1. | Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? | No | Details of Project: | (a)Name of the project(s) | Aurobindo Pharma Limited, Unit XI | (b)Name of the Company / Organisation | AUROBINDIO PHARMA LTD UNIT XI | (c)Registered Address | Aurobindo Pharma Ltd Unit XI,Plot No. 11, Sy. No. 9, The Warer Mark Building, Kondapur, Hitech City, Hyderabad,Hyderabad,Telangana-500084 | (d)Legal Status of the Company | Central Government | (e)Joint Venture | No | |
|
2. | Address for the correspondence: | (a)Name of the Applicant | JVN Reddy VN Reddy | (b)Designation (Owner/ Partner/ CEO) | AP | (c)Address | Aurobindo Pharma Limited, Unit XI, Sy. No. 52, 53, 58, 59, 61, 62, 63, 64, 65, 66, 67, 68, 69, 70, 71, 72, 73, 74, 75, 76, 77 and 78 Pydibhimavaram Village, 2, 4, 5, 6, 7, 8 , 9 and 11 Chittivalasa Village,,,Srikakulam,Andhra Pradesh-532409 | (d)Pin code | 532409 | (e)E-mail | jvnreddy1960@gmail.com | (f)STD Code. | 40(f)Telephone No. | 23736370 | (g)Fax No. | 04023747340 | (h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . | Annexure-Uploaded Copy of documents in support of the competence/authority | |
|
3. | Category of the Project/Activity as per Schedule of EIA Notification,2006: | (a.I)Project/Activity | 5(f) Synthetic organic chemicals industry (dyes & dye intermediates; bulk
| Minor Activity | | (b)Category | A | (c)Proposal Number | IA/AP/IND2/78618/1900 | (d)Master Proposal Number(Single Window) | SW/78616/2018 | (e)EAC concerned (for category A Projects only) | Industrial Projects - 3 | (f)Project Type | Expansion |
|
|
4. | Location of the Project: | (a)Plot/Survey/Khasra No. | Sy. No. 52,53,58,59,61,62,63,64,65,66,67,68,69,70, | (b)Pincode | 532409 | (c)Bounded Latitudes (North) | | From | | Degree | 18.074916 | Minutes | | Second | | From | | Degree | 18.0909 | Minutes | | Second | | (d)Bounded Longitudes (East) | | From | | Degree | 83.372273 | Minutes | | Second | | From | | Degree | 83.374556 | Minutes | | Second | | (e)Survey of India Topo Sheet No. | 65N/12 (E44L12) | (f)Uploaded Topo Sheet File | Copy of Topo Sheet File | (g)Maximum Elevation Above Means Sea Level(AMSL) | 30 | (h)Uploaded (kml) File | Copy of Kml File | (i)Distance of Nearest HFL from the project boundary within the study area | 7.2 | (j)Seismic Zone | 2 | |
|
5. | (a)Number of States in which Project will be Executed | 1 | (b)Main State of the project | Andhra Pradesh | |
|
|
Details of State(s) of the project |
---|
S. No. | State Name | District Name | Tehsil Name | Village Name |
---|
(1.) | Andhra Pradesh | Srikakulam | Ranasthalam | Pydibheemavaram | |
|
6. | Details of Terms of Reference (ToR)/EC: | (a)MoEF&CC / SEIAA File Number | J-11011/53/2005-IA II (I) | (c)Date of Issue of TOR | 01 Jan 1900 | (f)Previous TOR Letter | Copy of Previous TOR letter | (b)Date of Apply of EC | 04 Jan 2019 | (c)Date of Issue of EC | 25 Jan 2021 | (d)Previous EC Letter | Copy of Previous EC letter | |
|
7. | Details of Public Consultation: | (a)Whether the Project Exempted from Public Hearing? | No | (b)Whether details of Public Hearing available? | Yes | (c)Whether Public hearing was presided over by an officer of the rank of Additional District Magistrate or above | Yes | |
|
7.1. Details of Public Hearing |
---|
|
S. No. | Details of Advertisement | Details of Public Hearing | Venue | Location Details | No. of People Attended | Issues Raised | Designation of Presiding Officer | Other Designation of Presiding Officer |
---|
(1.) | | Copy of Public Hearing : | Copy of Public Hearing | Date : | 28 Mar 2018 | Distance of Public Hearing Venue from the Proposed Project : | 0.7 |
| Play Ground of ZP High School, Pydibheemavaram | State : | Andhra Pradesh | District : | Srikakulam | Tehsil : | Ranasthalam | Village : | Pydibheemavaram |
| 250 | Employment
CSR | District Collector | | |
8. | Details of Project Configuration/Product: | Details Not Applicable | |
|
9. | In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii): | (a)Details of certified report on compliance of earlier environmental clearance condition | (i)Certified Compliance By | Regional | (ii)Details of Regional Office of MoEFCC / Zonal Office of CPCB / SPCB / UTPCC from which certified report on | Chennai | (iii)Letter No. | EP/12.1/324/AP/1134 | (iv)Status of Compliance | Compiled | (v)Certified report on compliance of earlier environmental clearance conditions (Including Monitoring Report) | Copy of Certified Compliance Report | (vi)Date of site visit | Jun 28 2018 12:00AM | (b)Details of Capacity Expansion | |
|
S. No. | Product/Activity (Capacity/Area) | Quantity From | Quantity To | Total | Unit | Other Unit | Mode of Transport / Transmission of Product | Other Mode of Transport / Transmission of Product |
---|
(1.) | 0 | 583.31 | 935 | 1518 | Others | Tons Per Month | Road | | |
| (c)Details of Configuration | |
|
S. No. | Plant / Equipment / Facility | Existing Configuration | Proposed Configuration | Final configuration after expansion | Remarks |
---|
(1.) | Plant | 583.31TPM | 934.99TPM | 1518.33 TPM | Bulk Drug and Intermediates Mannufacturing Unit | |
9.1. | Details of Consent to Operate | (i)Whether Consent to operate obtained ? | NA | (ii)Copies of all Consent to operate obtained since inception | NA | (iii)Date of Issue | 26 Oct 2017 | (iv)Valid Upto | 31 Dec 2021 | (v)File No. | APPCB/VSP/VZN/142/CFO/HO/2015-2064 | (vi)Application No. | 26.09.2017 Auto Renewal of CTO | (vii)Copy of Consent to operate valid as on date | Copy of Consent to Operate | |
|
|
10. | Project Cost: | (a)Total Cost of the Project at current price level (in Crores) | 250 | (b) Funds Allocated for Environment Management (Capital) (in Crores) | 32.77 | (c) Funds Allocated Towards CER (Corporate Environment Responsibility) (in Crores) | 6.25 | (d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in Crores) | 8.84 | |
|
11. | Whether project attracts the General Condition specified in the Schedule of EIA Notification ? | No | | |
12. | Whether project attract the Specific Condition specified in the Schedule of EIA Notification ? | No | | |
13. | Raw Material / Fuel Requirement: | (a)Proposed quantity of raw material/fuel | 1247 | (b)Existing quantity of raw material/fuel | 835 | (c)Total quantity of raw material/fuel | 2082 | |
|
  13.1. Raw Material / Fuel Profile |
---|
S. No. | Raw Material / Fuel | Quantity | Unit | Other Unit | Source (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received ) | Mode of Transport | Other Mode of Transport | Distance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received) | Type of Linkage | Other Type of Linkage | Uploaded Copy of Linkage |
---|
(1.) | Synthetic Organic Chemicals | 2082 | Others | Tons Per Month | Indigenous | Road | | 250 | Open Market | | Copy of Linkage | |
|
14. | Baseline Data : | (a)Period of Base Line Data Collection | FROM 01 Mar 2018 To 30 May 2018 | (b)Season | Summer | |
|
14.1. No. of ambient Air Quality (AAQ) monitoring locations : 8 |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Unit | Maximum Value | Minimum Value | 98 Percentile Value | Prescribed Standard |
---|
(1.) | PM10 | | Micro Gram per Meter Cube | 56 | 35 | 56 | 100 | (2.) | PM2.5 | | Micro Gram per Meter Cube | 24 | 14 | 24 | 60 | (3.) | SO2 | | Micro Gram per Meter Cube | 15 | 9 | 15 | 80 | (4.) | NOx | | Micro Gram per Meter Cube | 14 | 9 | 14 | 80 | |
14.2. No. of Ground Water monitoring locations : 8 |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Heavy Metal | Unit | Other Unit | Maximum Value | Minimum Value | Desirable Limit | Maximum Permissible Limit |
---|
(1.) | Chlorides | | | mg/l | | 279 | 153 | 250 | 250 | (2.) | TDS | | | mg/l | | 888 | 699 | 500 | 500 | (3.) | TSS | | | mg/l | | 16 | 10 | 100 | 100 | (4.) | Total Hardness | | | mg/l | | 632 | 323 | 200 | 200 | (5.) | pH | | | Others | No Units | 7.84 | 7 | 6.5 | 8.5 | (6.) | Fluoride | | | mg/l | | 0.53 | 0.3 | 1 | 1 | |
14.3. No. of Surface Water monitoring locations : 2 |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Unit | Other Unit | Maximum Value | Minimum Value | Classification of inland water body |
---|
(1.) | pH | | NA | | 8.25 | 8.15 | E | (2.) | DO | | mg/l | | 6 | 4 | E | (3.) | COD | | mg/l | | 50 | 20 | E | (4.) | BOD | | mg/l | | 16.5 | 6.6 | E | |
14.4. No. of Ambient Noise monitoring locations : 8 |
---|
S. No. | Parameter | Unit | Maximum Value | Minimum Value | Prescribed Standard |
---|
(1.) | Leq(Night) | A-weighted decibels(dB(A)) | 42 | 32 | 70 | (2.) | Leq(Day) | A-weighted decibels(dB(A)) | 58 | 46 | 75 | |
14.5. No. of Soil Sample Monitored locations : 8 |
---|
S. No. | Parameter | Unit | Other Unit | Maximum Value | Minimum Value |
---|
(1.) | N(Nitrogen) | Percent | | 0.19 | 0.01 | (2.) | P(Phosphorus) | Percent | | 1.03 | 0.3 | (3.) | Electric Conductivity | Others | dS/m | 0.26 | 0.06 | (4.) | K(Potassium) | Milligram per Kilogram | | 259 | 46 | (5.) | pH | Others | NA | 7.55 | 6.35 | |
|
14.6. | Details of Ground Water Table: | (a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) | From 15 To 4 | (b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) | From 12 To 2 | (c)Whether Ground Water Intersection will be there ? | NA | |
|
15. Details of Water Requirement (During Operation) |
---|
S. No. | Source | Source Other | Required Quantity (Kilolitre per Day (Kld)) | Distance from Source | Copy of Permission from Competent Authority | Mode of Transport | Other Mode of Transport | Method of Water Withdrawal | Other Method of Water Withdrawal | Letter No. | Date of Issue | Permitted Quantity |
---|
(1.) | GroundWater | | 4043 | 0 | Copy of Permission Letter | Pipeline | | Tube Well | | 2452/Hg.II/2018 | 26 Nov 2018 | 4178 | |
|
15.1. | (a)Whether Desalination is proposed | No | |
|
16. Waste Water Management(During Operation) |
---|
S. No. | Type/Source | Quantity of Waste Water Generated (Kilolitre per Day) | Treatment Capacity (Kilolitre per Day) | Treatment Method | Mode of Disposal | Other Mode of Disposal | Quantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day) | Quantity of Discharged Water (Kilolitre per Day) |
---|
(1.) | High TDS and Low COD | 375 | 800 | Sent to RO. RO permeate reused for cooling towers and rejects sent to Guard ponds followed by Marine outfall system | Discharge into Seawater Body | | | 375 | (2.) | Domestic Wastewater | 305 | 350 | Sent to Sewage Treatment Plant and treated wastewater is used for on land irrigation for greenbelt development | Green Belt Renewal Plant | | 305 | | (3.) | Low TDS and High COD | 155 | 250 | Effluent is stripped in a standalone steam stripper to remove organics. Stripper condensate will be sent to cement plants for Co-Incineration. Stripper bottom is further treated with Stream I effluent. | Discharge into Seawater Body | | | 155 | (4.) | Low TDS and Low COD | 748 | 1000 | Sent to Biological effluent treatment plant followed by Membrane Bio Reactor (MBR), Guard ponds and Marine outfall system. | Discharge into Seawater Body | | | 748 | (5.) | High TDS and High COD | 737 | 1000 | Effluent is stripped in a steam stripper to remove organics and then concentrated in Multiple Effect Evaporators (MEE) followed by drying in Agitated Thin Film Dryer (ATFD). Stripper condensate will be sent to cement plants for Co-Incineration. Solid waste from ATFD is sent to secured land fill. Distillate from MEE and ATFD is sent for further treatment in biological treatment plant | Discharge into Seawater Body | | | 737 | |
|
16.1. | (a)Total Waste Water Generation (Kilolitre per Day) | 2320 | (b)Total Discharged Water (Kilolitre per Day) | 2015 | (c)Total Reused Water (Kilolitre per Day) | 305 | |
|
17. Solid Waste Generation/Management |
---|
S. No. | Name of Waste | Item | Other Item | Quantity per Annum | Unit | Distance from Site(KM) | Mode of Transport | Other Mode of Transport | Mode of Disposal | Other Mode of Disposal |
---|
(1.) | Organic Incinerable Waste | Hazardous Waste (as per Hazardous and Other Waste Management rules 2016) | | 27144 | Tons | 120 | Road | | Others | Sent to Cement Plant for Incineration/TSDF | (2.) | Evaporation Salts | Hazardous Waste (as per Hazardous and Other Waste Management rules 2016) | | 6890.4 | Tons | 90 | Road | | Treatment, Storage and Disposal Facility(TSDF) | | |
|
|
18.1. Air Quality Impact Prediction |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Unit | Baseline Concentration | Distance GLC | Incremental Concentration | Total GLC | Prescribed Standard |
---|
(1.) | PM10 | | Microgram per Meter Cube | 53 | 1.1 | 0.21 | 53.21 | 100 | (2.) | PM2.5 | | Microgram per Meter Cube | 19 | 1.1 | 0.09 | 19.09 | 60 | (3.) | SO2 | | Microgram per Meter Cube | 12 | 1.1 | 1.1 | 13.1 | 80 | (4.) | NOx | | Microgram per Meter Cube | 12 | 1.1 | 1.15 | 13.15 | 80 | |
|
18.2. Stack Details |
---|
S. No. | Source | Fuel | Stack Height(m) | Stack Diameter(m) | Pollutants | Other Pollutants | Emission (GLS) |
---|
(1.) | 35 TPH Boiler | Coal | 47 | 1.31 | PM10 | | 1.04 gms/sec | (2.) | 35 TPH Boiler | Coal | 47 | 1.31 | NOx | | 2.33 gms/sec | (3.) | 35 TPH Boiler | Coal | 47 | 1.31 | SO2 | | 4.23 gms/sec | |
|
19. | Power Requirement: | (a)Quantity (Kilo Volt Amps (kVA)) | 19950 | (b)Source | Captive Power Plant and APTRANSCO | (c)Uploaded Copy of Agreement | Not Applicable | (d)Standby Arrangement (Details of DG Sets) | 16630 | (e)Stack Height (in m) | 12 | |
|
20. | Land Ownership Pattern: | (a)Forest Land (ha.) | 0 | (b)Private Land (ha.) | 66.773 | (c)Government Land (ha.) | 0 | (d)Revenue Land (ha.) | 0 | (e)Other Land (ha.) | 0.0 | Total Land (ha.) | 66.773 | |
|
21. | Present Land Use Breakup of the Study Area in Ha: | (a)Agriculture Area (ha.) | 0 | (b)Waste/Barren Land (ha.) | 0 | (c)Grazing/ Community Land (ha.) | 0 | (d)Surface Water Bodies (ha.) | 0 | (e)Settlements (ha.) | 0 | (f)Industrial (ha.) | 66.773 | (g)Forest (ha.) | 0 | (h)Mangroves (ha.) | 0 | (i)Marine Area (ha.) | 0 | (j)Others (ha.) : Expansion is within existing site area | 0.0 | Total (ha.) | 66.773 | |
|
22. Land requirement for various activities |
---|
S. No. | Description of Activity / Facility / Plant / Others | Others | Land Requirement (ha.) | Remarks |
---|
(1.) | Green belt | | 22.25 | | (2.) | Built Up Area | | 44.523 | | |
|
|
23. | Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Sanctuaries; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones : | |
|
23.1. Details of Ecological Sensitivity : |
---|
S. No. | Details of Ecological Sensitivity | Name | Distance from the Project (Km) | Remarks |
---|
(1.) | Critically Polluted Area | No CPA within 10 km radius | 0 | No CPA within 10 km radius | (2.) | ESAs | No ESAs | 0 | No ESAs | (3.) | Corridors | No Corridors | 0 | No Corridors | (4.) | WLS | No WLS | 0 | No WLS | (5.) | NPA | No NPA | 0 | No NPA | (6.) | ESZs | No ESZs | 0 | Np ESZs | (7.) | Wildlife Corridors | No Wildlife Corridors | 0 | No Wildlife Corridors | |
23.2. Details of Environmental Sensitivity : |
---|
S. No. | Details of Environmental Sensitivity | Other Details of Environmental Sensitivity | Name | Distance from the Project (Km) | Remarks |
---|
(1.) | Forest | | Kumili RF | 2.1 | Northwest direction | (2.) | Archaeological Sites | | No Archaeological Sites | 0 | No Archaeological Sites | (3.) | Defence Installations | | No Defence Installations | 0 | No Defence Installations | |
|
23.3. | (a)Whether Noc / Permission from the competent authority is required? | No | (b)Whether NBWL recommendation is required? | No | |
|
24. | Forest Land: | Whether any Forest Land involved? | No | |
|
25. | Tree Cutting: | (a)No. of Trees Cut for the Project (if Forest Land not Involved) | Not Applicable | (b)Details of Tree Cutting and Planting of Trees | Not Applicable | |
|
26. | Land Acquisition Status: | (a)Acquired Land(Ha) | 66.773 | (b)Land yet to be acquired(Ha) | 0 | (c)Status of Land acquisition if not acquired | Acquired | |
|
27. | Rehabilitation and Resettlement (R&R): | (a)No. of Villages | 0 | (b)No. of Households | 0 | (c)No. of PDFs (Project Displaced Families) | 0 | (d)No. of PAFs (Project Affected Families) | 0 | (e)Funds Allocated for R&R(in INR) (in Lacs) | 0 | (f)Status of R&R | Completed | |
|
28. | Details of Presence of Schedule-I Species: | (a)Whether there is Presence of Schedule-I Species ? | No | (b)Whether conservation plan for Schedule-I Species has been prepared ? | No | (c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? | No | |
|
29. | Details of Presence of Water Bodies in Core Area: | (a)Whether there is Presence of Water Bodies in Core Area ? | No | (b)Whether there is Diversion Required ? | No | (c)Whether permission has been obtained from competent authority ? | No | |
|
30. | Details of Presence of Water Bodies in Buffer Area: | (a)Whether there is Presence of Water Bodies in Buffer Area ? | Yes | (i)Details of Water Bodies in Buffer Area | Bay of Bengal | (ii)Direction of Water Bodies in Buffer Area | South East | (iii)Distance of Water Bodies in Buffer Area | 7.2 | |
|
31. | Manpower Requirement: | (a)Permanent Employment-During Construction | 30 | (b)Permanent Employment-During Operation | 400 | (c)Temporary Employment- During Construction | 90 | (d)Temporary Employment- During Operation | 200 | (e)No. of working days | 720 | (f)Total Manpower | 720 | |
|
|
S. No. | Description | Existing | Proposed | Total |
---|
(1.) | Total Area of Green Belt | 22.257 | 0 | 22 | (2.) | Percentage of Total Project Area | 33.33 | 0 | 33 | (3.) | No. of Plants | 30000 | 3500 | 33500 | (4.) | Funds Allocated | 20 | 8 | 28 | |
|
33. Project Benefits |
---|
S. No. | Type of Project Benefits | Details of Project Benefits |
---|
(1.) | Social | Employement Potential
CSR | (2.) | Environmental | Greenbelt Development | |
|
34. CRZ Specific Details : Not Applicable |
35. Sector Specific Details For Industrial Projects - 3 |
|
|
36. | Details of Court Cases: | (a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? | No | |
|
37. | Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act: | (a)Whether any Direction issued under EPA Act/Air Act/Water Act ? | No | |
|
38. | Details of EIA Consultant: | (a)Have you hired Consultant for preparing document? | Yes | (i)Accreditation No. | NABET/EIA/1619/RA 0077 | (ii)Name of the EIA Consultant | Team Labs and Consultants | (iii)Address | B-115 to 117, Annapurna Block, Aditya enclave, Ameerpet, Hyderabad, telangana | (iv)Mobile No. | 9866415966 | (v)Landline No. | 0402374855 | (vi)Email Id | teamlabs@@gmail.com | (vii)Category of Accreditation | A | (viii)Sector of Accreditation | Industrial Projects - 3 | (ix)Validity of Accreditation | 01 Dec 2019 | (x)Uploaded Certificate of Accreditation certified by QCI/NABET | Copy of Certificate of Accreditation | |
|
|
Essential Detail Sought: |
---|
Sno. | EDS Letter | Remarks | Date of EDS |
---|
1. | NA | - Please inform about the status of clearances obtained/required (EC/Consent to Operate) for the present production of 583.31 TPM, and the compliance status thereof.
- No details provided against item 6 of the Form-2.
- Commitment/permission from the competent authority for ground water withdrawal of 4043 cum/day along with the supporting document. | 23 Sep 2018 | 2. | NA | The correction have been made as per the instruction received | 10 Oct 2018 | 3. | NA | The correction have been made as per the instruction received | 10 Oct 2018 | 4. | NA | The correction have been made as per the instruction received | 10 Oct 2018 | 5. | NA | Please provide firm commitment or acceptance of your request by the concerned regulatory authority for additional ground water withdrawal of 1850 cum/day. | 15 Oct 2018 | 6. | NA | The correction have been made as per the instruction received | 16 Nov 2018 | 7. | NA | Please inform/clarify the following:-
- No details provided against cloumn 6 of Form-2.
- There is no consistency in approvals given by the State Government vide letters dated 6/10/2001, 4/1/2015 & 26/7/2017 in respect of existing/proposed bore wells for ground water withdrawal of 410, 2240 and 560 cum/day respectively.
- As already requested, firm commitment or acceptance of your request by the concerned regulatory authority for additional ground water withdrawal of 1000 cum/day. | 03 Dec 2018 | 8. | NA | The correction have been made as per the instruction received | 04 Dec 2018 | 9. | NA | Please reply to our observations dated 3/12/2018 to take the proposal forward. | 12 Dec 2018 | 10. | NA | The correction have been made as per the instruction received | 17 Dec 2018 | 11. | NA | As already requested, please reply to our observations dated 3/12/2018 to take the proposal forward. | 22 Dec 2018 | 12. | NA | The correction have been made as per the instruction received | 23 Dec 2018 | 13. | NA | We reiterate our observations dated 3/12/2018 for the needful, and to take the proposal forward. | 30 Dec 2018 | 14. | NA | The correction have been made as per the instruction received | 04 Jan 2019 | |
Additional Detail Sought: |
---|
Sno. | ADS Letter | Remarks | Date of ADS |
---|
1. | ADS Reply Letter | Dear Sir,
Please find the point wise response to the clarifications sought by ministry | 05 Dec 2020 | 2. | NA | The Ministry has examined the proposal for environmental clearance to the project for expansion of bulk drugs and Intermediates manufacturing unit from 583.31 TPM to 1518.3 TPM by M/s Aurobindo Pharma Limited (Unit XI) in an area of 165 acres located at Sy. Nos. 52, 53, 58, 59, 61 to 78, Village Pydibhimavaram, Sy.Nos. 2, 4 to 9 & 11, Village Chittivalasa, Mandal Ranasthalam, District Srikakulam (Andhra Pradesh).
2. It is noted that the proposal also involves CRZ clearance. In this regard, the Ministry has asked certain additional information from the project proponent and the same was found not addressing the concerns raised by the Ministry.
3. In this regard, it has been decided to convene a meeting under the Chairmanship of the Joint Secretary (SKB), IA Division, MoEF&CC on 7th October, 2020 at 11.00 AM.
4. In this regard, I am directed to request you to kindly attend the meeting through Video Conferencing (VC). The project proponent is requested to make presentation on the CRZ matters along with all the requisite documents as desired by the Ministry earlier through ADS.
Meeting Notice vide email dated 30.09.2020 has already forwarded to PP and Consultant. | 03 Oct 2020 | 3. | ADS Reply Letter | Dear Sir, Please find the enclosed ADS Response. Kindly process our application. | 21 Sep 2020 | 4. | ADS Raise Letter | Based on the information submitted by PP on 05.08.2020, the proposal was examined by the CRZ sector of IA Division and accordingly again the deficiencies were observed by the sector. The observation is attached herewith. In view of the above, the under signed is directed to say that PP is kindly requested again to submit the clarification as sought by CRZ sector for further necessary action by the Ministry. | 21 Aug 2020 | 5. | ADS Reply Letter | Dear Sir,
please find the point wise response to the ADS sought on 24.07.2020 | 06 Aug 2020 | 6. | ADS Raise Letter | The proposal was examined by the Ministry. As desired by the CRZ section of the Ministry, following additional information may be submitted for taking the proposal forward. | 24 Jul 2020 | 7. | ADS Reply Letter | Dear Sir,
Please find the response to the ADS sought on 11.06.2020.
1. NOC from APCZMA
2. Rapid Marine EIA
3. CRZ Application submitted to APCZMA
4. Resubmission of CRZ Application to APCZMA
5. Clarifications sought by APCZMA and its reponse | 24 Jun 2020 | 8. | NA | The ADS uploaded by the PP is having recommendations from APCZMA only. PP is kindly requested to submit all the documents submitted for CRZ clearance as per para 4.2 of the CRZ Notification, 2011, like Marine EIA, CRZ map, NOC etc to the Ministry immediately. | 11 Jun 2020 | 9. | ADS Reply Letter | Dear Sir,
Please find the NOC from APCZMA. Please process our EC application and issue the same. | 01 Jun 2020 | 10. | NA | Dear Sir,
The information submitted by PP vide letter dated 27.03.2020 has been examined and it is noted that the State CZMA recommendations for CRZ clearance was not submitted due to postponed of APCZMA meeting. The Ministry will wait the APCZMA recommendations for necessary action. | 28 Mar 2020 | 11. | ADS Reply Letter | Dear Sir,
Please find the enclosed ADS Response | 27 Mar 2020 | 12. | NA | Please refer our earlier ADS dated 20.02.2020 and it seems that PP has not submitted the information yet. Please submit the details otherwise your proposal may be delisted.
Sir, This has reference to your proposal No. IA/AP/IND2/78618/1900 dated 4th January, 2019 on the subject matter. 2. The proposal for environmental clearance was considered by the Expert Appraisal Committee (Industry-2) in its meeting held on 8-9 April, 2019. On examination of the proposal in the Ministry subsequent to the recommendations of the EAC, it is noted that the project also involves certain activities in the CRZ area, and the proposal has been submitted without the recommendations State Coastal Zone Management Authority. 3. In view of the above, it is requested to submit the proposal for environmental and CRZ clearance along with the recommendations of the Andhra Pradesh State Coastal Zone Management Authority, and with supporting documents for further action into the matter. | 17 Mar 2020 | 13. | ADS Reply Letter | Dear Sir,
Please find the resposne for the clarifications sought on CRZ recommendations | 28 Feb 2020 | 14. | NA | Sir,
This has reference to your proposal No. IA/AP/IND2/78618/1900 dated 4th January, 2019 on the subject matter.
2. The proposal for environmental clearance was considered by the Expert Appraisal Committee (Industry-2) in its meeting held on 8-9 April, 2019. On examination of the proposal in the Ministry subsequent to the recommendations of the EAC, it is noted that the project also involves certain activities in the CRZ area, and the proposal has been submitted without the recommendations State Coastal Zone Management Authority.
3. In view of the above, it is requested to submit the proposal for environmental and CRZ clearance along with the recommendations of the Andhra Pradesh State Coastal Zone Management Authority, and with supporting documents for further action into the matter. | 20 Feb 2020 | |
| Undertaking |
| I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief. And I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity/ construction/ expansion has since been taken up. |
| Name of Applicant | JVN Reddy VN Reddy | Designation | AP | Name of Company (Applicant Name should not be given here) | AUROBINDIO PHARMA LTD UNIT XI | Address | Aurobindo Pharma Ltd Unit XI |
|