Form-2
APPLICATION FOR PRIOR ENVIRONMENTAL CLEARANCE
S. No.Item Details
1.
Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? No
Details of Project:
(a)Name of the project(s) M/s Rebecca Laminates
(b)Name of the Company / Organisation REBECCA LAMINATES
(c)Registered Address Survey no.: 132 paiki 1, NH 8A, Village: Bahadurgadh, Taluka: Morbi, District: Morbi, Gujarat.363642,,Morbi,Gujarat-363642
(d)Legal Status of the Company Private
(e)Joint Venture No
2.
Address for the correspondence:
(a)Name of the Applicant Jignesh Bavarva
(b)Designation (Owner/ Partner/ CEO) Partner
(c)Address Survey no.132 paiki 1, NH 8A, village- Bahadurgadh, Taluka-Morbi, District- Morbi, Gujarat.,,Morbi,Morbi,Gujarat-363642
(d)Pin code 363642
(e)E-mail rebeccalaminates123@gmail.com
(f)STD Code. 2822(f)Telephone No. 291349
(g)Fax No.
(h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . Annexure-Uploaded Copy of documents in support of the competence/authority
3.
Category of the Project/Activity as per Schedule of EIA Notification,2006:
(a.I)Project/Activity5(f) Synthetic organic chemicals industry (dyes & dye intermediates; bulk
Minor Activity
(b)Category A
(c)Proposal Number IA/GJ/IND2/78761/2017
(d)Master Proposal Number(Single Window) SW/78753/2018
(e)EAC concerned (for category A Projects only) Industrial Projects - 3
(f)Project Type Expansion
4.
Location of the Project:
(a)Plot/Survey/Khasra No. Survey No.: 132/P1, N.H.-8A, Village: Bahadurgadh,
(b)Pincode 363642
(c)Bounded Latitudes (North)
From
Degree 23.032812
Minutes
Second
From
Degree 23.033623
Minutes
Second
(d)Bounded Longitudes (East)
From
Degree 70.810659
Minutes
Second
From
Degree 70.813521
Minutes
Second
(e)Survey of India Topo Sheet No. F42E16
(f)Uploaded Topo Sheet File Copy of Topo Sheet File
(g)Maximum Elevation Above Means Sea Level(AMSL) 14
(h)Uploaded (kml) File Copy of Kml File      
(i)Distance of Nearest HFL from the project boundary within the study area 4.8
(j)Seismic Zone 3
5.
(a)Number of States in which Project will be Executed 1
(b)Main State of the project Gujarat
Details of State of the project
S. No. State Name District Name Tehsil Name Village Name
NIL
6.
Details of Terms of Reference (ToR)/EC:
(a)MoEF&CC / SEIAA File Number IA-J-11011/108/2017-IA-II(I)
(b)Date of Apply of TOR 18 Feb 2017
(c)Date of Issue of TOR / Standard ToR 10 Jul 2017
(d)Date of Apply of EC 11 Oct 2014
(e)Date of Issue of EC 21 Aug 2015
(f)Previous TOR Letter Copy of Previous TOR letter
(g)Previous EC Letter Copy of Previous EC letter
7.
Details of Public Consultation:
(a)Whether the Project Exempted from Public Hearing?No
(b)Whether details of Public Hearing available? Yes
(c)Whether Public hearing was presided over by an officer of the rank of Additional District Magistrate or above Yes
     7.1.       Details of Public Hearing
S. No.Details of Advertisement Details of Public Hearing Venue Location DetailsNo. of People AttendedIssues RaisedDesignation of Presiding OfficerOther Designation of Presiding Officer
(1.)
Date of Advertisement :20 Jun 2018
Copy of advertisement :Copy of Advertisement
Copy of Public Hearing :Copy of Public Hearing
Date :26 Jul 2018
Distance of Public Hearing Venue from the Proposed Project :0
At Project Site
State :Gujarat
District :Morbi
Tehsil :Morbi
Village :Bahadurgadh
118During the public hearing participants raised questions regarding workers health, employment to the locals, AAQ monitoring and CSR activities undertaken and allocated fund for the same etc.OthersAdditional District Collector
8.
Details of Project Configuration/Product:
Details Not Applicable
9.
In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii):
(a)Details of certified report on compliance of earlier environmental clearance condition
(i)Certified Compliance By Regional
(ii)Details of Regional Office of MoEFCC / Zonal Office of CPCB / SPCB / UTPCC from which certified report on Bhopal
(iii)Letter No. 5-81/2018(ENV)/351
(iv)Status of Compliance Compiled
(v)Certified report on compliance of earlier environmental clearance conditions (Including Monitoring Report) Copy of Certified Compliance Report
(vi)Date of site visit Jun 15 2018 12:00AM
(b)Details of Capacity Expansion
S. No.Product/Activity (Capacity/Area)Quantity FromQuantity ToTotal UnitOther UnitMode of Transport / Transmission of ProductOther Mode of Transport / Transmission of Product
(1.)1800015001650018000Tons per Annum(TPA)Road
(c)Details of Configuration
S. No.Plant / Equipment / Facility Existing ConfigurationProposed ConfigurationFinal configuration after expansionRemarks
(1.)Vessel ShedResin Manufacturing FacilityResin Manufacturing FacilityResin Manufacturing Facility
(2.)Thermic Fluid Heater10 Lakh KCal/HourNot Applicable10 Lakh KCal/Hour
(3.)Chemical Storage ShedRaw material storage areaRaw material storage areaRaw material storage area
(4.)Cooling Tower350 TR (1 no.) + 150 TR (1 no.)150 TR (1 no.)350 TR (1 no.) + 150 TR (2 nos.)
(5.)Security CabinSecurity Officer areaSecurity Officer areaSecurity Officer area
(6.)Manufacturing ShedLaminated Sheets Manufacturing facilityLaminated Sheets Manufacturing facilityLaminated Sheets Manufacturing facility
(7.)D. G. Set250 KVANot Applicable250 KVA
(8.)Boiler4 TPH4 TPH8 TPH
(9.)Finished Goods ShedFinal Product Storage areaFinal Product Storage areaFinal Product Storage area
(10.)OfficeAdministrative WorkAdministrative WorkAdministrative Work
9.1.
Details of Consent to Operate
(i)Whether Consent to operate obtained ? NA
(ii)Copies of all Consent to operate obtained since inception NA
(iii)Date of Issue 23 Mar 2018
(iv)Valid Upto 13 Feb 2023
(v)File No. GPCB/RO-MORBI/ID-35071/984/15384
(vi)Application No. AWH-28314
(vii)Copy of Consent to operate valid as on date Copy of Consent to Operate
10.
Project Cost:
(a)Total Cost of the Project at current price level (in Crores) 7
(b) Funds Allocated for Environment Management (Capital) (in Crores) 0.46
(c) Funds Allocated Towards CER (Corporate Environment Responsibility) (in Crores) 0.0162
(d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in Crores) 0.072
11.
Whether project attracts the General Condition specified in the Schedule of EIA Notification ? No
12.
Whether project attract the Specific Condition specified in the Schedule of EIA Notification ? No
13.
Raw Material / Fuel Requirement:
(a)Proposed quantity of raw material/fuel 16500
(b)Existing quantity of raw material/fuel 1500
(c)Total quantity of raw material/fuel 18000
    13.1.        Raw Material / Fuel Profile
S. No.Raw Material / Fuel QuantityUnitOther UnitSource (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received )Mode of TransportOther Mode of TransportDistance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received)Type of Linkage Other Type of Linkage Uploaded Copy of Linkage
(1.)Caustic Soda294Tons per AnnumLocal Traders/SuppliersRoad30 Open MarketCopy of Linkage
(2.)Melamine2388Tons per AnnumLocal Traders/SuppliersRoad200 Open MarketCopy of Linkage
(3.)Phenol2580Tons per AnnumLocal Traders/SuppliersRoad135 Open MarketCopy of Linkage
(4.)Urea2376Tons per AnnumLocal Traders/SuppliersRoad200 Open MarketCopy of Linkage
(5.)Formaldehyde 37%10320Tons per AnnumLocal Traders/SuppliersRoad200 Open MarketCopy of Linkage
(6.)Acetic Acid30Tons per AnnumLocal Traders/SuppliersRoad30 Open MarketCopy of Linkage
14.
Baseline Data :
(a)Period of Base Line Data Collection FROM 02 Mar 2017 To 05 Jun 2017
(b)Season Summer
    14.1.     No. of ambient Air Quality (AAQ) monitoring locations : 8
S. No.Criteria Pollutants Other Criteria PollutantsUnitMaximum ValueMinimum Value98 Percentile ValuePrescribed Standard
(1.)SO2Micro Gram per Meter Cube64.6820.6564.2780
(2.)NOxMicro Gram per Meter Cube70.9319.6070.5980
(3.)PM2.5Micro Gram per Meter Cube59.4420.5458.9760
(4.)PM10Micro Gram per Meter Cube88.4740.1287.99100
    14.2.     No. of Ground Water monitoring locations : 8
S. No.Criteria Pollutants Other Criteria PollutantsHeavy MetalUnitOther UnitMaximum ValueMinimum ValueDesirable LimitMaximum Permissible Limit
(1.)TSSmg/l874800
(2.)TDSmg/l10404685002000
(3.)Chloridesmg/l339.8999.902501000
(4.)Heavy MetalsMagnesiummg/l58.3224.330100
(5.)Total Hardnessmg/l350130200600
(6.)Fluoridemg/l0011.5
(7.)OthersSulphatemg/l176.683.2200400
(8.)pHNA7.896.848.58.5
    14.3.     No. of Surface Water monitoring locations : 8
S. No.Criteria Pollutants Other Criteria PollutantsUnitOther UnitMaximum ValueMinimum ValueClassification of inland water body
(1.)CODmg/l22424B
(2.)DOmg/l5.74.2B
(3.)OthersTDSmg/l1524512B
(4.)pHNA7.947.08B
(5.)BODmg/l72.897.8B
    14.4.     No. of Ambient Noise monitoring locations : 8
S. No.Parameter UnitMaximum ValueMinimum ValuePrescribed Standard
(1.)Leq(Day)A-weighted decibels(dB(A))58.741.855
(2.)Leq(Night)A-weighted decibels(dB(A))48.841.345
    14.5.     No. of Soil Sample Monitored locations : 8
S. No.Parameter UnitOther UnitMaximum ValueMinimum Value
(1.)N(Nitrogen)OthersNot Measured00
(2.)P(Phosphorus)Milligram per Kilogram4.230.43
(3.)K(Potassium)Milliequivalents per 100 Gram26.2015.53
(4.)Electric ConductivityMillisiemens per Centimetre0.8330.069
(5.)pHOthersNot Applicable7.356.72
14.6.
Details of Ground Water Table:
(a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) From 0.78 To 22.45
(b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) From 1.68 To 21.97
(c)Whether Ground Water Intersection will be there ? No
     15.      Details of Water Requirement (During Operation)
S. No.Source Source Other Required Quantity (Kilolitre per Day (Kld))Distance from SourceCopy of Permission from Competent Authority Mode of TransportOther Mode of TransportMethod of Water WithdrawalOther Method of Water WithdrawalLetter No.Date of IssuePermitted Quantity
(1.)Surface42.30Copy of Permission LetterPipelineOthersNarmada WaterGWIL/Rajkot/Ind.Conn./45905 Mar 201533
15.1.
(a)Whether Desalination is proposed No
    16.       Waste Water Management(During Operation)
S. No.Type/Source Quantity of Waste Water Generated (Kilolitre per Day)Treatment Capacity (Kilolitre per Day) Treatment MethodMode of DisposalOther Mode of DisposalQuantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day)Quantity of Discharged Water (Kilolitre per Day)
(1.)Domestic00Total 6 KL/Day Domestic Wastewater will be treated in the STPOthersTreated Sewage will be reused for gardening00
(2.)Industrial00Total 6.1 KL/Day effluent will be treated in ETP followed by EvaporatorOthersZero Discharge00
16.1.
(a)Total Waste Water Generation (Kilolitre per Day) 0
(b)Total Discharged Water (Kilolitre per Day) 0
(c)Total Reused Water (Kilolitre per Day) 0
    17.       Solid Waste Generation/Management
S. No.Name of Waste Item Other ItemQuantity per AnnumUnitDistance from Site(KM)Mode of TransportOther Mode of TransportMode of DisposalOther Mode of Disposal
(1.)ETP Sludge + Evaporation ResidueHazardous Waste (as per Hazardous and Other Waste Management rules 2016)53.4Tons61RoadTreatment, Storage and Disposal Facility(TSDF)
(2.)Discarded Plastic Bags/BarrelsHazardous Waste (as per Hazardous and Other Waste Management rules 2016)583Tons30RoadOthersAuthorized Vendors
(3.)Used OilHazardous Waste (as per Hazardous and Other Waste Management rules 2016)0.036Tons30RoadAuthorized Recyclers
18.
    18.1.     Air Quality Impact Prediction
S. No.Criteria Pollutants Other Criteria PollutantsUnitBaseline ConcentrationDistance GLCIncremental ConcentrationTotal GLCPrescribed Standard
(1.)PM2.5NA00000
(2.)NOxMicrogram per Meter Cube70.937.040.070.9380
(3.)SO2Microgram per Meter Cube64.688.050.064.6880
(4.)PM10Microgram per Meter Cube88.478.050.088.47100
    18.2.     Stack Details
S. No.Source FuelStack Height(m)Stack Diameter(m)PollutantsOther PollutantsEmission (GLS)
(1.)Stack attached to Boiler & TFHBriquettes/Lignite401.0PM100.71
(2.)Stack attached to Boiler & TFHBriquettes/Lignite401.0NOx0.57
(3.)Stack attached to D.G.SetHigh Speed Diesel100.3OthersSPM, SO2, NOxD.G.Set will be used as back-up
(4.)Stack attached to Boiler & TFHBriquettes/Lignite401.0SO20.34
19.
Power Requirement:
(a)Quantity (Kilo Volt Amps (kVA)) 250
(b)Source Paschim Gujarat Vij Company Limited
(c)Uploaded Copy of Agreement Copy of Agreement
(d)Standby Arrangement (Details of DG Sets) 250 KVA D.G.Set (1 no.)
(e)Stack Height (in m) 10
20.
Land Ownership Pattern:
(a)Forest Land (ha.) 0
(b)Private Land (ha.) 1.4569
(c)Government Land (ha.) 0
(d)Revenue Land (ha.) 0
(e)Other Land (ha.) 0
    Total Land (ha.) 1.4569
21.
Present Land Use Breakup of the Study Area in Ha:
(a)Agriculture Area (ha.) 26397
(b)Waste/Barren Land (ha.) 2330
(c)Grazing/ Community Land (ha.) 188
(d)Surface Water Bodies (ha.) 1401
(e)Settlements (ha.) 477
(f)Industrial (ha.) 84
(g)Forest (ha.) 0
(h)Mangroves (ha.) 0
(i)Marine Area (ha.) 0
(j)Others (ha.) : Salt affected, Waterlogged and Sandy areas 535
    Total (ha.) 31412
    22.     Land requirement for various activities
S. No.Description of Activity / Facility / Plant / Others OthersLand Requirement (ha.)Remarks
(1.)Built Up Area0.6269
(2.)Green belt0.4810
(3.)OthersOpen Area0.3490
Total (ha.) 1.4569
23.
Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Sanctuaries; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones :
    23.1.     Details of Ecological Sensitivity :
S. No.Details of Ecological Sensitivity NameDistance from the Project (Km)Remarks
(1.)WLSNone within 10 km Radius0Not Applicable
(2.)NPANone within 10 km Radius0Not Applicable
(3.)ESAsNone within 10 km Radius0Not Applicable
(4.)ESZsNone within 10 km Radius0Not Applicable
(5.)CorridorsNone within 10 km Radius0Not Applicable
(6.)Wildlife CorridorsNone within 10 km Radius0Not Applicable
(7.)Critically Polluted AreaNone within 10 km Radius0Not Applicable
    23.2.     Details of Environmental Sensitivity :
S. No.Details of Environmental Sensitivity Other Details of Environmental Sensitivity NameDistance from the Project (Km)Remarks
(1.)ForestNone within 10 km Radius0Not Applicable
(2.)Archaeological SitesNone within 10 km Radius0Not Applicable
(3.)Defence InstallationsNone within 10 km Radius0Not Applicable
23.3.
(a)Whether Noc / Permission from the competent authority is required? No
(b)Whether NBWL recommendation is required? No
24.
Forest Land:
Whether any Forest Land involved? No
25.
Tree Cutting:
(a)No. of Trees Cut for the Project (if Forest Land not Involved) 0
(b)Details of Tree Cutting and Planting of Trees Not Applicable
26.
Land Acquisition Status:
(a)Acquired Land(Ha) 1.4569
(b)Land yet to be acquired(Ha) 0
(c)Status of Land acquisition if not acquired Not Applicable
27.
Rehabilitation and Resettlement (R&R):
(a)No. of Villages 0
(b)No. of Households 0
(c)No. of PDFs (Project Displaced Families) 0
(d)No. of PAFs (Project Affected Families) 0
(e)Funds Allocated for R&R(in INR) (in Lacs) 0
(f)Status of R&R Yet To Start
28.
Details of Presence of Schedule-I Species:
(a)Whether there is Presence of Schedule-I Species ? Yes
(i)Details of Schedule-I Species Indian Peafowl (Peacock)
(b)Whether conservation plan for Schedule-I Species has been prepared ? Yes
(i)Uploaded copy of conservation plan Copy of conservation plan
(ii)Fund Provision made 2 Lakhs
(iii)Period of Implementation 1 to 5 Years
(c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? No
29.
Details of Presence of Water Bodies in Core Area:
(a)Whether there is Presence of Water Bodies in Core Area ? No
(b)Whether there is Diversion Required ? No
(c)Whether permission has been obtained from competent authority ? No
30.
Details of Presence of Water Bodies in Buffer Area:
(a)Whether there is Presence of Water Bodies in Buffer Area ? Yes
(i)Details of Water Bodies in Buffer Area Macchu River
(ii)Direction of Water Bodies in Buffer Area North West
(iii)Distance of Water Bodies in Buffer Area 4.8
31.
Manpower Requirement:
(a)Permanent Employment-During Construction 0
(b)Permanent Employment-During Operation 70
(c)Temporary Employment- During Construction 0
(d)Temporary Employment- During Operation 0
(e)No. of working days 26
(f)Total Manpower 70
32.
Green Belt in Ha:
(a)Uploaded Green Belt plan Copy of Green Belt Plan
S. No.Description ExistingProposedTotal
(1.)No. of Plants500225725
(2.)Percentage of Total Project Area231033
(3.)Total Area of Green Belt332014904810
(4.)Funds Allocated20000090000290000
    33.         Project Benefits
S. No.Type of Project Benefits Details of Project Benefits
(1.)FinancialRevenue generation to the government
(2.)SocialEmployment generation in surrounding area
   34.   CRZ Specific Details : Not Applicable
   35.   Sector Specific Details For Industrial Projects - 3
S. No.Item Details
S. No.Item Details
36.
Details of Court Cases:
(a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? Yes
(b)Name of the Court Districts Courts
(c)Name of the Sub Court City Civil Courts, Ahmedabad
(d)Case No. GJMR010002312014
(e)Orders/Directions of the court ,if any and its relevance with the proposed project At present, litigation is pending against our exis
(f)Case Details Criminal Appeal
(g)Uploaded Court Order Copy of Court Order
37.
Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act:
(a)Whether any Direction issued under EPA Act/Air Act/Water Act ? Yes
(b)Details of Direction Issued Under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act GPCB has issued Direction Notice under Section 33-A under Water Act-1974 as well as Show Cause Notice under Air Act-1981 & Water Act-1974 to the existing unit on 17/10/2012 and 25/11/2016 respectively
(c)Uploaded Copy of Direction Issued Under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act Copy of Direction Issued
(d)Compliance status of the directions Complied
38.
Details of EIA Consultant:
(a)Have you hired Consultant for preparing document? Yes
(i)Accreditation No. NABET/EIA/1619/RA 0033
(ii)Name of the EIA Consultant M/s. T. R. Associates
(iii)Address A-401, S. G. Business Hub, Between Bhagwat Vidhyapith & Gota Over Bridge, Near Umiya Campus, S. G. Highway, Ahmedabad- 380060.
(iv)Mobile No. 9825371099
(v)Landline No. 9712971099
(vi)Email Id adm.trassociates@gmail.com
(vii)Category of Accreditation A
(viii)Sector of Accreditation Industrial Projects - 3
(ix)Validity of Accreditation 17 Mar 2019
(x)Uploaded Certificate of Accreditation certified by QCI/NABET Copy of Certificate of Accreditation
39.
Documents to be Attached:
(a)Uploaded Copy of EIA/EMP Report Copy of EIA/EMP
Copy of EIA/EMP(Annexures)
Copy of EIA/EMP(Plans/Figures)
(b)Uploaded Copy of Risk Assessment Report Copy of Risk Assessment
(c)Uploaded Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan
(d)Uploaded Copy of Final Layout Plan Copy of Final Layout Plan
(e)Uploaded Cover Letter Copy of Cover Letter
(f)Uploaded Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency
(g)Uploaded Additional File Copy of Additional File
(h)Uploaded Proposal Presentation (To be given in EAC meeting) NA
            Essential Detail Sought:
Sno. EDS Letter Remarks Date of EDS
1.NAPlease inform/clarify the following:- - Status of clearances (EC/Consent to Operate) for the present industrial operations of capacity 1500 TPA, and the compliance status thereof. - Commitment of the competent authority to supply 42.3 cum/day of surface water. - Entry against item 6 of the Form-2 shows the details as Nil, which needs to be corrected. 23 Sep 2018
2.NAThe correction have been made as per the instruction received 06 Oct 2018
3.NA- As per the CTO dated 23/3/2018, resin manufacturing capacity is 125000 TPM. Whereas, as per Form-2, project is for expansion from 125 TPM to 1500 TPM. This needs to be clarified/corrected. - The project involves violation of the EIA Notification, 2006 due to resin mfg plant already established without obtaining the prior EC. In such a case, the project requires consideration in terms of the Ministry's Notification dated 14/3/2017. 13 Oct 2018
4.NAThe correction have been made as per the instruction received 17 Oct 2018
5.NAPlease submit legible copy of the compliance report for the EC dated 21/8/2015 granted by SEIAA. 25 Oct 2018
6.NAThe correction have been made as per the instruction received 30 Oct 2018
7.NA- As desired earlier also, legible copy of the compliance report for the EC dated 21/8/2015, has not been provided. - Details of pending court matter as reflected in column 36 of Form-2, and the directions, if any. - Present status of the directions issued by SPCB under the Air/Water Act, as mentioned in column 37 of Form-2. 07 Nov 2018
8.NAThe correction have been made as per the instruction received 05 Dec 2018
      Additional Detail Sought : NIL
Undertaking
I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief. And I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity/ construction/ expansion has since been taken up.
Name of ApplicantJignesh Bavarva
DesignationPartner
Name of Company (Applicant Name should not be given here)REBECCA LAMINATES
AddressSurvey no.: 132 paiki 1, NH 8A, Village: Bahadurgadh, Taluka: Morbi, District: Morbi, Gujarat.363642
Print