1. | Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? | No | Details of Project: | (a)Name of the project(s) | INFOCUS REMEDIES PVT LTD | (b)Name of the Company / Organisation | INFOCUS REMEDIES PVT LTD | (c)Registered Address | C-609, Dev Auram, Anand Nagar Cross Road, Prahlad Nagar Road, Vejalpur, Ahmedabad,,Ahmedabad,Gujarat-380015 | (d)Legal Status of the Company | Others | (e)Joint Venture | No | |
|
2. | Address for the correspondence: | (a)Name of the Applicant | Aditya M Sadaria | (b)Designation (Owner/ Partner/ CEO) | Director | (c)Address | C-609, Dev Auram, Anand Nagar Cross Road, Prahalad Nagar Road, Vejalpur, Ahmedabad,,Ahmedabad City,Ahmedabad,Gujarat-380015 | (d)Pin code | 380015 | (e)E-mail | infocus.remedies@gmail.com | (f)STD Code. | 79(f)Telephone No. | 26583077 | (g)Fax No. | | (h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . | Annexure-Uploaded Copy of documents in support of the competence/authority | |
|
3. | Category of the Project/Activity as per Schedule of EIA Notification,2006: | (a.I)Project/Activity | 5(f) Synthetic organic chemicals industry (dyes & dye intermediates; bulk
| Minor Activity | 5(f) Synthetic organic chemicals industry (dyes & dye intermediates; bulk
| (b)Category | A | (c)Proposal Number | IA/GJ/IND2/70401/2017 | (d)Master Proposal Number(Single Window) | SW/78708/2018 | (e)EAC concerned (for category A Projects only) | Industrial Projects - 2 | (f)Project Type | Fresh EC |
|
|
4. | Location of the Project: | (a)Plot/Survey/Khasra No. | Survey No. 1530 | (b)Pincode | 382715 | (c)Bounded Latitudes (North) | | From | | Degree | 23.342131 | Minutes | | Second | | From | | Degree | 23.342383 | Minutes | | Second | | (d)Bounded Longitudes (East) | | From | | Degree | 72.410550 | Minutes | | Second | | From | | Degree | 72.412864 | Minutes | | Second | | (e)Survey of India Topo Sheet No. | F43A7 | (f)Uploaded Topo Sheet File | Copy of Topo Sheet File | (g)Maximum Elevation Above Means Sea Level(AMSL) | 79 | (h)Uploaded (kml) File | Copy of Kml File | (i)Distance of Nearest HFL from the project boundary within the study area | 30 | (j)Seismic Zone | 3 | |
|
5. | (a)Number of States in which Project will be Executed | 1 | (b)Main State of the project | Gujarat | |
|
|
Details of State(s) of the project |
---|
S. No. | State Name | District Name | Tehsil Name | Village Name |
---|
(1.) | Gujarat | Mahesana | Kadi | | (2.) | Gujarat | Mahesana | Kadi | | |
|
6. | Details of Terms of Reference (ToR): | (a)MoEF&CC / SEIAA File Number | IA-J-11011/530/2017-IA-II(I) | (b)Date of Apply of TOR | 31 Oct 2017 | (c)Date of Issue of TOR / Standard ToR | 09 Dec 2017 | (d)Previous TOR Letter | Copy of Previous TOR letter | |
|
7. | Details of Public Consultation: | (a)Whether the Project Exempted from Public Hearing? | No | (b)Whether details of Public Hearing available? | Yes | (c)Whether Public hearing was presided over by an officer of the rank of Additional District Magistrate or above | Yes | |
|
7.1. Details of Public Hearing |
---|
|
S. No. | Details of Advertisement | Details of Public Hearing | Venue | Location Details | No. of People Attended | Issues Raised | Designation of Presiding Officer | Other Designation of Presiding Officer |
---|
(1.) | | Copy of Public Hearing : | Copy of Public Hearing | Date : | 23 Jul 2018 | Distance of Public Hearing Venue from the Proposed Project : | 7.6 |
| Champaben Ratilal Patel Town Hall | State : | Gujarat | District : | Mahesana | Tehsil : | Kadi | Village : | Kadi |
| 61 | public asked about end-use of products, employment generation opportunities, disposal of hazardous waste, greenbelt plantations, women empowerment classes, safety of workers, and disposal of industria | Others | Resident Additional Collector and Additional District Magistrate | |
8. | Details of Project Configuration/Product: | |
|
8.1. Project Configuration |
---|
S. No. | Plant/Equipment/Facility | Configuration | Remarks |
---|
(1.) | Process Reactor | 5.0 KL | 8 Nos. | (2.) | Crystallization Reactor | 8.0 KL | 5 Nos. | (3.) | Reaction Reactor | 5.0 KL | 8 Nos. | (4.) | Heat Exchanger | 20 m2 | | (5.) | Fluid Bed Dryer | 1250 Kg/hr | | (6.) | Fluid Bed Dryer | 1500 Kg/hr | | (7.) | Distillation Reactor | 5.0 KL | 2 Nos. | (8.) | Distillation Column | 5 m | 2 Nos. | (9.) | Ejector | 40 Torr | 2 Nos. | (10.) | Pulverizer | 4 Nos. | | (11.) | Classifier | 2 Nos. | | (12.) | Spray Dryer | 1500 Kg/Hr | 1 Sets | (13.) | Boiler | 3 TPH | | (14.) | Thermic fluid heater | 10 lac Kcal/hr | | (15.) | Hot air generator | 20 lac Kcal/hr | | (16.) | Heat Exchanger | 20 m2 | | (17.) | Continuous Centrifuge | 48" | | (18.) | Decanter Centrifuge | 48" | | (19.) | Decanter Centrifuge | 48" | | (20.) | DG Set | 250 kVA | | (21.) | Receiver | 4.0 KL | 4 Nos. | (22.) | Hot air generator | 30 lac Kcal/hr | | (23.) | Process Reactor | 8.0 KL | 8 Nos. | (24.) | Filter Press | 48" | 3 Nos. | (25.) | Boiler | 2 TPH | | |
8.2. Product |
---|
S. No. | Product/Activity (Capacity/Area) | Quantity | Unit | Other Unit | Mode of Transport / Transmission of Product | Other Mode of Transport / Transmission of Product |
---|
(1.) | Excipients Group 2 | 200 | Others | Tons per Month (TPM) | Road | | (2.) | Excipients Group 3 | 100 | Others | Tons per Month (TPM) | Road | | (3.) | Excipients Group 4 | 1500 | Others | Tons per Month (TPM) | Road | | (4.) | R & D | 10 | Others | Tons per Month (TPM) | Road | | (5.) | Excipients Group 1 | 500 | Others | Tons per Month (TPM) | Road | | (6.) | Active Pharmaceutical Ingredients Group 3 | 75 | Others | Tons per Month (TPM) | Road | | (7.) | Active Pharmaceutical Ingredients Group 2 | 50 | Others | Tons per Month (TPM) | Road | | (8.) | Active Pharmaceutical Ingredients Group 4 | 100 | Others | Tons per Month (TPM) | Road | | (9.) | Active Pharmaceutical Ingredients G1 Metformin HCl | 500 | Others | Tons per Month (TPM) | Road | | (10.) | Active Pharmaceutical Ingredients Group 5 | 10 | Others | Tons per Month (TPM) | Road | | |
|
9. | In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii): | Details Not Applicable | |
|
9.1. | Details of Consent to Operate | (i)Whether Consent to operate obtained ? | NA | (ii)Copies of all Consent to operate obtained since inception | NA | (iii)Date of Issue | N/A | (iv)Valid Upto | N/A | (v)File No. | NA | (vi)Application No. | NA | (vii)Copy of Consent to operate valid as on date | NA | |
|
|
10. | Project Cost: | (a)Total Cost of the Project at current price level (in Crores) | 20 | (b) Funds Allocated for Environment Management (Capital) (in Crores) | 3.50 | (c) Funds Allocated Towards CER (Corporate Environment Responsibility) (in Crores) | 0.5 | (d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in Crores) | 2.0 | |
|
11. | Whether project attracts the General Condition specified in the Schedule of EIA Notification ? | No | | |
12. | Whether project attract the Specific Condition specified in the Schedule of EIA Notification ? | No | | |
13. | Raw Material / Fuel Requirement: | (a)Proposed quantity of raw material/fuel | 48000 | (b)Existing quantity of raw material/fuel | N/A | (c)Total quantity of raw material/fuel | 48000 | |
|
  13.1. Raw Material / Fuel Profile |
---|
S. No. | Raw Material / Fuel | Quantity | Unit | Other Unit | Source (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received ) | Mode of Transport | Other Mode of Transport | Distance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received) | Type of Linkage | Other Type of Linkage | Uploaded Copy of Linkage |
---|
(1.) | attached | 48000 | Tons per Annum | | attached | Road | | 50 | Open Market | | Copy of Linkage | |
|
14. | Baseline Data : | (a)Period of Base Line Data Collection | FROM 01 Jan 2018 To 31 Mar 2018 | (b)Season | Winter | |
|
14.1. No. of ambient Air Quality (AAQ) monitoring locations : 8 |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Unit | Maximum Value | Minimum Value | 98 Percentile Value | Prescribed Standard |
---|
(1.) | SO2 | | Micro Gram per Meter Cube | 25.8 | 12.5 | 22.6 | 80 | (2.) | NOx | | Micro Gram per Meter Cube | 28.4 | 15.1 | 25.0 | 80 | (3.) | PM10 | | Micro Gram per Meter Cube | 77.3 | 53.8 | 70.7 | 100 | (4.) | PM2.5 | | Micro Gram per Meter Cube | 47.0 | 30.9 | 42.1 | 60 | |
14.2. No. of Ground Water monitoring locations : 8 |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Heavy Metal | Unit | Other Unit | Maximum Value | Minimum Value | Desirable Limit | Maximum Permissible Limit |
---|
(1.) | pH | | | NA | | 7.8 | 7.2 | 8.5 | 8.5 | (2.) | TDS | | | mg/l | | 1428 | 1097 | 500 | 2000 | (3.) | Total Hardness | | | mg/l | | 341 | 288 | 300 | 600 | (4.) | Chlorides | | | mg/l | | 642 | 341 | 250 | 1000 | (5.) | Fluoride | | | mg/l | | 0.71 | 0.62 | 1 | 1.5 | (6.) | TSS | | | mg/l | | 14.4 | 10.2 | 00 | 00 | |
14.3. No. of Surface Water monitoring locations : 5 |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Unit | Other Unit | Maximum Value | Minimum Value | Classification of inland water body |
---|
(1.) | pH | | NA | | 7.8 | 7.4 | A | (2.) | DO | | mg/l | | 6.6 | 5.1 | B | (3.) | COD | | mg/l | | 7.6 | 0 | B | (4.) | BOD | | mg/l | | 3.2 | 0 | B | |
14.4. No. of Ambient Noise monitoring locations : 9 |
---|
S. No. | Parameter | Unit | Maximum Value | Minimum Value | Prescribed Standard |
---|
(1.) | Leq(Night) | A-weighted decibels(dB(A)) | 42.0 | 38.8 | 45 | (2.) | Leq(Day) | A-weighted decibels(dB(A)) | 52.9 | 51.3 | 55 | |
14.5. No. of Soil Sample Monitored locations : 8 |
---|
S. No. | Parameter | Unit | Other Unit | Maximum Value | Minimum Value |
---|
(1.) | pH | Others | pH unit | 7.8 | 7.4 | (2.) | N(Nitrogen) | Milligram per Kilogram | | 180 | 31 | (3.) | P(Phosphorus) | Milligram per Kilogram | | 120 | 23 | (4.) | Electric Conductivity | Others | dS/m | 1.8 | 1.1 | (5.) | K(Potassium) | Milligram per Kilogram | | 210 | 108 | |
|
14.6. | Details of Ground Water Table: | (a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) | From 10 To 5 | (b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) | From 10 To 5 | (c)Whether Ground Water Intersection will be there ? | No | |
|
15. Details of Water Requirement (During Operation) |
---|
S. No. | Source | Source Other | Required Quantity (Kilolitre per Day (Kld)) | Distance from Source | Copy of Permission from Competent Authority | Mode of Transport | Other Mode of Transport | Method of Water Withdrawal | Other Method of Water Withdrawal | Letter No. | Date of Issue | Permitted Quantity |
---|
(1.) | GroundWater | | 204 | 00 | Copy of Permission Letter | Pipeline | | Others | Bore well | 21-4/4427/GJ/IND/2018 | 25 Sep 2018 | 313 | |
|
15.1. | (a)Whether Desalination is proposed | No | |
|
16. Waste Water Management(During Operation) |
---|
S. No. | Type/Source | Quantity of Waste Water Generated (Kilolitre per Day) | Treatment Capacity (Kilolitre per Day) | Treatment Method | Mode of Disposal | Other Mode of Disposal | Quantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day) | Quantity of Discharged Water (Kilolitre per Day) |
---|
(1.) | Industrial | 306 | 350 | ETP RO MEE | Reuse within the Plant & Recycling | | 306 | | (2.) | Domestic | 8 | 0 | Soak pit | Others | Soak pit | 0 | 8 | |
|
16.1. | (a)Total Waste Water Generation (Kilolitre per Day) | 314 | (b)Total Discharged Water (Kilolitre per Day) | 8 | (c)Total Reused Water (Kilolitre per Day) | 306 | |
|
17. Solid Waste Generation/Management |
---|
S. No. | Name of Waste | Item | Other Item | Quantity per Annum | Unit | Distance from Site(KM) | Mode of Transport | Other Mode of Transport | Mode of Disposal | Other Mode of Disposal |
---|
(1.) | ETP sludge | Hazardous Waste (as per Hazardous and Other Waste Management rules 2016) | | 600 | Tons | 105 | Road | | Treatment, Storage and Disposal Facility(TSDF) | | (2.) | MEE salt | Hazardous Waste (as per Hazardous and Other Waste Management rules 2016) | | 780 | Tons | 105 | Road | | Treatment, Storage and Disposal Facility(TSDF) | | (3.) | Spent solvent | Hazardous Waste (as per Hazardous and Other Waste Management rules 2016) | | 900 | Tons | 25 | Road | | Authorized Recyclers | | (4.) | Distillation residue | Hazardous Waste (as per Hazardous and Other Waste Management rules 2016) | | 900 | Tons | 25 | Road | | Others | CHWIF or co-processing | (5.) | Spent carbon | Hazardous Waste (as per Hazardous and Other Waste Management rules 2016) | | 18 | Tons | 25 | Road | | Others | CHWIF or co-processing | (6.) | Spent catalyst | Hazardous Waste (as per Hazardous and Other Waste Management rules 2016) | | 6 | Tons | 50 | Road | | Authorized Recyclers | | (7.) | Fly ash | Fly Ash | | 1500 | Tons | 20 | Road | | Others | Brick manufacturing | (8.) | Used lubricating oil | Hazardous Waste (as per Hazardous and Other Waste Management rules 2016) | | 0.5 | Kilolitre | 40 | Road | | Authorized Recyclers | | (9.) | Discarded containers, barrels and liners | Hazardous Waste (as per Hazardous and Other Waste Management rules 2016) | | 972 | Tons | 25 | Road | | Authorized Recyclers | | |
|
|
18.1. Air Quality Impact Prediction |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Unit | Baseline Concentration | Distance GLC | Incremental Concentration | Total GLC | Prescribed Standard |
---|
(1.) | PM10 | | Microgram per Meter Cube | 64.7 | 1.4 | 4.8 | 69.5 | 100 | (2.) | PM2.5 | | Microgram per Meter Cube | 37.7 | 1.4 | 4.8 | 42.5 | 60 | (3.) | NOx | | Microgram per Meter Cube | 20.4 | 1.4 | 1.1 | 21.5 | 80 | (4.) | SO2 | | Microgram per Meter Cube | 17.8 | 1.4 | 3.4 | 21.2 | 80 | |
|
18.2. Stack Details |
---|
S. No. | Source | Fuel | Stack Height(m) | Stack Diameter(m) | Pollutants | Other Pollutants | Emission (GLS) |
---|
(1.) | Thermic fluid heater (10 lac Kcal/hr) | Coal | 21 | 0.45 | Others | PM, SO2, NOx | 0 | (2.) | Hot air generator (30 lac Kcal/hr) | Coal | 21 | 0.45 | Others | PM, SO2, NOx | 0 | (3.) | DG set (250 kVA) | HSD | 11 | 0.225 | Others | PM, SO2, NOx | 0 | (4.) | Hot air generator (20 lac Kcal/hr) | Coal | 21 | 0.45 | Others | PM, SO2, NOx | 0 | (5.) | Spray Dryer | None | 21 | 0.45 | PM10 | | 0 | (6.) | Common vent of SFD - 1 | None | 11 | 0.3 | PM10 | | 0 | (7.) | Boiler (3 TPH) | Coal | 21 | 0.45 | Others | PM, SO2, NOx | 0 | (8.) | Boiler (2 TPH) | Coal | 21 | 0.45 | Others | PM, SO2, NOx | 0 | (9.) | Common vent of SFD - 2 | None | 11 | 0.3 | PM10 | | 0 | (10.) | Process vent | None | 11 | 0.3 | Others | SO2, HCl, HF | 0 | |
|
19. | Power Requirement: | (a)Quantity (Kilo Volt Amps (kVA)) | 500 | (b)Source | Uttar Gujarat Vij Company Ltd | (c)Uploaded Copy of Agreement | Not Applicable | (d)Standby Arrangement (Details of DG Sets) | 250 kVA | (e)Stack Height (in m) | 11 | |
|
20. | Land Ownership Pattern: | (a)Forest Land (ha.) | 0 | (b)Private Land (ha.) | 1.9 | (c)Government Land (ha.) | 0 | (d)Revenue Land (ha.) | 0 | (e)Other Land (ha.) | 0 | Total Land (ha.) | 1.9 | |
|
21. | Present Land Use Breakup of the Study Area in Ha: | (a)Agriculture Area (ha.) | 0 | (b)Waste/Barren Land (ha.) | 0 | (c)Grazing/ Community Land (ha.) | 0 | (d)Surface Water Bodies (ha.) | 0 | (e)Settlements (ha.) | 0 | (f)Industrial (ha.) | 1.9 | (g)Forest (ha.) | 0 | (h)Mangroves (ha.) | 0 | (i)Marine Area (ha.) | 0 | (j)Others (ha.) : 0 | 0 | Total (ha.) | 1.9 | |
|
22. Land requirement for various activities |
---|
S. No. | Description of Activity / Facility / Plant / Others | Others | Land Requirement (ha.) | Remarks |
---|
(1.) | Main Plant | | 0.207 | | (2.) | Green belt | | 0.640 | | (3.) | Others | Roads, parking | 0.565 | | (4.) | Built Up Area | | 0.487 | Admin, material storage, ETP | |
|
|
23. | Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Sanctuaries; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones : | |
|
23.1. Details of Ecological Sensitivity : |
---|
S. No. | Details of Ecological Sensitivity | Name | Distance from the Project (Km) | Remarks |
---|
(1.) | Critically Polluted Area | Vatva | 51 | None Within 10 Kilometers | (2.) | NPA | Blackbuck National Park Velavadar | 164 | None Within 10 Kilometers | (3.) | ESZs | Thol Wildlife Sanctuary | 24 | None Within 10 Kilometers | (4.) | Corridors | None Within 10 Kilometers | 00 | None Within 10 Kilometers | (5.) | WLS | Nal Sarovar Birds Sanctuary | 75 | None Within 10 Kilometers | (6.) | ESAs | Mount Abu | 133 | None Within 10 Kilometers | (7.) | Wildlife Corridors | None Within 10 Kilometers | 00 | None Within 10 Kilometers | |
23.2. Details of Environmental Sensitivity : |
---|
S. No. | Details of Environmental Sensitivity | Other Details of Environmental Sensitivity | Name | Distance from the Project (Km) | Remarks |
---|
(1.) | Forest | | None Within 10 Kilometers | 00 | None Within 10 Kilometers | (2.) | Archaeological Sites | | Adalaj Stepwell | 27 | None Within 10 Kilometers | (3.) | Defence Installations | | None Within 10 Kilometers | 00 | None Within 10 Kilometers | |
|
23.3. | (a)Whether Noc / Permission from the competent authority is required? | No | (b)Whether NBWL recommendation is required? | No | |
|
24. | Forest Land: | Whether any Forest Land involved? | No | |
|
25. | Tree Cutting: | (a)No. of Trees Cut for the Project (if Forest Land not Involved) | 00 | (b)Details of Tree Cutting and Planting of Trees | Not Applicable | |
|
26. | Land Acquisition Status: | (a)Acquired Land(Ha) | 1.9 | (b)Land yet to be acquired(Ha) | 0 | (c)Status of Land acquisition if not acquired | 00 | |
|
27. | Rehabilitation and Resettlement (R&R): | (a)No. of Villages | 00 | (b)No. of Households | 00 | (c)No. of PDFs (Project Displaced Families) | 00 | (d)No. of PAFs (Project Affected Families) | 00 | (e)Funds Allocated for R&R(in INR) (in Lacs) | 00 | (f)Status of R&R | Completed | |
|
28. | Details of Presence of Schedule-I Species: | (a)Whether there is Presence of Schedule-I Species ? | No | (b)Whether conservation plan for Schedule-I Species has been prepared ? | No | (c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? | No | |
|
29. | Details of Presence of Water Bodies in Core Area: | (a)Whether there is Presence of Water Bodies in Core Area ? | Yes | (i)Details of Water Bodies in Core Area | Pond of village Chandarda | (b)Whether there is Diversion Required ? | No | (c)Whether permission has been obtained from competent authority ? | No | |
|
30. | Details of Presence of Water Bodies in Buffer Area: | (a)Whether there is Presence of Water Bodies in Buffer Area ? | Yes | (i)Details of Water Bodies in Buffer Area | Narmada canal | (ii)Direction of Water Bodies in Buffer Area | South | (iii)Distance of Water Bodies in Buffer Area | 9.4 | |
|
31. | Manpower Requirement: | (a)Permanent Employment-During Construction | 5 | (b)Permanent Employment-During Operation | 60 | (c)Temporary Employment- During Construction | 5 | (d)Temporary Employment- During Operation | 5 | (e)No. of working days | 25 | (f)Total Manpower | 75 | |
|
32. | Green Belt in Ha: | (a)Total Area of Green Belt | 0.640 | (b)Percentage of Total Project Area | 33.68 | (c)No. of Plants to be Planted | 1600 | (d)Funds Allocated for Plantation | 450000 | (e)Uploaded Green Belt plan | Copy of Green Belt Plan | |
|
33. Project Benefits |
---|
S. No. | Type of Project Benefits | Details of Project Benefits |
---|
NIL | |
|
34. CRZ Specific Details : Not Applicable |
35. Sector Specific Details : NOT APPLICABLE |
35. Sector Specific Details For Industrial Projects - 2 |
|
|
36. | Details of Court Cases: | (a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? | No | |
|
37. | Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act: | (a)Whether any Direction issued under EPA Act/Air Act/Water Act ? | No | |
|
38. | Details of EIA Consultant: | (a)Have you hired Consultant for preparing document? | Yes | (i)Accreditation No. | Sr no. 17 | (ii)Name of the EIA Consultant | Bhagwati Enviro care Pvt. Ltd. | (iii)Address | 28,29,30 Parmeshwar Estate II, Phase I, GIDC estate, Vatva, Ahmedabad – 382445 | (iv)Mobile No. | 9824051541 | (v)Landline No. | 0793683456 | (vi)Email Id | bhagwatienviro@yahoo.com | (vii)Category of Accreditation | A | (viii)Sector of Accreditation | Industrial Projects - 2 | (ix)Validity of Accreditation | 28 Apr 2019 | (x)Uploaded Certificate of Accreditation certified by QCI/NABET | Copy of Certificate of Accreditation | |
|
|
Essential Detail Sought: |
---|
Sno. | EDS Letter | Remarks | Date of EDS |
---|
1. | NA | - As requested earlier also, please submit proof of submitting the proposal to the concerned authorities for ground water withdrawal of 204 KLD.
- Entry at item No.6 shows no details therein or attached and needs to be corrected. | 23 Sep 2018 | 2. | NA | The correction have been made as per the instruction received | 25 Sep 2018 | 3. | NA | On examination of your reply, we reiterate our earlier observations as under:-
- Entry at item No.6 shows no details therein or attached and needs to be corrected.
- No in-principle approval of the SPCB to allow such units in the non-notified area.
- The area being over exploited with regard to ground water, mere submission of the proposal to CGWA, would have no relevance.
. Information/clarification is still required i | 29 Sep 2018 | 4. | NA | The correction have been made as per the instruction received | 04 Oct 2018 | 5. | NA | None of our earlier observations vide query dated 29/9/2018 seem to have been resolved. The matter may be discussed with us in the Ministry for clarifications and to facilitate its consideration. | 10 Oct 2018 | 6. | NA | The correction have been made as per the instruction received | 16 Oct 2018 | |
Additional Detail Sought : NIL |
| Undertaking |
| I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief. And I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity/ construction/ expansion has since been taken up. |
| Name of Applicant | Aditya M Sadaria | Designation | Director | Name of Company (Applicant Name should not be given here) | INFOCUS REMEDIES PVT LTD | Address | C-609, Dev Auram, Anand Nagar Cross Road, Prahlad Nagar Road, Vejalpur, Ahmedabad |
|