Form-2
APPLICATION FOR PRIOR ENVIRONMENTAL CLEARANCE
S. No.Item Details
1.
Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? No
Details of Project:
(a)Name of the project(s) Redevelopment of Residential Colony at West Campus, Ansari Nagar, New Delhi
(b)Name of the Company / Organisation ALL INDIA INSTITUTE OF MEDICAL SCIENCES
(c)Registered Address NBCC Bhawan Lodhi Road New Delhi,,South,Delhi-110003
(d)Legal Status of the Company Central Government
(e)Joint Venture No
2.
Address for the correspondence:
(a)Name of the Applicant B C Dhiman
(b)Designation (Owner/ Partner/ CEO) AGM
(c)Address Additional General Manager (Engg.) RBG Delhi-IV GPRA Complex, New Moti Bagh New Delhi-110023,,Hauz Khas,South,Delhi-110003
(d)Pin code 110003
(e)E-mail drshekhar.aplinka@gmail.com
(f)STD Code. 11(f)Telephone No. 24367314
(g)Fax No.
(h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . Annexure-Uploaded Copy of documents in support of the competence/authority
3.
Category of the Project/Activity as per Schedule of EIA Notification,2006:
(a.I)Project/Activity8(b) Townships and Area Development projects.
Minor Activity
(b)Category B1
   Reason for Applying at Ministry SEIAA
(c)Proposal Number IA/DL/MIS/79485/2017
(d)Master Proposal Number(Single Window) SW/79468/2018
(e)EAC concerned (for category A Projects only) INFRA-2
(f)Project Type Fresh EC
4.
Location of the Project:
(a)Plot/Survey/Khasra No. attached with land documents
(b)Pincode 110029
(c)Bounded Latitudes (North)
From
Degree 28.562226
Minutes
Second
From
Degree 28.566934
Minutes
Second
(d)Bounded Longitudes (East)
From
Degree 77.203616
Minutes
Second
From
Degree 77.207376
Minutes
Second
(e)Survey of India Topo Sheet No. 53H2
(f)Uploaded Topo Sheet File Copy of Topo Sheet File
(g)Maximum Elevation Above Means Sea Level(AMSL) 256.4
(h)Uploaded (kml) File Copy of Kml File      
(i)Distance of Nearest HFL from the project boundary within the study area 6.4
(j)Seismic Zone 4
5.
(a)Number of States in which Project will be Executed 1
(b)Main State of the project Delhi
Details of State of the project
S. No. State Name District Name Tehsil Name Village Name
NIL
6.
Details of Terms of Reference (ToR):
(a)Whether TOR is mandatory for submitting application Yes
(b)MoEF&CC / SEIAA File Number F. NO. 21-123/2017-IA-III
(c)Date of Apply of TOR 29 Mar 2017
(d)Date of Issue of TOR / Standard ToR 06 Jun 2017
(e)Previous TOR Letter Copy of Previous TOR letter
7.
Details of Public Consultation:
(a)Whether the Project Exempted from Public Hearing?Yes
(b)Reason Township & Area Development Project are exempted
(c)Supporting Document Copy of Supporting Document
8.
Details of Project Configuration/Product:
     8.1.       Project Configuration
S. No.Plant/Equipment/FacilityConfigurationRemarks
(1.)Redevelopment of Group Housing ColonyBuilt Up Area : 3,31,371.32 sqmIts a redevelopment of the existing colony
     8.2.       Product
S. No.Product/Activity (Capacity/Area)QuantityUnitOther UnitMode of Transport / Transmission of ProductOther Mode of Transport / Transmission of Product
(1.)built up area331371.32OtherssqmRoad
9.
In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii):
Details Not Applicable
9.1.
Details of Consent to Operate
(i)Whether Consent to operate obtained ? NA
(ii)Copies of all Consent to operate obtained since inception NA
(iii)Date of Issue N/A
(iv)Valid Upto N/A
(v)File No. NA
(vi)Application No. NA
(vii)Copy of Consent to operate valid as on date NA
10.
Project Cost:
(a)Total Cost of the Project at current price level (in Crores) 2500
(b) Funds Allocated for Environment Management (Capital) (in Crores) 7.32
(c) Funds Allocated Towards CER (Corporate Environment Responsibility) (in Crores) 625
(d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in Crores) 0.71
11.
Whether project attracts the General Condition specified in the Schedule of EIA Notification ? No
12.
Whether project attract the Specific Condition specified in the Schedule of EIA Notification ? No
13.
Raw Material / Fuel Requirement:
(a)Proposed quantity of raw material/fuel 2
(b)Existing quantity of raw material/fuel N/A
(c)Total quantity of raw material/fuel 2
    13.1.        Raw Material / Fuel Profile
S. No.Raw Material / Fuel QuantityUnitOther UnitSource (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received )Mode of TransportOther Mode of TransportDistance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received)Type of Linkage Other Type of Linkage Uploaded Copy of Linkage
(1.)Diesel3OthersKLlocalRoad0 Open MarketCopy of Linkage
14.
Baseline Data :
(a)Period of Base Line Data Collection FROM 01 Mar 2017 To 31 May 2017
(b)Season Pre-Monsoon
    14.1.     No. of ambient Air Quality (AAQ) monitoring locations : 6
S. No.Criteria Pollutants Other Criteria PollutantsUnitMaximum ValueMinimum Value98 Percentile ValuePrescribed Standard
(1.)PM2.5Micro Gram per Meter Cube263.589.56169.0860
(2.)NOxMicro Gram per Meter Cube39.5412.8437.1180
(3.)PM10Micro Gram per Meter Cube366.2173.25278.162100
(4.)OthersCOMili Gram per Meter Cube1.720.711.42
(5.)SO2Micro Gram per Meter Cube25.5410.2522.480
    14.2.     No. of Ground Water monitoring locations : 2
S. No.Criteria Pollutants Other Criteria PollutantsHeavy MetalUnitOther UnitMaximum ValueMinimum ValueDesirable LimitMaximum Permissible Limit
(1.)pHOtherslog7.217.216.58.5
(2.)TDSmg/l201618455002000
(3.)Total Hardnessmg/l504479200600
(4.)Heavy MetalsIronmg/l0.3750.3430.30.3
(5.)TSSmg/l25162020
(6.)Chloridesmg/l6455782501000
(7.)Fluoridemg/l0.950.8911.5
    14.3.     No. of Surface Water monitoring locations : 2
S. No.Criteria Pollutants Other Criteria PollutantsUnitOther UnitMaximum ValueMinimum ValueClassification of inland water body
(1.)pHOtherslog8.418.3E
(2.)BODmg/l7363E
(3.)CODmg/l260240E
(4.)DOmg/l2.81E
    14.4.     No. of Ambient Noise monitoring locations : 6
S. No.Parameter UnitMaximum ValueMinimum ValuePrescribed Standard
(1.)Leq(Day)A-weighted decibels(dB(A))72.46455
(2.)Leq(Night)A-weighted decibels(dB(A))52.543.845
    14.5.     No. of Soil Sample Monitored locations : 1
S. No.Parameter UnitOther UnitMaximum ValueMinimum Value
(1.)pHOtherslog8.428.42
(2.)N(Nitrogen)Percent0.030.03
(3.)K(Potassium)Milligram per Kilogram2.662.66
(4.)Electric ConductivityOthersµmhos/cm424424
(5.)P(Phosphorus)Milligram per Kilogram8.458.45
14.6.
Details of Ground Water Table:
(a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) From 40 To 45
(b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) From 38 To 42
(c)Whether Ground Water Intersection will be there ? No
     15.      Details of Water Requirement (During Operation)
S. No.Source Source Other Required Quantity (Kilolitre per Day (Kld))Distance from SourceCopy of Permission from Competent Authority Mode of TransportOther Mode of TransportMethod of Water WithdrawalOther Method of Water WithdrawalLetter No.Date of IssuePermitted Quantity
(1.)OthersNew Delhi Municipal Corporation650105 Not Appliacble PipelineOthersPurchased from NDMCBULK 1361/40331 Aug 2018650
15.1.
(a)Whether Desalination is proposed No
    16.       Waste Water Management(During Operation)
S. No.Type/Source Quantity of Waste Water Generated (Kilolitre per Day)Treatment Capacity (Kilolitre per Day) Treatment MethodMode of DisposalOther Mode of DisposalQuantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day)Quantity of Discharged Water (Kilolitre per Day)
(1.)Domestic852852STPReuse within the Plant & Recycling,OthersFLUSHING, HVAC, FILTER BACKWASH,76389
16.1.
(a)Total Waste Water Generation (Kilolitre per Day) 852
(b)Total Discharged Water (Kilolitre per Day) 89
(c)Total Reused Water (Kilolitre per Day) 763
    17.       Solid Waste Generation/Management
S. No.Name of Waste Item Other ItemQuantity per AnnumUnitDistance from Site(KM)Mode of TransportOther Mode of TransportMode of DisposalOther Mode of Disposal
(1.)MUNICIPAL SOLID WASTEMunicipal Solid Waste1372.77Tons0RoadCo-Processing
(2.)E-WASTEE Waste6Tons20RoadAuthorized Recyclers
18.
    18.1.     Air Quality Impact Prediction
S. No.Criteria Pollutants Other Criteria PollutantsUnitBaseline ConcentrationDistance GLCIncremental ConcentrationTotal GLCPrescribed Standard
(1.)PM10Microgram per Meter Cube278.165000.028278.188100
(2.)PM2.5Microgram per Meter Cube152.585000.028152.60860
(3.)SO2Microgram per Meter Cube12.615000.112.7180
(4.)NOxMicrogram per Meter Cube23.036000.4423.4780
    18.2.     Stack Details
S. No.Source FuelStack Height(m)Stack Diameter(m)PollutantsOther PollutantsEmission (GLS)
(1.)DG set 500 kVADeisel60.19NOx0.04
(2.)DG set 1500 kVADeisel60.49PM100.005
(3.)DG set 1500 kVADeisel60.49SO20.016
(4.)DG set 1500 kVADiesel60.49NOx0.1
(5.)DG set 500 kVADeisel60.19PM100.001
(6.)DG set 500 kVADeisel60.19SO20.005
19.
Power Requirement:
(a)Quantity (Kilo Volt Amps (kVA)) 14475.29
(b)Source NDMC
(c)Uploaded Copy of Agreement Not Applicable
(d)Standby Arrangement (Details of DG Sets) 2 x 500 kVA + 2 x 1500 kVA
(e)Stack Height (in m) 6
20.
Land Ownership Pattern:
(a)Forest Land (ha.) 0
(b)Private Land (ha.) 0
(c)Government Land (ha.) 11.34332
(d)Revenue Land (ha.) 0
(e)Other Land (ha.) 0
    Total Land (ha.) 11.34332
21.
Present Land Use Breakup of the Study Area in Ha:
(a)Agriculture Area (ha.) 0
(b)Waste/Barren Land (ha.) 0
(c)Grazing/ Community Land (ha.) 0
(d)Surface Water Bodies (ha.) 0
(e)Settlements (ha.) 11.34332
(f)Industrial (ha.) 0
(g)Forest (ha.) 0
(h)Mangroves (ha.) 0
(i)Marine Area (ha.) 0
(j)Others (ha.) : Revenue land 0
    Total (ha.) 11.34332
    22.     Land requirement for various activities
S. No.Description of Activity / Facility / Plant / Others OthersLand Requirement (ha.)Remarks
(1.)Green belt4.78
(2.)OthersGround Coverage/ Roads & Pavements/Surface Parking6.56332
Total (ha.) 11.34332
23.
Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Sanctuaries; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones :
    23.1.     Details of Ecological Sensitivity :
S. No.Details of Ecological Sensitivity NameDistance from the Project (Km)Remarks
(1.)WLSOkhla Bird Sanctuary8.6South
(2.)NPANA0none
(3.)Corridorsno0none
(4.)Wildlife CorridorsNA0none
(5.)Critically Polluted AreaOkhla Industrial Area5.8East direction
(6.)ESAsNo0none
(7.)ESZsOkhla Industrial Area8.6South
    23.2.     Details of Environmental Sensitivity :
S. No.Details of Environmental Sensitivity Other Details of Environmental Sensitivity NameDistance from the Project (Km)Remarks
(1.)ForestJahapanah City PF3.6South east
(2.)Archaeological SitesKutub Minar4.6South west
(3.)Defence InstallationsDelhi Cant5.4North west
23.3.
(a)Whether Noc / Permission from the competent authority is required? No
(b)Whether NBWL recommendation is required? No
24.
Forest Land:
Whether any Forest Land involved? No
25.
Tree Cutting:
(a)No. of Trees Cut for the Project (if Forest Land not Involved) 539
(b)Details of Tree Cutting and Planting of Trees Copy of Details of Tree Cutting and Planting of Trees
26.
Land Acquisition Status:
(a)Acquired Land(Ha) 11.3432
(b)Land yet to be acquired(Ha) 0
(c)Status of Land acquisition if not acquired land acquired already
27.
Rehabilitation and Resettlement (R&R):
(a)No. of Villages 0
(b)No. of Households 0
(c)No. of PDFs (Project Displaced Families) 0
(d)No. of PAFs (Project Affected Families) 0
(e)Funds Allocated for R&R(in INR) (in Lacs) 0
(f)Status of R&R Completed
28.
Details of Presence of Schedule-I Species:
(a)Whether there is Presence of Schedule-I Species ? No
(b)Whether conservation plan for Schedule-I Species has been prepared ? No
(c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? No
29.
Details of Presence of Water Bodies in Core Area:
(a)Whether there is Presence of Water Bodies in Core Area ? No
(b)Whether there is Diversion Required ? No
(c)Whether permission has been obtained from competent authority ? No
30.
Details of Presence of Water Bodies in Buffer Area:
(a)Whether there is Presence of Water Bodies in Buffer Area ? Yes
(i)Details of Water Bodies in Buffer Area Yamuna river
(ii)Direction of Water Bodies in Buffer Area North East
(iii)Distance of Water Bodies in Buffer Area 7.18
31.
Manpower Requirement:
(a)Permanent Employment-During Construction 100
(b)Permanent Employment-During Operation 50
(c)Temporary Employment- During Construction 200
(d)Temporary Employment- During Operation 150
(e)No. of working days 365
(f)Total Manpower 500
32.
Green Belt in Ha:
(a)Total Area of Green Belt 4.775483
(b)Percentage of Total Project Area 42.10
(c)No. of Plants to be Planted 1275
(d)Funds Allocated for Plantation 40000000
(e)Uploaded Green Belt plan Copy of Green Belt Plan
    33.         Project Benefits
S. No.Type of Project Benefits Details of Project Benefits
(1.)SocialThe project will provide the housing facility to 6997 persons
(2.)EnvironmentalIncreased in organized green area and aesthetic beauty
(3.)FinancialWill contribute to state GDP
   34.   CRZ Specific Details : Not Applicable
   35.   Sector Specific Details For INFRA-2
S. No.Item Details
1.
Details of Building Construction:
(a)Maximum Height of the Building (Meters) 39.4
(b)Total No. of Flats to be Build 759
(c)No. of Buildings 21
(d)Total plot area (sqm) 113433.2
(e)Total built up area (sqm) 342496.5
2.
Foreshore Facilities and/or Marine Disposal:
(a)Whether Project Involves Foreshore Activities and/or marine Disposal? No
3.
Rain Water Harvesting:
(a)No. of Storage 0
(b)Capacity 0
(c)No. of Recharge Pits 30
(d)Capacity 2865.91
4.
Parking:
(a)Details of 4 Wheeler/ 2 Wheeler Parking 4375 ECS
5.
Energy Saving Measures:
(a)Source/Mode PV Cells
(b)Percentage 1
(c)Quantity 215
6.
Other details:
(a)Details of impact on Water Bodies and Drainage patters of catchment area Details are given EIA report Chapter 3 & 4
(b)Details of Traffic Density Impact Assessment and Modelling Study Copy of Details of Traffic Density Impact Assessment and Modelling Study
(c)In case Underground Tunnel Project below the Forest Land - Subsidence Impact Study report Copy of Underground Tunnel Project below the Forest Land - Subsidence Impact Study report
     7.       Type of Industries to be established with Industrial Estate as per their category A/B
S. No.Type of IndustryNo. of UnitsCategory A/B
NIL
8.
Length of the alignment N/A
9.
Details Bridges/ROB/Interchanges,Flyovers,Vehicle Underpass and Pedestrian Underpass
Details Not Applicable
S. No.Item Details
36.
Details of Court Cases:
(a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? No
37.
Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act:
(a)Whether any Direction issued under EPA Act/Air Act/Water Act ? No
38.
Details of EIA Consultant:
(a)Have you hired Consultant for preparing document? Yes
(i)Accreditation No. NABET/EIA/1619/SA 068
(ii)Name of the EIA Consultant Aplinka Solutions & Technologies Pvt Ltd
(iii)Address A48, Sector 64; Noida; Gautam Buddha NagarUttar Pradesh
(iv)Mobile No. 8447218705
(v)Landline No. 1204540584
(vi)Email Id info.aplinkasolutions@gmail.com
(vii)Category of Accreditation A
(viii)Sector of Accreditation INFRA-2
(ix)Validity of Accreditation 29 Mar 2019
(x)Uploaded Certificate of Accreditation certified by QCI/NABET Copy of Certificate of Accreditation
39.
Documents to be Attached:
(a)Uploaded Copy of EIA/EMP Report Copy of EIA/EMP
Copy of EIA/EMP(Annexures)
Copy of EIA/EMP(Plans/Figures)
(b)Uploaded Copy of Risk Assessment Report Copy of Risk Assessment
(c)Uploaded Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan
(d)Uploaded Copy of Final Layout Plan Copy of Final Layout Plan
(e)Uploaded Cover Letter Copy of Cover Letter
(f)Uploaded Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency
(g)Uploaded Additional File NA
(h)Uploaded Proposal Presentation (To be given in EAC meeting) NA
      Essential Detail Sought : NIL
            Additional Detail Sought:
Sno. ADS Letter Remarks Date of ADS
1. ADS Reply LetterThe reply to the shortcomings raised is attached herewith. Hope this meets to your satisfaction. Kindly grant the EC letter 08 Jan 2019
2.NAKindly see the Final Minutes of 36th EAC Infra-II Meeting held on 26-28 November, 2018 04 Dec 2018
Undertaking
I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief. And I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity/ construction/ expansion has since been taken up.
Name of ApplicantB C Dhiman
DesignationAGM
Name of Company (Applicant Name should not be given here)ALL INDIA INSTITUTE OF MEDICAL SCIENCES
AddressNBCC Bhawan Lodhi Road New Delhi