Form-2
APPLICATION FOR PRIOR ENVIRONMENTAL CLEARANCE
S. No.Item Details
1.
Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? No
Details of Project:
(a)Name of the project(s) Capacity Expansion Of Hot Metal Production From 0.5 To 0.75 MTPA, DI Pipe Production From 0.3 To 0.5 MTPA And Production of 0.1 MTPA Castings & Fittings
(b)Name of the Company / Organisation TATA METALIKS LIMITED
(c)Registered Address Village - Maheshpur, P.O. - Samraipur,P.S. - Kharagpur Local,West Medinipur,West Bengal-721301
(d)Legal Status of the Company Others
(e)Joint Venture No
2.
Address for the correspondence:
(a)Name of the Applicant Debasis Mishra
(b)Designation (Owner/ Partner/ CEO) VP
(c)Address Village - Maheshpur, P.O. - Samraipur,,No Data,West Medinipur,West Bengal-721301
(d)Pin code 721301
(e)E-mail rahul.deb@tatametaliks.co.in
(f)STD Code. 3222(f)Telephone No. 651138
(g)Fax No.
(h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . Annexure-Uploaded Copy of documents in support of the competence/authority
3.
Category of the Project/Activity as per Schedule of EIA Notification,2006:
(a.I)Project/Activity3(a) Metallurgical industries (ferrous & non ferrous)
Minor Activity
(b)Category A
(c)Proposal Number IA/WB/IND/21443/2014
(d)Master Proposal Number(Single Window) SW/79455/2018
(e)EAC concerned (for category A Projects only) Industrial Projects - 1
(f)Project Type Expansion
4.
Location of the Project:
(a)Plot/Survey/Khasra No. Please see Annexure 1 of Additional attachments fi
(b)Pincode 721301
(c)Bounded Latitudes (North)
From
Degree 22.38
Minutes
Second
From
Degree 22.39
Minutes
Second
(d)Bounded Longitudes (East)
From
Degree 87.28
Minutes
Second
From
Degree 87.29
Minutes
Second
(e)Survey of India Topo Sheet No. F45J3, F45J7
(f)Uploaded Topo Sheet File Copy of Topo Sheet File
(g)Maximum Elevation Above Means Sea Level(AMSL) 35
(h)Uploaded (kml) File Copy of Kml File      
(i)Distance of Nearest HFL from the project boundary within the study area 1
(j)Seismic Zone 3
5.
(a)Number of States in which Project will be Executed 1
(b)Main State of the project West Bengal
Details of State(s) of the project
S. No. State Name District Name Tehsil Name Village Name
(1.)West BengalMedinipurKharagpur - I
6.
Details of Terms of Reference (ToR)/EC:
(a)MoEF&CC / SEIAA File Number J-11011/377/2013.IA-II(I)
(c)Date of Issue of TOR 19 May 2014
(f)Previous TOR Letter Copy of Previous TOR letter
(b)Date of Apply of EC 05 Feb 2015
(c)Date of Issue of EC 28 Jan 2019
(d)Previous EC Letter Copy of Previous EC letter
7.
Details of Public Consultation:
(a)Whether the Project Exempted from Public Hearing?No
(b)Whether details of Public Hearing available? Yes
(c)Whether Public hearing was presided over by an officer of the rank of Additional District Magistrate or above Yes
     7.1.       Details of Public Hearing
S. No.Details of Advertisement Details of Public Hearing Venue Location DetailsNo. of People AttendedIssues RaisedDesignation of Presiding OfficerOther Designation of Presiding Officer
(1.)
Date of Advertisement :03 Aug 2018
Copy of advertisement :Copy of Advertisement
Copy of Public Hearing :Copy of Public Hearing
Date :07 Sep 2018
Distance of Public Hearing Venue from the Proposed Project :5
Kharagpur-I, BDO Office
State :West Bengal
District :West Medinipur
Tehsil :No Data
Village :Satkui
148Majority of the respondents welcomed the proposed expansion and appreciated the ongoing CSR activities in local villages, undertaken by TML. Respondents of Samraipur requested the authority of TML tOthers
8.
Details of Project Configuration/Product:
Details Not Applicable
9.
In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii):
(a)Details of certified report on compliance of earlier environmental clearance condition
(i)Certified Compliance By Regional
(ii)Details of Regional Office of MoEFCC / Zonal Office of CPCB / SPCB / UTPCC from which certified report on Bhubaneswar
(iii)Letter No. 102-539/EPE & 102-314/EPE
(iv)Status of Compliance Compiled
(v)Certified report on compliance of earlier environmental clearance conditions (Including Monitoring Report) Copy of Certified Compliance Report
(vi)Date of site visit Jul 26 2018 12:00AM
(b)Details of Capacity Expansion
S. No.Product/Activity (Capacity/Area)Quantity FromQuantity ToTotal UnitOther UnitMode of Transport / Transmission of ProductOther Mode of Transport / Transmission of Product
(1.)Pig Iron3450000345000Tons per Annum(TPA)Road,Rail
(2.)Casting & Fittings0100000100000Tons per Annum(TPA)Road
(3.)DI Pipes300000200000500000Tons per Annum(TPA)Road
(4.)Hot Metal500000250000750000Tons per Annum(TPA)OthersInternal transfer by road
(c)Details of Configuration
S. No.Plant / Equipment / Facility Existing ConfigurationProposed ConfigurationFinal configuration after expansionRemarks
(1.)Sinter Plant44000 tpm50000 tpm50000 tpmAugmentation of existing unit
(2.)Pellet Plant-450000 TPA450000 TPANew Pellet Plant
(3.)Pig Casting Machine345000 TPA-345000 TPANo change
(4.)Foundry-100000 TPA100000 TPANew unit for production of castings and fittings
(5.)CPP24 MW (BF Gas Fired)4.5 MW (BF Gas Fired)4.5 MW (BF Gas Fired)Augmentation
(6.)CPP310 MW (Coke Oven Gas WHRB)-10 MW (Coke Oven Gas WHRB)No change
(7.)CPP4-10 MW (Coke Oven Gas WHRB)10 MW (Coke Oven Gas WHRB)New Unit
(8.)DI Pipe Plant300000 TPA200000 TPA1 x 300000 TPA; 1 x 200000 TPAAddition of new unit
(9.)Air Separation Unit/Oxygen Plant-Oxygen - 3600 Nm3/hr; Nitrogen - 1000 Nm3/hrOxygen - 3600 Nm3/hr; Nitrogen - 1000 Nm3/hrNew Units
(10.)CPP1CPP1 - 2.76 MW (BF Gas fired)CPP1 - 10 MW (BF Gas fired)CPP1 - 10 MW (BF Gas fired)CPP1 - Augmentation
(11.)Blast Furnace2 x 259 m32 x 305 m32 x 305 m3Augmentation of existing units by increasing working volume
9.1.
Details of Consent to Operate
(i)Whether Consent to operate obtained ? NA
(ii)Copies of all Consent to operate obtained since inception NA
(iii)Date of Issue 05 Feb 2018
(iv)Valid Upto 30 Jan 2019
(v)File No. CO106566/CO106542
(vi)Application No. Co0000000190276/co0000000183977
(vii)Copy of Consent to operate valid as on date Copy of Consent to Operate
10.
Project Cost:
(a)Total Cost of the Project at current price level (in Crores) 800
(b) Funds Allocated for Environment Management (Capital) (in Crores) 49
(c) Funds Allocated Towards CER (Corporate Environment Responsibility) (in Crores) 4
(d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in Crores) 2
11.
Whether project attracts the General Condition specified in the Schedule of EIA Notification ? No
12.
Whether project attract the Specific Condition specified in the Schedule of EIA Notification ? No
13.
Raw Material / Fuel Requirement:
(a)Proposed quantity of raw material/fuel 361050
(b)Existing quantity of raw material/fuel 1616870
(c)Total quantity of raw material/fuel 1977920
    13.1.        Raw Material / Fuel Profile
S. No.Raw Material / Fuel QuantityUnitOther UnitSource (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received )Mode of TransportOther Mode of TransportDistance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received)Type of Linkage Other Type of Linkage Uploaded Copy of Linkage
(1.)Non coking coal for PCI90000Tons per AnnumImportedOtherssea150 Open MarketCopy of Linkage
(2.)Dolomite28000Tons per AnnumImported -BhutanRoad,Rail,OthersSea130 e-auctionLong Term Agreement with HMCCopy of Linkage
(3.)Limestone60600Tons per AnnumWest Bengal (Haldia)Road,Rail130 e-auctionCopy of Linkage
(4.)Iron Ore fines1017000Tons per AnnumTSL Noamundi, Joda mines, KhanbandRail300 OthersLong Term Agreement with TSLCopy of Linkage
(5.)Resin, Hardener, Catalyst, Paints870Tons per AnnumKolkataRoad100 e-auctionCopy of Linkage
(6.)Scrap68000Tons per AnnumWest BengalRoad130 Open MarketCopy of Linkage
(7.)Inoculants600Tons per AnnumImport - Dubai, FranceRoad,OthersSea130 e-auctionCopy of Linkage
(8.)Bitumen2700Tons per AnnumKolkataRoad100 Open MarketCopy of Linkage
(9.)Cement58500Tons per AnnumDomesticRoad100 Open MarketCopy of Linkage
(10.)Iron ore187500Tons per AnnumTSL Noamundi, Joda mines, KhanbandRail300 OthersLong Term Agreement with TSLCopy of Linkage
(11.)Purchase coke345750Tons per AnnumImported - Japanese, Chinese and DomesticRoad,Rail,OthersSea126 OthersLong Term Agreement with HMCCopy of Linkage
(12.)Zinc4000Tons per AnnumPune, Import - GermanyRoad,OthersSea130 Open MarketCopy of Linkage
(13.)Quartzite7500Tons per AnnumWest Bengal (Jhargram)Road,Rail100 Open MarketCopy of Linkage
(14.)Magnesium7500Tons per AnnumPune, Jamshedpur & KolkataRoad170 Open MarketCopy of Linkage
(15.)Foundry Sand8400Tons per AnnumWest BengalRoad150 Open MarketCopy of Linkage
(16.)Sand91000Tons per AnnumWest BengalRoad150 e-auctionCopy of Linkage
14.
Baseline Data :
(a)Period of Base Line Data Collection FROM 03 Feb 2018 To 09 May 2018
(b)Season Summer
    14.1.     No. of ambient Air Quality (AAQ) monitoring locations : 8
S. No.Criteria Pollutants Other Criteria PollutantsUnitMaximum ValueMinimum Value98 Percentile ValuePrescribed Standard
(1.)PM10Micro Gram per Meter Cube118.652.8110.9100
(2.)PM2.5Micro Gram per Meter Cube65.426.561.360
(3.)NOxMicro Gram per Meter Cube42.812.54080
(4.)OthersO3Micro Gram per Meter Cube26.51026.5180
(5.)SO2Micro Gram per Meter Cube20418.280
    14.2.     No. of Ground Water monitoring locations : 8
S. No.Criteria Pollutants Other Criteria PollutantsHeavy MetalUnitOther UnitMaximum ValueMinimum ValueDesirable LimitMaximum Permissible Limit
(1.)Chloridesmg/l73.7412.92501000
(2.)Fluoridemg/l0.10.111.5
(3.)Heavy MetalsChromiummg/l0.010.010.050.05
(4.)OthersArsenicmg/l0.010.010.010.05
(5.)TDSmg/l7201475002000
(6.)Total Hardnessmg/l28056200600
(7.)pHNA6.926.787.58.5
(8.)TSSmg/l1010100150
    14.3.     No. of Surface Water monitoring locations : 8
S. No.Criteria Pollutants Other Criteria PollutantsUnitOther UnitMaximum ValueMinimum ValueClassification of inland water body
(1.)pHNA7.27.1B
(2.)DOmg/l5.75.4B
(3.)BODmg/l106.7B
(4.)CODmg/l3424.1B
    14.4.     No. of Ambient Noise monitoring locations : 10
S. No.Parameter UnitMaximum ValueMinimum ValuePrescribed Standard
(1.)Leq(Day)A-weighted decibels(dB(A))70.755.675
(2.)Leq(Night)A-weighted decibels(dB(A))60.246.270
    14.5.     No. of Soil Sample Monitored locations : 3
S. No.Parameter UnitOther UnitMaximum ValueMinimum Value
(1.)Electric ConductivityMillisiemens per Centimetre3.22.3
(2.)N(Nitrogen)Milligram per Kilogram950820
(3.)P(Phosphorus)Milligram per Kilogram1080685
(4.)pHOthersNA7.256.98
(5.)K(Potassium)Milligram per Kilogram1280812
14.6.
Details of Ground Water Table:
(a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) From 1.05 To 22.12
(b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) From 0.85 To 18.37
(c)Whether Ground Water Intersection will be there ? No
     15.      Details of Water Requirement (During Operation)
S. No.Source Source Other Required Quantity (Kilolitre per Day (Kld))Distance from SourceCopy of Permission from Competent Authority Mode of TransportOther Mode of TransportMethod of Water WithdrawalOther Method of Water WithdrawalLetter No.Date of IssuePermitted Quantity
(1.)GroundWater59040Copy of Permission LetterPipelineTube WellP1420113001900000003TSE12 Jun 20136114
15.1.
(a)Whether Desalination is proposed No
    16.       Waste Water Management(During Operation)
S. No.Type/Source Quantity of Waste Water Generated (Kilolitre per Day)Treatment Capacity (Kilolitre per Day) Treatment MethodMode of DisposalOther Mode of DisposalQuantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day)Quantity of Discharged Water (Kilolitre per Day)
(1.)BF Gas based power plant1515NeutralisationOthersReused for dust suppression, slag granulation etc.150
(2.)Blast Furnace99Gas Cleaning PlantReuse within the Plant & Recycling9
(3.)DI Pipe Plant4343Treatment in ETPOthersTreatment in ETP & reused as CPP make up430
(4.)Coke Oven WHRB CPP3838Effluent Treatment PlantReuse within the Plant & Recycling38
(5.)Sanitary Waste Water22SettlingOthersReused for low end purpose20
(6.)Sinter & Pellet Plant66ClarificationOthersReused for Dust Supression & Slag granulation60
16.1.
(a)Total Waste Water Generation (Kilolitre per Day) 113
(b)Total Discharged Water (Kilolitre per Day) 0
(c)Total Reused Water (Kilolitre per Day) 113
    17.       Solid Waste Generation/Management
S. No.Name of Waste Item Other ItemQuantity per AnnumUnitDistance from Site(KM)Mode of TransportOther Mode of TransportMode of DisposalOther Mode of Disposal
(1.)BF GCP Sludge & Flue DustIndustrial Waste24000Tons0RoadOthersRecycled in Sinter Making
(2.)Waste Core SandIndustrial Waste17500Tons0RoadOthersUsed in filling low lying areas
(3.)Waste foundry sandIndustrial Waste7000Tons50RoadOthersBrick manufacturing, concrete making
(4.)Used OilHazardous Waste (as per Hazardous and Other Waste Management rules 2016)15Kilolitre130RoadAuthorized Recyclers
(5.)BF SlagIndustrial Waste322500Tons45RoadOthersSold to cement plant
(6.)Zinc DustHazardous Waste (as per Hazardous and Other Waste Management rules 2016)1000Tons130RoadAuthorized Recyclers
(7.)Resin HardenerHazardous Waste (as per Hazardous and Other Waste Management rules 2016)20Tons130RoadTreatment, Storage and Disposal Facility(TSDF)
(8.)Paint DrumsHazardous Waste (as per Hazardous and Other Waste Management rules 2016)7Tons130RoadTreatment, Storage and Disposal Facility(TSDF)
(9.)Iron ScrapIndustrial Waste1250Tons0RoadOthersRecycled back in process
18.
    18.1.     Air Quality Impact Prediction
S. No.Criteria Pollutants Other Criteria PollutantsUnitBaseline ConcentrationDistance GLCIncremental ConcentrationTotal GLCPrescribed Standard
(1.)PM2.5Microgram per Meter Cube53.90.252.6456.5460
(2.)SO2Microgram per Meter Cube14.30.250.6114.9180
(3.)PM10Microgram per Meter Cube92.60.255.2897.88100
(4.)NOxMicrogram per Meter Cube30.60.254.43580
    18.2.     Stack Details
S. No.Source FuelStack Height(m)Stack Diameter(m)PollutantsOther PollutantsEmission (GLS)
(1.)Deslagging/DesulphurisationNA300.5PM100.03
(2.)Zn Coating Middle LineNA300.6PM100.083
(3.)Zn Coating Small LineNA300.5PM100.05
(4.)Sand Cleaning System & Core ShopNA300.6PM100.833
(5.)Magnesium Treatment & Induction FurnaceNA300.7PM100.055
(6.)Boiler1 (Attached to annealing furnace)BF Gas301.1NOx1.388
(7.)Zn Al CoatingNA300.6PM100.05
(8.)Zn Coating Small Line 2NA300.6PM100.05
(9.)Deslagging/Desulphurisation NewNA300.5PM100.033
(10.)Zn Coating Small Line NewNA300.5PM100.05
(11.)Zn Coating Middle Line NewNA300.6PM100.0833
(12.)Barrel & Socket grinder newNA300.85PM100.133
(13.)Boiler (attached to annealing furnace) newBF Gas301.1NOx1.38
(14.)Sinter Plant Head ESPCoke Breeze452.3NOx11
(15.)Sinter Plant RFP Bag FilterNA301.4PM100.33
(16.)Sinter Plant FluxNA201.1PM100.22
(17.)Sinter Plant Fuel CrusherNA300.6PM10.033
(18.)PCI StackBF Gas420.92NOx2.77
(19.)CPP Common StackBF Gas & Coke Oven Gas452.6PM100.58
(20.)CPP Common StackBF Gas & Coke Oven Gas452.6NOx5.833
(21.)Pellet plant 1 DENA451.8PM101.25
(22.)Pellet Plant Waste GasBF Gas452.5NOx16.667
(23.)BF Stove 1BF Gas452PM100.277
(24.)Magnesium treatment & induction furnace newNA300.7PM100.055
(25.)BF Stove 1BF Gas452NOx5.555
(26.)BF Stove 2BF Gas452PM100.277
(27.)BF Stove 2BF Gas452NOx5.555
(28.)Annealing FurnaceNA301.16PM100.166
(29.)Sand cleaning system & core shop newNA300.6PM100.083
(30.)Zn Al Coating NewNA300.6PM100.05
(31.)Boiler (attached to annealing furnace) newBF Gas301.1PM100.138
(32.)Zn Coating Small Line 2 NewNA300.6PM100.05
(33.)Sinter Plant Head ESPCoke Breeze452.3PM103.05
(34.)Sinter Plant Head ESPCoke Breeze452.3SO25.927
(35.)Sinter Plant Tail ESPNA402.3PM103.47
(36.)PCI StackBF Gas420.92PM100.416
(37.)BF Cast House DedustingNA301.2PM100.666
(38.)Pellet Plant 2 DENA451.8PM101.25
(39.)Pellet Plant Waste GasBF Gas452.5PM102.5
(40.)Pellet Plant Waste GasBF Gas452.5SO24.16
(41.)BF Stock House DedustingNA302PM102.66
(42.)FoundryNA300.6PM100.416
(43.)Barrel & Socket GrinderNA300.85PM100.133
(44.)Boiler1 (Attached to annealing furnace)BF Gas301.1PM100.1388
(45.)Annealing furnace NewNA301.16PM100.166
19.
Power Requirement:
(a)Quantity (Kilo Volt Amps (kVA)) 44.5
(b)Source Captive Generation and WBSEDCL
(c)Uploaded Copy of Agreement Copy of Agreement
(d)Standby Arrangement (Details of DG Sets) 4
(e)Stack Height (in m) 12
20.
Land Ownership Pattern:
(a)Forest Land (ha.) 0
(b)Private Land (ha.) 79.72
(c)Government Land (ha.) 0
(d)Revenue Land (ha.) 0
(e)Other Land (ha.) 0
    Total Land (ha.) 79.72
21.
Present Land Use Breakup of the Study Area in Ha:
(a)Agriculture Area (ha.) 0
(b)Waste/Barren Land (ha.) 0
(c)Grazing/ Community Land (ha.) 0
(d)Surface Water Bodies (ha.) 0
(e)Settlements (ha.) 0
(f)Industrial (ha.) 79.72
(g)Forest (ha.) 0
(h)Mangroves (ha.) 0
(i)Marine Area (ha.) 0
(j)Others (ha.) : NA 0
    Total (ha.) 79.72
    22.     Land requirement for various activities
S. No.Description of Activity / Facility / Plant / Others OthersLand Requirement (ha.)Remarks
(1.)Main Plant0Expansion would be undertaken within existing area
Total (ha.) 0
23.
Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Sanctuaries; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones :
    23.1.     Details of Ecological Sensitivity :
S. No.Details of Ecological Sensitivity NameDistance from the Project (Km)Remarks
(1.)NPAPF near Khejurdanga3.4Protected Forest
(2.)Critically Polluted AreaNA0NA
(3.)ESAsNA0NA
(4.)ESZsNA0NA
(5.)CorridorsNA0NA
(6.)Wildlife CorridorsNA0NA
(7.)WLSNA0NA
    23.2.     Details of Environmental Sensitivity :
S. No.Details of Environmental Sensitivity Other Details of Environmental Sensitivity NameDistance from the Project (Km)Remarks
(1.)Archaeological SitesNA0NA
(2.)Defence InstallationsKalaikunda6.4Air Force Base
(3.)OthersNANA0NA
(4.)ForestPF near Khejurdanga3.4Protected Forest
23.3.
(a)Whether Noc / Permission from the competent authority is required? No
(b)Whether NBWL recommendation is required? No
24.
Forest Land:
Whether any Forest Land involved? No
25.
Tree Cutting:
(a)No. of Trees Cut for the Project (if Forest Land not Involved) Not Applicable
(b)Details of Tree Cutting and Planting of Trees Not Applicable
26.
Land Acquisition Status:
(a)Acquired Land(Ha) 79.72
(b)Land yet to be acquired(Ha) 0
(c)Status of Land acquisition if not acquired NA
27.
Rehabilitation and Resettlement (R&R):
(a)No. of Villages 0
(b)No. of Households 0
(c)No. of PDFs (Project Displaced Families) 0
(d)No. of PAFs (Project Affected Families) 0
(e)Funds Allocated for R&R(in INR) (in Lacs) 0
(f)Status of R&R Completed
28.
Details of Presence of Schedule-I Species:
(a)Whether there is Presence of Schedule-I Species ? No
(b)Whether conservation plan for Schedule-I Species has been prepared ? No
(c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? No
29.
Details of Presence of Water Bodies in Core Area:
(a)Whether there is Presence of Water Bodies in Core Area ? No
(b)Whether there is Diversion Required ? No
(c)Whether permission has been obtained from competent authority ? No
30.
Details of Presence of Water Bodies in Buffer Area:
(a)Whether there is Presence of Water Bodies in Buffer Area ? Yes
(i)Details of Water Bodies in Buffer Area Kasai River
(ii)Direction of Water Bodies in Buffer Area North
(iii)Distance of Water Bodies in Buffer Area 1.5
31.
Manpower Requirement:
(a)Permanent Employment-During Construction 100
(b)Permanent Employment-During Operation 100
(c)Temporary Employment- During Construction 500
(d)Temporary Employment- During Operation 300
(e)No. of working days 350
(f)Total Manpower 1000
32.
Green Belt in Ha:
(a)Uploaded Green Belt plan Copy of Green Belt Plan
S. No.Description ExistingProposedTotal
(1.)Total Area of Green Belt26.3026
(2.)Percentage of Total Project Area33033
(3.)No. of Plants38000200040000
(4.)Funds Allocated01515
    33.         Project Benefits
S. No.Type of Project Benefits Details of Project Benefits
(1.)FinancialThe capital investment in the proposed project would be an asset for the State, leading to regional development and economic benefits to the Government.
(2.)SocialThe project would impact the socio-economic status of the region positively by generating direct and indirect employment opportunities. Furthermore, the allocated budget of CER and CSR for the following years would serve as a catalyst for overall social and economic development of the region in the areas of social infrastructure, health care, education and local entrepreneurship.
   34.   CRZ Specific Details : Not Applicable
   35.   Sector Specific Details : NOT APPLICABLE
   35.   Sector Specific Details For Industrial Projects - 1
S. No.Item Details
S. No.Item Details
36.
Details of Court Cases:
(a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? No
37.
Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act:
(a)Whether any Direction issued under EPA Act/Air Act/Water Act ? No
38.
Details of EIA Consultant:
(a)Have you hired Consultant for preparing document? Yes
(i)Accreditation No. RA 134th AC Meeting:Jun 08, 2017 Rev. 01
(ii)Name of the EIA Consultant M N Dastur & Co P Ltd
(iii)Address P 17 Mission Row Extension, Faraday House, Kol - 700013
(iv)Mobile No. 9433341156
(v)Landline No. 0332225050
(vi)Email Id sandip.m@dastur.com
(vii)Category of Accreditation A
(viii)Sector of Accreditation Industrial Projects - 1
(ix)Validity of Accreditation 30 Apr 2019
(x)Uploaded Certificate of Accreditation certified by QCI/NABET Copy of Certificate of Accreditation
39.
Documents to be Attached:
(a)Uploaded Copy of EIA/EMP Report Copy of EIA/EMP
Copy of EIA/EMP(Annexures)
Copy of EIA/EMP(Plans/Figures)
(b)Uploaded Copy of Risk Assessment Report Copy of Risk Assessment
(c)Uploaded Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan
(d)Uploaded Copy of Final Layout Plan Copy of Final Layout Plan
(e)Uploaded Cover Letter Copy of Cover Letter
(f)Uploaded Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency
(g)Uploaded Additional File Copy of Additional File
(h)Uploaded Proposal Presentation (To be given in EAC meeting) NA
      Essential Detail Sought : NIL
      Additional Detail Sought : NIL
Undertaking
I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief. And I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity/ construction/ expansion has since been taken up.
Name of ApplicantDebasis Mishra
DesignationVP
Name of Company (Applicant Name should not be given here)TATA METALIKS LIMITED
AddressVillage - Maheshpur, P.O. - Samraipur
Print