1. | Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? | No | Details of Project: | (a)Name of the project(s) | Sunvik Steel Private Limited | (b)Name of the Company / Organisation | Sunvik Steels Pvt Ltd | (c)Registered Address | No.23, 3rd Floor, MES Road, Bahubali Nagar, Jalahalli Village, Bangalore 560013,No.23, 3rd Floor, MES Road, Bahubali Nagar, Jalahalli Village, Bangalore 560013,Bangalore Urban,Karnataka-560013 | (d)Legal Status of the Company | Private | (e)Joint Venture | No | |
|
2. | Address for the correspondence: | (a)Name of the Applicant | Vivek Kejriwal | (b)Designation (Owner/ Partner/ CEO) | Managing Director | (c)Address | No.23, 3rd Floor, MES Road, Bahubali Nagar, Jalahalli Village, Bangalore 560013,No.23, 3rd Floor, MES Road, Bahubali Nagar, Jalahalli Village, Bangalore 560013,,Bangalore Urban,Karnataka-560013 | (d)Pin code | 560013 | (e)E-mail | harish@sunvik.in | (f)STD Code. | 80(f)Telephone No. | 23084713 | (g)Fax No. | 23084799 | (h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . | Annexure-Uploaded Copy of documents in support of the competence/authority | |
|
3. | Category of the Project/Activity as per Schedule of EIA Notification,2006: | (a.I)Project/Activity | 3(a) Metallurgical industries (ferrous & non ferrous)
| Minor Activity | | (b)Category | A | (c)Proposal Number | IA/KA/IND/79611/2008 | (d)Master Proposal Number(Single Window) | SW/79609/2018 | (e)EAC concerned (for category A Projects only) | Industrial Projects - 1 | (f)Project Type | Expansion |
|
|
4. | Location of the Project: | (a)Plot/Survey/Khasra No. | 24, 33, 33P - P4, 56, 57, 59 to 72 | (b)Pincode | 560013 | (c)Bounded Latitudes (North) | | From | | Degree | 13.553417 | Minutes | | Second | | From | | Degree | 13.558122 | Minutes | | Second | | (d)Bounded Longitudes (East) | | From | | Degree | 77.008008 | Minutes | | Second | | From | | Degree | 77.015778 | Minutes | | Second | | (e)Survey of India Topo Sheet No. | 57 C/14 and 57 G/2 | (f)Uploaded Topo Sheet File | Copy of Topo Sheet File | (g)Maximum Elevation Above Means Sea Level(AMSL) | 792 | (h)Uploaded (kml) File | Copy of Kml File | (i)Distance of Nearest HFL from the project boundary within the study area | 5.0 | (j)Seismic Zone | 2 | |
|
5. | (a)Number of States in which Project will be Executed | 1 | (b)Main State of the project | Karnataka | |
|
|
Details of State of the project |
---|
S. No. | State Name | District Name | Tehsil Name | Village Name |
---|
NIL | |
|
6. | Details of Terms of Reference (ToR)/EC: | (a)MoEF&CC / SEIAA File Number | J-11011/959/2008-IA II (I) | (c)Date of Issue of TOR | 09 Feb 2009 | (f)Previous TOR Letter | Copy of Previous TOR letter | (b)Date of Apply of EC | 20 Sep 2018 | (c)Date of Issue of EC | 06 May 2021 | (d)Previous EC Letter | Copy of Previous EC letter | |
|
7. | Details of Public Consultation: | (a)Whether the Project Exempted from Public Hearing? | No | (b)Whether details of Public Hearing available? | Yes | (c)Whether Public hearing was presided over by an officer of the rank of Additional District Magistrate or above | Yes | |
|
7.1. Details of Public Hearing |
---|
|
S. No. | Details of Advertisement | Details of Public Hearing | Venue | Location Details | No. of People Attended | Issues Raised | Designation of Presiding Officer | Other Designation of Presiding Officer |
---|
(1.) | | Copy of Public Hearing : | Copy of Public Hearing | Date : | 12 Sep 2017 | Distance of Public Hearing Venue from the Proposed Project : | 2.5 |
| Near premises of Sri Rama Devara Temple Community Hall | State : | Karnataka | District : | Tumkur | Tehsil : | Sira | Village : | Haldodderi |
| 70 | Dust pollution, Crop damage, Road damage, etc. | Deputy Commissioner | | |
8. | Details of Project Configuration/Product: | Details Not Applicable | |
|
9. | In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii): | (a)Details of certified report on compliance of earlier environmental clearance condition | (i)Certified Compliance By | Regional | (ii)Details of Regional Office of MoEFCC / Zonal Office of CPCB / SPCB / UTPCC from which certified report on | Bangalore | (iii)Letter No. | EP/12.1/629/Karnataka | (iv)Status of Compliance | Compiled | (v)Certified report on compliance of earlier environmental clearance conditions (Including Monitoring Report) | Copy of Certified Compliance Report | (vi)Date of site visit | May 19 2018 12:00AM | (b)Details of Capacity Expansion | |
|
S. No. | Product/Activity (Capacity/Area) | Quantity From | Quantity To | Total | Unit | Other Unit | Mode of Transport / Transmission of Product | Other Mode of Transport / Transmission of Product |
---|
(1.) | Sponge Iron | 90000 | 60000 | 150000 | Tons per Annum(TPA) | | Road | | (2.) | MS Ingots or Billets | 36000 | 150000 | 186000 | Tons per Annum(TPA) | | Road | | (3.) | Rolled Products | 30000 | 150000 | 180000 | Tons per Annum(TPA) | | Road | | (4.) | Cold Briquetted Iron | 0 | 6000 | 6000 | Tons per Annum(TPA) | | Road | | (5.) | Iron ore concentrate or Pellets | 0 | 600000 | 600000 | Tons per Annum(TPA) | | Road | | (6.) | Fly ash bricks | 2000 | 18000 | 20000 | Others | Bricks per day | Road | | (7.) | WHRB Power Plant | 6 | 5 | 11 | Mega Watt(MW) | | Others | through electrical cables | (8.) | AFBC Power Plant | 4 | 10 | 14 | Mega Watt(MW) | | Others | through electrical cables | (9.) | Pig Iron | 0 | 90000 | 90000 | Tons per Annum(TPA) | | Road | through electrical cables | (10.) | Slag crusher and beneficiation | 4500 | 9000 | 13500 | Tons per Annum(TPA) | | Road | | |
| (c)Details of Configuration | |
|
S. No. | Plant / Equipment / Facility | Existing Configuration | Proposed Configuration | Final configuration after expansion | Remarks |
---|
(1.) | AFBC Power Plant | 4 MW | 10 MW | 14 MW | | (2.) | Fly ash brick unit | 2000 Bricks/day | 18000 Bricks/day | 20000 Bricks/day | | (3.) | Rolling Mill | 1 x 100 TPD | 1 x 500 TPD | 1 x 100 TPD & 1 x 500 TPD | | (4.) | Tunnel Kilns | 0 | 2 x 100 TPD | 2 x 100 TPD | | (5.) | Iron ore beneficaiton & Pelletisation | 0 | 1 x 2000 TPD | 1 x 2000 TPD | | (6.) | Slag Crusher & Beneficiation Plant | 1 x 15 TPD | 1 x 30 TPD | 1 x 15 TPD & 1 x 30 TPD | | (7.) | WHRB Power Plant | 6 MW | 5 MW | 11 MW | | (8.) | DRI Kiln | 3 x 100 TPD | 1 x 200 TPD | 3 x 100 TPD & 1 x 200 TPD | | (9.) | Induction Furnace | 1 x 12 T | 2 x 25 T | 1 x 12 T & 2 x 25 T | | (10.) | Blast Furnace | 0 | 1 x 125 m3 | 1 x 125 m3 | | |
9.1. | Details of Consent to Operate | (i)Whether Consent to operate obtained ? | NA | (ii)Copies of all Consent to operate obtained since inception | NA | (iii)Date of Issue | 15 Sep 2016 | (iv)Valid Upto | 30 Jun 2021 | (v)File No. | AW-300966 | (vi)Application No. | 11783 | (vii)Copy of Consent to operate valid as on date | Copy of Consent to Operate | |
|
|
10. | Project Cost: | (a)Total Cost of the Project at current price level (in Crores) | 550 | (b) Funds Allocated for Environment Management (Capital) (in Crores) | 47 | (c) Funds Allocated Towards CER (Corporate Environment Responsibility) (in Crores) | 4.25 | (d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in Crores) | 3.45 | |
|
11. | Whether project attracts the General Condition specified in the Schedule of EIA Notification ? | No | | |
12. | Whether project attract the Specific Condition specified in the Schedule of EIA Notification ? | No | | |
13. | Raw Material / Fuel Requirement: | (a)Proposed quantity of raw material/fuel | 96000 | (b)Existing quantity of raw material/fuel | 144000 | (c)Total quantity of raw material/fuel | 240000 | |
|
  13.1. Raw Material / Fuel Profile |
---|
S. No. | Raw Material / Fuel | Quantity | Unit | Other Unit | Source (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received ) | Mode of Transport | Other Mode of Transport | Distance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received) | Type of Linkage | Other Type of Linkage | Uploaded Copy of Linkage |
---|
(1.) | Imported Coal | 150000 | Tons per Annum | | Indonesia or Australia | Road,Rail | | 350 | MoU | | Copy of Linkage | (2.) | Iron Ore fines | 900000 | Tons per Annum | | Karnataka | Road,Rail | | 200 | e-auction | | Copy of Linkage | |
|
14. | Baseline Data : | (a)Period of Base Line Data Collection | FROM 01 Oct 2015 To 31 Dec 2015 | (b)Season | Winter | |
|
14.1. No. of ambient Air Quality (AAQ) monitoring locations : 8 |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Unit | Maximum Value | Minimum Value | 98 Percentile Value | Prescribed Standard |
---|
(1.) | PM2.5 | | Micro Gram per Meter Cube | 31.4 | 17.1 | 31.4 | 60 | (2.) | PM10 | | Micro Gram per Meter Cube | 52.3 | 29.6 | 52.3 | 100 | (3.) | Others | CO | Micro Gram per Meter Cube | 690 | 355 | 690 | 2000 | (4.) | SO2 | | Micro Gram per Meter Cube | 15.9 | 9.5 | 15.9 | 80 | (5.) | NOx | | Micro Gram per Meter Cube | 17.9 | 9.9 | 17.9 | 80 | |
14.2. No. of Ground Water monitoring locations : 8 |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Heavy Metal | Unit | Other Unit | Maximum Value | Minimum Value | Desirable Limit | Maximum Permissible Limit |
---|
(1.) | pH | | | NA | | 7.6 | 7.1 | 6.5 | 8.5 | (2.) | TSS | | | mg/l | | 1.4 | 1 | 0 | 0 | (3.) | TDS | | | mg/l | | 375 | 243 | 500 | 2000 | (4.) | Total Hardness | | | mg/l | | 302 | 177 | 300 | 600 | (5.) | Chlorides | | | mg/l | | 180 | 105 | 250 | 1000 | (6.) | Fluoride | | | mg/l | | 0.36 | 0.18 | 1.0 | 1.5 | (7.) | Heavy Metals | | Fe | mg/l | | 0.039 | 0.020 | 0.3 | 1.0 | |
14.3. No. of Surface Water monitoring locations : 4 |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Unit | Other Unit | Maximum Value | Minimum Value | Classification of inland water body |
---|
(1.) | pH | | NA | | 8.1 | 7.8 | A | (2.) | DO | | mg/l | | 6.6 | 3.3 | A | (3.) | BOD | | mg/l | | 4.8 | 3.2 | A | (4.) | COD | | mg/l | | 13 | 8.5 | A | (5.) | Others | TDS | mg/l | | 379 | 166 | A | |
14.4. No. of Ambient Noise monitoring locations : 8 |
---|
S. No. | Parameter | Unit | Maximum Value | Minimum Value | Prescribed Standard |
---|
(1.) | Leq(Night) | A-weighted decibels(dB(A)) | 61 | 38 | 70 | (2.) | Leq(Day) | A-weighted decibels(dB(A)) | 65 | 44 | 75 | |
14.5. No. of Soil Sample Monitored locations : 8 |
---|
S. No. | Parameter | Unit | Other Unit | Maximum Value | Minimum Value |
---|
(1.) | pH | Others | NA | 7.6 | 7.1 | (2.) | N(Nitrogen) | Kilogram per hectare | | 292 | 205 | (3.) | P(Phosphorus) | Kilogram per hectare | | 82 | 52 | (4.) | Electric Conductivity | Kilogram per hectare | | 188 | 123 | (5.) | K(Potassium) | Kilogram per hectare | | 36 | 23 | |
|
14.6. | Details of Ground Water Table: | (a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) | From 1.2 To 12 | (b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) | From 0.3 To 11 | (c)Whether Ground Water Intersection will be there ? | Yes | (d)Upload Copy of Central Ground Water Authority Letter | Copy of Central Ground Water Authority Letter | (e)Letter No. | KGA/CU Application-1/2017-18 | (f)Date of Issue | 04 Nov 2017 | |
|
15. Details of Water Requirement (During Operation) |
---|
S. No. | Source | Source Other | Required Quantity (Kilolitre per Day (Kld)) | Distance from Source | Copy of Permission from Competent Authority | Mode of Transport | Other Mode of Transport | Method of Water Withdrawal | Other Method of Water Withdrawal | Letter No. | Date of Issue | Permitted Quantity |
---|
(1.) | GroundWater | | 1000 | 0 | Copy of Permission Letter | Pipeline | | Tube Well | | KGA/CU Application-1/2017-18 | 04 Nov 2017 | 1642 | |
|
15.1. | (a)Whether Desalination is proposed | No | |
|
16. Waste Water Management(During Operation) |
---|
S. No. | Type/Source | Quantity of Waste Water Generated (Kilolitre per Day) | Treatment Capacity (Kilolitre per Day) | Treatment Method | Mode of Disposal | Other Mode of Disposal | Quantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day) | Quantity of Discharged Water (Kilolitre per Day) |
---|
(1.) | GCP effluent | 80 | 80 | Settling Tank | Reuse within the Plant & Recycling | | 80 | | (2.) | DM Plant Regeneration | 20 | 20 | sent to Central Monitoring Basin | Green Belt Renewal Plant | | 20 | | (3.) | sanitary wastewater | 16 | 16 | septic tank following by saok pit | Others | septic tank followed by soak pit | 0 | 16 | (4.) | Boiler Blowdown | 24 | 24 | sent to Central Monitoring Basin | Green Belt Renewal Plant | | 24 | 0 | |
|
16.1. | (a)Total Waste Water Generation (Kilolitre per Day) | 140 | (b)Total Discharged Water (Kilolitre per Day) | 16 | (c)Total Reused Water (Kilolitre per Day) | 124 | |
|
17. Solid Waste Generation/Management |
---|
S. No. | Name of Waste | Item | Other Item | Quantity per Annum | Unit | Distance from Site(KM) | Mode of Transport | Other Mode of Transport | Mode of Disposal | Other Mode of Disposal |
---|
(1.) | Ash from Pellet Plant | Industrial Waste | | 16200 | Tons | 0 | Road | | Others | utilized in existing Brick manufacturing unit | (2.) | Wet Scrapper sludge | Industrial Waste | | 27000 | Tons | 100 | Road | | Others | will be given to Brick manufacturer | (3.) | Cinder from Gasifier | Industrial Waste | | 20 | Tons | 0 | Road | | Others | utilised in existing Brick manufacturing unit | (4.) | Dust from APCS | Others | Dust | 300 | Tons | 0 | Road | | Others | utilised in existing brick manufacturing unit | (5.) | Tailings | Industrial Waste | | 270000 | Tons | 270 | Road | | Others | given to Processing Plant | (6.) | Dolochar | Industrial Waste | | 18000 | Tons | 0 | Conveyor Belt | | Others | will be utilised in FBC Power plant | (7.) | slag from SMS | Industrial Waste | | 3000 | Tons | 25 | Road | | Others | after recovery of Fe, used for road construction | (8.) | Mill Scales | Industrial Waste | | 3000 | Tons | 30 | Road | | Others | given to ferro alloys unit | (9.) | End cutting | Industrial Waste | | 4500 | Tons | 0 | Conveyor Belt | | Others | resued in induction furnace | (10.) | Ash from Power Plant | Fly Ash | | 15120 | Tons | 0 | Road | | Others | used in existing brick manufacturing unit | (11.) | Tar from Gasifier | Hazardous Waste (as per Hazardous and Other Waste Management rules 2016) | | 4 | Kilolitre | 100 | Road | | Others | given to Tar recyclers | (12.) | Kiln accretion slag | Industrial Waste | | 6000 | Tons | 25 | Road | | Others | will be used in road construction | (13.) | Granulated slag | Industrial Waste | | 27000 | Tons | 100 | Road | | Others | given to concrete block manufacturing units | (14.) | Ash from DRI | Industrial Waste | | 10800 | Tons | 0 | Road | | Others | utilised in existing brick manufacturing unit | (15.) | waste oil | Hazardous Waste (as per Hazardous and Other Waste Management rules 2016) | | 1.0 | Kilolitre | 100 | Road | | Authorized Recyclers | | |
|
|
18.1. Air Quality Impact Prediction |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Unit | Baseline Concentration | Distance GLC | Incremental Concentration | Total GLC | Prescribed Standard |
---|
(1.) | PM10 | | Microgram per Meter Cube | 52.3 | 1050 | 7.62 | 59.92 | 100 | (2.) | SO2 | | Microgram per Meter Cube | 15.9 | 1050 | 21.7 | 37.6 | 80 | (3.) | NOx | | Microgram per Meter Cube | 17.8 | 1050 | 12.9 | 30.7 | 80 | (4.) | Others(Specify) | CO | Microgram per Meter Cube | 690 | 1050 | 2.0 | 692 | 2000 | (5.) | PM2.5 | | Microgram per Meter Cube | 31.4 | 1050 | 4.1 | 35.5 | 60 | |
|
18.2. Stack Details |
---|
S. No. | Source | Fuel | Stack Height(m) | Stack Diameter(m) | Pollutants | Other Pollutants | Emission (GLS) |
---|
(1.) | Rolling Mill | Producer Gas | 45 | 1.0 | NOx | | 4.0 | (2.) | Pellet Plant | Producer Gas | 52 | 2.2 | NOx | | 7.6 | (3.) | DRI Kiln | Coal | 70 | 1.9 | PM10 | | 1.5 | (4.) | DRI Kiln | Coal | 70 | 1.9 | SO2 | | 21.4 | (5.) | Induction Furnace | Electricity | 30 | 1.0 | PM10 | | 0.5 | (6.) | Induction Furnace | Electricity | 30 | 1.0 | NOx | | 1.9 | (7.) | Rolling Mill | Producer Gas | 45 | 1.0 | PM10 | | 0.4 | (8.) | Blast Furnace Stove | BF Coke | 50 | 1.7 | NOx | | 3.0 | (9.) | AFBC Power Plant | Coal | 56 | 1.5 | SO2 | | 1.8 | (10.) | Tunnel Kiln | Producer Gas | 61 | 1.0 | SO2 | | 10.9 | (11.) | Pellet Plant | Producer Gas | 52 | 2.2 | PM10 | | 1.9 | (12.) | Blast Furnace Stove | BF Coke | 50 | 1.7 | PM10 | | 17.4 | (13.) | DRI Kiln | Coal | 70 | 1.9 | NOx | | 5.8 | (14.) | Blast Furnace Stove | BF Coke | 50 | 1.7 | SO2 | | 17.4 | (15.) | AFBC Power Plant | Coal | 56 | 1.5 | NOx | | 1.8 | (16.) | Tunnel Kiln | Producer Gas | 61 | 1.0 | NOx | | 1.6 | (17.) | Rolling Mill | Producer Gas | 45 | 1.0 | SO2 | | 13.4 | (18.) | AFBC Power Plant | Coal | 56 | 1.5 | PM10 | | 0.5 | (19.) | Tunnel Kiln | Producer Gas | 61 | 1.0 | PM10 | | 0.4 | (20.) | Pellet Plant | Producer Gas | 52 | 2.2 | SO2 | | 21.3 | |
|
19. | Power Requirement: | (a)Quantity (Kilo Volt Amps (kVA)) | 45800 | (b)Source | 25 MW Captive & 20.8 MW from State Grid | (c)Uploaded Copy of Agreement | Copy of Agreement | (d)Standby Arrangement (Details of DG Sets) | 600 KVA, 380 KVA, 160 KVA | (e)Stack Height (in m) | 7 | |
|
20. | Land Ownership Pattern: | (a)Forest Land (ha.) | 0 | (b)Private Land (ha.) | 20.03 | (c)Government Land (ha.) | 0 | (d)Revenue Land (ha.) | 0 | (e)Other Land (ha.) | 19.43 | Total Land (ha.) | 39.46 | |
|
21. | Present Land Use Breakup of the Study Area in Ha: | (a)Agriculture Area (ha.) | 0 | (b)Waste/Barren Land (ha.) | 0 | (c)Grazing/ Community Land (ha.) | 0 | (d)Surface Water Bodies (ha.) | 0 | (e)Settlements (ha.) | 0 | (f)Industrial (ha.) | 20.03 | (g)Forest (ha.) | 0 | (h)Mangroves (ha.) | 0 | (i)Marine Area (ha.) | 0 | (j)Others (ha.) : 0 | 19.43 | Total (ha.) | 39 | |
|
22. Land requirement for various activities |
---|
S. No. | Description of Activity / Facility / Plant / Others | Others | Land Requirement (ha.) | Remarks |
---|
(1.) | Main Plant | | 12.14 | Plant area (existing and proposed) | (2.) | Area for Solid Waste Management | | 2.83 | Tailing and Solid waste storage | (3.) | Green belt | | 13.36 | Greenbelt (existing and proposed) | (4.) | Water Reservoir | | 1.21 | Water Reservoir | (5.) | Others | Raw material & product Storage area | 9.92 | | |
|
|
23. | Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Sanctuaries; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones : | |
|
23.1. Details of Ecological Sensitivity : |
---|
S. No. | Details of Ecological Sensitivity | Name | Distance from the Project (Km) | Remarks |
---|
(1.) | WLS | NA | 0 | NA | (2.) | NPA | NA | 0 | NA | (3.) | ESAs | NA | 0 | NA | (4.) | ESZs | NA | 0 | NA | (5.) | Corridors | NA | 0 | NA | (6.) | Wildlife Corridors | NA | 0 | NA | (7.) | Critically Polluted Area | NA | 0 | NA | |
23.2. Details of Environmental Sensitivity : |
---|
S. No. | Details of Environmental Sensitivity | Other Details of Environmental Sensitivity | Name | Distance from the Project (Km) | Remarks |
---|
(1.) | Forest | | Ankasandra | 6.2 | Nil | (2.) | Archaeological Sites | | None | 0 | Nil | (3.) | Defence Installations | | None | 0 | Nil | (4.) | Others | water body | Doddahalla Stream | 5.0 | nil | |
|
23.3. | (a)Whether Noc / Permission from the competent authority is required? | No | (b)Whether NBWL recommendation is required? | No | |
|
24. | Forest Land: | Whether any Forest Land involved? | No | |
|
25. | Tree Cutting: | (a)No. of Trees Cut for the Project (if Forest Land not Involved) | 0 | (b)Details of Tree Cutting and Planting of Trees | Not Applicable | |
|
26. | Land Acquisition Status: | (a)Acquired Land(Ha) | 25.3 | (b)Land yet to be acquired(Ha) | 14.16 | (c)Status of Land acquisition if not acquired | To be allotted under Section 109 of Karnataka Land | |
|
27. | Rehabilitation and Resettlement (R&R): | (a)No. of Villages | 0 | (b)No. of Households | 0 | (c)No. of PDFs (Project Displaced Families) | 0 | (d)No. of PAFs (Project Affected Families) | 0 | (e)Funds Allocated for R&R(in INR) (in Lacs) | 0 | (f)Status of R&R | Completed | |
|
28. | Details of Presence of Schedule-I Species: | (a)Whether there is Presence of Schedule-I Species ? | No | (b)Whether conservation plan for Schedule-I Species has been prepared ? | No | (c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? | No | |
|
29. | Details of Presence of Water Bodies in Core Area: | (a)Whether there is Presence of Water Bodies in Core Area ? | No | (b)Whether there is Diversion Required ? | No | (c)Whether permission has been obtained from competent authority ? | No | |
|
30. | Details of Presence of Water Bodies in Buffer Area: | (a)Whether there is Presence of Water Bodies in Buffer Area ? | Yes | (i)Details of Water Bodies in Buffer Area | Doddahalla Stream | (ii)Direction of Water Bodies in Buffer Area | West | (iii)Distance of Water Bodies in Buffer Area | 5.0 | |
|
31. | Manpower Requirement: | (a)Permanent Employment-During Construction | 0 | (b)Permanent Employment-During Operation | 150 | (c)Temporary Employment- During Construction | 300 | (d)Temporary Employment- During Operation | 0 | (e)No. of working days | 365 | (f)Total Manpower | 450 | |
|
|
S. No. | Description | Existing | Proposed | Total |
---|
(1.) | Total Area of Green Belt | 6.9 | 6.46 | 12 | (2.) | Percentage of Total Project Area | 34.5 | 33.3 | 67 | (3.) | No. of Plants | 11750 | 10000 | 21750 | (4.) | Funds Allocated | 700000 | 600000 | 1300000 | |
|
33. Project Benefits |
---|
S. No. | Type of Project Benefits | Details of Project Benefits |
---|
(1.) | Environmental | With the implementation of the proposed plant, the socio-economic status of the local people will improve substantially. This will help in upliftment of the social status of the people in the area. Educational institutions will also come-up and will lead to improvement of educational status of the people in the area. Primary health and medical facilities will certainly improve due to the proposed plant. | |
|
34. CRZ Specific Details : Not Applicable |
35. Sector Specific Details : NOT APPLICABLE |
35. Sector Specific Details For Industrial Projects - 1 |
|
|
36. | Details of Court Cases: | (a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? | No | |
|
37. | Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act: | (a)Whether any Direction issued under EPA Act/Air Act/Water Act ? | No | |
|
38. | Details of EIA Consultant: | (a)Have you hired Consultant for preparing document? | Yes | (i)Accreditation No. | NABET/EIA/1619/RA 026 | (ii)Name of the EIA Consultant | Pioneer Enviro Laboratory and Consultants Pvt Ltd | (iii)Address | 6-3-652, Flat # 7-3, Dhruvatara Apartments, Amrutha Estates, Erramanjil, Somajiguda, Hyderabad- 500082 | (iv)Mobile No. | 9440677333 | (v)Landline No. | 0402331427 | (vi)Email Id | pelcpl@yahoo.co.in | (vii)Category of Accreditation | A | (viii)Sector of Accreditation | Industrial Projects - 1 | (ix)Validity of Accreditation | 22 Jun 2019 | (x)Uploaded Certificate of Accreditation certified by QCI/NABET | Copy of Certificate of Accreditation | |
|
|
Essential Detail Sought : NIL |
Additional Detail Sought: |
---|
Sno. | ADS Letter | Remarks | Date of ADS |
---|
1. | ADS Reply Letter | Dear sir,please find the attachment for Reply to ADS | 19 Mar 2021 | 2. | NA | 26.0 After detailed deliberations, the Committee observed that non-compliance for two of the earlier environmental conditions granted in 2009 i.e. prior permission for abstraction of ground water and prior approval from the State Forest Department regarding likely impact of the emissions of the plant on the reserved forest and the project proponent shall also be required to prepare and implement conservation plant for wildlife in consultation with State Forest Department.vThe Committee also noted several terms of reference prescribed were not addressed properly.
Recommendations of the Committee:
27.0 Therefore, the Committee advised to submit the following information/reports for further consideration of the proposal.
i) Closure of non-compliances of the earlier environmental clearance | 12 Oct 2018 | |
| Undertaking |
| I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief. And I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity/ construction/ expansion has since been taken up. |
| Name of Applicant | Vivek Kejriwal | Designation | Managing Director | Name of Company (Applicant Name should not be given here) | Sunvik Steels Pvt Ltd | Address | No.23, 3rd Floor, MES Road, Bahubali Nagar, Jalahalli Village, Bangalore 560013 |
|