
Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? No
Details of Project:
(a)Name of the project(s) Change in technology from Rotary Kiln to Vertical Shaft Kiln for production of 500 TPD clinker and 500 TPD Cement grinding (closed circuit) at Dag 144, 145, 146, 147 & 151 of K.P. Patta No. 19, 21, 42
(b)Name of the Company / Organisation K R ASSOCIATES
(c)Registered Address HOUSE NO. 62, BY LANE -2, TARUN NAGAR, G S ROAD ,,Kamrup,Assam-781005
(d)Legal Status of the Company Private
(e)Joint Venture No
2.
Address for the correspondence:
(a)Name of the Applicant KIRAN KAYAL
(b)Designation (Owner/ Partner/ CEO) PARTNER
(c)Address HOUSE NO. 62, BY LANE 2, TARUN NAGAR, G S ROAD,,Guwahati,Kamrup,Assam-781005
(d)Pin code 781005
(e)E-mail ishaanmodi16@gmail.com
(f)STD Code. 361(f)Telephone No. 2460020
(g)Fax No.
(h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . Annexure-Uploaded Copy of documents in support of the competence/authority
3.
Category of the Project/Activity as per Schedule of EIA Notification,2006:
(a.I)Project/Activity3(b) Cement plants
Minor Activity
(b)Category A
(c)Proposal Number IA/AS/IND/79769/2018
(d)Master Proposal Number(Single Window) SW/79768/2018
(e)EAC concerned (for category A Projects only) NIL
(f)Project Type Modernization under para 7(ii)
4.
Location of the Project:
(a)Plot/Survey/Khasra No. Dag 144, 145, 146, 147 & 151 of K.P. Patta No. 19,
(b)Pincode 781022
(c)Bounded Latitudes (North)
From
Degree 26.08
Minutes
Second
From
Degree 26.08
Minutes
Second
(d)Bounded Longitudes (East)
From
Degree 91.8
Minutes
Second
From
Degree 91.8
Minutes
Second
(e)Survey of India Topo Sheet No. G46H16
(f)Uploaded Topo Sheet File Copy of Topo Sheet File
(g)Maximum Elevation Above Means Sea Level(AMSL) 86
(h)Uploaded (kml) File Copy of Kml File      
(i)Distance of Nearest HFL from the project boundary within the study area 2.5
(j)Seismic Zone 5
5.
(a)Number of States in which Project will be Executed 1
(b)Main State of the project Assam
Details of State of the project
S. No. State Name District Name Tehsil Name Village Name
NIL
6.
Details of Terms of Reference (ToR)/EC: Not Applicable
4.
Whether the Project Exempted from Public Hearing? Details Not Applicable
8.
Details of Project Configuration/Product:
Details Not Applicable
9.
In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii):
(a)Details of certified report on compliance of earlier environmental clearance condition
(i)Certified Compliance By Regional
(ii)Details of Regional Office of MoEFCC / Zonal Office of CPCB / SPCB / UTPCC from which certified report on Shillong
(iii)Letter No. RO-NE/E/IA/AS/IN/80/308
(iv)Status of Compliance Partially Complied
(v)Certified report on compliance of earlier environmental clearance conditions (Including Monitoring Report) Copy of Certified Compliance Report
(vi)Date of site visit May 2 2019 12:00AM
(b)Details of Capacity Expansion
S. No.Product/Activity (Capacity/Area)Quantity FromQuantity ToTotal UnitOther UnitMode of Transport / Transmission of ProductOther Mode of Transport / Transmission of Product
(1.)Cement5000500OthersTPDRoad
(c)Details of Configuration
S. No.Plant / Equipment / Facility Existing ConfigurationProposed ConfigurationFinal configuration after expansionRemarks
(1.)Rotary Kiln5000500Change in technology from Rotary Kiln to Vertical Shaft Kiln
9.1.
Details of Consent to Operate
(i)Whether Consent to operate obtained ? NA
(ii)Copies of all Consent to operate obtained since inception NA
(iii)Date of Issue 01 Sep 2018
(iv)Valid Upto 30 Dec 2019
(v)File No. Not Applicable
(vi)Application No. Not Applicable
(vii)Copy of Consent to operate valid as on date Copy of Consent to Operate
10.
Project Cost:
(a)Total Cost of the Project at current price level (in Crores) 76
(b) Funds Allocated for Environment Management (Capital) (in Crores) 3.2
(c) Funds Allocated Towards CER (Corporate Environment Responsibility) (in Crores) 1.52
(d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in Crores) 0.5
11.
Whether project attracts the General Condition specified in the Schedule of EIA Notification ? Yes
a)Protected areas notified under the wildlife (Protection) Act, 1972 Yes
d)Inter-State boundaries and international boundaries Yes
12.
Whether project attract the Specific Condition specified in the Schedule of EIA Notification ? No
13.
Raw Material / Fuel Requirement:
(a)Proposed quantity of raw material/fuel 938
(b)Existing quantity of raw material/fuel N/A
(c)Total quantity of raw material/fuel 938
    13.1.        Raw Material / Fuel Profile
S. No.Raw Material / Fuel QuantityUnitOther UnitSource (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received )Mode of TransportOther Mode of TransportDistance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received)Type of Linkage Other Type of Linkage Uploaded Copy of Linkage
(1.)Clay40150Tons per AnnumMeghalaya & AssamRoad250 Open MarketCopy of Linkage
(2.)coke Breeze37230Tons per AnnumAssamRoad150 Open MarketCopy of Linkage
(3.)Fly ash29200Tons per AnnumMeghalaya, Assam and West BengalRoad500 Open MarketCopy of Linkage
(4.)Iron Dust3650Tons per AnnumMeghalaya & AssamRoad250 Open MarketCopy of Linkage
(5.)GYPSUM2920Tons per AnnumMeghalaya & AssamRoad250 Open MarketCopy of Linkage
(6.)Limestone229220Tons per AnnumMeghalaya & AssamRoad250 Open MarketCopy of Linkage
16.
Baseline Data Not Applicable
14.6.
Details of Ground Water Table:
(a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) From 2 To 5
(b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) From 1 To 5
(c)Whether Ground Water Intersection will be there ? No
     15.      Details of Water Requirement (During Operation)
S. No.Source Source Other Required Quantity (Kilolitre per Day (Kld))Distance from SourceCopy of Permission from Competent Authority Mode of TransportOther Mode of TransportMethod of Water WithdrawalOther Method of Water WithdrawalLetter No.Date of IssuePermitted Quantity
(1.)GroundWater1240Copy of Permission LetterPipelineOthersBore Well21-4/161/AS/IND/2016-264202 Dec 201618
15.1.
(a)Whether Desalination is proposed No
    16.       Waste Water Management(During Operation)
S. No.Type/Source Quantity of Waste Water Generated (Kilolitre per Day)Treatment Capacity (Kilolitre per Day) Treatment MethodMode of DisposalOther Mode of DisposalQuantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day)Quantity of Discharged Water (Kilolitre per Day)
(1.)Domestic6.47Septic tank/Soak pitOthersSoak Pit06.4
16.1.
(a)Total Waste Water Generation (Kilolitre per Day) 6.4
(b)Total Discharged Water (Kilolitre per Day) 6.4
(c)Total Reused Water (Kilolitre per Day) 0
    17.       Solid Waste Generation/Management
S. No.Name of Waste Item Other ItemQuantity per AnnumUnitDistance from Site(KM)Mode of TransportOther Mode of TransportMode of DisposalOther Mode of Disposal
(1.)Used/Spent OilHazardous Waste (as per Hazardous and Other Waste Management rules 2016)0.24Kilolitre15RoadOthersAuthorized Recyclers
(2.)Discarded Plastic BagsIndustrial Waste200Tons250RoadOthersAuthorized Recyclers
18.
    18.1.     Air Quality Impact Prediction
S. No.Criteria Pollutants Other Criteria PollutantsUnitBaseline ConcentrationDistance GLCIncremental ConcentrationTotal GLCPrescribed Standard
(1.)NOxMicrogram per Meter Cube24.11.03.9428.0480
(2.)SO2Microgram per Meter Cube13.21.03.8817.0880
(3.)PM2.5Microgram per Meter Cube41.61.01.5443.1460
(4.)PM10Microgram per Meter Cube82.61.03.8586.45100
    18.2.     Stack Details
S. No.Source FuelStack Height(m)Stack Diameter(m)PollutantsOther PollutantsEmission (GLS)
(1.)Packing SectionNone240.52OthersPM30 mg/NM3
(2.)Jaw Crusher & ImpactorNone300.5OthersPM30 mg/Nm3
(3.)Tunnel VentilationNone260.6OthersPM30 mg/Nm3
(4.)Kiln VSK 250 TPDCoke Breeze532OthersPM,SOx and NOx50, 200 & 500 mg/Nm3
(5.)D G set 600 KVADiesel120.2OthersPM,SOx and NOx150 mg/NM3,100ppm,50ppm
(6.)Raw Grinding MillNone301.75OthersPM30 mg/Nm3
(7.)FlyAsh & Gypsum FeedingNone240.76OthersPM30 mg/Nm3
(8.)Cement MillNone280.7OthersPM30 mg/Nm3
(9.)Cement MillNone280.7OthersPM30 mg/Nm3
(10.)Kiln VSK 250 TPDCoke Breeze532OthersPM,SOx and NOx50,200&500 mg/Nm3
(11.)D G Set 250 KVADiesel90.15OthersPM,SOx and NOx150mg/Nm3,100ppm,50ppm
(12.)D G Set 600 KVADiesel120.2OthersPM,SOx and NOx150mg/NM3,100ppm,50ppm
19.
Power Requirement:
(a)Quantity (Kilo Volt Amps (kVA)) 3600
(b)Source Assam State Electricity Board
(c)Uploaded Copy of Agreement Copy of Agreement
(d)Standby Arrangement (Details of DG Sets) 2x600 KVA and 1x250 KVA
(e)Stack Height (in m) 12
20.
Land Ownership Pattern:
(a)Forest Land (ha.) 0
(b)Private Land (ha.) 2.6
(c)Government Land (ha.) 0
(d)Revenue Land (ha.) 0
(e)Other Land (ha.) 0
    Total Land (ha.) 2.6
21.
Present Land Use Breakup of the Study Area in Ha:
(a)Agriculture Area (ha.) 0
(b)Waste/Barren Land (ha.) 26859.4
(c)Grazing/ Community Land (ha.) 0
(d)Surface Water Bodies (ha.) 0
(e)Settlements (ha.) 0
(f)Industrial (ha.) 0
(g)Forest (ha.) 0
(h)Mangroves (ha.) 0
(i)Marine Area (ha.) 0
(j)Others (ha.) : NA 0
    Total (ha.) 26859.4
    22.     Land requirement for various activities
S. No.Description of Activity / Facility / Plant / Others OthersLand Requirement (ha.)Remarks
(1.)Green belt883333 % area
(2.)Main Plant18026.4All area other than green belt area
Total (ha.) 26859.4
23.
Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Sanctuaries; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones :
    23.1.     Details of Ecological Sensitivity :
S. No.Details of Ecological Sensitivity NameDistance from the Project (Km)Remarks
(1.)Critically Polluted AreaNone0None within 10 km Radius
(2.)NPANone0None within 10 km Radius
(3.)Wildlife CorridorsAmchang1.44None
(4.)CorridorsAmchang1.44None
(5.)ESAsNone0None within 10 km Radius
(6.)WLSAmchang1.64ESZ defined by MoEF&CC on 7th May 2017
(7.)ESZsAmchang1.44ESZ defined by MoEF&CC on 7th May 2017
    23.2.     Details of Environmental Sensitivity :
S. No.Details of Environmental Sensitivity Other Details of Environmental Sensitivity NameDistance from the Project (Km)Remarks
(1.)ForestMylliem RF1.01None
(2.)Archaeological SitesNone0None
(3.)Defence InstallationsNone0None
23.3.
(a)Whether Noc / Permission from the competent authority is required? No
(b)Whether NBWL recommendation is required? No
24.
Forest Land:
Whether any Forest Land involved? No
25.
Tree Cutting:
(a)No. of Trees Cut for the Project (if Forest Land not Involved) 0
(b)Details of Tree Cutting and Planting of Trees Not Applicable
26.
Land Acquisition Status:
(a)Acquired Land(Ha) 26859.4
(b)Land yet to be acquired(Ha) 0
(c)Status of Land acquisition if not acquired Not Applicable
27.
Rehabilitation and Resettlement (R&R):
(a)No. of Villages 0
(b)No. of Households 0
(c)No. of PDFs (Project Displaced Families) 0
(d)No. of PAFs (Project Affected Families) 0
(e)Funds Allocated for R&R(in INR) (in Lacs) 0
(f)Status of R&R Completed
28.
Details of Presence of Schedule-I Species:
(a)Whether there is Presence of Schedule-I Species ? No
(b)Whether conservation plan for Schedule-I Species has been prepared ? No
(c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? No
29.
Details of Presence of Water Bodies in Core Area:
(a)Whether there is Presence of Water Bodies in Core Area ? No
(b)Whether there is Diversion Required ? No
(c)Whether permission has been obtained from competent authority ? No
30.
Details of Presence of Water Bodies in Buffer Area:
(a)Whether there is Presence of Water Bodies in Buffer Area ? Yes
(i)Details of Water Bodies in Buffer Area Umtru River
(ii)Direction of Water Bodies in Buffer Area South East
(iii)Distance of Water Bodies in Buffer Area 2.5
31.
Manpower Requirement:
(a)Permanent Employment-During Construction 5
(b)Permanent Employment-During Operation 90
(c)Temporary Employment- During Construction 10
(d)Temporary Employment- During Operation 5
(e)No. of working days 365
(f)Total Manpower 110
32.
Green Belt in Ha:
(a)Uploaded Green Belt plan Copy of Green Belt Plan
S. No.Description ExistingProposedTotal
(1.)Total Area of Green Belt883308833
(2.)Percentage of Total Project Area33033
(3.)No. of Plants200002000
(4.)Funds Allocated120000001200000
    33.         Project Benefits
S. No.Type of Project Benefits Details of Project Benefits
(1.)EnvironmentalDevelopment of green belt,all along the boundary wall
(2.)SocialEmployment generation
(3.)FinancialRevenue generation
   34.   CRZ Specific Details : Not Applicable
   35.   Sector Specific Details : NOT APPLICABLE
   35.   Sector Specific Details For Industrial Projects - 1
S. No.Item Details
S. No.Item Details
36.
Details of Court Cases:
(a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? No
37.
Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act:
(a)Whether any Direction issued under EPA Act/Air Act/Water Act ? No
38.
Details of EIA Consultant:
(a)Have you hired Consultant for preparing document? Yes
(i)Accreditation No. NABET/EIA/1821/RA0102
(ii)Name of the EIA Consultant Envision Enviro Technologies Pvt. Ltd.
(iii)Address 2nd Floor, Shree Ram Complex, Near KArgil Chowk, Piplod, Surat-395007, Gujarat
(iv)Mobile No. 9428001875
(v)Landline No. 0261222300
(vi)Email Id envision.surat@gmail.com
(vii)Category of Accreditation A
(viii)Sector of Accreditation Industrial Projects - 1
(ix)Validity of Accreditation 06 Dec 2020
(x)Uploaded Certificate of Accreditation certified by QCI/NABET Copy of Certificate of Accreditation
39.
Documents to be Attached:
(a)Uploaded Copy of EIA/EMP Report Copy of EIA/EMP
Copy of EIA/EMP(Annexures)
Copy of EIA/EMP(Plans/Figures)
(b)Uploaded Copy of Risk Assessment Report Copy of Risk Assessment
(c)Uploaded Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan
(d)Uploaded Copy of Final Layout Plan Copy of Final Layout Plan
(e)Uploaded Cover Letter Copy of Cover Letter
(f)Uploaded Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency
(g)Uploaded Additional File Copy of Additional File
(h)Uploaded Proposal Presentation (To be given in EAC meeting) NA
            Essential Detail Sought:
Sno. EDS Letter Remarks Date of EDS
1.NAYou are requested to submit certificate of compliance of earlier EC conditions form regional office of MoEFCC 03 Dec 2018
2.NAThe correction have been made as per the instruction received 13 May 2019
      Additional Detail Sought : NIL
Undertaking
I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief. And I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity/ construction/ expansion has since been taken up.
Name of ApplicantKIRAN KAYAL
DesignationPARTNER
Name of Company (Applicant Name should not be given here)K R ASSOCIATES
AddressHOUSE NO. 62, BY LANE -2, TARUN NAGAR, G S ROAD
Print