Form-2
APPLICATION FOR PRIOR ENVIRONMENTAL CLEARANCE
S. No.Item Details
1.
Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? No
Details of Project:
(a)Name of the project(s) SAGAR CEMENTS LIMITED - Cement Plant
(b)Name of the Company / Organisation SAGAR CEMENTS LTD
(c)Registered Address Plot No.111, Road No. 10, Jubilee Hills,Hyderabad,Hyderabad,Telangana-500033
(d)Legal Status of the Company Others
(e)Joint Venture No
2.
Address for the correspondence:
(a)Name of the Applicant B S P RAJU RAJU
(b)Designation (Owner/ Partner/ CEO) Vice President - Mines
(c)Address Plot No.111, Road No. 10, Jubilee Hills,HYderabad,Shaikpet,Hyderabad,Telangana-500033
(d)Pin code 500033
(e)E-mail ganeshk@sagarcements.in
(f)STD Code. 40(f)Telephone No. 23351571
(g)Fax No. 04023351571
(h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . Annexure-Uploaded Copy of documents in support of the competence/authority
3.
Category of the Project/Activity as per Schedule of EIA Notification,2006:
(a.I)Project/Activity3(b) Cement plants
Minor Activity1(d) Thermal Power Plants
(b)Category A
(c)Proposal Number IA/TG/IND/78600/2006
(d)Master Proposal Number(Single Window) SW/78599/2018
(e)EAC concerned (for category A Projects only) Industrial Projects - 1
(f)Project Type Expansion
4.
Location of the Project:
(a)Plot/Survey/Khasra No. 433, 434 & 435
(b)Pincode 508204
(c)Bounded Latitudes (North)
From
Degree 1853478
Minutes
Second
From
Degree 1854752
Minutes
Second
(d)Bounded Longitudes (East)
From
Degree 378242
Minutes
Second
From
Degree 379333
Minutes
Second
(e)Survey of India Topo Sheet No. 56 P/13
(f)Uploaded Topo Sheet File Copy of Topo Sheet File
(g)Maximum Elevation Above Means Sea Level(AMSL) 84
(h)Uploaded (kml) File Copy of Kml File      
(i)Distance of Nearest HFL from the project boundary within the study area 6.0
(j)Seismic Zone 2
5.
(a)Number of States in which Project will be Executed 1
(b)Main State of the project Telangana
Details of State(s) of the project
S. No. State Name District Name Tehsil Name Village Name
(1.)TelanganaNalgondaMattam palleMakarwali
6.
Details of Terms of Reference (ToR)/EC:
(a)MoEF&CC / SEIAA File Number J-11011/379/2006-IAII (I)
(c)Date of Issue of TOR 02 Aug 2006
(f)Previous TOR Letter Copy of Previous TOR letter
(b)Date of Apply of EC 12 Sep 2018
(c)Date of Issue of EC 29 Jan 2019
(d)Previous EC Letter Copy of Previous EC letter
7.
Details of Public Consultation:
(a)Whether the Project Exempted from Public Hearing?No
(b)Whether details of Public Hearing available? Yes
(c)Whether Public hearing was presided over by an officer of the rank of Additional District Magistrate or above Yes
     7.1.       Details of Public Hearing
S. No.Details of Advertisement Details of Public Hearing Venue Location DetailsNo. of People AttendedIssues RaisedDesignation of Presiding OfficerOther Designation of Presiding Officer
(1.)
Date of Advertisement :05 Jul 2018
Copy of advertisement :Copy of Advertisement
Copy of Public Hearing :Copy of Public Hearing
Date :09 Aug 2018
Distance of Public Hearing Venue from the Proposed Project :0
At Cement Plant Gate
State :Telangana
District :Nalgonda
Tehsil :Mattam palle
Village :Mattampally
800Employment Infrastructure requirement Medical facilities requirement Educational Facilities requirementDistrict Collector
8.
Details of Project Configuration/Product:
Details Not Applicable
9.
In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii):
(a)Details of certified report on compliance of earlier environmental clearance condition
(i)Certified Compliance By Regional
(ii)Details of Regional Office of MoEFCC / Zonal Office of CPCB / SPCB / UTPCC from which certified report on Chennai
(iii)Letter No. F.No. EP/12.1/545/AP/600 dated: 25.04.2018
(iv)Status of Compliance Compiled
(v)Certified report on compliance of earlier environmental clearance conditions (Including Monitoring Report) Copy of Certified Compliance Report
(vi)Date of site visit Feb 8 2018 12:00AM
(b)Details of Capacity Expansion
S. No.Product/Activity (Capacity/Area)Quantity FromQuantity ToTotal UnitOther UnitMode of Transport / Transmission of ProductOther Mode of Transport / Transmission of Product
(1.)1235000026500005000000OthersTons per Annum of CementRoad,Rail
(2.)2200000028100004810000OthersTons per Annum of ClinkerRoad,Rail
(3.)3075158Mega Watt(MW)OthersCaptive Use
(c)Details of Configuration
S. No.Plant / Equipment / Facility Existing ConfigurationProposed ConfigurationFinal configuration after expansionRemarks
(1.)Unit -II (Cement), MTPA2.050.953.00Through Modernisation
(2.)Unit -I (Cement), MTPA0.3000.30No Change
(3.)Unit -II(Clinker), MTPA1.500.652.15Through Modernisation
(4.)Unit - III (Cement), MTPA01.701.7New Unit
(5.)Unit -I (Clinker), MTPA0.50.160.66Through Modernisation
(6.)Captive Power Generation, MW07515858 MW (addition of 2x18MW Coal based CPP +15 MW WHRB CPP
(7.)Unit -III (Clinker), MTPA02.002.00New Unit
9.1.
Details of Consent to Operate
(i)Whether Consent to operate obtained ? NA
(ii)Copies of all Consent to operate obtained since inception NA
(iii)Date of Issue 14 Mar 2017
(iv)Valid Upto 31 Jan 2022
(v)File No. TSPCB/RCP/NLG/CFO/HO/2017-3408
(vi)Application No. 462601
(vii)Copy of Consent to operate valid as on date Copy of Consent to Operate
10.
Project Cost:
(a)Total Cost of the Project at current price level (in Crores) 1000
(b) Funds Allocated for Environment Management (Capital) (in Crores) 80
(c) Funds Allocated Towards CER (Corporate Environment Responsibility) (in Crores) 6.50
(d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in Crores) 6.65
11.
Whether project attracts the General Condition specified in the Schedule of EIA Notification ? No
12.
Whether project attract the Specific Condition specified in the Schedule of EIA Notification ? No
13.
Raw Material / Fuel Requirement:
(a)Proposed quantity of raw material/fuel 4750000
(b)Existing quantity of raw material/fuel 3780000
(c)Total quantity of raw material/fuel 8530000
    13.1.        Raw Material / Fuel Profile
S. No.Raw Material / Fuel QuantityUnitOther UnitSource (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received )Mode of TransportOther Mode of TransportDistance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received)Type of Linkage Other Type of Linkage Uploaded Copy of Linkage
(1.)Limestone7200000Tons per AnnumCaptive MineRoad,Conveyor Belt2.9 CaptiveCopy of Linkage
(2.)Coal1080000Tons per AnnumSingareni ColleriesRoad,Rail230 e-auctionCopy of Linkage
(3.)GYPSUM250000Tons per AnnumEID ParryRoad500 Open MarketCopy of Linkage
14.
Baseline Data :
(a)Period of Base Line Data Collection FROM 01 Oct 2017 To 31 Dec 2017
(b)Season Post-Monsoon
    14.1.     No. of ambient Air Quality (AAQ) monitoring locations : 8
S. No.Criteria Pollutants Other Criteria PollutantsUnitMaximum ValueMinimum Value98 Percentile ValuePrescribed Standard
(1.)PM2.5Micro Gram per Meter Cube32.318.531.960
(2.)SO2Micro Gram per Meter Cube14.1813.980
(3.)NOxMicro Gram per Meter Cube15.391580
(4.)PM10Micro Gram per Meter Cube60.541.560.4100
    14.2.     No. of Ground Water monitoring locations : 8
S. No.Criteria Pollutants Other Criteria PollutantsHeavy MetalUnitOther UnitMaximum ValueMinimum ValueDesirable LimitMaximum Permissible Limit
(1.)TSSmg/l0000
(2.)Total Hardnessmg/l592169200600
(3.)pHNA7.197.098.58.5
(4.)Chloridesmg/l330632501000
(5.)Fluoridemg/l10.4911.5
(6.)Heavy MetalsZincmg/l0.930.02515
(7.)TDSmg/l15094715002000
    14.3.     No. of Surface Water monitoring locations : 6
S. No.Criteria Pollutants Other Criteria PollutantsUnitOther UnitMaximum ValueMinimum ValueClassification of inland water body
(1.)BODmg/l32A
(2.)CODmg/l1610A
(3.)DOmg/l5.85.2A
(4.)pHNA8.377.39A
    14.4.     No. of Ambient Noise monitoring locations : 8
S. No.Parameter UnitMaximum ValueMinimum ValuePrescribed Standard
(1.)Leq(Day)A-weighted decibels(dB(A))53.950.455
(2.)Leq(Night)A-weighted decibels(dB(A))43.841.145
    14.5.     No. of Soil Sample Monitored locations : 8
S. No.Parameter UnitOther UnitMaximum ValueMinimum Value
(1.)N(Nitrogen)Kilogram per hectare588242
(2.)K(Potassium)Kilogram per hectare1246212
(3.)P(Phosphorus)Kilogram per hectare21117
(4.)Electric ConductivityMillisiemens per Centimetre645191
(5.)pHOthersNA8.197.41
14.6.
Details of Ground Water Table:
(a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) From 5 To 60
(b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) From 5 To 50
(c)Whether Ground Water Intersection will be there ? No
     15.      Details of Water Requirement (During Operation)
S. No.Source Source Other Required Quantity (Kilolitre per Day (Kld))Distance from SourceCopy of Permission from Competent Authority Mode of TransportOther Mode of TransportMethod of Water WithdrawalOther Method of Water WithdrawalLetter No.Date of IssuePermitted Quantity
(1.)OthersBorewell and mine pit23000Copy of Permission LetterPipelineTube WellC/2073/1711 Jul 2017453
15.1.
(a)Whether Desalination is proposed No
    16.       Waste Water Management(During Operation)
S. No.Type/Source Quantity of Waste Water Generated (Kilolitre per Day)Treatment Capacity (Kilolitre per Day) Treatment MethodMode of DisposalOther Mode of DisposalQuantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day)Quantity of Discharged Water (Kilolitre per Day)
(1.)POWER PLANT272300ETPReuse within the Plant & Recycling272
(2.)DOMESTIC192200STPGreen Belt Renewal Plant192
16.1.
(a)Total Waste Water Generation (Kilolitre per Day) 464
(b)Total Discharged Water (Kilolitre per Day) 0
(c)Total Reused Water (Kilolitre per Day) 464
    17.       Solid Waste Generation/Management
S. No.Name of Waste Item Other ItemQuantity per AnnumUnitDistance from Site(KM)Mode of TransportOther Mode of TransportMode of DisposalOther Mode of Disposal
(1.)FlyashFly Ash80000Tons0OthersPneumatic ConveyorOthersused in cement plant for cement production
18.
    18.1.     Air Quality Impact Prediction
S. No.Criteria Pollutants Other Criteria PollutantsUnitBaseline ConcentrationDistance GLCIncremental ConcentrationTotal GLCPrescribed Standard
(1.)PM10Microgram per Meter Cube60.40.37.3767.77100
(2.)PM2.5Microgram per Meter Cube31.90.32.534.460
(3.)NOxMicrogram per Meter Cube150.515.930.980
(4.)SO2Microgram per Meter Cube13.90.35.8619.7680
    18.2.     Stack Details
S. No.Source FuelStack Height(m)Stack Diameter(m)PollutantsOther PollutantsEmission (GLS)
(1.)CPP EACH BOILERCOAL301.8NOx3.05
(2.)COAL MILL UNI-IIINA552.2PM100.7
(3.)CLINKER COOLER UNIT - IIIINA503.6PM102.3
(4.)KILN UNIT-IIICoal1205.6PM107.5
(5.)KILN UNIT-IIICOAL1205.6SO225
(6.)KILN UNI-IIICOAL1205.6NOx150
(7.)CPP EACH BOILERCOAL301.8PM100.91
(8.)CPP EACH BOILERCOAL301.8SO23.05
(9.)CEMENT MILL UNIT-IIINA553.5PM103.6
19.
Power Requirement:
(a)Quantity (Kilo Volt Amps (kVA)) 75000
(b)Source In future proposed captive power plant and Grid
(c)Uploaded Copy of Agreement Copy of Agreement
(d)Standby Arrangement (Details of DG Sets) 3 X 1250 + 320 kVA DG sets are existing
(e)Stack Height (in m) 30
20.
Land Ownership Pattern:
(a)Forest Land (ha.) 0
(b)Private Land (ha.) 86
(c)Government Land (ha.) 0
(d)Revenue Land (ha.) 0
(e)Other Land (ha.) 0
    Total Land (ha.) 86
21.
Present Land Use Breakup of the Study Area in Ha:
(a)Agriculture Area (ha.) 0
(b)Waste/Barren Land (ha.) 0
(c)Grazing/ Community Land (ha.) 0
(d)Surface Water Bodies (ha.) 0
(e)Settlements (ha.) 0
(f)Industrial (ha.) 0
(g)Forest (ha.) 0
(h)Mangroves (ha.) 0
(i)Marine Area (ha.) 0
(j)Others (ha.) : Own Land of SCL 86
    Total (ha.) 86
    22.     Land requirement for various activities
S. No.Description of Activity / Facility / Plant / Others OthersLand Requirement (ha.)Remarks
(1.)Main Plant28
(2.)Green belt29
(3.)Township6
(4.)OthersParking, area inbetween and vacant space23
Total (ha.) 86
23.
Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Sanctuaries; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones :
    23.1.     Details of Ecological Sensitivity :
S. No.Details of Ecological Sensitivity NameDistance from the Project (Km)Remarks
(1.)WLSNone0None within 10 km
(2.)NPANone0None within 10 km
(3.)ESAsNone0None within 10 km
(4.)ESZsNone0None within 10 km
(5.)Critically Polluted AreaNone0None within 10 km
(6.)CorridorsNone0None within 10 km
(7.)Wildlife CorridorsNone0None within 10 km
    23.2.     Details of Environmental Sensitivity :
S. No.Details of Environmental Sensitivity Other Details of Environmental Sensitivity NameDistance from the Project (Km)Remarks
(1.)Archaeological SitesNone0None within 10 km
(2.)Defence InstallationsNone0None within 10 km
(3.)ForestSultanpur RF1.9from Plant Boundary
23.3.
(a)Whether Noc / Permission from the competent authority is required? No
(b)Whether NBWL recommendation is required? No
24.
Forest Land:
Whether any Forest Land involved? No
25.
Tree Cutting:
(a)No. of Trees Cut for the Project (if Forest Land not Involved) 0
(b)Details of Tree Cutting and Planting of Trees Not Applicable
26.
Land Acquisition Status:
(a)Acquired Land(Ha) 86
(b)Land yet to be acquired(Ha) 0
(c)Status of Land acquisition if not acquired None. total land acquired
27.
Rehabilitation and Resettlement (R&R):
(a)No. of Villages 0
(b)No. of Households 0
(c)No. of PDFs (Project Displaced Families) 0
(d)No. of PAFs (Project Affected Families) 0
(e)Funds Allocated for R&R(in INR) (in Lacs) 0
(f)Status of R&R Completed
28.
Details of Presence of Schedule-I Species:
(a)Whether there is Presence of Schedule-I Species ? No
(b)Whether conservation plan for Schedule-I Species has been prepared ? No
(c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? No
29.
Details of Presence of Water Bodies in Core Area:
(a)Whether there is Presence of Water Bodies in Core Area ? No
(b)Whether there is Diversion Required ? No
(c)Whether permission has been obtained from competent authority ? No
30.
Details of Presence of Water Bodies in Buffer Area:
(a)Whether there is Presence of Water Bodies in Buffer Area ? Yes
(i)Details of Water Bodies in Buffer Area Krishna River
(ii)Direction of Water Bodies in Buffer Area South
(iii)Distance of Water Bodies in Buffer Area 6
31.
Manpower Requirement:
(a)Permanent Employment-During Construction 50
(b)Permanent Employment-During Operation 250
(c)Temporary Employment- During Construction 300
(d)Temporary Employment- During Operation 300
(e)No. of working days 365
(f)Total Manpower 900
32.
Green Belt in Ha:
(a)Uploaded Green Belt plan Copy of Green Belt Plan
S. No.Description ExistingProposedTotal
(1.)Total Area of Green Belt20929
(2.)Percentage of Total Project Area33033
(3.)No. of Plants29267412750305424
(4.)Funds Allocated454590
    33.         Project Benefits
S. No.Type of Project Benefits Details of Project Benefits
(1.)EnvironmentalNo additional Land Expansion Plant designed to comply with new norms Ash generated from CPP will be used in cement production
(2.)SocialEmployment to additional 250 persons CER Rs 6.50 crores
(3.)FinancialUsage of existing infrastructure will be optimised
   34.   CRZ Specific Details : Not Applicable
   35.   Sector Specific Details : NOT APPLICABLE
   35.   Sector Specific Details For Industrial Projects - 1
S. No.Item Details
S. No.Item Details
36.
Details of Court Cases:
(a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? No
37.
Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act:
(a)Whether any Direction issued under EPA Act/Air Act/Water Act ? No
38.
Details of EIA Consultant:
(a)Have you hired Consultant for preparing document? Yes
(i)Accreditation No. NABET/EIA/1619/SA064
(ii)Name of the EIA Consultant B. S. Envi-Tech Pvt Ltd
(iii)Address B. S. Envi-Tech Pvt Ltd., ?'Amity Ville' 12-13-1270/71/73, 4th Floor, St. Ann's School Road, Tarnaka, Secunderabad - 500 017 TELANGANA
(iv)Mobile No. 9848053012
(v)Landline No. 0404978306
(vi)Email Id info@bsenvitech.com
(vii)Category of Accreditation A
(viii)Sector of Accreditation Industrial Projects - 1
(ix)Validity of Accreditation 12 Nov 2019
(x)Uploaded Certificate of Accreditation certified by QCI/NABET Copy of Certificate of Accreditation
39.
Documents to be Attached:
(a)Uploaded Copy of EIA/EMP Report Copy of EIA/EMP
Copy of EIA/EMP(Annexures)
Copy of EIA/EMP(Plans/Figures)
(b)Uploaded Copy of Risk Assessment Report Copy of Risk Assessment
(c)Uploaded Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan
(d)Uploaded Copy of Final Layout Plan Copy of Final Layout Plan
(e)Uploaded Cover Letter Copy of Cover Letter
(f)Uploaded Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency
(g)Uploaded Additional File Copy of Additional File
(h)Uploaded Proposal Presentation (To be given in EAC meeting) NA
      Essential Detail Sought : NIL
      Additional Detail Sought : NIL
Undertaking
I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief. And I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity/ construction/ expansion has since been taken up.
Name of ApplicantB S P RAJU RAJU
DesignationVice President - Mines
Name of Company (Applicant Name should not be given here)SAGAR CEMENTS LTD
AddressPlot No.111, Road No. 10, Jubilee Hills
Print