Form-2
APPLICATION FOR PRIOR ENVIRONMENTAL CLEARANCE
S. No.Item Details
1.
Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? No
Details of Project:
(a)Name of the project(s) Establishment of EPS at BTSAD, Bhimavaram, West Godavari District, Andhra Pradesh
(b)Name of the Company / Organisation ONGC
(c)Registered Address NIL
(d)Legal Status of the Company NIL
(e)Joint Venture No
2.
Address for the correspondence:
(a)Name of the Applicant
(b)Designation (Owner/ Partner/ CEO) ChiefGeneralManager
(c)Address NIL
(d)Pin code 110070
(e)E-mail kumar_rajeeva@ongc.co.in
(f)STD Code. (f)Telephone No.
(g)Fax No. 26129067
(h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . Annexure-Uploaded Copy of documents in support of the competence/authority
3.
Category of the Project/Activity as per Schedule of EIA Notification,2006:
(a.I)Project/Activity1(b) Offshore and onshore oil and gas exploration, development & production
Minor Activity
(b)Category A
(c)Proposal Number IA/AP/IND2/62860/2017
(d)Master Proposal Number(Single Window) SW/79447/2018
(e)EAC concerned (for category A Projects only) Industrial Projects - 2
(f)Project Type Fresh EC
4.
Location of the Project:
(a)Plot/Survey/Khasra No. 294 etc of Losarigutlapadu (v) of Bhimavaram
(b)Pincode 534281
(c)Bounded Latitudes (North)
From
Degree 16.4202
Minutes
Second
From
Degree 16.4220
Minutes
Second
(d)Bounded Longitudes (East)
From
Degree 81.4983
Minutes
Second
From
Degree 81.5
Minutes
Second
(e)Survey of India Topo Sheet No. E44V7
(f)Uploaded Topo Sheet File Copy of Topo Sheet File
(g)Maximum Elevation Above Means Sea Level(AMSL) 5
(h)Uploaded (kml) File Copy of Kml File      
(i)Distance of Nearest HFL from the project boundary within the study area 7.5
(j)Seismic Zone 3
5.
(a)Number of States in which Project will be Executed 1
(b)Main State of the project Andhra Pradesh
Details of State(s) of the project
S. No. State Name District Name Tehsil Name Village Name
(1.)Andhra PradeshWest GodavariBhimavaram
6.
Details of Terms of Reference (ToR):
(a)MoEF&CC / SEIAA File Number IA-J-11011/75/2017-IA-II(I)
(b)Date of Apply of TOR 06 Mar 2017
(c)Date of Issue of TOR / Standard ToR 25 Apr 2017
(d)Previous TOR Letter Copy of Previous TOR letter
7.
Details of Public Consultation:
(a)Whether the Project Exempted from Public Hearing?Yes
(b)Reason Public Hearing already conducted in the district o
(c)Supporting Document Copy of Supporting Document
8.
Details of Project Configuration/Product:
     8.1.       Project Configuration
S. No.Plant/Equipment/FacilityConfigurationRemarks
(1.)Early Production System7 LSCMD
     8.2.       Product
S. No.Product/Activity (Capacity/Area)QuantityUnitOther UnitMode of Transport / Transmission of ProductOther Mode of Transport / Transmission of Product
(1.)GAS7OthersLSCMDOthersPipeline
9.
In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii):
Details Not Applicable
9.1.
Details of Consent to Operate
(i)Whether Consent to operate obtained ? NA
(ii)Copies of all Consent to operate obtained since inception NA
(iii)Date of Issue N/A
(iv)Valid Upto N/A
(v)File No. NA
(vi)Application No. NA
(vii)Copy of Consent to operate valid as on date Copy of Consent to Operate
10.
Project Cost:
(a)Total Cost of the Project at current price level (in Crores) 250
(b) Funds Allocated for Environment Management (Capital) (in Crores) 2.5
(c) Funds Allocated Towards CER (Corporate Environment Responsibility) (in Crores) 0.625
(d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in Crores) 0.125
11.
Whether project attracts the General Condition specified in the Schedule of EIA Notification ? No
12.
Whether project attract the Specific Condition specified in the Schedule of EIA Notification ? No
13.
Raw Material / Fuel Requirement:
(a)Proposed quantity of raw material/fuel 20
(b)Existing quantity of raw material/fuel N/A
(c)Total quantity of raw material/fuel 20
    13.1.        Raw Material / Fuel Profile
S. No.Raw Material / Fuel QuantityUnitOther UnitSource (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received )Mode of TransportOther Mode of TransportDistance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received)Type of Linkage Other Type of Linkage Uploaded Copy of Linkage
(1.)Water20Cubic Meter per DayTankersOthersTankers10 OthersNACopy of Linkage
14.
Baseline Data :
(a)Period of Base Line Data Collection FROM 29 Jan 2018 To 22 Apr 2018
(b)Season Winter
    14.1.     No. of ambient Air Quality (AAQ) monitoring locations : 6
S. No.Criteria Pollutants Other Criteria PollutantsUnitMaximum ValueMinimum Value98 Percentile ValuePrescribed Standard
(1.)PM2.5Micro Gram per Meter Cube27.119.324.660
(2.)NOxMicro Gram per Meter Cube15.18.515.180
(3.)PM10Micro Gram per Meter Cube55.64055.1100
(4.)SO2Micro Gram per Meter Cube12.47.410.180
    14.2.     No. of Ground Water monitoring locations : 7
S. No.Criteria Pollutants Other Criteria PollutantsHeavy MetalUnitOther UnitMaximum ValueMinimum ValueDesirable LimitMaximum Permissible Limit
(1.)pHNA7.76.68.58.5
(2.)TDSmg/l1734256500200
(3.)Chloridesmg/l588.9542501000
(4.)Total Hardnessmg/l807104.8200600
(5.)Fluoridemg/l1.20.311.5
(6.)Heavy MetalsMercurymg/l0.010.010.0010.001
(7.)TSSmg/l55250250
    14.3.     No. of Surface Water monitoring locations : 4
S. No.Criteria Pollutants Other Criteria PollutantsUnitOther UnitMaximum ValueMinimum ValueClassification of inland water body
(1.)pHNA7.216.8A
(2.)DOmg/l6.15.7A
(3.)BODmg/l7.63E
(4.)CODmg/l255E
    14.4.     No. of Ambient Noise monitoring locations : 3
S. No.Parameter UnitMaximum ValueMinimum ValuePrescribed Standard
(1.)Leq(Day)A-weighted decibels(dB(A))755075
(2.)Leq(Night)A-weighted decibels(dB(A))37.832.770
    14.5.     No. of Soil Sample Monitored locations : 5
S. No.Parameter UnitOther UnitMaximum ValueMinimum Value
(1.)pHOthersNA7.935.35
(2.)N(Nitrogen)Kilogram per hectare411.6120.8
(3.)P(Phosphorus)Kilogram per hectare17.84.3
(4.)Electric ConductivityMillisiemens per Centimetre5370438
(5.)K(Potassium)Kilogram per hectare43021208.6
14.6.
Details of Ground Water Table:
(a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) From 1.0 To 12.95
(b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) From 1 To 4.94
(c)Whether Ground Water Intersection will be there ? No
     15.      Details of Water Requirement (During Operation)
S. No.Source Source Other Required Quantity (Kilolitre per Day (Kld))Distance from SourceCopy of Permission from Competent Authority Mode of TransportOther Mode of TransportMethod of Water WithdrawalOther Method of Water WithdrawalLetter No.Date of IssuePermitted Quantity
(1.)OthersTankers2020 Not Appliacble modeOthersTankersOthersTankersNA31 Mar 201720
15.1.
(a)Whether Desalination is proposed No
    16.       Waste Water Management(During Operation)
S. No.Type/Source Quantity of Waste Water Generated (Kilolitre per Day)Treatment Capacity (Kilolitre per Day) Treatment MethodMode of DisposalOther Mode of DisposalQuantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day)Quantity of Discharged Water (Kilolitre per Day)
(1.)Produced Water25400ETPOthersSubsurface below 1000 m as per APPCB Norms.025
16.1.
(a)Total Waste Water Generation (Kilolitre per Day) 25
(b)Total Discharged Water (Kilolitre per Day) 25
(c)Total Reused Water (Kilolitre per Day) 0
    17.       Solid Waste Generation/Management
S. No.Name of Waste Item Other ItemQuantity per AnnumUnitDistance from Site(KM)Mode of TransportOther Mode of TransportMode of DisposalOther Mode of Disposal
(1.)Domestic WasteOthersDomestic Waste0.5Tons0.5OthersNAOthersSeggregated at source
(2.)Spent oilHazardous Waste (as per Hazardous and Other Waste Management rules 2016)0.2Kilolitre0.5OthersNAOthersSent to APPCB authorized recyclers
18.
    18.1.     Air Quality Impact Prediction
S. No.Criteria Pollutants Other Criteria PollutantsUnitBaseline ConcentrationDistance GLCIncremental ConcentrationTotal GLCPrescribed Standard
(1.)PM10Microgram per Meter Cube55.11.8055.1100
(2.)PM2.5Microgram per Meter Cube26.91.8026.960
(3.)SO2Microgram per Meter Cube10.81.80.14210.94280
(4.)NOxMicrogram per Meter Cube12.01.816.0628.0680
    18.2.     Stack Details
S. No.Source FuelStack Height(m)Stack Diameter(m)PollutantsOther PollutantsEmission (GLS)
(1.)Gas based power plant at EPSGas100.18NOx232 g/s
19.
Power Requirement:
(a)Quantity (Kilo Volt Amps (kVA)) 50
(b)Source Gas based power plant at EPS
(c)Uploaded Copy of Agreement Not Applicable
(d)Standby Arrangement (Details of DG Sets) NA
(e)Stack Height (in m) 10
20.
Land Ownership Pattern:
(a)Forest Land (ha.) 0
(b)Private Land (ha.) 7.04
(c)Government Land (ha.) 0
(d)Revenue Land (ha.) 0
(e)Other Land (ha.) 0
    Total Land (ha.) 7.04
21.
Present Land Use Breakup of the Study Area in Ha:
(a)Agriculture Area (ha.) 5754.7
(b)Waste/Barren Land (ha.) 412.6
(c)Grazing/ Community Land (ha.) 0
(d)Surface Water Bodies (ha.) 21778
(e)Settlements (ha.) 1023
(f)Industrial (ha.) 0
(g)Forest (ha.) 0
(h)Mangroves (ha.) 186
(i)Marine Area (ha.) 1670
(j)Others (ha.) : Swamps and wetlands 829
    Total (ha.) 31653.3
    22.     Land requirement for various activities
S. No.Description of Activity / Facility / Plant / Others OthersLand Requirement (ha.)Remarks
(1.)Built Up Area1
(2.)Green belt2
(3.)OthersStorage and utilities0.5
(4.)Main Plant3Vacant area for future expansion
(5.)Safety Zone0.5road & pathways
Total (ha.) 7
23.
Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Sanctuaries; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones :
    23.1.     Details of Ecological Sensitivity :
S. No.Details of Ecological Sensitivity NameDistance from the Project (Km)Remarks
(1.)Critically Polluted AreaNA0NA
(2.)WLSNA0NA
(3.)NPANA0NA
(4.)ESAsNA0NA
(5.)CorridorsNA0NA
(6.)Wildlife CorridorsNA0NA
(7.)ESZsNA0NA
    23.2.     Details of Environmental Sensitivity :
S. No.Details of Environmental Sensitivity Other Details of Environmental Sensitivity NameDistance from the Project (Km)Remarks
(1.)ForestNA0NA
(2.)Defence InstallationsNA0NA
(3.)Archaeological SitesNA0NA
23.3.
(a)Whether Noc / Permission from the competent authority is required? No
(b)Whether NBWL recommendation is required? No
24.
Forest Land:
Whether any Forest Land involved? No
25.
Tree Cutting:
(a)No. of Trees Cut for the Project (if Forest Land not Involved) 0
(b)Details of Tree Cutting and Planting of Trees Not Applicable
26.
Land Acquisition Status:
(a)Acquired Land(Ha) 7.04
(b)Land yet to be acquired(Ha) 0
(c)Status of Land acquisition if not acquired 0
27.
Rehabilitation and Resettlement (R&R):
(a)No. of Villages 0
(b)No. of Households 0
(c)No. of PDFs (Project Displaced Families) 0
(d)No. of PAFs (Project Affected Families) 0
(e)Funds Allocated for R&R(in INR) (in Lacs) 0
(f)Status of R&R Yet To Start
28.
Details of Presence of Schedule-I Species:
(a)Whether there is Presence of Schedule-I Species ? Yes
(i)Details of Schedule-I Species Pavo cristatus, Gracula Sp.
(b)Whether conservation plan for Schedule-I Species has been prepared ? No
(c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? No
29.
Details of Presence of Water Bodies in Core Area:
(a)Whether there is Presence of Water Bodies in Core Area ? No
(b)Whether there is Diversion Required ? No
(c)Whether permission has been obtained from competent authority ? No
30.
Details of Presence of Water Bodies in Buffer Area:
(a)Whether there is Presence of Water Bodies in Buffer Area ? Yes
(i)Details of Water Bodies in Buffer Area Upputeru River
(ii)Direction of Water Bodies in Buffer Area South West
(iii)Distance of Water Bodies in Buffer Area 3.8
31.
Manpower Requirement:
(a)Permanent Employment-During Construction 0
(b)Permanent Employment-During Operation 8
(c)Temporary Employment- During Construction 25
(d)Temporary Employment- During Operation 0
(e)No. of working days 365
(f)Total Manpower 33
32.
Green Belt in Ha:
(a)Total Area of Green Belt 2.32
(b)Percentage of Total Project Area NaN
(c)No. of Plants to be Planted 1000
(d)Funds Allocated for Plantation 5000000
(e)Uploaded Green Belt plan Copy of Green Belt Plan
    33.         Project Benefits
S. No.Type of Project Benefits Details of Project Benefits
(1.)EnvironmentalSustainable livelihood and strengthening of village Self Help Groups
(2.)FinancialIncrease in purchasing power and improved standard of living of the area
(3.)SocialThe basic requirement of the community needs will be strengthened by extending health care, educational facilities to the community, building/strengthening of existing roads in the area
   34.   CRZ Specific Details : Not Applicable
   35.   Sector Specific Details : NOT APPLICABLE
   35.   Sector Specific Details For Industrial Projects - 2
S. No.Item Details
S. No.Item Details
36.
Details of Court Cases:
(a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? No
37.
Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act:
(a)Whether any Direction issued under EPA Act/Air Act/Water Act ? No
38.
Details of EIA Consultant:
(a)Have you hired Consultant for preparing document? Yes
(i)Accreditation No. NABET/EIA/1619/RA0049
(ii)Name of the EIA Consultant Bhagavathi Ana Labs Pvt Ltd
(iii)Address Plot No. 7-2-C14, Industrial Estate, Sanath Nagar, Hyderabad 500018
(iv)Mobile No. 9391116139
(v)Landline No. 0402380380
(vi)Email Id shyam.sundar@in.bureauveritas.com
(vii)Category of Accreditation A
(viii)Sector of Accreditation Industrial Projects - 2
(ix)Validity of Accreditation 01 Jun 2019
(x)Uploaded Certificate of Accreditation certified by QCI/NABET Copy of Certificate of Accreditation
39.
Documents to be Attached:
(a)Uploaded Copy of EIA/EMP Report Copy of EIA/EMP
Copy of EIA/EMP(Annexures)
Copy of EIA/EMP(Plans/Figures)
(b)Uploaded Copy of Risk Assessment Report Copy of Risk Assessment
(c)Uploaded Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan
(d)Uploaded Copy of Final Layout Plan Copy of Final Layout Plan
(e)Uploaded Cover Letter Copy of Cover Letter
(f)Uploaded Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency
(g)Uploaded Additional File Copy of Additional File
(h)Uploaded Proposal Presentation (To be given in EAC meeting) NA
            Essential Detail Sought:
Sno. EDS Letter Remarks Date of EDS
1.NAForm-2 is not visible. 06 Oct 2018
2.NAThe correction have been made as per the instruction received 08 Oct 2018
3.NAPlease submit copy of the ToR amendment dated 8/8/2018. Also, please confirm applicability of the EIA Notification, 2006 for establishment of EPS along with the categorization in terms of the Schedule. 15 Oct 2018
4.NAThe correction have been made as per the instruction received 16 Oct 2018
5.NAConstruction of EPS as proposed may not be covered under item 1(b) of the schedule to the EIA Notification, 2006. In fact, such a structure is one of the allied facilities for oil & gas development and production from the wells having ECs, and should be integrated with that. 25 Oct 2018
6.NAThe correction have been made as per the instruction received 31 Oct 2018
7.NAPlease submit reply to our observations vide query dated 25/10/2018 for further consideration of the proposal. 07 Nov 2018
8.NAThe correction have been made as per the instruction received 12 Nov 2018
9.NAPlease see our earlier observations vide query dated 25/10/2018, reiterated on 7/11/2018, for the needful and further action into the matter. 20 Nov 2018
10.NAThe correction have been made as per the instruction received 22 Nov 2018
11.NAPlease refer our earlier observations regarding applicability of the EIA Notification, 2006 to the project. In case, the proposed EPS is one of the associated facilities of the project for which EC was granted on 31/10/2018, then proposal may be submitted for amendment in the said EC. 04 Dec 2018
      Additional Detail Sought : NIL
Undertaking
I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief. And I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity/ construction/ expansion has since been taken up.
Name of Applicant
DesignationChiefGeneralManager
Name of Company (Applicant Name should not be given here)ONGC
AddressCorporate HSE, 8th Floor Core IV, SCOPE Minar, Delhi 10092
Print