Form-2
APPLICATION FOR PRIOR ENVIRONMENTAL CLEARANCE
S. No.Item Details
1.
Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? No
Details of Project:
(a)Name of the project(s) INFOCUS REMEDIES PVT LTD
(b)Name of the Company / Organisation INFOCUS REMEDIES PVT LTD
(c)Registered Address C-609, Dev Auram, Anand Nagar Cross Road, Prahlad Nagar Road, Vejalpur, Ahmedabad,,Ahmedabad,Gujarat-380015
(d)Legal Status of the Company Others
(e)Joint Venture No
2.
Address for the correspondence:
(a)Name of the Applicant Aditya M Sadaria
(b)Designation (Owner/ Partner/ CEO) Director
(c)Address C-609, Dev Auram, Anand Nagar Cross Road, Prahalad Nagar Road, Vejalpur, Ahmedabad,,Ahmedabad City,Ahmedabad,Gujarat-380015
(d)Pin code 380015
(e)E-mail infocus.remedies@gmail.com
(f)STD Code. 79(f)Telephone No. 26583077
(g)Fax No.
(h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . Annexure-Uploaded Copy of documents in support of the competence/authority
3.
Category of the Project/Activity as per Schedule of EIA Notification,2006:
(a.I)Project/Activity5(f) Synthetic organic chemicals industry (dyes & dye intermediates; bulk
Minor Activity5(f) Synthetic organic chemicals industry (dyes & dye intermediates; bulk
(b)Category A
(c)Proposal Number IA/GJ/IND2/70401/2017
(d)Master Proposal Number(Single Window) SW/78708/2018
(e)EAC concerned (for category A Projects only) Industrial Projects - 2
(f)Project Type Fresh EC
4.
Location of the Project:
(a)Plot/Survey/Khasra No. Survey No. 1530
(b)Pincode 382715
(c)Bounded Latitudes (North)
From
Degree 23.342131
Minutes
Second
From
Degree 23.342383
Minutes
Second
(d)Bounded Longitudes (East)
From
Degree 72.410550
Minutes
Second
From
Degree 72.412864
Minutes
Second
(e)Survey of India Topo Sheet No. F43A7
(f)Uploaded Topo Sheet File Copy of Topo Sheet File
(g)Maximum Elevation Above Means Sea Level(AMSL) 79
(h)Uploaded (kml) File Copy of Kml File      
(i)Distance of Nearest HFL from the project boundary within the study area 30
(j)Seismic Zone 3
5.
(a)Number of States in which Project will be Executed 1
(b)Main State of the project Gujarat
Details of State(s) of the project
S. No. State Name District Name Tehsil Name Village Name
(1.)GujaratMahesanaKadi
(2.)GujaratMahesanaKadi
6.
Details of Terms of Reference (ToR):
(a)MoEF&CC / SEIAA File Number IA-J-11011/530/2017-IA-II(I)
(b)Date of Apply of TOR 31 Oct 2017
(c)Date of Issue of TOR / Standard ToR 09 Dec 2017
(d)Previous TOR Letter Copy of Previous TOR letter
7.
Details of Public Consultation:
(a)Whether the Project Exempted from Public Hearing?No
(b)Whether details of Public Hearing available? Yes
(c)Whether Public hearing was presided over by an officer of the rank of Additional District Magistrate or above Yes
     7.1.       Details of Public Hearing
S. No.Details of Advertisement Details of Public Hearing Venue Location DetailsNo. of People AttendedIssues RaisedDesignation of Presiding OfficerOther Designation of Presiding Officer
(1.)
Date of Advertisement :21 Jun 2018
Copy of advertisement :Copy of Advertisement
Copy of Public Hearing :Copy of Public Hearing
Date :23 Jul 2018
Distance of Public Hearing Venue from the Proposed Project :7.6
Champaben Ratilal Patel Town Hall
State :Gujarat
District :Mahesana
Tehsil :Kadi
Village :Kadi
61public asked about end-use of products, employment generation opportunities, disposal of hazardous waste, greenbelt plantations, women empowerment classes, safety of workers, and disposal of industriaOthersResident Additional Collector and Additional District Magistrate
8.
Details of Project Configuration/Product:
     8.1.       Project Configuration
S. No.Plant/Equipment/FacilityConfigurationRemarks
(1.)Process Reactor5.0 KL8 Nos.
(2.)Crystallization Reactor8.0 KL5 Nos.
(3.)Reaction Reactor5.0 KL8 Nos.
(4.)Heat Exchanger20 m2
(5.)Fluid Bed Dryer1250 Kg/hr
(6.)Fluid Bed Dryer1500 Kg/hr
(7.)Distillation Reactor5.0 KL2 Nos.
(8.)Distillation Column5 m2 Nos.
(9.)Ejector40 Torr2 Nos.
(10.)Pulverizer4 Nos.
(11.)Classifier2 Nos.
(12.)Spray Dryer1500 Kg/Hr1 Sets
(13.)Boiler3 TPH
(14.)Thermic fluid heater10 lac Kcal/hr
(15.)Hot air generator20 lac Kcal/hr
(16.)Heat Exchanger20 m2
(17.)Continuous Centrifuge48"
(18.)Decanter Centrifuge48"
(19.)Decanter Centrifuge48"
(20.)DG Set250 kVA
(21.)Receiver4.0 KL4 Nos.
(22.)Hot air generator30 lac Kcal/hr
(23.)Process Reactor8.0 KL8 Nos.
(24.)Filter Press48"3 Nos.
(25.)Boiler2 TPH
     8.2.       Product
S. No.Product/Activity (Capacity/Area)QuantityUnitOther UnitMode of Transport / Transmission of ProductOther Mode of Transport / Transmission of Product
(1.)Excipients Group 2200OthersTons per Month (TPM)Road
(2.)Excipients Group 3100OthersTons per Month (TPM)Road
(3.)Excipients Group 41500OthersTons per Month (TPM)Road
(4.)R & D10OthersTons per Month (TPM)Road
(5.)Excipients Group 1500OthersTons per Month (TPM)Road
(6.)Active Pharmaceutical Ingredients Group 375OthersTons per Month (TPM)Road
(7.)Active Pharmaceutical Ingredients Group 250OthersTons per Month (TPM)Road
(8.)Active Pharmaceutical Ingredients Group 4100OthersTons per Month (TPM)Road
(9.)Active Pharmaceutical Ingredients G1 Metformin HCl500OthersTons per Month (TPM)Road
(10.)Active Pharmaceutical Ingredients Group 510OthersTons per Month (TPM)Road
9.
In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii):
Details Not Applicable
9.1.
Details of Consent to Operate
(i)Whether Consent to operate obtained ? NA
(ii)Copies of all Consent to operate obtained since inception NA
(iii)Date of Issue N/A
(iv)Valid Upto N/A
(v)File No. NA
(vi)Application No. NA
(vii)Copy of Consent to operate valid as on date NA
10.
Project Cost:
(a)Total Cost of the Project at current price level (in Crores) 20
(b) Funds Allocated for Environment Management (Capital) (in Crores) 3.50
(c) Funds Allocated Towards CER (Corporate Environment Responsibility) (in Crores) 0.5
(d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in Crores) 2.0
11.
Whether project attracts the General Condition specified in the Schedule of EIA Notification ? No
12.
Whether project attract the Specific Condition specified in the Schedule of EIA Notification ? No
13.
Raw Material / Fuel Requirement:
(a)Proposed quantity of raw material/fuel 48000
(b)Existing quantity of raw material/fuel N/A
(c)Total quantity of raw material/fuel 48000
    13.1.        Raw Material / Fuel Profile
S. No.Raw Material / Fuel QuantityUnitOther UnitSource (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received )Mode of TransportOther Mode of TransportDistance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received)Type of Linkage Other Type of Linkage Uploaded Copy of Linkage
(1.)attached48000Tons per AnnumattachedRoad50 Open MarketCopy of Linkage
14.
Baseline Data :
(a)Period of Base Line Data Collection FROM 01 Jan 2018 To 31 Mar 2018
(b)Season Winter
    14.1.     No. of ambient Air Quality (AAQ) monitoring locations : 8
S. No.Criteria Pollutants Other Criteria PollutantsUnitMaximum ValueMinimum Value98 Percentile ValuePrescribed Standard
(1.)SO2Micro Gram per Meter Cube25.812.522.680
(2.)NOxMicro Gram per Meter Cube28.415.125.080
(3.)PM10Micro Gram per Meter Cube77.353.870.7100
(4.)PM2.5Micro Gram per Meter Cube47.030.942.160
    14.2.     No. of Ground Water monitoring locations : 8
S. No.Criteria Pollutants Other Criteria PollutantsHeavy MetalUnitOther UnitMaximum ValueMinimum ValueDesirable LimitMaximum Permissible Limit
(1.)pHNA7.87.28.58.5
(2.)TDSmg/l142810975002000
(3.)Total Hardnessmg/l341288300600
(4.)Chloridesmg/l6423412501000
(5.)Fluoridemg/l0.710.6211.5
(6.)TSSmg/l14.410.20000
    14.3.     No. of Surface Water monitoring locations : 5
S. No.Criteria Pollutants Other Criteria PollutantsUnitOther UnitMaximum ValueMinimum ValueClassification of inland water body
(1.)pHNA7.87.4A
(2.)DOmg/l6.65.1B
(3.)CODmg/l7.60B
(4.)BODmg/l3.20B
    14.4.     No. of Ambient Noise monitoring locations : 9
S. No.Parameter UnitMaximum ValueMinimum ValuePrescribed Standard
(1.)Leq(Night)A-weighted decibels(dB(A))42.038.845
(2.)Leq(Day)A-weighted decibels(dB(A))52.951.355
    14.5.     No. of Soil Sample Monitored locations : 8
S. No.Parameter UnitOther UnitMaximum ValueMinimum Value
(1.)pHOtherspH unit7.87.4
(2.)N(Nitrogen)Milligram per Kilogram18031
(3.)P(Phosphorus)Milligram per Kilogram12023
(4.)Electric ConductivityOthersdS/m1.81.1
(5.)K(Potassium)Milligram per Kilogram210108
14.6.
Details of Ground Water Table:
(a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) From 10 To 5
(b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) From 10 To 5
(c)Whether Ground Water Intersection will be there ? No
     15.      Details of Water Requirement (During Operation)
S. No.Source Source Other Required Quantity (Kilolitre per Day (Kld))Distance from SourceCopy of Permission from Competent Authority Mode of TransportOther Mode of TransportMethod of Water WithdrawalOther Method of Water WithdrawalLetter No.Date of IssuePermitted Quantity
(1.)GroundWater20400Copy of Permission LetterPipelineOthersBore well21-4/4427/GJ/IND/201825 Sep 2018313
15.1.
(a)Whether Desalination is proposed No
    16.       Waste Water Management(During Operation)
S. No.Type/Source Quantity of Waste Water Generated (Kilolitre per Day)Treatment Capacity (Kilolitre per Day) Treatment MethodMode of DisposalOther Mode of DisposalQuantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day)Quantity of Discharged Water (Kilolitre per Day)
(1.)Industrial306350ETP RO MEEReuse within the Plant & Recycling306
(2.)Domestic80Soak pitOthersSoak pit08
16.1.
(a)Total Waste Water Generation (Kilolitre per Day) 314
(b)Total Discharged Water (Kilolitre per Day) 8
(c)Total Reused Water (Kilolitre per Day) 306
    17.       Solid Waste Generation/Management
S. No.Name of Waste Item Other ItemQuantity per AnnumUnitDistance from Site(KM)Mode of TransportOther Mode of TransportMode of DisposalOther Mode of Disposal
(1.)ETP sludgeHazardous Waste (as per Hazardous and Other Waste Management rules 2016)600Tons105RoadTreatment, Storage and Disposal Facility(TSDF)
(2.)MEE saltHazardous Waste (as per Hazardous and Other Waste Management rules 2016)780Tons105RoadTreatment, Storage and Disposal Facility(TSDF)
(3.)Spent solventHazardous Waste (as per Hazardous and Other Waste Management rules 2016)900Tons25RoadAuthorized Recyclers
(4.)Distillation residueHazardous Waste (as per Hazardous and Other Waste Management rules 2016)900Tons25RoadOthersCHWIF or co-processing
(5.)Spent carbonHazardous Waste (as per Hazardous and Other Waste Management rules 2016)18Tons25RoadOthersCHWIF or co-processing
(6.)Spent catalystHazardous Waste (as per Hazardous and Other Waste Management rules 2016)6Tons50RoadAuthorized Recyclers
(7.)Fly ashFly Ash1500Tons20RoadOthersBrick manufacturing
(8.)Used lubricating oilHazardous Waste (as per Hazardous and Other Waste Management rules 2016)0.5Kilolitre40RoadAuthorized Recyclers
(9.)Discarded containers, barrels and linersHazardous Waste (as per Hazardous and Other Waste Management rules 2016)972Tons25RoadAuthorized Recyclers
18.
    18.1.     Air Quality Impact Prediction
S. No.Criteria Pollutants Other Criteria PollutantsUnitBaseline ConcentrationDistance GLCIncremental ConcentrationTotal GLCPrescribed Standard
(1.)PM10Microgram per Meter Cube64.71.44.869.5100
(2.)PM2.5Microgram per Meter Cube37.71.44.842.560
(3.)NOxMicrogram per Meter Cube20.41.41.121.580
(4.)SO2Microgram per Meter Cube17.81.43.421.280
    18.2.     Stack Details
S. No.Source FuelStack Height(m)Stack Diameter(m)PollutantsOther PollutantsEmission (GLS)
(1.)Thermic fluid heater (10 lac Kcal/hr)Coal210.45OthersPM, SO2, NOx0
(2.)Hot air generator (30 lac Kcal/hr)Coal210.45OthersPM, SO2, NOx0
(3.)DG set (250 kVA)HSD110.225OthersPM, SO2, NOx0
(4.)Hot air generator (20 lac Kcal/hr)Coal210.45OthersPM, SO2, NOx0
(5.)Spray DryerNone210.45PM100
(6.)Common vent of SFD - 1None110.3PM100
(7.)Boiler (3 TPH)Coal210.45OthersPM, SO2, NOx0
(8.)Boiler (2 TPH)Coal210.45OthersPM, SO2, NOx0
(9.)Common vent of SFD - 2None110.3PM100
(10.)Process ventNone110.3OthersSO2, HCl, HF0
19.
Power Requirement:
(a)Quantity (Kilo Volt Amps (kVA)) 500
(b)Source Uttar Gujarat Vij Company Ltd
(c)Uploaded Copy of Agreement Not Applicable
(d)Standby Arrangement (Details of DG Sets) 250 kVA
(e)Stack Height (in m) 11
20.
Land Ownership Pattern:
(a)Forest Land (ha.) 0
(b)Private Land (ha.) 1.9
(c)Government Land (ha.) 0
(d)Revenue Land (ha.) 0
(e)Other Land (ha.) 0
    Total Land (ha.) 1.9
21.
Present Land Use Breakup of the Study Area in Ha:
(a)Agriculture Area (ha.) 0
(b)Waste/Barren Land (ha.) 0
(c)Grazing/ Community Land (ha.) 0
(d)Surface Water Bodies (ha.) 0
(e)Settlements (ha.) 0
(f)Industrial (ha.) 1.9
(g)Forest (ha.) 0
(h)Mangroves (ha.) 0
(i)Marine Area (ha.) 0
(j)Others (ha.) : 0 0
    Total (ha.) 1.9
    22.     Land requirement for various activities
S. No.Description of Activity / Facility / Plant / Others OthersLand Requirement (ha.)Remarks
(1.)Main Plant0.207
(2.)Green belt0.640
(3.)OthersRoads, parking0.565
(4.)Built Up Area0.487Admin, material storage, ETP
Total (ha.) 1.899
23.
Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Sanctuaries; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones :
    23.1.     Details of Ecological Sensitivity :
S. No.Details of Ecological Sensitivity NameDistance from the Project (Km)Remarks
(1.)Critically Polluted AreaVatva51None Within 10 Kilometers
(2.)NPABlackbuck National Park Velavadar164None Within 10 Kilometers
(3.)ESZsThol Wildlife Sanctuary24None Within 10 Kilometers
(4.)CorridorsNone Within 10 Kilometers00None Within 10 Kilometers
(5.)WLSNal Sarovar Birds Sanctuary75None Within 10 Kilometers
(6.)ESAsMount Abu133None Within 10 Kilometers
(7.)Wildlife CorridorsNone Within 10 Kilometers00None Within 10 Kilometers
    23.2.     Details of Environmental Sensitivity :
S. No.Details of Environmental Sensitivity Other Details of Environmental Sensitivity NameDistance from the Project (Km)Remarks
(1.)ForestNone Within 10 Kilometers00None Within 10 Kilometers
(2.)Archaeological SitesAdalaj Stepwell27None Within 10 Kilometers
(3.)Defence InstallationsNone Within 10 Kilometers00None Within 10 Kilometers
23.3.
(a)Whether Noc / Permission from the competent authority is required? No
(b)Whether NBWL recommendation is required? No
24.
Forest Land:
Whether any Forest Land involved? No
25.
Tree Cutting:
(a)No. of Trees Cut for the Project (if Forest Land not Involved) 00
(b)Details of Tree Cutting and Planting of Trees Not Applicable
26.
Land Acquisition Status:
(a)Acquired Land(Ha) 1.9
(b)Land yet to be acquired(Ha) 0
(c)Status of Land acquisition if not acquired 00
27.
Rehabilitation and Resettlement (R&R):
(a)No. of Villages 00
(b)No. of Households 00
(c)No. of PDFs (Project Displaced Families) 00
(d)No. of PAFs (Project Affected Families) 00
(e)Funds Allocated for R&R(in INR) (in Lacs) 00
(f)Status of R&R Completed
28.
Details of Presence of Schedule-I Species:
(a)Whether there is Presence of Schedule-I Species ? No
(b)Whether conservation plan for Schedule-I Species has been prepared ? No
(c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? No
29.
Details of Presence of Water Bodies in Core Area:
(a)Whether there is Presence of Water Bodies in Core Area ? Yes
(i)Details of Water Bodies in Core Area Pond of village Chandarda
(b)Whether there is Diversion Required ? No
(c)Whether permission has been obtained from competent authority ? No
30.
Details of Presence of Water Bodies in Buffer Area:
(a)Whether there is Presence of Water Bodies in Buffer Area ? Yes
(i)Details of Water Bodies in Buffer Area Narmada canal
(ii)Direction of Water Bodies in Buffer Area South
(iii)Distance of Water Bodies in Buffer Area 9.4
31.
Manpower Requirement:
(a)Permanent Employment-During Construction 5
(b)Permanent Employment-During Operation 60
(c)Temporary Employment- During Construction 5
(d)Temporary Employment- During Operation 5
(e)No. of working days 25
(f)Total Manpower 75
32.
Green Belt in Ha:
(a)Total Area of Green Belt 0.640
(b)Percentage of Total Project Area 33.68
(c)No. of Plants to be Planted 1600
(d)Funds Allocated for Plantation 450000
(e)Uploaded Green Belt plan Copy of Green Belt Plan
    33.       Project Benefits
S. No. Type of Project BenefitsDetails of Project Benefits
NIL
   34.   CRZ Specific Details : Not Applicable
   35.   Sector Specific Details : NOT APPLICABLE
   35.   Sector Specific Details For Industrial Projects - 2
S. No.Item Details
S. No.Item Details
36.
Details of Court Cases:
(a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? No
37.
Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act:
(a)Whether any Direction issued under EPA Act/Air Act/Water Act ? No
38.
Details of EIA Consultant:
(a)Have you hired Consultant for preparing document? Yes
(i)Accreditation No. Sr no. 17
(ii)Name of the EIA Consultant Bhagwati Enviro care Pvt. Ltd.
(iii)Address 28,29,30 Parmeshwar Estate II, Phase I, GIDC estate, Vatva, Ahmedabad – 382445
(iv)Mobile No. 9824051541
(v)Landline No. 0793683456
(vi)Email Id bhagwatienviro@yahoo.com
(vii)Category of Accreditation A
(viii)Sector of Accreditation Industrial Projects - 2
(ix)Validity of Accreditation 28 Apr 2019
(x)Uploaded Certificate of Accreditation certified by QCI/NABET Copy of Certificate of Accreditation
39.
Documents to be Attached:
(a)Uploaded Copy of EIA/EMP Report Copy of EIA/EMP
Copy of EIA/EMP(Annexures)
Copy of EIA/EMP(Plans/Figures)
(b)Uploaded Copy of Risk Assessment Report Copy of Risk Assessment
(c)Uploaded Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan
(d)Uploaded Copy of Final Layout Plan Copy of Final Layout Plan
(e)Uploaded Cover Letter Copy of Cover Letter
(f)Uploaded Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency
(g)Uploaded Additional File Copy of Additional File
(h)Uploaded Proposal Presentation (To be given in EAC meeting) NA
            Essential Detail Sought:
Sno. EDS Letter Remarks Date of EDS
1.NA- As requested earlier also, please submit proof of submitting the proposal to the concerned authorities for ground water withdrawal of 204 KLD. - Entry at item No.6 shows no details therein or attached and needs to be corrected. 23 Sep 2018
2.NAThe correction have been made as per the instruction received 25 Sep 2018
3.NAOn examination of your reply, we reiterate our earlier observations as under:- - Entry at item No.6 shows no details therein or attached and needs to be corrected. - No in-principle approval of the SPCB to allow such units in the non-notified area. - The area being over exploited with regard to ground water, mere submission of the proposal to CGWA, would have no relevance. . Information/clarification is still required i 29 Sep 2018
4.NAThe correction have been made as per the instruction received 04 Oct 2018
5.NANone of our earlier observations vide query dated 29/9/2018 seem to have been resolved. The matter may be discussed with us in the Ministry for clarifications and to facilitate its consideration. 10 Oct 2018
6.NAThe correction have been made as per the instruction received 16 Oct 2018
      Additional Detail Sought : NIL
Undertaking
I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief. And I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity/ construction/ expansion has since been taken up.
Name of ApplicantAditya M Sadaria
DesignationDirector
Name of Company (Applicant Name should not be given here)INFOCUS REMEDIES PVT LTD
AddressC-609, Dev Auram, Anand Nagar Cross Road, Prahlad Nagar Road, Vejalpur, Ahmedabad
Print