Form-2
APPLICATION FOR PRIOR ENVIRONMENTAL CLEARANCE
S. No.Item Details
1.
Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? No
Details of Project:
(a)Name of the project(s) Development of New Civil Enclave at Agra Airport (Near Air Force Base), Uttar Pradesh by Airports Authority of India.
(b)Name of the Company / Organisation AIRPORTS AUTHORITY OF INDIA AGRA
(c)Registered Address Civil Air Terminal, Agra Airport,,Uttar Pradesh,Agra,Uttar Pradesh-282001
(d)Legal Status of the Company Central Government
(e)Joint Venture No
2.
Address for the correspondence:
(a)Name of the Applicant Shishir Jain
(b)Designation (Owner/ Partner/ CEO) AGMCivil
(c)Address Civil Air Terminal,,Agra Airport,Agra,Agra,Uttar Pradesh-282001
(d)Pin code 282001
(e)E-mail agraairport@gmail.com
(f)STD Code. 562(f)Telephone No. 2400544
(g)Fax No.
(h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . Annexure-Uploaded Copy of documents in support of the competence/authority
3.
Category of the Project/Activity as per Schedule of EIA Notification,2006:
(a.I)Project/Activity7(a) Air ports
Minor Activity7(a) Air ports
(b)Category A
(c)Proposal Number IA/UP/MIS/73712/2018
(d)Master Proposal Number(Single Window) SW/78961/2018
(e)EAC concerned (for category A Projects only) INFRA-2
(f)Project Type Fresh EC
4.
Location of the Project:
(a)Plot/Survey/Khasra No. -
(b)Pincode 282001
(c)Bounded Latitudes (North)
From
Degree 27.13928056
Minutes
Second
From
Degree 27.14520833
Minutes
Second
(d)Bounded Longitudes (East)
From
Degree 77.9438888
Minutes
Second
From
Degree 77.950555
Minutes
Second
(e)Survey of India Topo Sheet No. 53E/16
(f)Uploaded Topo Sheet File Copy of Topo Sheet File
(g)Maximum Elevation Above Means Sea Level(AMSL) 169
(h)Uploaded (kml) File Copy of Kml File      
(i)Distance of Nearest HFL from the project boundary within the study area 9.1
(j)Seismic Zone 3
5.
(a)Number of States in which Project will be Executed 1
(b)Main State of the project Uttar Pradesh
Details of State(s) of the project
S. No. State Name District Name Tehsil Name Village Name
(1.)Uttar PradeshAgraAgra
6.
Details of Terms of Reference (ToR):
(a)Whether TOR is mandatory for submitting application Yes
(b)MoEF&CC / SEIAA File Number 10-27/2018-IA-III
(c)Date of Apply of TOR 26 Mar 2018
(d)Date of Issue of TOR / Standard ToR 17 May 2018
(e)Previous TOR Letter Copy of Previous TOR letter
7.
Details of Public Consultation:
(a)Whether the Project Exempted from Public Hearing?No
(b)Whether details of Public Hearing available? Yes
(c)Whether Public hearing was presided over by an officer of the rank of Additional District Magistrate or above Yes
     7.1.       Details of Public Hearing
S. No.Details of Advertisement Details of Public Hearing Venue Location DetailsNo. of People AttendedIssues RaisedDesignation of Presiding OfficerOther Designation of Presiding Officer
(1.)
Date of Advertisement :04 Aug 2018
Copy of advertisement :Copy of Advertisement
Copy of Public Hearing :Copy of Public Hearing
Date :06 Sep 2018
Distance of Public Hearing Venue from the Proposed Project :0
Project site
State :Uttar Pradesh
District :Agra
Tehsil :Agra
Village :Kheria
46Approach road to non-acquired land, adequacy of EMP budget, CGWA approval, green belt details, impact on Taj Mahal and Rain water harvesting.District Magistrate
8.
Details of Project Configuration/Product:
     8.1.       Project Configuration
S. No.Plant/Equipment/FacilityConfigurationRemarks
(1.)---
     8.2.       Product
S. No.Product/Activity (Capacity/Area)QuantityUnitOther UnitMode of Transport / Transmission of ProductOther Mode of Transport / Transmission of Product
(1.)New civil enclave developed in an area 49.8 Acres0OthersNilOthersNil
9.
In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii):
Details Not Applicable
9.1.
Details of Consent to Operate
(i)Whether Consent to operate obtained ? NA
(ii)Copies of all Consent to operate obtained since inception NA
(iii)Date of Issue N/A
(iv)Valid Upto N/A
(v)File No. NA
(vi)Application No. NA
(vii)Copy of Consent to operate valid as on date NA
10.
Project Cost:
(a)Total Cost of the Project at current price level (in Crores) 300
(b) Funds Allocated for Environment Management (Capital) (in Crores) 148
(c) Funds Allocated Towards CER (Corporate Environment Responsibility) (in Crores) 450
(d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in Crores) 0.222
11.
Whether project attracts the General Condition specified in the Schedule of EIA Notification ? No
12.
Whether project attract the Specific Condition specified in the Schedule of EIA Notification ? No
13.
Raw Material / Fuel Requirement:
(a)Proposed quantity of raw material/fuel 0
(b)Existing quantity of raw material/fuel N/A
(c)Total quantity of raw material/fuel 0
    13.1.        Raw Material / Fuel Profile
S. No.Raw Material / Fuel QuantityUnitOther UnitSource (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received )Mode of TransportOther Mode of TransportDistance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received)Type of Linkage Other Type of Linkage Uploaded Copy of Linkage
(1.)NA0OthersNANAOthersNA0 OthersNACopy of Linkage
14.
Baseline Data :
(a)Period of Base Line Data Collection FROM 01 Apr 2018 To 30 Jun 2018
(b)Season Summer
    14.1.     No. of ambient Air Quality (AAQ) monitoring locations : 8
S. No.Criteria Pollutants Other Criteria PollutantsUnitMaximum ValueMinimum Value98 Percentile ValuePrescribed Standard
(1.)OthersCOMicro Gram per Meter Cube1.230.381.232
(2.)PM10Micro Gram per Meter Cube160.464.9160.2100
(3.)PM2.5Micro Gram per Meter Cube80.228.780.260
(4.)SO2Micro Gram per Meter Cube8.33.88.280
(5.)NOxMicro Gram per Meter Cube31.811.931.580
    14.2.     No. of Ground Water monitoring locations : 8
S. No.Criteria Pollutants Other Criteria PollutantsHeavy MetalUnitOther UnitMaximum ValueMinimum ValueDesirable LimitMaximum Permissible Limit
(1.)TDSmg/l7982965002000
(2.)Total Hardnessmg/l450196200600
(3.)Fluoridemg/l0.80.11.01.5
(4.)pHNA7.66.516.58.5
(5.)TSSmg/l0000
(6.)Chloridesmg/l212632501000
(7.)Heavy MetalsIronmg/l0.30.050.30.3
    14.3.     No. of Surface Water monitoring locations : 2
S. No.Criteria Pollutants Other Criteria PollutantsUnitOther UnitMaximum ValueMinimum ValueClassification of inland water body
(1.)CODmg/l6418C
(2.)DOmg/l6.23.6C
(3.)BODmg/l23.62.8C
(4.)pHNA8.07.1C
    14.4.     No. of Ambient Noise monitoring locations : 8
S. No.Parameter UnitMaximum ValueMinimum ValuePrescribed Standard
(1.)Leq(Day)A-weighted decibels(dB(A))54.652.155
(2.)Leq(Night)A-weighted decibels(dB(A))44.342.145
    14.5.     No. of Soil Sample Monitored locations : 8
S. No.Parameter UnitOther UnitMaximum ValueMinimum Value
(1.)K(Potassium)Kilogram per hectare405197
(2.)P(Phosphorus)Kilogram per hectare71.525.8
(3.)pHOthersNA8.147.17
(4.)N(Nitrogen)Kilogram per hectare517246
(5.)Electric ConductivityMillisiemens per Centimetre0.2160.058
14.6.
Details of Ground Water Table:
(a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) From 2.19 To 45.58
(b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) From 1.10 To 46.34
(c)Whether Ground Water Intersection will be there ? No
     15.      Details of Water Requirement (During Operation)
S. No.Source Source Other Required Quantity (Kilolitre per Day (Kld))Distance from SourceCopy of Permission from Competent Authority Mode of TransportOther Mode of TransportMethod of Water WithdrawalOther Method of Water WithdrawalLetter No.Date of IssuePermitted Quantity
(1.)GroundWater3870Copy of Permission LetterPipelineTube WellNil01 Jan 1900387
15.1.
(a)Whether Desalination is proposed No
    16.       Waste Water Management(During Operation)
S. No.Type/Source Quantity of Waste Water Generated (Kilolitre per Day)Treatment Capacity (Kilolitre per Day) Treatment MethodMode of DisposalOther Mode of DisposalQuantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day)Quantity of Discharged Water (Kilolitre per Day)
(1.)Sewage272300MBBRReuse within the Plant & Recycling,Green Belt Renewal Plant,OthersTreatment Loss24527
16.1.
(a)Total Waste Water Generation (Kilolitre per Day) 272
(b)Total Discharged Water (Kilolitre per Day) 27
(c)Total Reused Water (Kilolitre per Day) 245
    17.       Solid Waste Generation/Management
S. No.Name of Waste Item Other ItemQuantity per AnnumUnitDistance from Site(KM)Mode of TransportOther Mode of TransportMode of DisposalOther Mode of Disposal
(1.)Used OilHazardous Waste (as per Hazardous and Other Waste Management rules 2016)0.5Kilolitre0RoadAuthorized Recyclers
(2.)Paper, Plastic, food, etcMunicipal Solid Waste219Tons0RoadAuthorized Recyclers
(3.)STP SludgeOthersNon Hazardous3Tons0OthersNAOthersManure in Landscaping
18.
    18.1.     Air Quality Impact Prediction
S. No.Criteria Pollutants Other Criteria PollutantsUnitBaseline ConcentrationDistance GLCIncremental ConcentrationTotal GLCPrescribed Standard
(1.)NOxMicrogram per Meter Cube31.81.00.9632.7680
(2.)SO2Microgram per Meter Cube8.3008.380
(3.)PM10Microgram per Meter Cube160.41.00.24160.64100
(4.)PM2.5Microgram per Meter Cube80.21.00.2480.4460
    18.2.     Stack Details
S. No.Source FuelStack Height(m)Stack Diameter(m)PollutantsOther PollutantsEmission (GLS)
(1.)DG Set (2 x 500 KVA)Natural Gas100.25PM1025 mg/Nm3
19.
Power Requirement:
(a)Quantity (Kilo Volt Amps (kVA)) 600
(b)Source Uttar Pradesh Power Corporation Ltd.
(c)Uploaded Copy of Agreement Not Applicable
(d)Standby Arrangement (Details of DG Sets) 2 x 500 KVA Natural Gas based DG sets
(e)Stack Height (in m) 10
20.
Land Ownership Pattern:
(a)Forest Land (ha.) 0
(b)Private Land (ha.) 0
(c)Government Land (ha.) 20.153
(d)Revenue Land (ha.) 0
(e)Other Land (ha.) 0
    Total Land (ha.) 20.153
21.
Present Land Use Breakup of the Study Area in Ha:
(a)Agriculture Area (ha.) 0
(b)Waste/Barren Land (ha.) 20.153
(c)Grazing/ Community Land (ha.) 0
(d)Surface Water Bodies (ha.) 0
(e)Settlements (ha.) 0
(f)Industrial (ha.) 0
(g)Forest (ha.) 0
(h)Mangroves (ha.) 0
(i)Marine Area (ha.) 0
(j)Others (ha.) : Nil 0
    Total (ha.) 20.153
    22.     Land requirement for various activities
S. No.Description of Activity / Facility / Plant / Others OthersLand Requirement (ha.)Remarks
(1.)Built Up Area1.94
(2.)Green belt4.41
(3.)OthersSupporting infra like Apron, link taxiway, etc13.803
Total (ha.) 20.153
23.
Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Sanctuaries; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones :
    23.1.     Details of Ecological Sensitivity :
S. No.Details of Ecological Sensitivity NameDistance from the Project (Km)Remarks
(1.)WLSNil0Nil in 10 km radius
(2.)Critically Polluted AreaNil0Nil in 10 km radius
(3.)NPANil0Nil in 10 km radius
(4.)ESAsNil0Nil in 10 km radius
(5.)CorridorsNil0Nil in 10 km radius
(6.)Wildlife CorridorsNil0Nil in 10 km radius
(7.)ESZsNil0Nil in 10 km radius
    23.2.     Details of Environmental Sensitivity :
S. No.Details of Environmental Sensitivity Other Details of Environmental Sensitivity NameDistance from the Project (Km)Remarks
(1.)Defence InstallationsAir Force Station, Agra0-
(2.)OthersTaj Trapezium ZoneTaj Trapezium Zone0Site located withing TTZ
(3.)ForestNil0Nil in 10 km radius
(4.)Archaeological SitesAgra Fort & Sikandra8.2-
23.3.
(a)Whether Noc / Permission from the competent authority is required? Yes
(i)Uploaded Noc / Permission from the competent authority Copy of Noc / Permission from the competent authority
(b)Whether NBWL recommendation is required? No
24.
Forest Land:
Whether any Forest Land involved? No
25.
Tree Cutting:
(a)No. of Trees Cut for the Project (if Forest Land not Involved) 12
(b)Details of Tree Cutting and Planting of Trees Copy of Details of Tree Cutting and Planting of Trees
26.
Land Acquisition Status:
(a)Acquired Land(Ha) 20.153
(b)Land yet to be acquired(Ha) 0
(c)Status of Land acquisition if not acquired -
27.
Rehabilitation and Resettlement (R&R):
(a)No. of Villages 0
(b)No. of Households 0
(c)No. of PDFs (Project Displaced Families) 0
(d)No. of PAFs (Project Affected Families) 0
(e)Funds Allocated for R&R(in INR) (in Lacs) 0
(f)Status of R&R Completed
28.
Details of Presence of Schedule-I Species:
(a)Whether there is Presence of Schedule-I Species ? No
(b)Whether conservation plan for Schedule-I Species has been prepared ? No
(c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? No
29.
Details of Presence of Water Bodies in Core Area:
(a)Whether there is Presence of Water Bodies in Core Area ? No
(b)Whether there is Diversion Required ? No
(c)Whether permission has been obtained from competent authority ? No
30.
Details of Presence of Water Bodies in Buffer Area:
(a)Whether there is Presence of Water Bodies in Buffer Area ? Yes
(i)Details of Water Bodies in Buffer Area Yamuna River
(ii)Direction of Water Bodies in Buffer Area North East
(iii)Distance of Water Bodies in Buffer Area 9.1
31.
Manpower Requirement:
(a)Permanent Employment-During Construction 5
(b)Permanent Employment-During Operation 5
(c)Temporary Employment- During Construction 5
(d)Temporary Employment- During Operation 5
(e)No. of working days 365
(f)Total Manpower 20
32.
Green Belt in Ha:
(a)Total Area of Green Belt 4.4117
(b)Percentage of Total Project Area 21.89
(c)No. of Plants to be Planted 3500
(d)Funds Allocated for Plantation 2000000
(e)Uploaded Green Belt plan Copy of Green Belt Plan
    33.         Project Benefits
S. No.Type of Project Benefits Details of Project Benefits
(1.)SocialProvide additional air transport to tourists visiting Agra
   34.   CRZ Specific Details : Not Applicable
   35.   Sector Specific Details For INFRA-2
S. No.Item Details
1.
Details of Building Construction:
(a)Maximum Height of the Building (Meters) 18
(b)Total No. of Flats to be Build 0
(c)No. of Buildings 1
(d)Total plot area (sqm) 201533
(e)Total built up area (sqm) 82305
2.
Foreshore Facilities and/or Marine Disposal:
(a)Whether Project Involves Foreshore Activities and/or marine Disposal? No
3.
Rain Water Harvesting:
(a)No. of Storage 0
(b)Capacity 0
(c)No. of Recharge Pits 41
(d)Capacity 28
4.
Parking:
(a)Details of 4 Wheeler/ 2 Wheeler Parking 300 Cars, 20 VIP Cars & 5 Buses
5.
Energy Saving Measures:
(a)Source/Mode Solar Power Plant
(b)Percentage 30
(c)Quantity 150
6.
Other details:
(a)Details of impact on Water Bodies and Drainage patters of catchment area No water body will be affected.
(b)Details of Traffic Density Impact Assessment and Modelling Study Copy of Details of Traffic Density Impact Assessment and Modelling Study
(c)In case Underground Tunnel Project below the Forest Land - Subsidence Impact Study report Copy of Underground Tunnel Project below the Forest Land - Subsidence Impact Study report
     7.       Type of Industries to be established with Industrial Estate as per their category A/B
S. No.Type of IndustryNo. of UnitsCategory A/B
NIL
8.
Length of the alignment N/A
9.
Details Bridges/ROB/Interchanges,Flyovers,Vehicle Underpass and Pedestrian Underpass
Details Not Applicable
S. No.Item Details
36.
Details of Court Cases:
(a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? No
37.
Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act:
(a)Whether any Direction issued under EPA Act/Air Act/Water Act ? No
38.
Details of EIA Consultant:
(a)Have you hired Consultant for preparing document? Yes
(i)Accreditation No. NABET/EIA/1619/RA0048
(ii)Name of the EIA Consultant ABC Techno Labs India Private Limited
(iii)Address ABC Tower, No. 400, 13th Street, SIDCO Industrial Estate - North Phase, Ambattur, Chennai - 600098
(iv)Mobile No. 9566067777
(v)Landline No. 0442625779
(vi)Email Id abc@abctechnolab.com
(vii)Category of Accreditation A
(viii)Sector of Accreditation INFRA-2
(ix)Validity of Accreditation 25 May 2019
(x)Uploaded Certificate of Accreditation certified by QCI/NABET Copy of Certificate of Accreditation
39.
Documents to be Attached:
(a)Uploaded Copy of EIA/EMP Report Copy of EIA/EMP
Copy of EIA/EMP(Annexures)
Copy of EIA/EMP(Plans/Figures)
(b)Uploaded Copy of Risk Assessment Report Copy of Risk Assessment
(c)Uploaded Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan
(d)Uploaded Copy of Final Layout Plan Copy of Final Layout Plan
(e)Uploaded Cover Letter Copy of Cover Letter
(f)Uploaded Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency
(g)Uploaded Additional File Copy of Additional File
(h)Uploaded Proposal Presentation (To be given in EAC meeting) NA
            Essential Detail Sought:
Sno. EDS Letter Remarks Date of EDS
1.NAAs per ToR condition, kindly submit permission from Taj Trapezium Zone Authority (TTZA). Also, Hon’ble Supreme Court in its order dated 22.03.2018 while hearing the matter under IA. No. 57183/2017 in W.P. No. 13381 of 1984, passed an Order for maintaining the status quo in TTZ area. Kindly submit permission/direction of Hon’ble Supreme Court of India for the instant project. 10 Oct 2018
2.NAThe correction have been made as per the instruction received 08 Jan 2019
            Additional Detail Sought:
Sno. ADS Letter Remarks Date of ADS
1. ADS Reply LetterAs per the directions the letter from TTZ Authority is hereby submitted 02 Aug 2023
2.NAThe copy of permission from Taj Trapezium Zone Authority (TTZA) have not been uploaded on Parivesh portal. It is requested to upload the copy of TTZA permission on PARIVESH for further examination of the proposal. 20 Jul 2023
Undertaking
I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief. And I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity/ construction/ expansion has since been taken up.
Name of ApplicantShishir Jain
DesignationAGMCivil
Name of Company (Applicant Name should not be given here)AIRPORTS AUTHORITY OF INDIA AGRA
AddressCivil Air Terminal, Agra Airport,
Print