Form-2
APPLICATION FOR PRIOR ENVIRONMENTAL CLEARANCE
S. No.Item Details
1.
Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? No
Details of Project:
(a)Name of the project(s) Proposed additional storage facilities 3X300 MT Mounded storage vessel at Village - Panishalahat, Raiganj, Dist - Uttar Dinajpur, West Bengal
(b)Name of the Company / Organisation Bharat Petroleum Corporation Ltd.
(c)Registered Address Raiganj LPG Bottling Plant, Panishalahat, Raiganj, Uttar Dinajpur, West Bengal-733134,,Uttar Dinajpur,West Bengal-733134
(d)Legal Status of the Company Central PSU
(e)Joint Venture No
2.
Address for the correspondence:
(a)Name of the Applicant Surajit Borah
(b)Designation (Owner/ Partner/ CEO) TM
(c)Address NIL
(d)Pin code 733134
(e)E-mail bpclraiganjlpg@gmail.com
(f)STD Code. 3523(f)Telephone No. 204257
(g)Fax No. 204257
(h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . Annexure-Uploaded Copy of documents in support of the competence/authority
3.
Category of the Project/Activity as per Schedule of EIA Notification,2006:
(a.I)Project/Activity6(b)Isolated storage & handling of hazardous chemicals (As per threshold planning
Minor Activity8(a) Building and Construction projects
(b)Category A
(c)Proposal Number IA/WB/IND2/67726/2017
(d)Master Proposal Number(Single Window) SW/79063/2018
(e)EAC concerned (for category A Projects only) Industrial Projects - 2
(f)Project Type Fresh EC
4.
Location of the Project:
(a)Plot/Survey/Khasra No. 1623
(b)Pincode 733134
(c)Bounded Latitudes (North)
From
Degree 25.4047
Minutes
Second
From
Degree 25.4059
Minutes
Second
(d)Bounded Longitudes (East)
From
Degree 88.0421
Minutes
Second
From
Degree 88.0467
Minutes
Second
(e)Survey of India Topo Sheet No. 2
(f)Uploaded Topo Sheet File Copy of Topo Sheet File
(g)Maximum Elevation Above Means Sea Level(AMSL) 35
(h)Uploaded (kml) File Copy of Kml File      
(i)Distance of Nearest HFL from the project boundary within the study area 24
(j)Seismic Zone 4
5.
(a)Number of States in which Project will be Executed 1
(b)Main State of the project West Bengal
Details of State(s) of the project
S. No. State Name District Name Tehsil Name Village Name
(1.)West BengalUttar DinajpurRaiganj
6.
Details of Terms of Reference (ToR):
(a)MoEF&CC / SEIAA File Number IA-J-11011/436/2017-IA-II(I)
(b)Date of Apply of TOR 09 Nov 2017
(c)Date of Issue of TOR / Standard ToR 17 Dec 2017
(d)Previous TOR Letter Copy of Previous TOR letter
7.
Details of Public Consultation:
(a)Whether the Project Exempted from Public Hearing?No
(b)Whether details of Public Hearing available? Yes
(c)Whether Public hearing was presided over by an officer of the rank of Additional District Magistrate or above Yes
     7.1.       Details of Public Hearing
S. No.Details of Advertisement Details of Public Hearing Venue Location DetailsNo. of People AttendedIssues RaisedDesignation of Presiding OfficerOther Designation of Presiding Officer
(1.)
Date of Advertisement :16 Jul 2018
Copy of advertisement :Copy of Advertisement
Copy of Public Hearing :Copy of Public Hearing
Date :17 Aug 2018
Distance of Public Hearing Venue from the Proposed Project :4
Rabindra Bhaban, Raiganj
State :West Bengal
District :Uttar Dinajpur
Tehsil :Raiganj
Village :Panishalahat
60Employment, Traffic Congestion and Parking FacilityOthers
8.
Details of Project Configuration/Product:
     8.1.       Project Configuration
S. No.Plant/Equipment/FacilityConfigurationRemarks
(1.)Bullets (Existing)450 MT3 Nos of 150 MT LPG bullet
(2.)Mounded Storage Vessel900 MT3 Nos of 300 MT mounded bullet
     8.2.       Product
S. No.Product/Activity (Capacity/Area)QuantityUnitOther UnitMode of Transport / Transmission of ProductOther Mode of Transport / Transmission of Product
(1.)LPG STORAGE (PROPOSED)100000Tons per AnnumRoad
(2.)LPG STORAGE (EXISTING)50000Tons per AnnumRoad
9.
In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii):
Details Not Applicable
9.1.
Details of Consent to Operate
(i)Whether Consent to operate obtained ? NA
(ii)Copies of all Consent to operate obtained since inception NA
(iii)Date of Issue 01 Oct 2015
(iv)Valid Upto 01 Oct 2018
(v)File No. CO65930
(vi)Application No. 1117
(vii)Copy of Consent to operate valid as on date Copy of Consent to Operate
10.
Project Cost:
(a)Total Cost of the Project at current price level (in Crores) 49.92
(b) Funds Allocated for Environment Management (Capital) (in Crores) 0.71
(c) Funds Allocated Towards CER (Corporate Environment Responsibility) (in Crores) 1.25
(d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in Crores) 0.125
11.
Whether project attracts the General Condition specified in the Schedule of EIA Notification ? Yes
d)Inter-State boundaries and international boundaries Yes
12.
Whether project attract the Specific Condition specified in the Schedule of EIA Notification ? No
13.
Raw Material / Fuel Requirement:
(a)Proposed quantity of raw material/fuel 150000
(b)Existing quantity of raw material/fuel N/A
(c)Total quantity of raw material/fuel 150000
    13.1.        Raw Material / Fuel Profile
S. No.Raw Material / Fuel QuantityUnitOther UnitSource (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received )Mode of TransportOther Mode of TransportDistance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received)Type of Linkage Other Type of Linkage Uploaded Copy of Linkage
(1.)LPG150000Tons per AnnumREFINERYRoad200 CaptiveCopy of Linkage
14.
Baseline Data :
(a)Period of Base Line Data Collection FROM 07 Nov 2017 To 31 Jan 2018
(b)Season Winter
    14.1.     No. of ambient Air Quality (AAQ) monitoring locations : 8
S. No.Criteria Pollutants Other Criteria PollutantsUnitMaximum ValueMinimum Value98 Percentile ValuePrescribed Standard
(1.)PM2.5Micro Gram per Meter Cube30.616.53060
(2.)PM10Micro Gram per Meter Cube63.829.462.9100
(3.)SO2Micro Gram per Meter Cube9.355.680
(4.)NOxMicro Gram per Meter Cube15.17.414.880
    14.2.     No. of Ground Water monitoring locations : 8
S. No.Criteria Pollutants Other Criteria PollutantsHeavy MetalUnitOther UnitMaximum ValueMinimum ValueDesirable LimitMaximum Permissible Limit
(1.)TDSmg/l3681335002000
(2.)Total Hardnessmg/l23276200600
(3.)Fluoridemg/l1.360.8311.5
(4.)Heavy MetalsMercurymg/l0.0010.0010.0010.001
(5.)OthersSulphatemg/l264.6200400
(6.)pHmg/l7.76.516.58.5
(7.)TSSmg/l2155
(8.)Chloridesmg/l92152501000
    14.3.     No. of Surface Water monitoring locations : 5
S. No.Criteria Pollutants Other Criteria PollutantsUnitOther UnitMaximum ValueMinimum ValueClassification of inland water body
(1.)DOmg/l5.13.4C
(2.)BODmg/l4.12C
(3.)CODmg/l2812C
(4.)OthersTotal ColiformOthersMPN/100 ML16001200C
(5.)pHNA8.147.64C
    14.4.     No. of Ambient Noise monitoring locations : 8
S. No.Parameter UnitMaximum ValueMinimum ValuePrescribed Standard
(1.)Leq(Night)A-weighted decibels(dB(A))49.638.245
(2.)Leq(Day)A-weighted decibels(dB(A))53.943.955
    14.5.     No. of Soil Sample Monitored locations : 6
S. No.Parameter UnitOther UnitMaximum ValueMinimum Value
(1.)pHOthersNA8.477.56
(2.)N(Nitrogen)Kilogram per hectare402284
(3.)P(Phosphorus)Kilogram per hectare82.442.6
(4.)Electric ConductivityMillisiemens per Centimetre0.3140.086
(5.)K(Potassium)Kilogram per hectare248169
14.6.
Details of Ground Water Table:
(a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) From 15 To 5
(b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) From 1 To 3
(c)Whether Ground Water Intersection will be there ? No
     15.      Details of Water Requirement (During Operation)
S. No.Source Source Other Required Quantity (Kilolitre per Day (Kld))Distance from SourceCopy of Permission from Competent Authority Mode of TransportOther Mode of TransportMethod of Water WithdrawalOther Method of Water WithdrawalLetter No.Date of IssuePermitted Quantity
(1.)GroundWater51 Not Appliacble PipelineIntake WellXYZ01 Sep 20185
15.1.
(a)Whether Desalination is proposed No
    16.       Waste Water Management(During Operation)
S. No.Type/Source Quantity of Waste Water Generated (Kilolitre per Day)Treatment Capacity (Kilolitre per Day) Treatment MethodMode of DisposalOther Mode of DisposalQuantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day)Quantity of Discharged Water (Kilolitre per Day)
(1.)domestic35extended aerationGreen Belt Renewal Plant3
(2.)industrial11owsReuse within the Plant & Recycling1
16.1.
(a)Total Waste Water Generation (Kilolitre per Day) 4
(b)Total Discharged Water (Kilolitre per Day) 0
(c)Total Reused Water (Kilolitre per Day) 4
    17.       Solid Waste Generation/Management
S. No.Name of Waste Item Other ItemQuantity per AnnumUnitDistance from Site(KM)Mode of TransportOther Mode of TransportMode of DisposalOther Mode of Disposal
(1.)MSWMunicipal Solid Waste4Tons7RoadOthersMUNICIPALITY DUMPING GROUND
(2.)KITCHEN WASTEMunicipal Solid Waste4.9Tons7RoadSanitary Landfills
(3.)DAMAGED CYLINDERSOthersSCRAP5Tons10RoadAuthorized Recyclers
18.
    18.1.     Air Quality Impact Prediction
S. No.Criteria Pollutants Other Criteria PollutantsUnitBaseline ConcentrationDistance GLCIncremental ConcentrationTotal GLCPrescribed Standard
(1.)PM10Microgram per Meter Cube63.80.000.0063.8100
(2.)PM2.5Microgram per Meter Cube30.60.000.0030.660
(3.)SO2Microgram per Meter Cube9.30.000.009.380
(4.)NOxMicrogram per Meter Cube15.10.000.0015.180
    18.2.     Stack Details
S. No.Source FuelStack Height(m)Stack Diameter(m)PollutantsOther PollutantsEmission (GLS)
(1.)DGHSD BSIV128SO20.004
19.
Power Requirement:
(a)Quantity (Kilo Volt Amps (kVA)) 380
(b)Source WBSEDCL
(c)Uploaded Copy of Agreement Not Applicable
(d)Standby Arrangement (Details of DG Sets) 750
(e)Stack Height (in m) 12
20.
Land Ownership Pattern:
(a)Forest Land (ha.) 0
(b)Private Land (ha.) 0
(c)Government Land (ha.) 7.62
(d)Revenue Land (ha.) 0
(e)Other Land (ha.) 0
    Total Land (ha.) 7.62
21.
Present Land Use Breakup of the Study Area in Ha:
(a)Agriculture Area (ha.) 11980.44
(b)Waste/Barren Land (ha.) 0
(c)Grazing/ Community Land (ha.) 0
(d)Surface Water Bodies (ha.) 3868.31
(e)Settlements (ha.) 6334.13
(f)Industrial (ha.) 0
(g)Forest (ha.) 1300.01
(h)Mangroves (ha.) 0
(i)Marine Area (ha.) 0
(j)Others (ha.) : Mud, Road, railways 6741.31
    Total (ha.) 30224.2
    22.     Land requirement for various activities
S. No.Description of Activity / Facility / Plant / Others OthersLand Requirement (ha.)Remarks
(1.)Main Plant7.62including green belt area of 6.3 acres
Total (ha.) 7.62
23.
Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Sanctuaries; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones :
    23.1.     Details of Ecological Sensitivity :
S. No.Details of Ecological Sensitivity NameDistance from the Project (Km)Remarks
(1.)ESZsKulik Bird Sanctuary7.5Raiganj Wildlife Sanctuary also popularly known as Kulik Bird Sanctuary
(2.)Critically Polluted AreaNil0Not applicable
(3.)ESAsNil0Not applicable
(4.)CorridorsNil0Not applicable
(5.)WLSKulik Bird Sanctuary7.5Raiganj Wildlife Sanctuary also popularly known as Kulik Bird Sanctuary
(6.)NPANil0Not applicable
(7.)Wildlife CorridorsNil0Not applicable
    23.2.     Details of Environmental Sensitivity :
S. No.Details of Environmental Sensitivity Other Details of Environmental Sensitivity NameDistance from the Project (Km)Remarks
(1.)ForestKulik Bird Sanctuary7.5Raiganj Wildlife Sanctuary also popularly known as Kulik Bird Sanctuary
(2.)Defence InstallationsNil0Not applicable
(3.)Archaeological SitesNil0Not applicable
23.3.
(a)Whether Noc / Permission from the competent authority is required? No
(b)Whether NBWL recommendation is required? No
24.
Forest Land:
Whether any Forest Land involved? No
25.
Tree Cutting:
(a)No. of Trees Cut for the Project (if Forest Land not Involved) 0
(b)Details of Tree Cutting and Planting of Trees Not Applicable
26.
Land Acquisition Status:
(a)Acquired Land(Ha) 7.62
(b)Land yet to be acquired(Ha) 0
(c)Status of Land acquisition if not acquired existing plant
27.
Rehabilitation and Resettlement (R&R):
(a)No. of Villages 0
(b)No. of Households 0
(c)No. of PDFs (Project Displaced Families) 0
(d)No. of PAFs (Project Affected Families) 0
(e)Funds Allocated for R&R(in INR) (in Lacs) 0
(f)Status of R&R Completed
28.
Details of Presence of Schedule-I Species:
(a)Whether there is Presence of Schedule-I Species ? No
(b)Whether conservation plan for Schedule-I Species has been prepared ? No
(c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? No
29.
Details of Presence of Water Bodies in Core Area:
(a)Whether there is Presence of Water Bodies in Core Area ? No
(b)Whether there is Diversion Required ? No
(c)Whether permission has been obtained from competent authority ? No
30.
Details of Presence of Water Bodies in Buffer Area:
(a)Whether there is Presence of Water Bodies in Buffer Area ? Yes
(i)Details of Water Bodies in Buffer Area Nagar River
(ii)Direction of Water Bodies in Buffer Area West
(iii)Distance of Water Bodies in Buffer Area 2
31.
Manpower Requirement:
(a)Permanent Employment-During Construction 5
(b)Permanent Employment-During Operation 15
(c)Temporary Employment- During Construction 20
(d)Temporary Employment- During Operation 10
(e)No. of working days 330
(f)Total Manpower 50
32.
Green Belt in Ha:
(a)Total Area of Green Belt 2.54
(b)Percentage of Total Project Area 33.33
(c)No. of Plants to be Planted 1500
(d)Funds Allocated for Plantation 4
(e)Uploaded Green Belt plan Copy of Green Belt Plan
    33.       Project Benefits
S. No. Type of Project BenefitsDetails of Project Benefits
NIL
   34.   CRZ Specific Details : Not Applicable
   35.   Sector Specific Details : NOT APPLICABLE
   35.   Sector Specific Details For Industrial Projects - 2
S. No.Item Details
S. No.Item Details
36.
Details of Court Cases:
(a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? No
37.
Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act:
(a)Whether any Direction issued under EPA Act/Air Act/Water Act ? No
38.
Details of EIA Consultant:
(a)Have you hired Consultant for preparing document? Yes
(i)Accreditation No. NABET/EIA/1619/RA0048
(ii)Name of the EIA Consultant ABC Techno Labs India Pvt. Ltd.
(iii)Address 400, 13th Street, SIDCO Industrial Estate (North Phase) Ambattur – 600 098
(iv)Mobile No. 8420642002
(v)Landline No. 0442616112
(vi)Email Id abc@abctechnolab.com
(vii)Category of Accreditation A
(viii)Sector of Accreditation Industrial Projects - 2
(ix)Validity of Accreditation 25 May 2019
(x)Uploaded Certificate of Accreditation certified by QCI/NABET Copy of Certificate of Accreditation
39.
Documents to be Attached:
(a)Uploaded Copy of EIA/EMP Report Copy of EIA/EMP
Copy of EIA/EMP(Annexures)
Copy of EIA/EMP(Plans/Figures)
(b)Uploaded Copy of Risk Assessment Report Copy of Risk Assessment
(c)Uploaded Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan
(d)Uploaded Copy of Final Layout Plan Copy of Final Layout Plan
(e)Uploaded Cover Letter Copy of Cover Letter
(f)Uploaded Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency
(g)Uploaded Additional File Copy of Additional File
(h)Uploaded Proposal Presentation (To be given in EAC meeting) NA
            Essential Detail Sought:
Sno. EDS Letter Remarks Date of EDS
1.NANo document visible. Please submit the proposal for EC online in Form-2 on the Ministry's portal 'Parivesh'. 16 Sep 2018
2.NAThe correction have been made as per the instruction received 05 Oct 2018
3.NAPlease refer our earlier observations vide queries dated 3/9/2017, 24/9/2017, 15/10/2017 & 8/11/2017. Still there has been no clarity on applicability of general conditions. The unit established before issue of the EIA Notification, 1994/2006 and thus not requiring any prior EC, is yet to be established. CTO dated 1/10/2015 is for LPG bottling plant of 5000 TPM, whereas item 13.1 of Form-2 shows the product capacity as 15000 TPA, This needs to be clarified. 05 Oct 2018
4.NAThe correction have been made as per the instruction received 08 Oct 2018
5.NAPlease see our earlier observations regarding inconsistency in LPG storage capacity reflected in CTO (5000 TPM), item 8.2 of Form-2 (15000 TPA) and item 13.1 of Form-2 (150000 TPA). This needs to be clarified. 15 Oct 2018
6.NAThe correction have been made as per the instruction received 19 Oct 2018
7.NAPlease reply to our observations vide query dated 15/10/2018 for further consideration of the proposal. 28 Oct 2018
8.NAThe correction have been made as per the instruction received 03 Nov 2018
9.NAPlease reply to our observations vide query dated 15/10/2018, reiterated on 28/10/2018, for further consideration of the proposal. 11 Nov 2018
10.NAThe correction have been made as per the instruction received 13 Nov 2018
      Additional Detail Sought : NIL
Undertaking
I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief. And I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity/ construction/ expansion has since been taken up.
Name of ApplicantSurajit Borah
DesignationTM
Name of Company (Applicant Name should not be given here)Bharat Petroleum Corporation Ltd.
AddressRaiganj LPG Bottling Plant, Panishalahat, Raiganj, Uttar Dinajpur, West Bengal-733134