Form-2
APPLICATION FOR PRIOR ENVIRONMENTAL CLEARANCE
S. No.Item Details
1.
Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? No
Details of Project:
(a)Name of the project(s) Grass root Petroleum Storage Terminal at Asanur
(b)Name of the Company / Organisation INDIANOIL CORPORATION LTD
(c)Registered Address IndianOil Bhawan, G-9, Ali Yavar Jung Marg, Bandra (E), Mumbai,,Mumbai City,Maharashtra-400051
(d)Legal Status of the Company Central PSU
(e)Joint Venture No
2.
Address for the correspondence:
(a)Name of the Applicant Vaneet Bansal
(b)Designation (Owner/ Partner/ CEO) DGM
(c)Address 6th Floor Engineering Department, Indian Oil Corporation Ltd, G-9, Ali Yavar Jung Marg, Bandra E, Mumbai,,Mumbai,Mumbai City,Maharashtra-400051
(d)Pin code 400051
(e)E-mail ksrivin@indianoil.in
(f)STD Code. 22(f)Telephone No. 26447031
(g)Fax No.
(h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . Annexure-Uploaded Copy of documents in support of the competence/authority
3.
Category of the Project/Activity as per Schedule of EIA Notification,2006:
(a.I)Project/Activity6(b)Isolated storage & handling of hazardous chemicals (As per threshold planning
Minor Activity6(b)Isolated storage & handling of hazardous chemicals (As per threshold planning
(b)Category B1
   Reason for Applying at Ministry SEIAA
(c)Proposal Number IA/TN/IND2/79760/2016
(d)Master Proposal Number(Single Window) SW/79758/2018
(e)EAC concerned (for category A Projects only) Industrial Projects - 2
(f)Project Type Fresh EC
4.
Location of the Project:
(a)Plot/Survey/Khasra No. 365/4(pt)
(b)Pincode 606305
(c)Bounded Latitudes (North)
From
Degree 113616.99
Minutes
Second
From
Degree 113645.06
Minutes
Second
(d)Bounded Longitudes (East)
From
Degree 791120.24
Minutes
Second
From
Degree 791159.34
Minutes
Second
(e)Survey of India Topo Sheet No. 58M/2 and 58M/6
(f)Uploaded Topo Sheet File Copy of Topo Sheet File
(g)Maximum Elevation Above Means Sea Level(AMSL) 61
(h)Uploaded (kml) File Copy of Kml File      
(i)Distance of Nearest HFL from the project boundary within the study area 2.2
(j)Seismic Zone 2
5.
(a)Number of States in which Project will be Executed 1
(b)Main State of the project Tamil Nadu
Details of State of the project
S. No. State Name District Name Tehsil Name Village Name
NIL
6.
Details of Terms of Reference (ToR):
(a)MoEF&CC / SEIAA File Number 5365/2016
(b)Date of Apply of TOR 18 Aug 2016
(c)Date of Issue of TOR / Standard ToR 27 Sep 2016
(d)Previous TOR Letter Copy of Previous TOR letter
7.
Details of Public Consultation:
(a)Whether the Project Exempted from Public Hearing?No
(b)Whether details of Public Hearing available? Yes
(c)Whether Public hearing was presided over by an officer of the rank of Additional District Magistrate or above Yes
     7.1.       Details of Public Hearing
S. No.Details of Advertisement Details of Public Hearing Venue Location DetailsNo. of People AttendedIssues RaisedDesignation of Presiding OfficerOther Designation of Presiding Officer
(1.)
Date of Advertisement :12 Oct 2017
Copy of advertisement :Copy of Advertisement
Copy of Public Hearing :Copy of Public Hearing
Date :16 Nov 2017
Distance of Public Hearing Venue from the Proposed Project :0.5
Within the premises of IOCL at SIDCO Industrial Estate,Asanur
State :Tamil Nadu
District :Viluppuram
Tehsil :Ulundurpettai
Village :Asanur
248Construction of compound wall by IOCL will bypass the water course Employment opportunities shall be provided to local people If the water courses are bypassed, the near by MSME units will be affectOthersDistrict Revenue Officer
8.
Details of Project Configuration/Product:
     8.1.       Project Configuration
S. No.Plant/Equipment/FacilityConfigurationRemarks
(1.)Petroleum Storage TerminalAboveground TanksPetroleum Storage Terminal
     8.2.       Product
S. No.Product/Activity (Capacity/Area)QuantityUnitOther UnitMode of Transport / Transmission of ProductOther Mode of Transport / Transmission of Product
(1.)Ethanol, HSD,MS,Biodiesel80870Otherscubic meterPipe Conveyor
9.
In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii):
Details Not Applicable
9.1.
Details of Consent to Operate
(i)Whether Consent to operate obtained ? NA
(ii)Copies of all Consent to operate obtained since inception NA
(iii)Date of Issue N/A
(iv)Valid Upto N/A
(v)File No. NA
(vi)Application No. NA
(vii)Copy of Consent to operate valid as on date NA
10.
Project Cost:
(a)Total Cost of the Project at current price level (in Crores) 406
(b) Funds Allocated for Environment Management (Capital) (in Crores) 71.47
(c) Funds Allocated Towards CER (Corporate Environment Responsibility) (in Crores) 8
(d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in Crores) 2.51
11.
Whether project attracts the General Condition specified in the Schedule of EIA Notification ? No
12.
Whether project attract the Specific Condition specified in the Schedule of EIA Notification ? No
13.
Raw Material / Fuel Requirement:
(a)Proposed quantity of raw material/fuel 80870
(b)Existing quantity of raw material/fuel N/A
(c)Total quantity of raw material/fuel 80870
    13.1.        Raw Material / Fuel Profile
S. No.Raw Material / Fuel QuantityUnitOther UnitSource (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received )Mode of TransportOther Mode of TransportDistance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received)Type of Linkage Other Type of Linkage Uploaded Copy of Linkage
(1.)Ethanol, HSD, MS, Biodiesel80870Otherscubic meterAsanur ToPPipe Conveyor0.9 Open MarketCopy of Linkage
14.
Baseline Data :
(a)Period of Base Line Data Collection FROM 04 Apr 2016 To 01 Jul 2016
(b)Season Pre-Monsoon
    14.1.     No. of ambient Air Quality (AAQ) monitoring locations : 10
S. No.Criteria Pollutants Other Criteria PollutantsUnitMaximum ValueMinimum Value98 Percentile ValuePrescribed Standard
(1.)PM2.5Micro Gram per Meter Cube31.210.129.960
(2.)SO2Micro Gram per Meter Cube12.84.512.580
(3.)OthersBenzeneMicro Gram per Meter Cube1.01.01.05.0
(4.)NOxMicro Gram per Meter Cube20.19.919.780
(5.)PM10Micro Gram per Meter Cube67.230.265.4100
    14.2.     No. of Ground Water monitoring locations : 5
S. No.Criteria Pollutants Other Criteria PollutantsHeavy MetalUnitOther UnitMaximum ValueMinimum ValueDesirable LimitMaximum Permissible Limit
(1.)pHNA7.256.967.08.5
(2.)Chloridesmg/l530.3122.32501000
(3.)Heavy MetalsMercurymg/l0.00050.00050.001.001
(4.)TSSmg/l2.62.11.05.0
(5.)TDSmg/l1975783.84002000
(6.)Total Hardnessmg/l754325.4200600
(7.)Fluoridemg/l3.410.11.01.5
(8.)OthersNitratemg/l0.50.54545
    14.3.     No. of Surface Water monitoring locations : 1
S. No.Criteria Pollutants Other Criteria PollutantsUnitOther UnitMaximum ValueMinimum ValueClassification of inland water body
(1.)DOmg/l4.54.5C
(2.)BODmg/l2.42.4C
(3.)pHNA5.95.9C
(4.)CODmg/l20.320.3C
    14.4.     No. of Ambient Noise monitoring locations : 10
S. No.Parameter UnitMaximum ValueMinimum ValuePrescribed Standard
(1.)Leq(Day)A-weighted decibels(dB(A))52.748.255
(2.)Leq(Night)A-weighted decibels(dB(A))42.839.545
    14.5.     No. of Soil Sample Monitored locations : 5
S. No.Parameter UnitOther UnitMaximum ValueMinimum Value
(1.)P(Phosphorus)Milliequivalents per 100 Gram1.51.1
(2.)K(Potassium)Milliequivalents per 100 Gram1.91.1
(3.)Electric ConductivityMillisiemens per Centimetre2.047.0049
(4.)pHOthersNA10.457.61
(5.)N(Nitrogen)Milliequivalents per 100 Gram3.61.9
14.6.
Details of Ground Water Table:
(a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) From 4 To 5
(b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) From 2 To 4
(c)Whether Ground Water Intersection will be there ? Yes
(d)Upload Copy of Central Ground Water Authority Letter Copy of Central Ground Water Authority Letter
(e)Letter No. Application to be submitted
(f)Date of Issue 21 Sep 2018
     15.      Details of Water Requirement (During Operation)
S. No.Source Source Other Required Quantity (Kilolitre per Day (Kld))Distance from SourceCopy of Permission from Competent Authority Mode of TransportOther Mode of TransportMethod of Water WithdrawalOther Method of Water WithdrawalLetter No.Date of IssuePermitted Quantity
(1.)GroundWater200Copy of Permission LetterPipelineOthersBore wellApplication to be submitted21 Sep 201820
15.1.
(a)Whether Desalination is proposed No
    16.       Waste Water Management(During Operation)
S. No.Type/Source Quantity of Waste Water Generated (Kilolitre per Day)Treatment Capacity (Kilolitre per Day) Treatment MethodMode of DisposalOther Mode of DisposalQuantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day)Quantity of Discharged Water (Kilolitre per Day)
(1.)sewage77mbbrOthersfirefighting70
16.1.
(a)Total Waste Water Generation (Kilolitre per Day) 7
(b)Total Discharged Water (Kilolitre per Day) 0
(c)Total Reused Water (Kilolitre per Day) 7
    17.       Solid Waste Generation/Management
S. No.Name of Waste Item Other ItemQuantity per AnnumUnitDistance from Site(KM)Mode of TransportOther Mode of TransportMode of DisposalOther Mode of Disposal
(1.)domesticMunicipal Solid Waste13.5Tons0.9RoadAuthorized Recyclers
18.
    18.1.     Air Quality Impact Prediction
S. No.Criteria Pollutants Other Criteria PollutantsUnitBaseline ConcentrationDistance GLCIncremental ConcentrationTotal GLCPrescribed Standard
(1.)PM10Microgram per Meter Cube00000
(2.)PM2.5Microgram per Meter Cube00000
(3.)SO2Microgram per Meter Cube00000
(4.)NOxMicrogram per Meter Cube00000
    18.2.     Stack Details
S. No.Source FuelStack Height(m)Stack Diameter(m)PollutantsOther PollutantsEmission (GLS)
(1.)DG SetDiesel4.50.15PM100
19.
Power Requirement:
(a)Quantity (Kilo Volt Amps (kVA)) 1570
(b)Source TNSEB
(c)Uploaded Copy of Agreement Not Applicable
(d)Standby Arrangement (Details of DG Sets) 2 DG sets of 750 kVA and 1 DG set of 500 kVA
(e)Stack Height (in m) 5.5
20.
Land Ownership Pattern:
(a)Forest Land (ha.) 0
(b)Private Land (ha.) 0
(c)Government Land (ha.) 0
(d)Revenue Land (ha.) 0
(e)Other Land (ha.) 30.19
    Total Land (ha.) 30.19
21.
Present Land Use Breakup of the Study Area in Ha:
(a)Agriculture Area (ha.) 0
(b)Waste/Barren Land (ha.) 0
(c)Grazing/ Community Land (ha.) 0
(d)Surface Water Bodies (ha.) 0
(e)Settlements (ha.) 0
(f)Industrial (ha.) 30.19
(g)Forest (ha.) 0
(h)Mangroves (ha.) 0
(i)Marine Area (ha.) 0
(j)Others (ha.) : only industrial 0
    Total (ha.) 30.19
    22.     Land requirement for various activities
S. No.Description of Activity / Facility / Plant / Others OthersLand Requirement (ha.)Remarks
(1.)Main Plant30.19
Total (ha.) 30.19
23.
Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Sanctuaries; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones :
    23.1.     Details of Ecological Sensitivity :
S. No.Details of Ecological Sensitivity NameDistance from the Project (Km)Remarks
(1.)NPAnone20none within 10km study area
(2.)ESAsnone20none within 10km study area
(3.)ESZsnone20none within 10km study area
(4.)Wildlife Corridorsnone20none within 10km study area
(5.)Corridorsnone20none within 10km study area
(6.)WLSnone20no within 10 km study area
(7.)Critically Polluted Areanone20none within 10km study area
    23.2.     Details of Environmental Sensitivity :
S. No.Details of Environmental Sensitivity Other Details of Environmental Sensitivity NameDistance from the Project (Km)Remarks
(1.)ForestKoothakudi Reserve forest4.5reserve forest
(2.)Defence Installationsnone15none within 10 km study area
(3.)Archaeological Sitesnone15none within 10 km study area
23.3.
(a)Whether Noc / Permission from the competent authority is required? No
(b)Whether NBWL recommendation is required? No
24.
Forest Land:
Whether any Forest Land involved? No
25.
Tree Cutting:
(a)No. of Trees Cut for the Project (if Forest Land not Involved) 0
(b)Details of Tree Cutting and Planting of Trees Not Applicable
26.
Land Acquisition Status:
(a)Acquired Land(Ha) 0
(b)Land yet to be acquired(Ha) 0
(c)Status of Land acquisition if not acquired 0
27.
Rehabilitation and Resettlement (R&R):
(a)No. of Villages 0
(b)No. of Households 0
(c)No. of PDFs (Project Displaced Families) 0
(d)No. of PAFs (Project Affected Families) 0
(e)Funds Allocated for R&R(in INR) (in Lacs) 0
(f)Status of R&R Completed
28.
Details of Presence of Schedule-I Species:
(a)Whether there is Presence of Schedule-I Species ? No
(b)Whether conservation plan for Schedule-I Species has been prepared ? No
(c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? No
29.
Details of Presence of Water Bodies in Core Area:
(a)Whether there is Presence of Water Bodies in Core Area ? No
(b)Whether there is Diversion Required ? No
(c)Whether permission has been obtained from competent authority ? No
30.
Details of Presence of Water Bodies in Buffer Area:
(a)Whether there is Presence of Water Bodies in Buffer Area ? No
31.
Manpower Requirement:
(a)Permanent Employment-During Construction 0
(b)Permanent Employment-During Operation 85
(c)Temporary Employment- During Construction 0
(d)Temporary Employment- During Operation 0
(e)No. of working days 300
(f)Total Manpower 85
32.
Green Belt in Ha:
(a)Total Area of Green Belt 9.9
(b)Percentage of Total Project Area 32.79
(c)No. of Plants to be Planted 400
(d)Funds Allocated for Plantation 5000000
(e)Uploaded Green Belt plan Copy of Green Belt Plan
    33.         Project Benefits
S. No.Type of Project Benefits Details of Project Benefits
(1.)EnvironmentalDeveloped in industrial estate. Reduction in road traffic resulting in increased safety and less pollution due to pipeline transportation of petroleum products
(2.)SocialEmployment potential. Socially relevant CSR activities to be undertaken in consultation with the district administration
(3.)FinancialBetter supply of petroleum products for industries. Direct revenue to the National and State exchequer
   34.   CRZ Specific Details : Not Applicable
   35.   Sector Specific Details : NOT APPLICABLE
   35.   Sector Specific Details For Industrial Projects - 2
S. No.Item Details
S. No.Item Details
36.
Details of Court Cases:
(a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? No
37.
Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act:
(a)Whether any Direction issued under EPA Act/Air Act/Water Act ? No
38.
Details of EIA Consultant:
(a)Have you hired Consultant for preparing document? Yes
(i)Accreditation No. NABET/EIA/1720/RA/0094
(ii)Name of the EIA Consultant ULTRA-TECH Environmental Consultancy and Laborator
(iii)Address Jai Commercial Complex, Eastern Express Hwy, Khopat, Thane (W, Thane, Maharashtra 400601, India
(iv)Mobile No. 9895200526
(v)Landline No. 0484401117
(vi)Email Id ananthitha@ultratech.in
(vii)Category of Accreditation B
(viii)Sector of Accreditation Industrial Projects - 2
(ix)Validity of Accreditation 10 Mar 2020
(x)Uploaded Certificate of Accreditation certified by QCI/NABET Copy of Certificate of Accreditation
39.
Documents to be Attached:
(a)Uploaded Copy of EIA/EMP Report Copy of EIA/EMP
Copy of EIA/EMP(Annexures)
Copy of EIA/EMP(Plans/Figures)
(b)Uploaded Copy of Risk Assessment Report Copy of Risk Assessment
(c)Uploaded Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan
(d)Uploaded Copy of Final Layout Plan Copy of Final Layout Plan
(e)Uploaded Cover Letter Copy of Cover Letter
(f)Uploaded Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency
(g)Uploaded Additional File Copy of Additional File
(h)Uploaded Proposal Presentation (To be given in EAC meeting) NA
            Essential Detail Sought:
Sno. EDS Letter Remarks Date of EDS
1.NAPlease submit minutes of SEAC meeting held on 28/5/2018 and the compliance status thereof. Also, submit documentary proof for the proposal/application submitted for ground water withdrawal of 20 cum/day (through 3 bore wells). 23 Sep 2018
2.NAThe correction have been made as per the instruction received 26 Sep 2018
3.NA- Please inform whether public hearing was conducted on 16/11/2017 under the chairmanship of an officer not below the rank of Additional District Magistrate as provided under the EIA Notification, 2006. - During public hearing, concerns were raised against construction of compound wall and disturbance of the existing natural water course. However, there seems no comprehensive plan submitted in this regard. 29 Sep 2018
4.NAThe correction have been made as per the instruction received 01 Oct 2018
5.NAThe query regarding public hearing (chaired by ADM or equivalent) needs to be resolved through endorsement by the concerned District authorities. 04 Oct 2018
6.NAThe correction have been made as per the instruction received 06 Oct 2018
      Additional Detail Sought : NIL
Undertaking
I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief. And I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity/ construction/ expansion has since been taken up.
Name of ApplicantVaneet Bansal
DesignationDGM
Name of Company (Applicant Name should not be given here)INDIANOIL CORPORATION LTD
AddressIndianOil Bhawan, G-9, Ali Yavar Jung Marg, Bandra (E), Mumbai
Print