Form-2
APPLICATION FOR PRIOR ENVIRONMENTAL CLEARANCE
S. No.Item Details
1.
Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? No
Details of Project:
(a)Name of the project(s) Wanksons Chemical Industries Pvt. Ltd.
(b)Name of the Company / Organisation WANKSONS CHEMICAL INDUSTRIES PVT. LTD.
(c)Registered Address Plot No. 518, GIDC Industrial Estate, Panoli, Tal. Ankleshwar Dist. Bharuch, Gujarat,,Bharuch,Gujarat-394116
(d)Legal Status of the Company Others
(e)Joint Venture No
2.
Address for the correspondence:
(a)Name of the Applicant Mahesh J Khokhani
(b)Designation (Owner/ Partner/ CEO) CEO
(c)Address Plot No. 518, GIDC Industrial Estate, Panoli, Tal. Ankleshwar, Dist. Bharuch, Gujarat,,,Bharuch,Gujarat-394116
(d)Pin code 394116
(e)E-mail ihparmar@hotmail.com
(f)STD Code. 261(f)Telephone No. 2460854
(g)Fax No.
(h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . Annexure-Uploaded Copy of documents in support of the competence/authority
3.
Category of the Project/Activity as per Schedule of EIA Notification,2006:
(a.I)Project/Activity5(b) Pesticides industry and pesticide specific intermediates (excluding formulations)
Minor Activity
(b)Category A
(c)Proposal Number IA/GJ/IND2/79057/2014
(d)Master Proposal Number(Single Window) SW/79054/2018
(e)EAC concerned (for category A Projects only) Industrial Projects - 2
(f)Project Type Expansion
4.
Location of the Project:
(a)Plot/Survey/Khasra No. 518
(b)Pincode 394116
(c)Bounded Latitudes (North)
From
Degree 21.570267
Minutes
Second
From
Degree 21.570325
Minutes
Second
(d)Bounded Longitudes (East)
From
Degree 72.993594
Minutes
Second
From
Degree 72.993605
Minutes
Second
(e)Survey of India Topo Sheet No. F43N2
(f)Uploaded Topo Sheet File Copy of Topo Sheet File
(g)Maximum Elevation Above Means Sea Level(AMSL) 25
(h)Uploaded (kml) File Copy of Kml File      
(i)Distance of Nearest HFL from the project boundary within the study area 10
(j)Seismic Zone 3
5.
(a)Number of States in which Project will be Executed 1
(b)Main State of the project Gujarat
Details of State of the project
S. No. State Name District Name Tehsil Name Village Name
NIL
6.
Details of Terms of Reference (ToR)/EC:
(a)MoEF&CC / SEIAA File Number J-11011/223/2018-IA-II (I)
(c)Date of Issue of TOR 09 Jul 2018
(f)Previous TOR Letter Copy of Previous TOR letter
(b)Date of Apply of EC 07 Dec 2018
(c)Date of Issue of EC 25 Nov 2019
(d)Previous EC Letter Copy of Previous EC letter
7.
Details of Public Consultation:
(a)Whether the Project Exempted from Public Hearing?Yes
(b)Reason Company is located in notified industrial estate-P
(c)Supporting Document Copy of Supporting Document
8.
Details of Project Configuration/Product:
Details Not Applicable
9.
In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii):
(a)Details of certified report on compliance of earlier environmental clearance condition
(i)Certified Compliance By Regional
(ii)Details of Regional Office of MoEFCC / Zonal Office of CPCB / SPCB / UTPCC from which certified report on Bhopal
(iii)Letter No. 1112
(iv)Status of Compliance Compiled
(v)Certified report on compliance of earlier environmental clearance conditions (Including Monitoring Report) Copy of Certified Compliance Report
(vi)Date of site visit Apr 10 2018 12:00AM
(b)Details of Capacity Expansion
S. No.Product/Activity (Capacity/Area)Quantity FromQuantity ToTotal UnitOther UnitMode of Transport / Transmission of ProductOther Mode of Transport / Transmission of Product
(1.)Specialty Chemicals263373636OthersTons per MonthRoad
(2.)Pesticide20180200OthersTons per MonthRoad
(c)Details of Configuration
S. No.Plant / Equipment / Facility Existing ConfigurationProposed ConfigurationFinal configuration after expansionRemarks
(1.)5235
9.1.
Details of Consent to Operate
(i)Whether Consent to operate obtained ? NA
(ii)Copies of all Consent to operate obtained since inception NA
(iii)Date of Issue 23 Jun 2017
(iv)Valid Upto 24 Apr 2022
(v)File No. AWH-63660
(vi)Application No. GPCB/ANK/CCA-175(5)/ID-15873/415850
(vii)Copy of Consent to operate valid as on date Copy of Consent to Operate
10.
Project Cost:
(a)Total Cost of the Project at current price level (in Crores) 4.5
(b) Funds Allocated for Environment Management (Capital) (in Crores) 1.6
(c) Funds Allocated Towards CER (Corporate Environment Responsibility) (in Crores) 0.45
(d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in Crores) 1.6
11.
Whether project attracts the General Condition specified in the Schedule of EIA Notification ? No
12.
Whether project attract the Specific Condition specified in the Schedule of EIA Notification ? No
13.
Raw Material / Fuel Requirement:
(a)Proposed quantity of raw material/fuel 30
(b)Existing quantity of raw material/fuel 5
(c)Total quantity of raw material/fuel
    13.1.        Raw Material / Fuel Profile
S. No.Raw Material / Fuel QuantityUnitOther UnitSource (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received )Mode of TransportOther Mode of TransportDistance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received)Type of Linkage Other Type of Linkage Uploaded Copy of Linkage
(1.)ammonia300Tons per AnnumNeraestRoad5 Open MarketCopy of Linkage
(2.)FUEL2290OthersSM3/DayNeraestRoad2 Fuel Supply AgreementCopy of Linkage
14.
Baseline Data :
(a)Period of Base Line Data Collection FROM 01 Mar 2017 To 31 May 2017
(b)Season Pre-Monsoon
    14.1.     No. of ambient Air Quality (AAQ) monitoring locations : 9
S. No.Criteria Pollutants Other Criteria PollutantsUnitMaximum ValueMinimum Value98 Percentile ValuePrescribed Standard
(1.)PM10Micro Gram per Meter Cube96.3874.9196.00100
(2.)SO2Micro Gram per Meter Cube26.7215.7526.0080
(3.)NOxMicro Gram per Meter Cube28.5318.6328.0080
(4.)PM2.5Micro Gram per Meter Cube51.2843.5551.0060
    14.2.     No. of Ground Water monitoring locations : 9
S. No.Criteria Pollutants Other Criteria PollutantsHeavy MetalUnitOther UnitMaximum ValueMinimum ValueDesirable LimitMaximum Permissible Limit
(1.)pHNA8.026.938.58.5
(2.)Chloridesmg/l389.998.5510001000
(3.)Heavy MetalsSodiummg/l194.8719.6200200
(4.)TSSmg/l682100100
(5.)FluorideNA00000000
(6.)TDSmg/l138637221002100
(7.)Total Hardnessmg/l753165.310001000
    14.3.     No. of Surface Water monitoring locations : 1
S. No.Criteria Pollutants Other Criteria PollutantsUnitOther UnitMaximum ValueMinimum ValueClassification of inland water body
(1.)pHNA8.338.33A
(2.)CODmg/l8.7400B
(3.)DOmg/l7.084.60A
(4.)BODmg/l0000B
    14.4.     No. of Ambient Noise monitoring locations : 9
S. No.Parameter UnitMaximum ValueMinimum ValuePrescribed Standard
(1.)Leq(Day)A-weighted decibels(dB(A))554755
(2.)Leq(Night)A-weighted decibels(dB(A))453750
    14.5.     No. of Soil Sample Monitored locations : 9
S. No.Parameter UnitOther UnitMaximum ValueMinimum Value
(1.)pHOthersnone8.167.52
(2.)P(Phosphorus)Percent28.527.8
(3.)N(Nitrogen)Percent57.1457.00
(4.)K(Potassium)Milligram per Kilogram1082260
(5.)Electric ConductivityMillisiemens per Centimetre560320
14.6.
Details of Ground Water Table:
(a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) From 80 To 75
(b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) From 40 To 45
(c)Whether Ground Water Intersection will be there ? No
     15.      Details of Water Requirement (During Operation)
S. No.Source Source Other Required Quantity (Kilolitre per Day (Kld))Distance from SourceCopy of Permission from Competent Authority Mode of TransportOther Mode of TransportMethod of Water WithdrawalOther Method of Water WithdrawalLetter No.Date of IssuePermitted Quantity
(1.)Surface1.51.5Copy of Permission LetterPipelineOthersGIDC Water SupplyNO/GIDC/DEE/PNL/155302 May 2017160
15.1.
(a)Whether Desalination is proposed No
    16.       Waste Water Management(During Operation)
S. No.Type/Source Quantity of Waste Water Generated (Kilolitre per Day)Treatment Capacity (Kilolitre per Day) Treatment MethodMode of DisposalOther Mode of DisposalQuantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day)Quantity of Discharged Water (Kilolitre per Day)
(1.)Industrial Projects - 25050ETP, Solvent Stripper, MEEDischarge into Surface Water Body,Reuse within the Plant & Recycling446
16.1.
(a)Total Waste Water Generation (Kilolitre per Day) 50
(b)Total Discharged Water (Kilolitre per Day) 6
(c)Total Reused Water (Kilolitre per Day) 44
    17.       Solid Waste Generation/Management
S. No.Name of Waste Item Other ItemQuantity per AnnumUnitDistance from Site(KM)Mode of TransportOther Mode of TransportMode of DisposalOther Mode of Disposal
(1.)Used OilHazardous Waste (as per Hazardous and Other Waste Management rules 2016)1.104Tons10RoadAuthorized Recyclers
(2.)Distillation ResidueHazardous Waste (as per Hazardous and Other Waste Management rules 2016)180Tons15RoadCo-Processing
(3.)MEE SaltHazardous Waste (as per Hazardous and Other Waste Management rules 2016)720Tons15RoadTreatment, Storage and Disposal Facility(TSDF)
(4.)Discarded Container/Bags/DrumsHazardous Waste (as per Hazardous and Other Waste Management rules 2016)19.2Tons10RoadAuthorized Recyclers
(5.)ETP SludgeHazardous Waste (as per Hazardous and Other Waste Management rules 2016)48Tons15RoadTreatment, Storage and Disposal Facility(TSDF)
(6.)Spent SolventHazardous Waste (as per Hazardous and Other Waste Management rules 2016)600Tons15RoadCo-Processing
18.
    18.1.     Air Quality Impact Prediction
S. No.Criteria Pollutants Other Criteria PollutantsUnitBaseline ConcentrationDistance GLCIncremental ConcentrationTotal GLCPrescribed Standard
(1.)SO2Microgram per Meter Cube26.7210.10226.82280
(2.)PM10Microgram per Meter Cube95.9410.0495.98100
(3.)PM2.5Microgram per Meter Cube49.8710.09149.96160
(4.)NOxMicrogram per Meter Cube28.5310.08528.61580
(5.)Others(Specify)HCLMicrogram per Meter Cube11.4910.002611.51620
    18.2.     Stack Details
S. No.Source FuelStack Height(m)Stack Diameter(m)PollutantsOther PollutantsEmission (GLS)
(1.)BoilerNatural gas300.5PM10150
(2.)Thermic Fluid HeaterNatural gas300.5PM10150
(3.)D G SetHSD90.1PM10150
19.
Power Requirement:
(a)Quantity (Kilo Volt Amps (kVA)) 1000
(b)Source DGVCL
(c)Uploaded Copy of Agreement Copy of Agreement
(d)Standby Arrangement (Details of DG Sets) 3 Nos. of D.G.Set
(e)Stack Height (in m) 9
20.
Land Ownership Pattern:
(a)Forest Land (ha.) 00
(b)Private Land (ha.) 1.029
(c)Government Land (ha.) 00
(d)Revenue Land (ha.) 00
(e)Other Land (ha.) 00
    Total Land (ha.) 1.029
21.
Present Land Use Breakup of the Study Area in Ha:
(a)Agriculture Area (ha.) 25.56
(b)Waste/Barren Land (ha.) 10.62
(c)Grazing/ Community Land (ha.) 1.00
(d)Surface Water Bodies (ha.) 0.99
(e)Settlements (ha.) 9.97
(f)Industrial (ha.) 9.05
(g)Forest (ha.) 00
(h)Mangroves (ha.) 00
(i)Marine Area (ha.) 00
(j)Others (ha.) : MArshy Land 0.06
    Total (ha.) 57.25
    22.     Land requirement for various activities
S. No.Description of Activity / Facility / Plant / Others OthersLand Requirement (ha.)Remarks
(1.)Main Plant1.029
Total (ha.) 1.029
23.
Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Sanctuaries; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones :
    23.1.     Details of Ecological Sensitivity :
S. No.Details of Ecological Sensitivity NameDistance from the Project (Km)Remarks
(1.)NPA--0000
(2.)ESAs--0000
(3.)ESZs000000
(4.)Corridors--0000
(5.)Wildlife Corridors--0000
(6.)WLS--0000
(7.)Critically Polluted Area--0000
    23.2.     Details of Environmental Sensitivity :
S. No.Details of Environmental Sensitivity Other Details of Environmental Sensitivity NameDistance from the Project (Km)Remarks
(1.)Forest000000
(2.)Defence InstallationsAnkleshwar0505
(3.)Archaeological Sites000000
23.3.
(a)Whether Noc / Permission from the competent authority is required? No
(b)Whether NBWL recommendation is required? No
24.
Forest Land:
Whether any Forest Land involved? No
25.
Tree Cutting:
(a)No. of Trees Cut for the Project (if Forest Land not Involved) 00
(b)Details of Tree Cutting and Planting of Trees Not Applicable
26.
Land Acquisition Status:
(a)Acquired Land(Ha) 1.029
(b)Land yet to be acquired(Ha) 1.029
(c)Status of Land acquisition if not acquired acquired
27.
Rehabilitation and Resettlement (R&R):
(a)No. of Villages 1
(b)No. of Households 1
(c)No. of PDFs (Project Displaced Families) 1
(d)No. of PAFs (Project Affected Families) 1
(e)Funds Allocated for R&R(in INR) (in Lacs) 1
(f)Status of R&R In-Progress
28.
Details of Presence of Schedule-I Species:
(a)Whether there is Presence of Schedule-I Species ? No
(b)Whether conservation plan for Schedule-I Species has been prepared ? No
(c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? No
29.
Details of Presence of Water Bodies in Core Area:
(a)Whether there is Presence of Water Bodies in Core Area ? No
(b)Whether there is Diversion Required ? No
(c)Whether permission has been obtained from competent authority ? No
30.
Details of Presence of Water Bodies in Buffer Area:
(a)Whether there is Presence of Water Bodies in Buffer Area ? No
31.
Manpower Requirement:
(a)Permanent Employment-During Construction 5
(b)Permanent Employment-During Operation 10
(c)Temporary Employment- During Construction 5
(d)Temporary Employment- During Operation 5
(e)No. of working days 25
(f)Total Manpower 25
32.
Green Belt in Ha:
(a)Uploaded Green Belt plan Copy of Green Belt Plan
S. No.Description ExistingProposedTotal
(1.)Total Area of Green Belt3000003000
(2.)Percentage of Total Project Area300030
(3.)No. of Plants20000200
(4.)Funds Allocated60000000600000
    33.       Project Benefits
S. No. Type of Project BenefitsDetails of Project Benefits
NIL
   34.   CRZ Specific Details : Not Applicable
   35.   Sector Specific Details : NOT APPLICABLE
   35.   Sector Specific Details For Industrial Projects - 2
S. No.Item Details
S. No.Item Details
36.
Details of Court Cases:
(a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? No
37.
Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act:
(a)Whether any Direction issued under EPA Act/Air Act/Water Act ? No
38.
Details of EIA Consultant:
(a)Have you hired Consultant for preparing document? Yes
(i)Accreditation No. Stay Order against the NABET/QCI
(ii)Name of the EIA Consultant Aqua-air environmental Engineers Pvt. Ltd.
(iii)Address 403, Centre Point, Nr. Kadiwala School, Ring Road, Surat
(iv)Mobile No. 9904433995
(v)Landline No. 0261246085
(vi)Email Id aqua_eia@yahoo.com
(vii)Category of Accreditation A
(viii)Sector of Accreditation Industrial Projects - 2
(ix)Validity of Accreditation 09 Mar 2018
(x)Uploaded Certificate of Accreditation certified by QCI/NABET Copy of Certificate of Accreditation
39.
Documents to be Attached:
(a)Uploaded Copy of EIA/EMP Report Copy of EIA/EMP
Copy of EIA/EMP(Annexures)
Copy of EIA/EMP(Plans/Figures)
(b)Uploaded Copy of Risk Assessment Report Copy of Risk Assessment
(c)Uploaded Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan
(d)Uploaded Copy of Final Layout Plan Copy of Final Layout Plan
(e)Uploaded Cover Letter Copy of Cover Letter
(f)Uploaded Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency
(g)Uploaded Additional File Copy of Additional File
(h)Uploaded Proposal Presentation (To be given in EAC meeting) NA
            Essential Detail Sought:
Sno. EDS Letter Remarks Date of EDS
1.NAPlease inform about the clearances (EC and consent to establish/operate) required/obtained for the present industrial operations of capacity 286 TPM, and the compliance status thereof. 21 Sep 2018
2.NAThe correction have been made as per the instruction received 05 Oct 2018
3.NAAs per the CTO amendment dated 12/4/2007, production capacity is 1550 TPM, which is not consistent with the instant proposal for expansion from 286 to 1112 TPM. 11 Oct 2018
4.NAThe correction have been made as per the instruction received 16 Nov 2018
5.NA- Relevant details to be shown in clomn 6 of Form-2. - As per the details provided, the proposed expansion would be from 283 to 836 TPM, which is still not consistent with that shown in column 9(a) of Form-2. - CTO dated 14/3/2005 is for mfg 'Chloral' 300 TPM, one of the specialty chemicals as informed now. Whether change of product mix may extend to other items also, as in the instant case (to include pesticides). 01 Dec 2018
6.NAThe correction have been made as per the instruction received 07 Dec 2018
            Additional Detail Sought:
Sno. ADS Letter Remarks Date of ADS
1. ADS Reply LetterReply of ADS is attached as Annexure - Reply of ADS. 17 May 2019
2.NANA 20 Mar 2019
Undertaking
I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief. And I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity/ construction/ expansion has since been taken up.
Name of ApplicantMahesh J Khokhani
DesignationCEO
Name of Company (Applicant Name should not be given here)WANKSONS CHEMICAL INDUSTRIES PVT. LTD.
AddressPlot No. 518, GIDC Industrial Estate, Panoli, Tal. Ankleshwar Dist. Bharuch, Gujarat
Print