Form-2
APPLICATION FOR PRIOR ENVIRONMENTAL CLEARANCE
S. No.Item Details
1.
Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? No
Details of Project:
(a)Name of the project(s) Ms Sunshine Laminate Pvt Ltd
(b)Name of the Company / Organisation SUNSHINE LAMINATE PVT LTD
(c)Registered Address Survey no. 1023(Old 852/1-A), Vadu-Ghumsan Road, Village: Dangarwa, Tal: Kadi, Ahmedabad-Mehsana Highway, Dist: Mehsana, Gujarat,,Mahesana,Gujarat-382705
(d)Legal Status of the Company Private
(e)Joint Venture No
2.
Address for the correspondence:
(a)Name of the Applicant Sankarsingh Surajmal Rajpurohit
(b)Designation (Owner/ Partner/ CEO) ManagingDirector
(c)Address 69, Shivalay Tenament, Behind Gayatri Mandir, Kalol-382721, Gujarat, India,,Kadi,Mahesana,Gujarat-382705
(d)Pin code 382705
(e)E-mail ecsunshinelaminate@gmail.com
(f)STD Code. 2764(f)Telephone No. 33748
(g)Fax No.
(h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . Annexure-Uploaded Copy of documents in support of the competence/authority
3.
Category of the Project/Activity as per Schedule of EIA Notification,2006:
(a.I)Project/Activity5(f) Synthetic organic chemicals industry (dyes & dye intermediates; bulk
Minor Activity
(b)Category A
(c)Proposal Number IA/GJ/IND2/70318/2017
(d)Master Proposal Number(Single Window) SW/79376/2018
(e)EAC concerned (for category A Projects only) Industrial Projects - 2
(f)Project Type Fresh EC
4.
Location of the Project:
(a)Plot/Survey/Khasra No. Survey No. 1023 (old 852/1-A
(b)Pincode 382705
(c)Bounded Latitudes (North)
From
Degree 23.351275
Minutes
Second
From
Degree 23.352447
Minutes
Second
(d)Bounded Longitudes (East)
From
Degree 72.473833
Minutes
Second
From
Degree 72.474089
Minutes
Second
(e)Survey of India Topo Sheet No. 46A/7
(f)Uploaded Topo Sheet File Copy of Topo Sheet File
(g)Maximum Elevation Above Means Sea Level(AMSL) 80
(h)Uploaded (kml) File Copy of Kml File      
(i)Distance of Nearest HFL from the project boundary within the study area 24
(j)Seismic Zone 3
5.
(a)Number of States in which Project will be Executed 1
(b)Main State of the project Gujarat
Details of State(s) of the project
S. No. State Name District Name Tehsil Name Village Name
(1.)GujaratMahesanaKadi
(2.)GujaratMahesanaKadi
6.
Details of Terms of Reference (ToR):
(a)MoEF&CC / SEIAA File Number IA-J-11011/533/2017-IA-II(I)
(b)Date of Apply of TOR 03 Nov 2017
(c)Date of Issue of TOR / Standard ToR 09 Dec 2017
(d)Previous TOR Letter Copy of Previous TOR letter
7.
Details of Public Consultation:
(a)Whether the Project Exempted from Public Hearing?No
(b)Whether details of Public Hearing available? Yes
(c)Whether Public hearing was presided over by an officer of the rank of Additional District Magistrate or above Yes
     7.1.       Details of Public Hearing
S. No.Details of Advertisement Details of Public Hearing Venue Location DetailsNo. of People AttendedIssues RaisedDesignation of Presiding OfficerOther Designation of Presiding Officer
(1.)
Date of Advertisement :15 May 2018
Copy of advertisement :Copy of Advertisement
Copy of Public Hearing :Copy of Public Hearing
Date :19 Jun 2018
Distance of Public Hearing Venue from the Proposed Project :0
Survey No. 1023 (old 852/1-A), Vadu-Ghumasan Road
State :Gujarat
District :Mahesana
Tehsil :Kadi
Village :Dangarwa
98Total 98 persons attended the public hearing and from them 7 persons have expressed their views; major points were related to local employment, CSR activities, plantation, waste management, etc. All pOthersRAC and ADM, Mehsana
8.
Details of Project Configuration/Product:
     8.1.       Project Configuration
S. No.Plant/Equipment/FacilityConfigurationRemarks
(1.)Reactor Vessel for PF resin8 MT x 1 No.
(2.)Reactor Vessel for MF resin3 MT x 1 No.
(3.)Reactor Vessel for UF resin8 MT x 1 No.
(4.)Hydraulic Press14 delight x 2 Nos.
(5.)Kraft Paper5 Zone x 1 No.
(6.)Design Paper3 Zone x 2 Nos.
(7.)Kraft Paper4 Zone x 1 No.
     8.2.       Product
S. No.Product/Activity (Capacity/Area)QuantityUnitOther UnitMode of Transport / Transmission of ProductOther Mode of Transport / Transmission of Product
(1.)Decorative & industrial laminated sheet900Tons per AnnumRoad
(2.)PF Resin or UF Resin or MF Resin8400Tons per AnnumRoad
9.
In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii):
Details Not Applicable
9.1.
Details of Consent to Operate
(i)Whether Consent to operate obtained ? NA
(ii)Copies of all Consent to operate obtained since inception NA
(iii)Date of Issue N/A
(iv)Valid Upto N/A
(v)File No. NA
(vi)Application No. NA
(vii)Copy of Consent to operate valid as on date NA
10.
Project Cost:
(a)Total Cost of the Project at current price level (in Crores) 1.35
(b) Funds Allocated for Environment Management (Capital) (in Crores) 0.35
(c) Funds Allocated Towards CER (Corporate Environment Responsibility) (in Crores) 0.034
(d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in Crores) 0.087
11.
Whether project attracts the General Condition specified in the Schedule of EIA Notification ? No
12.
Whether project attract the Specific Condition specified in the Schedule of EIA Notification ? No
13.
Raw Material / Fuel Requirement:
(a)Proposed quantity of raw material/fuel 28002
(b)Existing quantity of raw material/fuel N/A
(c)Total quantity of raw material/fuel 28002
    13.1.        Raw Material / Fuel Profile
S. No.Raw Material / Fuel QuantityUnitOther UnitSource (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received )Mode of TransportOther Mode of TransportDistance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received)Type of Linkage Other Type of Linkage Uploaded Copy of Linkage
(1.)Kraft Paper3780Tons per AnnumLocalRoad100 MoUCopy of Linkage
(2.)Agro Waste or Sawdust or Wood144Tons per AnnumlocalRoad50 MoUCopy of Linkage
(3.)Acetic Acid42Tons per AnnumLocalRoad25 MoUCopy of Linkage
(4.)Methanol1198.8Tons per AnnumkandlaRoad550 MoUCopy of Linkage
(5.)Phenol4057.2Tons per AnnumkandlaRoad550 MoUCopy of Linkage
(6.)Melamine3360Tons per AnnumLocalRoad50 MoUCopy of Linkage
(7.)Formaldehyde 37%4998Tons per AnnumlocalRoad100 MoUCopy of Linkage
(8.)Caustic Soda42Tons per AnnumLocalRoad50 MoUCopy of Linkage
(9.)Design Paper540Tons per AnnumLocalRoad150 MoUCopy of Linkage
(10.)Urea3360Tons per AnnumLocalRoad100 MoUCopy of Linkage
(11.)PF Resin or UF resin or MF resin6480Tons per AnnumInhouseOthersDrums0 CaptiveCopy of Linkage
14.
Baseline Data :
(a)Period of Base Line Data Collection FROM 01 Oct 2017 To 31 Dec 2017
(b)Season Post-Monsoon
    14.1.     No. of ambient Air Quality (AAQ) monitoring locations : 8
S. No.Criteria Pollutants Other Criteria PollutantsUnitMaximum ValueMinimum Value98 Percentile ValuePrescribed Standard
(1.)PM10Micro Gram per Meter Cube79.6054.8779.41100
(2.)NOxMicro Gram per Meter Cube34.1812.8633.2680
(3.)PM2.5Micro Gram per Meter Cube40.1819.8840.1260
(4.)SO2Micro Gram per Meter Cube18.9510.0118.9380
(5.)OthersCOMili Gram per Meter Cube0002
    14.2.     No. of Ground Water monitoring locations : 8
S. No.Criteria Pollutants Other Criteria PollutantsHeavy MetalUnitOther UnitMaximum ValueMinimum ValueDesirable LimitMaximum Permissible Limit
(1.)pHNA7.97.496.50
(2.)TDSmg/l16026785002000
(3.)Chloridesmg/l5212012501000
(4.)Fluoridemg/l1.520.5111.5
(5.)OthersTotalAlkalinitymg/l348256200600
(6.)Total Hardnessmg/l477225200600
(7.)TSSmg/l754200
(8.)Heavy MetalsIronmg/l6.56.50.30
    14.3.     No. of Surface Water monitoring locations : 5
S. No.Criteria Pollutants Other Criteria PollutantsUnitOther UnitMaximum ValueMinimum ValueClassification of inland water body
(1.)DOmg/l5.83.6B
(2.)CODmg/l10781E
(3.)OthersTDSmg/l1921678E
(4.)BODmg/l48.1536.45E
(5.)pHNA8.27.43A
    14.4.     No. of Ambient Noise monitoring locations : 8
S. No.Parameter UnitMaximum ValueMinimum ValuePrescribed Standard
(1.)Leq(Day)A-weighted decibels(dB(A))62.353.155
(2.)Leq(Night)A-weighted decibels(dB(A))51.130.245
    14.5.     No. of Soil Sample Monitored locations : 8
S. No.Parameter UnitOther UnitMaximum ValueMinimum Value
(1.)pHOthersNA8.37.2
(2.)Electric ConductivityOthersMicrosiemens per centimeter1052.0315.5
(3.)N(Nitrogen)Milligram per Kilogram69.234.3
(4.)P(Phosphorus)Milligram per Kilogram8.21.9
(5.)K(Potassium)Milligram per Kilogram53.613.2
14.6.
Details of Ground Water Table:
(a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) From 10 To 20
(b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) From 10 To 20
(c)Whether Ground Water Intersection will be there ? No
     15.      Details of Water Requirement (During Operation)
S. No.Source Source Other Required Quantity (Kilolitre per Day (Kld))Distance from SourceCopy of Permission from Competent Authority Mode of TransportOther Mode of TransportMethod of Water WithdrawalOther Method of Water WithdrawalLetter No.Date of IssuePermitted Quantity
(1.)OthersBorewell340Copy of Permission LetterPipelineOthersBorewellApplication under process20 Sep 201834
15.1.
(a)Whether Desalination is proposed No
    16.       Waste Water Management(During Operation)
S. No.Type/Source Quantity of Waste Water Generated (Kilolitre per Day)Treatment Capacity (Kilolitre per Day) Treatment MethodMode of DisposalOther Mode of DisposalQuantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day)Quantity of Discharged Water (Kilolitre per Day)
(1.)Domestic22NoneOtherssoak pit02
(2.)Industrial77ETP followed by evaporatorReuse within the Plant & Recycling7
(3.)scrubber22NoneReuse within the Plant & Recycling2
16.1.
(a)Total Waste Water Generation (Kilolitre per Day) 11
(b)Total Discharged Water (Kilolitre per Day) 2
(c)Total Reused Water (Kilolitre per Day) 9
    17.       Solid Waste Generation/Management
S. No.Name of Waste Item Other ItemQuantity per AnnumUnitDistance from Site(KM)Mode of TransportOther Mode of TransportMode of DisposalOther Mode of Disposal
(1.)Used oilHazardous Waste (as per Hazardous and Other Waste Management rules 2016)30Kilolitre42RoadAuthorized Recyclers
(2.)Resin residueHazardous Waste (as per Hazardous and Other Waste Management rules 2016)250Kilolitre187RoadOthersCHWIF
(3.)FlyashFly Ash37Tons0RoadOthersBrick manufacturer
(4.)Discarded ContainersHazardous Waste (as per Hazardous and Other Waste Management rules 2016)137480Tons65.4RoadAuthorized Recyclers
(5.)ETP sludgeHazardous Waste (as per Hazardous and Other Waste Management rules 2016)24Tons59.3RoadTreatment, Storage and Disposal Facility(TSDF)
(6.)Plastic wastePlastic Waste4800Kilolitre0RoadAuthorized Recyclers
(7.)Evaporator saltHazardous Waste (as per Hazardous and Other Waste Management rules 2016)69Tons59.3Road,Conveyor BeltTreatment, Storage and Disposal Facility(TSDF)
(8.)Spent carbonHazardous Waste (as per Hazardous and Other Waste Management rules 2016)14.4Tons187RoadOthersCHWIF
18.
    18.1.     Air Quality Impact Prediction
S. No.Criteria Pollutants Other Criteria PollutantsUnitBaseline ConcentrationDistance GLCIncremental ConcentrationTotal GLCPrescribed Standard
(1.)PM10Microgram per Meter Cube79.601.51.4722881.07228100
(2.)SO2Microgram per Meter Cube18.951.52.5698021.5198080
(3.)NOxMicrogram per Meter Cube34.181.50.9235235.1056380
(4.)PM2.5Microgram per Meter Cube00000
    18.2.     Stack Details
S. No.Source FuelStack Height(m)Stack Diameter(m)PollutantsOther PollutantsEmission (GLS)
(1.)boiler & TFHcoal/lignite or Agrowaste/ saw dust/ wood321.1NOx0.828
(2.)Boiler & TFHCoal/lignite or Agro waste/ sawdust/wood321.1PM101.32
(3.)boiler & TFHCoal/Lignite or Agrowaste/ saw dust/ wood321.1SO22.304
19.
Power Requirement:
(a)Quantity (Kilo Volt Amps (kVA)) 400
(b)Source Uttar Gujarat Vij Company
(c)Uploaded Copy of Agreement Copy of Agreement
(d)Standby Arrangement (Details of DG Sets) 350kVA*1 No.
(e)Stack Height (in m) 7
20.
Land Ownership Pattern:
(a)Forest Land (ha.) 0
(b)Private Land (ha.) 0
(c)Government Land (ha.) 0
(d)Revenue Land (ha.) 0
(e)Other Land (ha.) 1.32
    Total Land (ha.) 1.32
21.
Present Land Use Breakup of the Study Area in Ha:
(a)Agriculture Area (ha.) 25402.6
(b)Waste/Barren Land (ha.) 2637.6
(c)Grazing/ Community Land (ha.) 0
(d)Surface Water Bodies (ha.) 910.6
(e)Settlements (ha.) 1099
(f)Industrial (ha.) 1350.2
(g)Forest (ha.) 0
(h)Mangroves (ha.) 0
(i)Marine Area (ha.) 0
(j)Others (ha.) : None 0
    Total (ha.) 31399.999999999996
    22.     Land requirement for various activities
S. No.Description of Activity / Facility / Plant / Others OthersLand Requirement (ha.)Remarks
(1.)Built Up Area0.4560
(2.)Green belt0.4357
(3.)OthersOpen&Paved0.4286
Total (ha.) 1.3203
23.
Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Sanctuaries; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones :
    23.1.     Details of Ecological Sensitivity :
S. No.Details of Ecological Sensitivity NameDistance from the Project (Km)Remarks
(1.)NPANone0None
(2.)ESAsNone0None
(3.)ESZsNone0None
(4.)WLSthol lake bird sanctuary23.6None
(5.)Critically Polluted AreaNone0None
(6.)CorridorsNone0None
(7.)Wildlife CorridorsNone0None
    23.2.     Details of Environmental Sensitivity :
S. No.Details of Environmental Sensitivity Other Details of Environmental Sensitivity NameDistance from the Project (Km)Remarks
(1.)Forestnone0none
(2.)Archaeological Sitesnone0none
(3.)Defence Installationsnone0none
23.3.
(a)Whether Noc / Permission from the competent authority is required? No
(b)Whether NBWL recommendation is required? No
24.
Forest Land:
Whether any Forest Land involved? No
25.
Tree Cutting:
(a)No. of Trees Cut for the Project (if Forest Land not Involved) 0
(b)Details of Tree Cutting and Planting of Trees Not Applicable
26.
Land Acquisition Status:
(a)Acquired Land(Ha) 1.3203
(b)Land yet to be acquired(Ha) 0
(c)Status of Land acquisition if not acquired land already aquired
27.
Rehabilitation and Resettlement (R&R):
(a)No. of Villages 0
(b)No. of Households 0
(c)No. of PDFs (Project Displaced Families) 0
(d)No. of PAFs (Project Affected Families) 0
(e)Funds Allocated for R&R(in INR) (in Lacs) 0
(f)Status of R&R Completed
28.
Details of Presence of Schedule-I Species:
(a)Whether there is Presence of Schedule-I Species ? Yes
(i)Details of Schedule-I Species Pavocristatus-Indian pea fowl
(b)Whether conservation plan for Schedule-I Species has been prepared ? Yes
(i)Uploaded copy of conservation plan Copy of conservation plan
(ii)Fund Provision made Rs. 50000
(iii)Period of Implementation 2 years
(c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? No
29.
Details of Presence of Water Bodies in Core Area:
(a)Whether there is Presence of Water Bodies in Core Area ? Yes
(i)Details of Water Bodies in Core Area Lake in villages and Narmada Canal
(b)Whether there is Diversion Required ? No
(c)Whether permission has been obtained from competent authority ? No
30.
Details of Presence of Water Bodies in Buffer Area:
(a)Whether there is Presence of Water Bodies in Buffer Area ? Yes
(i)Details of Water Bodies in Buffer Area Lake in Chandarda Village
(ii)Direction of Water Bodies in Buffer Area West
(iii)Distance of Water Bodies in Buffer Area 5.3
31.
Manpower Requirement:
(a)Permanent Employment-During Construction 0
(b)Permanent Employment-During Operation 50
(c)Temporary Employment- During Construction 0
(d)Temporary Employment- During Operation 0
(e)No. of working days 365
(f)Total Manpower 50
32.
Green Belt in Ha:
(a)Total Area of Green Belt 0.4357
(b)Percentage of Total Project Area 33.01
(c)No. of Plants to be Planted 1075
(d)Funds Allocated for Plantation 645000
(e)Uploaded Green Belt plan Copy of Green Belt Plan
    33.         Project Benefits
S. No.Type of Project Benefits Details of Project Benefits
(1.)EnvironmentalAdequate EPCM will be provided to mitigate environmental impacts.
   34.   CRZ Specific Details : Not Applicable
   35.   Sector Specific Details : NOT APPLICABLE
   35.   Sector Specific Details For Industrial Projects - 2
S. No.Item Details
S. No.Item Details
36.
Details of Court Cases:
(a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? No
37.
Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act:
(a)Whether any Direction issued under EPA Act/Air Act/Water Act ? No
38.
Details of EIA Consultant:
(a)Have you hired Consultant for preparing document? Yes
(i)Accreditation No. NABET/EIA/1821/ RA0102
(ii)Name of the EIA Consultant Envision Enviro Technologies Pvt. Ltd.
(iii)Address 3rd Floor, Shri Ram Complex, Above Bank of India, Surat-Dumas Road, Piplod, Surat-395 007, Gujarat.
(iv)Mobile No. 9428001875
(v)Landline No. 0261222300
(vi)Email Id info@en-vision.in
(vii)Category of Accreditation A
(viii)Sector of Accreditation Industrial Projects - 2
(ix)Validity of Accreditation 06 Dec 2020
(x)Uploaded Certificate of Accreditation certified by QCI/NABET Copy of Certificate of Accreditation
39.
Documents to be Attached:
(a)Uploaded Copy of EIA/EMP Report Copy of EIA/EMP
Copy of EIA/EMP(Annexures)
Copy of EIA/EMP(Plans/Figures)
(b)Uploaded Copy of Risk Assessment Report Copy of Risk Assessment
(c)Uploaded Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan
(d)Uploaded Copy of Final Layout Plan Copy of Final Layout Plan
(e)Uploaded Cover Letter Copy of Cover Letter
(f)Uploaded Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency
(g)Uploaded Additional File Copy of Additional File
(h)Uploaded Proposal Presentation (To be given in EAC meeting) NA
            Essential Detail Sought:
Sno. EDS Letter Remarks Date of EDS
1.NAReply to our earlier observation regarding the clearance required for ground water withdrawal is not convincing. information may please be updated. 29 Sep 2018
2.NAThe correction have been made as per the instruction received 02 Nov 2018
      Additional Detail Sought : NIL
Undertaking
I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief. And I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity/ construction/ expansion has since been taken up.
Name of ApplicantSankarsingh Surajmal Rajpurohit
DesignationManagingDirector
Name of Company (Applicant Name should not be given here)SUNSHINE LAMINATE PVT LTD
AddressSurvey no. 1023(Old 852/1-A), Vadu-Ghumsan Road, Village: Dangarwa, Tal: Kadi, Ahmedabad-Mehsana Highway, Dist: Mehsana, Gujarat
Print