1. | Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? | No | Details of Project: | (a)Name of the project(s) | Capacity Expansion Of Hot Metal Production From 0.5 To 0.75 MTPA, DI Pipe Production From 0.3 To 0.5 MTPA And Production of 0.1 MTPA Castings & Fittings | (b)Name of the Company / Organisation | TATA METALIKS LIMITED | (c)Registered Address | Village - Maheshpur, P.O. - Samraipur,P.S. - Kharagpur Local,West Medinipur,West Bengal-721301 | (d)Legal Status of the Company | Others | (e)Joint Venture | No | |
|
2. | Address for the correspondence: | (a)Name of the Applicant | Debasis Mishra | (b)Designation (Owner/ Partner/ CEO) | VP | (c)Address | Village - Maheshpur, P.O. - Samraipur,,No Data,West Medinipur,West Bengal-721301 | (d)Pin code | 721301 | (e)E-mail | rahul.deb@tatametaliks.co.in | (f)STD Code. | 3222(f)Telephone No. | 651138 | (g)Fax No. | | (h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . | Annexure-Uploaded Copy of documents in support of the competence/authority | |
|
3. | Category of the Project/Activity as per Schedule of EIA Notification,2006: | (a.I)Project/Activity | 3(a) Metallurgical industries (ferrous & non ferrous)
| Minor Activity | | (b)Category | A | (c)Proposal Number | IA/WB/IND/21443/2014 | (d)Master Proposal Number(Single Window) | SW/79455/2018 | (e)EAC concerned (for category A Projects only) | Industrial Projects - 1 | (f)Project Type | Expansion |
|
|
4. | Location of the Project: | (a)Plot/Survey/Khasra No. | Please see Annexure 1 of Additional attachments fi | (b)Pincode | 721301 | (c)Bounded Latitudes (North) | | From | | Degree | 22.38 | Minutes | | Second | | From | | Degree | 22.39 | Minutes | | Second | | (d)Bounded Longitudes (East) | | From | | Degree | 87.28 | Minutes | | Second | | From | | Degree | 87.29 | Minutes | | Second | | (e)Survey of India Topo Sheet No. | F45J3, F45J7 | (f)Uploaded Topo Sheet File | Copy of Topo Sheet File | (g)Maximum Elevation Above Means Sea Level(AMSL) | 35 | (h)Uploaded (kml) File | Copy of Kml File | (i)Distance of Nearest HFL from the project boundary within the study area | 1 | (j)Seismic Zone | 3 | |
|
5. | (a)Number of States in which Project will be Executed | 1 | (b)Main State of the project | West Bengal | |
|
|
Details of State(s) of the project |
---|
S. No. | State Name | District Name | Tehsil Name | Village Name |
---|
(1.) | West Bengal | Medinipur | Kharagpur - I | | |
|
6. | Details of Terms of Reference (ToR)/EC: | (a)MoEF&CC / SEIAA File Number | J-11011/377/2013.IA-II(I) | (c)Date of Issue of TOR | 19 May 2014 | (f)Previous TOR Letter | Copy of Previous TOR letter | (b)Date of Apply of EC | 05 Feb 2015 | (c)Date of Issue of EC | 28 Jan 2019 | (d)Previous EC Letter | Copy of Previous EC letter | |
|
7. | Details of Public Consultation: | (a)Whether the Project Exempted from Public Hearing? | No | (b)Whether details of Public Hearing available? | Yes | (c)Whether Public hearing was presided over by an officer of the rank of Additional District Magistrate or above | Yes | |
|
7.1. Details of Public Hearing |
---|
|
S. No. | Details of Advertisement | Details of Public Hearing | Venue | Location Details | No. of People Attended | Issues Raised | Designation of Presiding Officer | Other Designation of Presiding Officer |
---|
(1.) | | Copy of Public Hearing : | Copy of Public Hearing | Date : | 07 Sep 2018 | Distance of Public Hearing Venue from the Proposed Project : | 5 |
| Kharagpur-I, BDO Office | State : | West Bengal | District : | West Medinipur | Tehsil : | No Data | Village : | Satkui |
| 148 | Majority of the respondents welcomed the proposed expansion and appreciated the ongoing CSR activities in local villages, undertaken by TML.
Respondents of Samraipur requested the authority of TML t | Others | | |
8. | Details of Project Configuration/Product: | Details Not Applicable | |
|
9. | In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii): | (a)Details of certified report on compliance of earlier environmental clearance condition | (i)Certified Compliance By | Regional | (ii)Details of Regional Office of MoEFCC / Zonal Office of CPCB / SPCB / UTPCC from which certified report on | Bhubaneswar | (iii)Letter No. | 102-539/EPE & 102-314/EPE | (iv)Status of Compliance | Compiled | (v)Certified report on compliance of earlier environmental clearance conditions (Including Monitoring Report) | Copy of Certified Compliance Report | (vi)Date of site visit | Jul 26 2018 12:00AM | (b)Details of Capacity Expansion | |
|
S. No. | Product/Activity (Capacity/Area) | Quantity From | Quantity To | Total | Unit | Other Unit | Mode of Transport / Transmission of Product | Other Mode of Transport / Transmission of Product |
---|
(1.) | Pig Iron | 345000 | 0 | 345000 | Tons per Annum(TPA) | | Road,Rail | | (2.) | Casting & Fittings | 0 | 100000 | 100000 | Tons per Annum(TPA) | | Road | | (3.) | DI Pipes | 300000 | 200000 | 500000 | Tons per Annum(TPA) | | Road | | (4.) | Hot Metal | 500000 | 250000 | 750000 | Tons per Annum(TPA) | | Others | Internal transfer by road | |
| (c)Details of Configuration | |
|
S. No. | Plant / Equipment / Facility | Existing Configuration | Proposed Configuration | Final configuration after expansion | Remarks |
---|
(1.) | Sinter Plant | 44000 tpm | 50000 tpm | 50000 tpm | Augmentation of existing unit | (2.) | Pellet Plant | - | 450000 TPA | 450000 TPA | New Pellet Plant | (3.) | Pig Casting Machine | 345000 TPA | - | 345000 TPA | No change | (4.) | Foundry | - | 100000 TPA | 100000 TPA | New unit for production of castings and fittings | (5.) | CPP2 | 4 MW (BF Gas Fired) | 4.5 MW (BF Gas Fired) | 4.5 MW (BF Gas Fired) | Augmentation | (6.) | CPP3 | 10 MW (Coke Oven Gas WHRB) | - | 10 MW (Coke Oven Gas WHRB) | No change | (7.) | CPP4 | - | 10 MW (Coke Oven Gas WHRB) | 10 MW (Coke Oven Gas WHRB) | New Unit | (8.) | DI Pipe Plant | 300000 TPA | 200000 TPA | 1 x 300000 TPA; 1 x 200000 TPA | Addition of new unit | (9.) | Air Separation Unit/Oxygen Plant | - | Oxygen - 3600 Nm3/hr; Nitrogen - 1000 Nm3/hr | Oxygen - 3600 Nm3/hr; Nitrogen - 1000 Nm3/hr | New Units | (10.) | CPP1 | CPP1 - 2.76 MW (BF Gas fired) | CPP1 - 10 MW (BF Gas fired) | CPP1 - 10 MW (BF Gas fired) | CPP1 - Augmentation | (11.) | Blast Furnace | 2 x 259 m3 | 2 x 305 m3 | 2 x 305 m3 | Augmentation of existing units by increasing working volume | |
9.1. | Details of Consent to Operate | (i)Whether Consent to operate obtained ? | NA | (ii)Copies of all Consent to operate obtained since inception | NA | (iii)Date of Issue | 05 Feb 2018 | (iv)Valid Upto | 30 Jan 2019 | (v)File No. | CO106566/CO106542 | (vi)Application No. | Co0000000190276/co0000000183977 | (vii)Copy of Consent to operate valid as on date | Copy of Consent to Operate | |
|
|
10. | Project Cost: | (a)Total Cost of the Project at current price level (in Crores) | 800 | (b) Funds Allocated for Environment Management (Capital) (in Crores) | 49 | (c) Funds Allocated Towards CER (Corporate Environment Responsibility) (in Crores) | 4 | (d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in Crores) | 2 | |
|
11. | Whether project attracts the General Condition specified in the Schedule of EIA Notification ? | No | | |
12. | Whether project attract the Specific Condition specified in the Schedule of EIA Notification ? | No | | |
13. | Raw Material / Fuel Requirement: | (a)Proposed quantity of raw material/fuel | 361050 | (b)Existing quantity of raw material/fuel | 1616870 | (c)Total quantity of raw material/fuel | 1977920 | |
|
  13.1. Raw Material / Fuel Profile |
---|
S. No. | Raw Material / Fuel | Quantity | Unit | Other Unit | Source (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received ) | Mode of Transport | Other Mode of Transport | Distance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received) | Type of Linkage | Other Type of Linkage | Uploaded Copy of Linkage |
---|
(1.) | Non coking coal for PCI | 90000 | Tons per Annum | | Imported | Others | sea | 150 | Open Market | | Copy of Linkage | (2.) | Dolomite | 28000 | Tons per Annum | | Imported -Bhutan | Road,Rail,Others | Sea | 130 | e-auction | Long Term Agreement with HMC | Copy of Linkage | (3.) | Limestone | 60600 | Tons per Annum | | West Bengal (Haldia) | Road,Rail | | 130 | e-auction | | Copy of Linkage | (4.) | Iron Ore fines | 1017000 | Tons per Annum | | TSL Noamundi, Joda mines, Khanband | Rail | | 300 | Others | Long Term Agreement with TSL | Copy of Linkage | (5.) | Resin, Hardener, Catalyst, Paints | 870 | Tons per Annum | | Kolkata | Road | | 100 | e-auction | | Copy of Linkage | (6.) | Scrap | 68000 | Tons per Annum | | West Bengal | Road | | 130 | Open Market | | Copy of Linkage | (7.) | Inoculants | 600 | Tons per Annum | | Import - Dubai, France | Road,Others | Sea | 130 | e-auction | | Copy of Linkage | (8.) | Bitumen | 2700 | Tons per Annum | | Kolkata | Road | | 100 | Open Market | | Copy of Linkage | (9.) | Cement | 58500 | Tons per Annum | | Domestic | Road | | 100 | Open Market | | Copy of Linkage | (10.) | Iron ore | 187500 | Tons per Annum | | TSL Noamundi, Joda mines, Khanband | Rail | | 300 | Others | Long Term Agreement with TSL | Copy of Linkage | (11.) | Purchase coke | 345750 | Tons per Annum | | Imported - Japanese, Chinese and Domestic | Road,Rail,Others | Sea | 126 | Others | Long Term Agreement with HMC | Copy of Linkage | (12.) | Zinc | 4000 | Tons per Annum | | Pune, Import - Germany | Road,Others | Sea | 130 | Open Market | | Copy of Linkage | (13.) | Quartzite | 7500 | Tons per Annum | | West Bengal (Jhargram) | Road,Rail | | 100 | Open Market | | Copy of Linkage | (14.) | Magnesium | 7500 | Tons per Annum | | Pune, Jamshedpur & Kolkata | Road | | 170 | Open Market | | Copy of Linkage | (15.) | Foundry Sand | 8400 | Tons per Annum | | West Bengal | Road | | 150 | Open Market | | Copy of Linkage | (16.) | Sand | 91000 | Tons per Annum | | West Bengal | Road | | 150 | e-auction | | Copy of Linkage | |
|
14. | Baseline Data : | (a)Period of Base Line Data Collection | FROM 03 Feb 2018 To 09 May 2018 | (b)Season | Summer | |
|
14.1. No. of ambient Air Quality (AAQ) monitoring locations : 8 |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Unit | Maximum Value | Minimum Value | 98 Percentile Value | Prescribed Standard |
---|
(1.) | PM10 | | Micro Gram per Meter Cube | 118.6 | 52.8 | 110.9 | 100 | (2.) | PM2.5 | | Micro Gram per Meter Cube | 65.4 | 26.5 | 61.3 | 60 | (3.) | NOx | | Micro Gram per Meter Cube | 42.8 | 12.5 | 40 | 80 | (4.) | Others | O3 | Micro Gram per Meter Cube | 26.5 | 10 | 26.5 | 180 | (5.) | SO2 | | Micro Gram per Meter Cube | 20 | 4 | 18.2 | 80 | |
14.2. No. of Ground Water monitoring locations : 8 |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Heavy Metal | Unit | Other Unit | Maximum Value | Minimum Value | Desirable Limit | Maximum Permissible Limit |
---|
(1.) | Chlorides | | | mg/l | | 73.74 | 12.9 | 250 | 1000 | (2.) | Fluoride | | | mg/l | | 0.1 | 0.1 | 1 | 1.5 | (3.) | Heavy Metals | | Chromium | mg/l | | 0.01 | 0.01 | 0.05 | 0.05 | (4.) | Others | Arsenic | | mg/l | | 0.01 | 0.01 | 0.01 | 0.05 | (5.) | TDS | | | mg/l | | 720 | 147 | 500 | 2000 | (6.) | Total Hardness | | | mg/l | | 280 | 56 | 200 | 600 | (7.) | pH | | | NA | | 6.92 | 6.78 | 7.5 | 8.5 | (8.) | TSS | | | mg/l | | 10 | 10 | 100 | 150 | |
14.3. No. of Surface Water monitoring locations : 8 |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Unit | Other Unit | Maximum Value | Minimum Value | Classification of inland water body |
---|
(1.) | pH | | NA | | 7.2 | 7.1 | B | (2.) | DO | | mg/l | | 5.7 | 5.4 | B | (3.) | BOD | | mg/l | | 10 | 6.7 | B | (4.) | COD | | mg/l | | 34 | 24.1 | B | |
14.4. No. of Ambient Noise monitoring locations : 10 |
---|
S. No. | Parameter | Unit | Maximum Value | Minimum Value | Prescribed Standard |
---|
(1.) | Leq(Day) | A-weighted decibels(dB(A)) | 70.7 | 55.6 | 75 | (2.) | Leq(Night) | A-weighted decibels(dB(A)) | 60.2 | 46.2 | 70 | |
14.5. No. of Soil Sample Monitored locations : 3 |
---|
S. No. | Parameter | Unit | Other Unit | Maximum Value | Minimum Value |
---|
(1.) | Electric Conductivity | Millisiemens per Centimetre | | 3.2 | 2.3 | (2.) | N(Nitrogen) | Milligram per Kilogram | | 950 | 820 | (3.) | P(Phosphorus) | Milligram per Kilogram | | 1080 | 685 | (4.) | pH | Others | NA | 7.25 | 6.98 | (5.) | K(Potassium) | Milligram per Kilogram | | 1280 | 812 | |
|
14.6. | Details of Ground Water Table: | (a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) | From 1.05 To 22.12 | (b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) | From 0.85 To 18.37 | (c)Whether Ground Water Intersection will be there ? | No | |
|
15. Details of Water Requirement (During Operation) |
---|
S. No. | Source | Source Other | Required Quantity (Kilolitre per Day (Kld)) | Distance from Source | Copy of Permission from Competent Authority | Mode of Transport | Other Mode of Transport | Method of Water Withdrawal | Other Method of Water Withdrawal | Letter No. | Date of Issue | Permitted Quantity |
---|
(1.) | GroundWater | | 5904 | 0 | Copy of Permission Letter | Pipeline | | Tube Well | | P1420113001900000003TSE | 12 Jun 2013 | 6114 | |
|
15.1. | (a)Whether Desalination is proposed | No | |
|
16. Waste Water Management(During Operation) |
---|
S. No. | Type/Source | Quantity of Waste Water Generated (Kilolitre per Day) | Treatment Capacity (Kilolitre per Day) | Treatment Method | Mode of Disposal | Other Mode of Disposal | Quantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day) | Quantity of Discharged Water (Kilolitre per Day) |
---|
(1.) | BF Gas based power plant | 15 | 15 | Neutralisation | Others | Reused for dust suppression, slag granulation etc. | 15 | 0 | (2.) | Blast Furnace | 9 | 9 | Gas Cleaning Plant | Reuse within the Plant & Recycling | | 9 | | (3.) | DI Pipe Plant | 43 | 43 | Treatment in ETP | Others | Treatment in ETP & reused as CPP make up | 43 | 0 | (4.) | Coke Oven WHRB CPP | 38 | 38 | Effluent Treatment Plant | Reuse within the Plant & Recycling | | 38 | | (5.) | Sanitary Waste Water | 2 | 2 | Settling | Others | Reused for low end purpose | 2 | 0 | (6.) | Sinter & Pellet Plant | 6 | 6 | Clarification | Others | Reused for Dust Supression & Slag granulation | 6 | 0 | |
|
16.1. | (a)Total Waste Water Generation (Kilolitre per Day) | 113 | (b)Total Discharged Water (Kilolitre per Day) | 0 | (c)Total Reused Water (Kilolitre per Day) | 113 | |
|
17. Solid Waste Generation/Management |
---|
S. No. | Name of Waste | Item | Other Item | Quantity per Annum | Unit | Distance from Site(KM) | Mode of Transport | Other Mode of Transport | Mode of Disposal | Other Mode of Disposal |
---|
(1.) | BF GCP Sludge & Flue Dust | Industrial Waste | | 24000 | Tons | 0 | Road | | Others | Recycled in Sinter Making | (2.) | Waste Core Sand | Industrial Waste | | 17500 | Tons | 0 | Road | | Others | Used in filling low lying areas | (3.) | Waste foundry sand | Industrial Waste | | 7000 | Tons | 50 | Road | | Others | Brick manufacturing, concrete making | (4.) | Used Oil | Hazardous Waste (as per Hazardous and Other Waste Management rules 2016) | | 15 | Kilolitre | 130 | Road | | Authorized Recyclers | | (5.) | BF Slag | Industrial Waste | | 322500 | Tons | 45 | Road | | Others | Sold to cement plant | (6.) | Zinc Dust | Hazardous Waste (as per Hazardous and Other Waste Management rules 2016) | | 1000 | Tons | 130 | Road | | Authorized Recyclers | | (7.) | Resin Hardener | Hazardous Waste (as per Hazardous and Other Waste Management rules 2016) | | 20 | Tons | 130 | Road | | Treatment, Storage and Disposal Facility(TSDF) | | (8.) | Paint Drums | Hazardous Waste (as per Hazardous and Other Waste Management rules 2016) | | 7 | Tons | 130 | Road | | Treatment, Storage and Disposal Facility(TSDF) | | (9.) | Iron Scrap | Industrial Waste | | 1250 | Tons | 0 | Road | | Others | Recycled back in process | |
|
|
18.1. Air Quality Impact Prediction |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Unit | Baseline Concentration | Distance GLC | Incremental Concentration | Total GLC | Prescribed Standard |
---|
(1.) | PM2.5 | | Microgram per Meter Cube | 53.9 | 0.25 | 2.64 | 56.54 | 60 | (2.) | SO2 | | Microgram per Meter Cube | 14.3 | 0.25 | 0.61 | 14.91 | 80 | (3.) | PM10 | | Microgram per Meter Cube | 92.6 | 0.25 | 5.28 | 97.88 | 100 | (4.) | NOx | | Microgram per Meter Cube | 30.6 | 0.25 | 4.4 | 35 | 80 | |
|
18.2. Stack Details |
---|
S. No. | Source | Fuel | Stack Height(m) | Stack Diameter(m) | Pollutants | Other Pollutants | Emission (GLS) |
---|
(1.) | Deslagging/Desulphurisation | NA | 30 | 0.5 | PM10 | | 0.03 | (2.) | Zn Coating Middle Line | NA | 30 | 0.6 | PM10 | | 0.083 | (3.) | Zn Coating Small Line | NA | 30 | 0.5 | PM10 | | 0.05 | (4.) | Sand Cleaning System & Core Shop | NA | 30 | 0.6 | PM10 | | 0.833 | (5.) | Magnesium Treatment & Induction Furnace | NA | 30 | 0.7 | PM10 | | 0.055 | (6.) | Boiler1 (Attached to annealing furnace) | BF Gas | 30 | 1.1 | NOx | | 1.388 | (7.) | Zn Al Coating | NA | 30 | 0.6 | PM10 | | 0.05 | (8.) | Zn Coating Small Line 2 | NA | 30 | 0.6 | PM10 | | 0.05 | (9.) | Deslagging/Desulphurisation New | NA | 30 | 0.5 | PM10 | | 0.033 | (10.) | Zn Coating Small Line New | NA | 30 | 0.5 | PM10 | | 0.05 | (11.) | Zn Coating Middle Line New | NA | 30 | 0.6 | PM10 | | 0.0833 | (12.) | Barrel & Socket grinder new | NA | 30 | 0.85 | PM10 | | 0.133 | (13.) | Boiler (attached to annealing furnace) new | BF Gas | 30 | 1.1 | NOx | | 1.38 | (14.) | Sinter Plant Head ESP | Coke Breeze | 45 | 2.3 | NOx | | 11 | (15.) | Sinter Plant RFP Bag Filter | NA | 30 | 1.4 | PM10 | | 0.33 | (16.) | Sinter Plant Flux | NA | 20 | 1.1 | PM10 | | 0.22 | (17.) | Sinter Plant Fuel Crusher | NA | 30 | 0.6 | PM10 | | .033 | (18.) | PCI Stack | BF Gas | 42 | 0.92 | NOx | | 2.77 | (19.) | CPP Common Stack | BF Gas & Coke Oven Gas | 45 | 2.6 | PM10 | | 0.58 | (20.) | CPP Common Stack | BF Gas & Coke Oven Gas | 45 | 2.6 | NOx | | 5.833 | (21.) | Pellet plant 1 DE | NA | 45 | 1.8 | PM10 | | 1.25 | (22.) | Pellet Plant Waste Gas | BF Gas | 45 | 2.5 | NOx | | 16.667 | (23.) | BF Stove 1 | BF Gas | 45 | 2 | PM10 | | 0.277 | (24.) | Magnesium treatment & induction furnace new | NA | 30 | 0.7 | PM10 | | 0.055 | (25.) | BF Stove 1 | BF Gas | 45 | 2 | NOx | | 5.555 | (26.) | BF Stove 2 | BF Gas | 45 | 2 | PM10 | | 0.277 | (27.) | BF Stove 2 | BF Gas | 45 | 2 | NOx | | 5.555 | (28.) | Annealing Furnace | NA | 30 | 1.16 | PM10 | | 0.166 | (29.) | Sand cleaning system & core shop new | NA | 30 | 0.6 | PM10 | | 0.083 | (30.) | Zn Al Coating New | NA | 30 | 0.6 | PM10 | | 0.05 | (31.) | Boiler (attached to annealing furnace) new | BF Gas | 30 | 1.1 | PM10 | | 0.138 | (32.) | Zn Coating Small Line 2 New | NA | 30 | 0.6 | PM10 | | 0.05 | (33.) | Sinter Plant Head ESP | Coke Breeze | 45 | 2.3 | PM10 | | 3.05 | (34.) | Sinter Plant Head ESP | Coke Breeze | 45 | 2.3 | SO2 | | 5.927 | (35.) | Sinter Plant Tail ESP | NA | 40 | 2.3 | PM10 | | 3.47 | (36.) | PCI Stack | BF Gas | 42 | 0.92 | PM10 | | 0.416 | (37.) | BF Cast House Dedusting | NA | 30 | 1.2 | PM10 | | 0.666 | (38.) | Pellet Plant 2 DE | NA | 45 | 1.8 | PM10 | | 1.25 | (39.) | Pellet Plant Waste Gas | BF Gas | 45 | 2.5 | PM10 | | 2.5 | (40.) | Pellet Plant Waste Gas | BF Gas | 45 | 2.5 | SO2 | | 4.16 | (41.) | BF Stock House Dedusting | NA | 30 | 2 | PM10 | | 2.66 | (42.) | Foundry | NA | 30 | 0.6 | PM10 | | 0.416 | (43.) | Barrel & Socket Grinder | NA | 30 | 0.85 | PM10 | | 0.133 | (44.) | Boiler1 (Attached to annealing furnace) | BF Gas | 30 | 1.1 | PM10 | | 0.1388 | (45.) | Annealing furnace New | NA | 30 | 1.16 | PM10 | | 0.166 | |
|
19. | Power Requirement: | (a)Quantity (Kilo Volt Amps (kVA)) | 44.5 | (b)Source | Captive Generation and WBSEDCL | (c)Uploaded Copy of Agreement | Copy of Agreement | (d)Standby Arrangement (Details of DG Sets) | 4 | (e)Stack Height (in m) | 12 | |
|
20. | Land Ownership Pattern: | (a)Forest Land (ha.) | 0 | (b)Private Land (ha.) | 79.72 | (c)Government Land (ha.) | 0 | (d)Revenue Land (ha.) | 0 | (e)Other Land (ha.) | 0 | Total Land (ha.) | 79.72 | |
|
21. | Present Land Use Breakup of the Study Area in Ha: | (a)Agriculture Area (ha.) | 0 | (b)Waste/Barren Land (ha.) | 0 | (c)Grazing/ Community Land (ha.) | 0 | (d)Surface Water Bodies (ha.) | 0 | (e)Settlements (ha.) | 0 | (f)Industrial (ha.) | 79.72 | (g)Forest (ha.) | 0 | (h)Mangroves (ha.) | 0 | (i)Marine Area (ha.) | 0 | (j)Others (ha.) : NA | 0 | Total (ha.) | 79.72 | |
|
22. Land requirement for various activities |
---|
S. No. | Description of Activity / Facility / Plant / Others | Others | Land Requirement (ha.) | Remarks |
---|
(1.) | Main Plant | | 0 | Expansion would be undertaken within existing area | |
|
|
23. | Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Sanctuaries; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones : | |
|
23.1. Details of Ecological Sensitivity : |
---|
S. No. | Details of Ecological Sensitivity | Name | Distance from the Project (Km) | Remarks |
---|
(1.) | NPA | PF near Khejurdanga | 3.4 | Protected Forest | (2.) | Critically Polluted Area | NA | 0 | NA | (3.) | ESAs | NA | 0 | NA | (4.) | ESZs | NA | 0 | NA | (5.) | Corridors | NA | 0 | NA | (6.) | Wildlife Corridors | NA | 0 | NA | (7.) | WLS | NA | 0 | NA | |
23.2. Details of Environmental Sensitivity : |
---|
S. No. | Details of Environmental Sensitivity | Other Details of Environmental Sensitivity | Name | Distance from the Project (Km) | Remarks |
---|
(1.) | Archaeological Sites | | NA | 0 | NA | (2.) | Defence Installations | | Kalaikunda | 6.4 | Air Force Base | (3.) | Others | NA | NA | 0 | NA | (4.) | Forest | | PF near Khejurdanga | 3.4 | Protected Forest | |
|
23.3. | (a)Whether Noc / Permission from the competent authority is required? | No | (b)Whether NBWL recommendation is required? | No | |
|
24. | Forest Land: | Whether any Forest Land involved? | No | |
|
25. | Tree Cutting: | (a)No. of Trees Cut for the Project (if Forest Land not Involved) | Not Applicable | (b)Details of Tree Cutting and Planting of Trees | Not Applicable | |
|
26. | Land Acquisition Status: | (a)Acquired Land(Ha) | 79.72 | (b)Land yet to be acquired(Ha) | 0 | (c)Status of Land acquisition if not acquired | NA | |
|
27. | Rehabilitation and Resettlement (R&R): | (a)No. of Villages | 0 | (b)No. of Households | 0 | (c)No. of PDFs (Project Displaced Families) | 0 | (d)No. of PAFs (Project Affected Families) | 0 | (e)Funds Allocated for R&R(in INR) (in Lacs) | 0 | (f)Status of R&R | Completed | |
|
28. | Details of Presence of Schedule-I Species: | (a)Whether there is Presence of Schedule-I Species ? | No | (b)Whether conservation plan for Schedule-I Species has been prepared ? | No | (c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? | No | |
|
29. | Details of Presence of Water Bodies in Core Area: | (a)Whether there is Presence of Water Bodies in Core Area ? | No | (b)Whether there is Diversion Required ? | No | (c)Whether permission has been obtained from competent authority ? | No | |
|
30. | Details of Presence of Water Bodies in Buffer Area: | (a)Whether there is Presence of Water Bodies in Buffer Area ? | Yes | (i)Details of Water Bodies in Buffer Area | Kasai River | (ii)Direction of Water Bodies in Buffer Area | North | (iii)Distance of Water Bodies in Buffer Area | 1.5 | |
|
31. | Manpower Requirement: | (a)Permanent Employment-During Construction | 100 | (b)Permanent Employment-During Operation | 100 | (c)Temporary Employment- During Construction | 500 | (d)Temporary Employment- During Operation | 300 | (e)No. of working days | 350 | (f)Total Manpower | 1000 | |
|
|
S. No. | Description | Existing | Proposed | Total |
---|
(1.) | Total Area of Green Belt | 26.3 | 0 | 26 | (2.) | Percentage of Total Project Area | 33 | 0 | 33 | (3.) | No. of Plants | 38000 | 2000 | 40000 | (4.) | Funds Allocated | 0 | 15 | 15 | |
|
33. Project Benefits |
---|
S. No. | Type of Project Benefits | Details of Project Benefits |
---|
(1.) | Financial | The capital investment in the proposed project would be an asset for the State, leading to regional development and economic benefits to the Government. | (2.) | Social | The project would impact the socio-economic status of the region positively by generating direct and indirect employment opportunities. Furthermore, the allocated budget of CER and CSR for the following years would serve as a catalyst for overall social and economic development of the region in the areas of social infrastructure, health care, education and local entrepreneurship. | |
|
34. CRZ Specific Details : Not Applicable |
35. Sector Specific Details : NOT APPLICABLE |
35. Sector Specific Details For Industrial Projects - 1 |
|
|
36. | Details of Court Cases: | (a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? | No | |
|
37. | Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act: | (a)Whether any Direction issued under EPA Act/Air Act/Water Act ? | No | |
|
38. | Details of EIA Consultant: | (a)Have you hired Consultant for preparing document? | Yes | (i)Accreditation No. | RA 134th AC Meeting:Jun 08, 2017 Rev. 01 | (ii)Name of the EIA Consultant | M N Dastur & Co P Ltd | (iii)Address | P 17 Mission Row Extension, Faraday House, Kol - 700013 | (iv)Mobile No. | 9433341156 | (v)Landline No. | 0332225050 | (vi)Email Id | sandip.m@dastur.com | (vii)Category of Accreditation | A | (viii)Sector of Accreditation | Industrial Projects - 1 | (ix)Validity of Accreditation | 30 Apr 2019 | (x)Uploaded Certificate of Accreditation certified by QCI/NABET | Copy of Certificate of Accreditation | |
|
|
Essential Detail Sought : NIL |
Additional Detail Sought : NIL |
| Undertaking |
| I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief. And I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity/ construction/ expansion has since been taken up. |
| Name of Applicant | Debasis Mishra | Designation | VP | Name of Company (Applicant Name should not be given here) | TATA METALIKS LIMITED | Address | Village - Maheshpur, P.O. - Samraipur |
|