Form-2
APPLICATION FOR PRIOR ENVIRONMENTAL CLEARANCE
S. No.Item Details
1.
Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? No
Details of Project:
(a)Name of the project(s) Aurobindo Pharma Limited, Unit XI
(b)Name of the Company / Organisation AUROBINDIO PHARMA LTD UNIT XI
(c)Registered Address Aurobindo Pharma Ltd Unit XI,Plot No. 11, Sy. No. 9, The Warer Mark Building, Kondapur, Hitech City, Hyderabad,Hyderabad,Telangana-500084
(d)Legal Status of the Company Central Government
(e)Joint Venture No
2.
Address for the correspondence:
(a)Name of the Applicant JVN Reddy VN Reddy
(b)Designation (Owner/ Partner/ CEO) AP
(c)Address Aurobindo Pharma Limited, Unit XI, Sy. No. 52, 53, 58, 59, 61, 62, 63, 64, 65, 66, 67, 68, 69, 70, 71, 72, 73, 74, 75, 76, 77 and 78 Pydibhimavaram Village, 2, 4, 5, 6, 7, 8 , 9 and 11 Chittivalasa Village,,,Srikakulam,Andhra Pradesh-532409
(d)Pin code 532409
(e)E-mail jvnreddy1960@gmail.com
(f)STD Code. 40(f)Telephone No. 23736370
(g)Fax No. 04023747340
(h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . Annexure-Uploaded Copy of documents in support of the competence/authority
3.
Category of the Project/Activity as per Schedule of EIA Notification,2006:
(a.I)Project/Activity5(f) Synthetic organic chemicals industry (dyes & dye intermediates; bulk
Minor Activity
(b)Category A
(c)Proposal Number IA/AP/IND2/78618/1900
(d)Master Proposal Number(Single Window) SW/78616/2018
(e)EAC concerned (for category A Projects only) Industrial Projects - 3
(f)Project Type Expansion
4.
Location of the Project:
(a)Plot/Survey/Khasra No. Sy. No. 52,53,58,59,61,62,63,64,65,66,67,68,69,70,
(b)Pincode 532409
(c)Bounded Latitudes (North)
From
Degree 18.074916
Minutes
Second
From
Degree 18.0909
Minutes
Second
(d)Bounded Longitudes (East)
From
Degree 83.372273
Minutes
Second
From
Degree 83.374556
Minutes
Second
(e)Survey of India Topo Sheet No. 65N/12 (E44L12)
(f)Uploaded Topo Sheet File Copy of Topo Sheet File
(g)Maximum Elevation Above Means Sea Level(AMSL) 30
(h)Uploaded (kml) File Copy of Kml File      
(i)Distance of Nearest HFL from the project boundary within the study area 7.2
(j)Seismic Zone 2
5.
(a)Number of States in which Project will be Executed 1
(b)Main State of the project Andhra Pradesh
Details of State(s) of the project
S. No. State Name District Name Tehsil Name Village Name
(1.)Andhra PradeshSrikakulamRanasthalamPydibheemavaram
6.
Details of Terms of Reference (ToR)/EC:
(a)MoEF&CC / SEIAA File Number J-11011/53/2005-IA II (I)
(c)Date of Issue of TOR 01 Jan 1900
(f)Previous TOR Letter Copy of Previous TOR letter
(b)Date of Apply of EC 04 Jan 2019
(c)Date of Issue of EC 25 Jan 2021
(d)Previous EC Letter Copy of Previous EC letter
7.
Details of Public Consultation:
(a)Whether the Project Exempted from Public Hearing?No
(b)Whether details of Public Hearing available? Yes
(c)Whether Public hearing was presided over by an officer of the rank of Additional District Magistrate or above Yes
     7.1.       Details of Public Hearing
S. No.Details of Advertisement Details of Public Hearing Venue Location DetailsNo. of People AttendedIssues RaisedDesignation of Presiding OfficerOther Designation of Presiding Officer
(1.)
Date of Advertisement :25 Feb 2018
Copy of advertisement :Copy of Advertisement
Copy of Public Hearing :Copy of Public Hearing
Date :28 Mar 2018
Distance of Public Hearing Venue from the Proposed Project :0.7
Play Ground of ZP High School, Pydibheemavaram
State :Andhra Pradesh
District :Srikakulam
Tehsil :Ranasthalam
Village :Pydibheemavaram
250Employment CSRDistrict Collector
8.
Details of Project Configuration/Product:
Details Not Applicable
9.
In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii):
(a)Details of certified report on compliance of earlier environmental clearance condition
(i)Certified Compliance By Regional
(ii)Details of Regional Office of MoEFCC / Zonal Office of CPCB / SPCB / UTPCC from which certified report on Chennai
(iii)Letter No. EP/12.1/324/AP/1134
(iv)Status of Compliance Compiled
(v)Certified report on compliance of earlier environmental clearance conditions (Including Monitoring Report) Copy of Certified Compliance Report
(vi)Date of site visit Jun 28 2018 12:00AM
(b)Details of Capacity Expansion
S. No.Product/Activity (Capacity/Area)Quantity FromQuantity ToTotal UnitOther UnitMode of Transport / Transmission of ProductOther Mode of Transport / Transmission of Product
(1.)0583.319351518OthersTons Per MonthRoad
(c)Details of Configuration
S. No.Plant / Equipment / Facility Existing ConfigurationProposed ConfigurationFinal configuration after expansionRemarks
(1.)Plant583.31TPM934.99TPM1518.33 TPMBulk Drug and Intermediates Mannufacturing Unit
9.1.
Details of Consent to Operate
(i)Whether Consent to operate obtained ? NA
(ii)Copies of all Consent to operate obtained since inception NA
(iii)Date of Issue 26 Oct 2017
(iv)Valid Upto 31 Dec 2021
(v)File No. APPCB/VSP/VZN/142/CFO/HO/2015-2064
(vi)Application No. 26.09.2017 Auto Renewal of CTO
(vii)Copy of Consent to operate valid as on date Copy of Consent to Operate
10.
Project Cost:
(a)Total Cost of the Project at current price level (in Crores) 250
(b) Funds Allocated for Environment Management (Capital) (in Crores) 32.77
(c) Funds Allocated Towards CER (Corporate Environment Responsibility) (in Crores) 6.25
(d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in Crores) 8.84
11.
Whether project attracts the General Condition specified in the Schedule of EIA Notification ? No
12.
Whether project attract the Specific Condition specified in the Schedule of EIA Notification ? No
13.
Raw Material / Fuel Requirement:
(a)Proposed quantity of raw material/fuel 1247
(b)Existing quantity of raw material/fuel 835
(c)Total quantity of raw material/fuel 2082
    13.1.        Raw Material / Fuel Profile
S. No.Raw Material / Fuel QuantityUnitOther UnitSource (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received )Mode of TransportOther Mode of TransportDistance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received)Type of Linkage Other Type of Linkage Uploaded Copy of Linkage
(1.)Synthetic Organic Chemicals2082OthersTons Per MonthIndigenousRoad250 Open MarketCopy of Linkage
14.
Baseline Data :
(a)Period of Base Line Data Collection FROM 01 Mar 2018 To 30 May 2018
(b)Season Summer
    14.1.     No. of ambient Air Quality (AAQ) monitoring locations : 8
S. No.Criteria Pollutants Other Criteria PollutantsUnitMaximum ValueMinimum Value98 Percentile ValuePrescribed Standard
(1.)PM10Micro Gram per Meter Cube563556100
(2.)PM2.5Micro Gram per Meter Cube24142460
(3.)SO2Micro Gram per Meter Cube1591580
(4.)NOxMicro Gram per Meter Cube1491480
    14.2.     No. of Ground Water monitoring locations : 8
S. No.Criteria Pollutants Other Criteria PollutantsHeavy MetalUnitOther UnitMaximum ValueMinimum ValueDesirable LimitMaximum Permissible Limit
(1.)Chloridesmg/l279153250250
(2.)TDSmg/l888699500500
(3.)TSSmg/l1610100100
(4.)Total Hardnessmg/l632323200200
(5.)pHOthersNo Units7.8476.58.5
(6.)Fluoridemg/l0.530.311
    14.3.     No. of Surface Water monitoring locations : 2
S. No.Criteria Pollutants Other Criteria PollutantsUnitOther UnitMaximum ValueMinimum ValueClassification of inland water body
(1.)pHNA8.258.15E
(2.)DOmg/l64E
(3.)CODmg/l5020E
(4.)BODmg/l16.56.6E
    14.4.     No. of Ambient Noise monitoring locations : 8
S. No.Parameter UnitMaximum ValueMinimum ValuePrescribed Standard
(1.)Leq(Night)A-weighted decibels(dB(A))423270
(2.)Leq(Day)A-weighted decibels(dB(A))584675
    14.5.     No. of Soil Sample Monitored locations : 8
S. No.Parameter UnitOther UnitMaximum ValueMinimum Value
(1.)N(Nitrogen)Percent0.190.01
(2.)P(Phosphorus)Percent1.030.3
(3.)Electric ConductivityOthersdS/m0.260.06
(4.)K(Potassium)Milligram per Kilogram25946
(5.)pHOthersNA7.556.35
14.6.
Details of Ground Water Table:
(a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) From 15 To 4
(b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) From 12 To 2
(c)Whether Ground Water Intersection will be there ? NA
     15.      Details of Water Requirement (During Operation)
S. No.Source Source Other Required Quantity (Kilolitre per Day (Kld))Distance from SourceCopy of Permission from Competent Authority Mode of TransportOther Mode of TransportMethod of Water WithdrawalOther Method of Water WithdrawalLetter No.Date of IssuePermitted Quantity
(1.)GroundWater40430Copy of Permission LetterPipelineTube Well2452/Hg.II/201826 Nov 20184178
15.1.
(a)Whether Desalination is proposed No
    16.       Waste Water Management(During Operation)
S. No.Type/Source Quantity of Waste Water Generated (Kilolitre per Day)Treatment Capacity (Kilolitre per Day) Treatment MethodMode of DisposalOther Mode of DisposalQuantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day)Quantity of Discharged Water (Kilolitre per Day)
(1.)High TDS and Low COD375800Sent to RO. RO permeate reused for cooling towers and rejects sent to Guard ponds followed by Marine outfall systemDischarge into Seawater Body375
(2.)Domestic Wastewater305350Sent to Sewage Treatment Plant and treated wastewater is used for on land irrigation for greenbelt developmentGreen Belt Renewal Plant305
(3.)Low TDS and High COD155250Effluent is stripped in a standalone steam stripper to remove organics. Stripper condensate will be sent to cement plants for Co-Incineration. Stripper bottom is further treated with Stream I effluent.Discharge into Seawater Body155
(4.)Low TDS and Low COD7481000Sent to Biological effluent treatment plant followed by Membrane Bio Reactor (MBR), Guard ponds and Marine outfall system.Discharge into Seawater Body748
(5.)High TDS and High COD7371000Effluent is stripped in a steam stripper to remove organics and then concentrated in Multiple Effect Evaporators (MEE) followed by drying in Agitated Thin Film Dryer (ATFD). Stripper condensate will be sent to cement plants for Co-Incineration. Solid waste from ATFD is sent to secured land fill. Distillate from MEE and ATFD is sent for further treatment in biological treatment plantDischarge into Seawater Body737
16.1.
(a)Total Waste Water Generation (Kilolitre per Day) 2320
(b)Total Discharged Water (Kilolitre per Day) 2015
(c)Total Reused Water (Kilolitre per Day) 305
    17.       Solid Waste Generation/Management
S. No.Name of Waste Item Other ItemQuantity per AnnumUnitDistance from Site(KM)Mode of TransportOther Mode of TransportMode of DisposalOther Mode of Disposal
(1.)Organic Incinerable WasteHazardous Waste (as per Hazardous and Other Waste Management rules 2016)27144Tons120RoadOthersSent to Cement Plant for Incineration/TSDF
(2.)Evaporation SaltsHazardous Waste (as per Hazardous and Other Waste Management rules 2016)6890.4Tons90RoadTreatment, Storage and Disposal Facility(TSDF)
18.
    18.1.     Air Quality Impact Prediction
S. No.Criteria Pollutants Other Criteria PollutantsUnitBaseline ConcentrationDistance GLCIncremental ConcentrationTotal GLCPrescribed Standard
(1.)PM10Microgram per Meter Cube531.10.2153.21100
(2.)PM2.5Microgram per Meter Cube191.10.0919.0960
(3.)SO2Microgram per Meter Cube121.11.113.180
(4.)NOxMicrogram per Meter Cube121.11.1513.1580
    18.2.     Stack Details
S. No.Source FuelStack Height(m)Stack Diameter(m)PollutantsOther PollutantsEmission (GLS)
(1.)35 TPH BoilerCoal471.31PM101.04 gms/sec
(2.)35 TPH BoilerCoal471.31NOx2.33 gms/sec
(3.)35 TPH BoilerCoal471.31SO24.23 gms/sec
19.
Power Requirement:
(a)Quantity (Kilo Volt Amps (kVA)) 19950
(b)Source Captive Power Plant and APTRANSCO
(c)Uploaded Copy of Agreement Not Applicable
(d)Standby Arrangement (Details of DG Sets) 16630
(e)Stack Height (in m) 12
20.
Land Ownership Pattern:
(a)Forest Land (ha.) 0
(b)Private Land (ha.) 66.773
(c)Government Land (ha.) 0
(d)Revenue Land (ha.) 0
(e)Other Land (ha.) 0.0
    Total Land (ha.) 66.773
21.
Present Land Use Breakup of the Study Area in Ha:
(a)Agriculture Area (ha.) 0
(b)Waste/Barren Land (ha.) 0
(c)Grazing/ Community Land (ha.) 0
(d)Surface Water Bodies (ha.) 0
(e)Settlements (ha.) 0
(f)Industrial (ha.) 66.773
(g)Forest (ha.) 0
(h)Mangroves (ha.) 0
(i)Marine Area (ha.) 0
(j)Others (ha.) : Expansion is within existing site area 0.0
    Total (ha.) 66.773
    22.     Land requirement for various activities
S. No.Description of Activity / Facility / Plant / Others OthersLand Requirement (ha.)Remarks
(1.)Green belt22.25
(2.)Built Up Area44.523
Total (ha.) 66.773
23.
Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Sanctuaries; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones :
    23.1.     Details of Ecological Sensitivity :
S. No.Details of Ecological Sensitivity NameDistance from the Project (Km)Remarks
(1.)Critically Polluted AreaNo CPA within 10 km radius0No CPA within 10 km radius
(2.)ESAsNo ESAs0No ESAs
(3.)CorridorsNo Corridors0No Corridors
(4.)WLSNo WLS0No WLS
(5.)NPANo NPA0No NPA
(6.)ESZsNo ESZs0Np ESZs
(7.)Wildlife CorridorsNo Wildlife Corridors0No Wildlife Corridors
    23.2.     Details of Environmental Sensitivity :
S. No.Details of Environmental Sensitivity Other Details of Environmental Sensitivity NameDistance from the Project (Km)Remarks
(1.)ForestKumili RF2.1Northwest direction
(2.)Archaeological SitesNo Archaeological Sites0No Archaeological Sites
(3.)Defence InstallationsNo Defence Installations0No Defence Installations
23.3.
(a)Whether Noc / Permission from the competent authority is required? No
(b)Whether NBWL recommendation is required? No
24.
Forest Land:
Whether any Forest Land involved? No
25.
Tree Cutting:
(a)No. of Trees Cut for the Project (if Forest Land not Involved) Not Applicable
(b)Details of Tree Cutting and Planting of Trees Not Applicable
26.
Land Acquisition Status:
(a)Acquired Land(Ha) 66.773
(b)Land yet to be acquired(Ha) 0
(c)Status of Land acquisition if not acquired Acquired
27.
Rehabilitation and Resettlement (R&R):
(a)No. of Villages 0
(b)No. of Households 0
(c)No. of PDFs (Project Displaced Families) 0
(d)No. of PAFs (Project Affected Families) 0
(e)Funds Allocated for R&R(in INR) (in Lacs) 0
(f)Status of R&R Completed
28.
Details of Presence of Schedule-I Species:
(a)Whether there is Presence of Schedule-I Species ? No
(b)Whether conservation plan for Schedule-I Species has been prepared ? No
(c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? No
29.
Details of Presence of Water Bodies in Core Area:
(a)Whether there is Presence of Water Bodies in Core Area ? No
(b)Whether there is Diversion Required ? No
(c)Whether permission has been obtained from competent authority ? No
30.
Details of Presence of Water Bodies in Buffer Area:
(a)Whether there is Presence of Water Bodies in Buffer Area ? Yes
(i)Details of Water Bodies in Buffer Area Bay of Bengal
(ii)Direction of Water Bodies in Buffer Area South East
(iii)Distance of Water Bodies in Buffer Area 7.2
31.
Manpower Requirement:
(a)Permanent Employment-During Construction 30
(b)Permanent Employment-During Operation 400
(c)Temporary Employment- During Construction 90
(d)Temporary Employment- During Operation 200
(e)No. of working days 720
(f)Total Manpower 720
32.
Green Belt in Ha:
(a)Uploaded Green Belt plan Copy of Green Belt Plan
S. No.Description ExistingProposedTotal
(1.)Total Area of Green Belt22.257022
(2.)Percentage of Total Project Area33.33033
(3.)No. of Plants30000350033500
(4.)Funds Allocated20828
    33.         Project Benefits
S. No.Type of Project Benefits Details of Project Benefits
(1.)SocialEmployement Potential CSR
(2.)EnvironmentalGreenbelt Development
   34.   CRZ Specific Details : Not Applicable
   35.   Sector Specific Details For Industrial Projects - 3
S. No.Item Details
S. No.Item Details
36.
Details of Court Cases:
(a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? No
37.
Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act:
(a)Whether any Direction issued under EPA Act/Air Act/Water Act ? No
38.
Details of EIA Consultant:
(a)Have you hired Consultant for preparing document? Yes
(i)Accreditation No. NABET/EIA/1619/RA 0077
(ii)Name of the EIA Consultant Team Labs and Consultants
(iii)Address B-115 to 117, Annapurna Block, Aditya enclave, Ameerpet, Hyderabad, telangana
(iv)Mobile No. 9866415966
(v)Landline No. 0402374855
(vi)Email Id teamlabs@@gmail.com
(vii)Category of Accreditation A
(viii)Sector of Accreditation Industrial Projects - 3
(ix)Validity of Accreditation 01 Dec 2019
(x)Uploaded Certificate of Accreditation certified by QCI/NABET Copy of Certificate of Accreditation
39.
Documents to be Attached:
(a)Uploaded Copy of EIA/EMP Report Copy of EIA/EMP
Copy of EIA/EMP(Annexures)
Copy of EIA/EMP(Plans/Figures)
(b)Uploaded Copy of Risk Assessment Report Copy of Risk Assessment
(c)Uploaded Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan
(d)Uploaded Copy of Final Layout Plan Copy of Final Layout Plan
(e)Uploaded Cover Letter Copy of Cover Letter
(f)Uploaded Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency
(g)Uploaded Additional File Copy of Additional File
(h)Uploaded Proposal Presentation (To be given in EAC meeting) NA
            Essential Detail Sought:
Sno. EDS Letter Remarks Date of EDS
1.NA- Please inform about the status of clearances obtained/required (EC/Consent to Operate) for the present production of 583.31 TPM, and the compliance status thereof. - No details provided against item 6 of the Form-2. - Commitment/permission from the competent authority for ground water withdrawal of 4043 cum/day along with the supporting document. 23 Sep 2018
2.NAThe correction have been made as per the instruction received 10 Oct 2018
3.NAThe correction have been made as per the instruction received 10 Oct 2018
4.NAThe correction have been made as per the instruction received 10 Oct 2018
5.NAPlease provide firm commitment or acceptance of your request by the concerned regulatory authority for additional ground water withdrawal of 1850 cum/day. 15 Oct 2018
6.NAThe correction have been made as per the instruction received 16 Nov 2018
7.NAPlease inform/clarify the following:- - No details provided against cloumn 6 of Form-2. - There is no consistency in approvals given by the State Government vide letters dated 6/10/2001, 4/1/2015 & 26/7/2017 in respect of existing/proposed bore wells for ground water withdrawal of 410, 2240 and 560 cum/day respectively. - As already requested, firm commitment or acceptance of your request by the concerned regulatory authority for additional ground water withdrawal of 1000 cum/day. 03 Dec 2018
8.NAThe correction have been made as per the instruction received 04 Dec 2018
9.NAPlease reply to our observations dated 3/12/2018 to take the proposal forward. 12 Dec 2018
10.NAThe correction have been made as per the instruction received 17 Dec 2018
11.NAAs already requested, please reply to our observations dated 3/12/2018 to take the proposal forward. 22 Dec 2018
12.NAThe correction have been made as per the instruction received 23 Dec 2018
13.NAWe reiterate our observations dated 3/12/2018 for the needful, and to take the proposal forward. 30 Dec 2018
14.NAThe correction have been made as per the instruction received 04 Jan 2019
            Additional Detail Sought:
Sno. ADS Letter Remarks Date of ADS
1. ADS Reply LetterDear Sir, Please find the point wise response to the clarifications sought by ministry 05 Dec 2020
2.NAThe Ministry has examined the proposal for environmental clearance to the project for expansion of bulk drugs and Intermediates manufacturing unit from 583.31 TPM to 1518.3 TPM by M/s Aurobindo Pharma Limited (Unit XI) in an area of 165 acres located at Sy. Nos. 52, 53, 58, 59, 61 to 78, Village Pydibhimavaram, Sy.Nos. 2, 4 to 9 & 11, Village Chittivalasa, Mandal Ranasthalam, District Srikakulam (Andhra Pradesh). 2. It is noted that the proposal also involves CRZ clearance. In this regard, the Ministry has asked certain additional information from the project proponent and the same was found not addressing the concerns raised by the Ministry. 3. In this regard, it has been decided to convene a meeting under the Chairmanship of the Joint Secretary (SKB), IA Division, MoEF&CC on 7th October, 2020 at 11.00 AM. 4. In this regard, I am directed to request you to kindly attend the meeting through Video Conferencing (VC). The project proponent is requested to make presentation on the CRZ matters along with all the requisite documents as desired by the Ministry earlier through ADS. Meeting Notice vide email dated 30.09.2020 has already forwarded to PP and Consultant. 03 Oct 2020
3. ADS Reply LetterDear Sir, Please find the enclosed ADS Response. Kindly process our application. 21 Sep 2020
4. ADS Raise LetterBased on the information submitted by PP on 05.08.2020, the proposal was examined by the CRZ sector of IA Division and accordingly again the deficiencies were observed by the sector. The observation is attached herewith. In view of the above, the under signed is directed to say that PP is kindly requested again to submit the clarification as sought by CRZ sector for further necessary action by the Ministry. 21 Aug 2020
5. ADS Reply LetterDear Sir, please find the point wise response to the ADS sought on 24.07.2020 06 Aug 2020
6. ADS Raise LetterThe proposal was examined by the Ministry. As desired by the CRZ section of the Ministry, following additional information may be submitted for taking the proposal forward. 24 Jul 2020
7. ADS Reply LetterDear Sir, Please find the response to the ADS sought on 11.06.2020. 1. NOC from APCZMA 2. Rapid Marine EIA 3. CRZ Application submitted to APCZMA 4. Resubmission of CRZ Application to APCZMA 5. Clarifications sought by APCZMA and its reponse 24 Jun 2020
8.NAThe ADS uploaded by the PP is having recommendations from APCZMA only. PP is kindly requested to submit all the documents submitted for CRZ clearance as per para 4.2 of the CRZ Notification, 2011, like Marine EIA, CRZ map, NOC etc to the Ministry immediately. 11 Jun 2020
9. ADS Reply LetterDear Sir, Please find the NOC from APCZMA. Please process our EC application and issue the same. 01 Jun 2020
10.NADear Sir, The information submitted by PP vide letter dated 27.03.2020 has been examined and it is noted that the State CZMA recommendations for CRZ clearance was not submitted due to postponed of APCZMA meeting. The Ministry will wait the APCZMA recommendations for necessary action. 28 Mar 2020
11. ADS Reply LetterDear Sir, Please find the enclosed ADS Response 27 Mar 2020
12.NAPlease refer our earlier ADS dated 20.02.2020 and it seems that PP has not submitted the information yet. Please submit the details otherwise your proposal may be delisted. Sir, This has reference to your proposal No. IA/AP/IND2/78618/1900 dated 4th January, 2019 on the subject matter. 2. The proposal for environmental clearance was considered by the Expert Appraisal Committee (Industry-2) in its meeting held on 8-9 April, 2019. On examination of the proposal in the Ministry subsequent to the recommendations of the EAC, it is noted that the project also involves certain activities in the CRZ area, and the proposal has been submitted without the recommendations State Coastal Zone Management Authority. 3. In view of the above, it is requested to submit the proposal for environmental and CRZ clearance along with the recommendations of the Andhra Pradesh State Coastal Zone Management Authority, and with supporting documents for further action into the matter. 17 Mar 2020
13. ADS Reply LetterDear Sir, Please find the resposne for the clarifications sought on CRZ recommendations 28 Feb 2020
14.NASir, This has reference to your proposal No. IA/AP/IND2/78618/1900 dated 4th January, 2019 on the subject matter. 2. The proposal for environmental clearance was considered by the Expert Appraisal Committee (Industry-2) in its meeting held on 8-9 April, 2019. On examination of the proposal in the Ministry subsequent to the recommendations of the EAC, it is noted that the project also involves certain activities in the CRZ area, and the proposal has been submitted without the recommendations State Coastal Zone Management Authority. 3. In view of the above, it is requested to submit the proposal for environmental and CRZ clearance along with the recommendations of the Andhra Pradesh State Coastal Zone Management Authority, and with supporting documents for further action into the matter. 20 Feb 2020
Undertaking
I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief. And I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity/ construction/ expansion has since been taken up.
Name of ApplicantJVN Reddy VN Reddy
DesignationAP
Name of Company (Applicant Name should not be given here)AUROBINDIO PHARMA LTD UNIT XI
AddressAurobindo Pharma Ltd Unit XI
Print