Details of Project:
(a)Name of the project(s) Capacity Addition of Integrated Steel Plant from 5.0 Mtpa To 10.0 Mtpa and Captive Power Plant from 300 MW To 600 MW at JSW Steel Ltd., Dolvi Works, Dolvi Village, Raigad District, Maharashtra. -- Re
(b)Name of the Company / Organisation JSW STEEL LTD.
(c)Registered Address JSW Steel Ltd., Dolvi, Village - Wadkhal, Taluka - Pen, Raigad District, Maharashtra,India,Raigad,Maharashtra-402107
(d)Legal Status of the Company Private
(e)Joint Venture No
2.
Address for the correspondence:
(a)Name of the Applicant Vitthal Waghchaure
(b)Designation (Owner/ Partner/ CEO) General Manager
(c)Address JSW Steel Ltd. Dolvi, Village - Wadkhal, Taluka - Pen, District Raigad. Maharashtra,,Pen,Raigad,Maharashtra-402107
(d)Pin code 402107
(e)E-mail vitthal.waghchaure@jsw.in
(f)STD Code. 0(f)Telephone No. 277501
(g)Fax No. 02143277533
(h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . Annexure-Uploaded Copy of documents in support of the competence/authority
3.
Category of the Project/Activity as per Schedule of EIA Notification,2006:
(a.I)Project/Activity3(a) Metallurgical industries (ferrous & non ferrous)
Minor Activity7(c) Industrial estates/ parks/ complexes/ areas, export processing Zones
(b)Category A
(c)Proposal Number IA/MH/IND/78340/2018
(d)Master Proposal Number(Single Window) SW/78339/2018
(e)EAC concerned (for category A Projects only) NIL
(f)Project Type Modernization under para 7(ii)
4.
Location of the Project:
(a)Plot/Survey/Khasra No. Dolvi Village
(b)Pincode 402107
(c)Bounded Latitudes (North)
From
Degree 18.665484
Minutes
Second
From
Degree 18.701469
Minutes
Second
(d)Bounded Longitudes (East)
From
Degree 73.027861
Minutes
Second
From
Degree 73.056086
Minutes
Second
(e)Survey of India Topo Sheet No. E43H2
(f)Uploaded Topo Sheet File Copy of Topo Sheet File
(g)Maximum Elevation Above Means Sea Level(AMSL) 1.7
(h)Uploaded (kml) File Copy of Kml File      
(i)Distance of Nearest HFL from the project boundary within the study area 1
(j)Seismic Zone 4
5.
(a)Number of States in which Project will be Executed 1
(b)Main State of the project Maharashtra
Details of State of the project
S. No. State Name District Name Tehsil Name Village Name
NIL
6.
Details of Terms of Reference (ToR)/EC: Not Applicable
4.
Whether the Project Exempted from Public Hearing? Details Not Applicable
8.
Details of Project Configuration/Product:
Details Not Applicable
9.
In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii):
(a)Details of certified report on compliance of earlier environmental clearance condition
(i)Certified Compliance By Regional
(ii)Details of Regional Office of MoEFCC / Zonal Office of CPCB / SPCB / UTPCC from which certified report on Nagpur
(iii)Letter No. 5-71/2015(ENV)/4529
(iv)Status of Compliance Partially Complied
(v)Certified report on compliance of earlier environmental clearance conditions (Including Monitoring Report) Copy of Certified Compliance Report
(vi)Date of site visit Oct 12 2018 12:00AM
(b)Details of Capacity Expansion
S. No.Product/Activity (Capacity/Area)Quantity FromQuantity ToTotal UnitOther UnitMode of Transport / Transmission of ProductOther Mode of Transport / Transmission of Product
(1.)15510OthersMTPA Finished ProductRail
(c)Details of Configuration
S. No.Plant / Equipment / Facility Existing ConfigurationProposed ConfigurationFinal configuration after expansionRemarks
(1.)Sinter Plant6 MTPA Existing + 2 X 4.0 MTPA Proposed6 MTPA Existing + 1 X 4.0 MTPA Proposed6 MTPA Existing + 1 X 4.0 MTPA ProposedDecrease by 4 MTPA
(2.)Coke OvenExisting 1 MTPAExisting 1 MTPAExisting 1 MTPANo Change
(3.)DRI PlantExisting 2 MTPA + Proposed 2 MTPAExisting 2 MTPA + Proposed 2 MTPAExisting 2 MTPA + Proposed 2 MTPANo Change
(4.)SMS BOF6.0 MTPA Proposed6.0 MTPA Proposed6.0 MTPA ProposedNo Change
(5.)Ladle Furnace2X200T + 250 T Existing + 2X300 T Proposed2X200T + 250 T Existing + 2X300 T Proposed2X200T + 250 T Existing + 2X300 T ProposedNo Change
(6.)VD/VOD & RH-TP1X200T + 1X205 T Existing + 2 X 300 T Proposed1X200T + 1X205 T Existing + 2 X 300 T Proposed1X200T + 1X205 T Existing + 2 X 300 T ProposedNo Change
(7.)Thin Caster3.5 MTPA Existing3.5 MTPA Existing3.5 MTPA ExistingNo Change
(8.)Slab Caster3.68 MTPA Existing + 5.73 MTPA Proposed3.68 MTPA Existing + 5.73 MTPA Proposed3.68 MTPA Existing + 5.73 MTPA ProposedNo Change
(9.)Plate Mill1.5 MTPA Existing1.5 MTPA Existing1.5 MTPA ExistingNo Change
(10.)Cold Rolling Mill1 MTPA Existing + 1.5 MTPA Proposed1 MTPA Existing + 1.5 MTPA Proposed1 MTPA Existing + 1.5 MTPA ProposedNo Change
(11.)Electrical Steel CRGO Line0.4 MTPA0.4 MTPA0.4 MTPANo Change
(12.)Lime & Dolo Plant1800 TPD Existing + 1800 TPD Proposed1800 TPD Existing + 1800 TPD Proposed1800 TPD Existing + 1800 TPD ProposedNo Change
(13.)Captive Power Plant300 MW + New 300 MW Additional Proposed300 MW + New 300 MW Additional Proposed300 MW + New 300 MW Additional ProposedNo Change
(14.)Pellet Plant1 X 4.0 MTPA Existing + 1 X 4.0 MTPA Proposed1 X 4.0 MTPA Existing + 1 X 9.0 MTPA Proposed1 X 4.0 MTPA Existing + 1 X 9.0 MTPA ProposedIncrease by 5 MTPA
(15.)Blast Furnace3.6 MTPA Existing + 4.5 MTPA Proposed3.6 MTPA Existing + 4.5 MTPA Proposed3.6 MTPA Existing + 4.5 MTPA ProposedNo Change
(16.)SMS CONARC5.2 MTPA Existing5.2 MTPA Existing5.2 MTPA ExistingNo Change
(17.)Billet Caster1 X 6 Strands Proposed1 X 6 Strands Proposed1 X 6 Strands ProposedNo Change
(18.)Hot Rolling Mill5.0 MTPA Proposed5.0 MTPA Proposed5.0 MTPA ProposedNo Change
(19.)Colour Coating Line0.5 MTPA0.5 MTPA0.5 MTPANo Change
(20.)Township150 Acre Township for 7500 Dwellings150 Acre Township for 7500 Dwellings150 Acre Township for 7500 DwellingsNo Change
(21.)Bar Mill1.4 MTPA Proposed1.4 MTPA Proposed1.4 MTPA ProposedNo Change
(22.)Oxygen Plant4100 TPD Existing + 3500 TPD Proposed4100 TPD Existing + 3500 TPD Proposed4100 TPD Existing + 3500 TPD ProposedNo Change
(23.)Tin Plate Mill0.4 MTPA0.4 MTPA0.4 MTPANo Change
9.1.
Details of Consent to Operate
(i)Whether Consent to operate obtained ? NA
(ii)Copies of all Consent to operate obtained since inception NA
(iii)Date of Issue 07 Feb 2018
(iv)Valid Upto 06 Feb 2023
(v)File No. NA
(vi)Application No. NA
(vii)Copy of Consent to operate valid as on date Copy of Consent to Operate
10.
Project Cost:
(a)Total Cost of the Project at current price level (in Crores) 17000
(b) Funds Allocated for Environment Management (Capital) (in Crores) 850
(c) Funds Allocated Towards CER (Corporate Environment Responsibility) (in Crores) 650
(d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in Crores) 120
11.
Whether project attracts the General Condition specified in the Schedule of EIA Notification ? No
12.
Whether project attract the Specific Condition specified in the Schedule of EIA Notification ? No
13.
Raw Material / Fuel Requirement:
(a)Proposed quantity of raw material/fuel 13650000
(b)Existing quantity of raw material/fuel N/A
(c)Total quantity of raw material/fuel 13650000
    13.1.        Raw Material / Fuel Profile
S. No.Raw Material / Fuel QuantityUnitOther UnitSource (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received )Mode of TransportOther Mode of TransportDistance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received)Type of Linkage Other Type of Linkage Uploaded Copy of Linkage
(1.)Iron ore13650000Tons per AnnumDharamtar Jetty / ImportedConveyor Belt,OthersSea1 MoUCopy of Linkage
16.
Baseline Data Not Applicable
14.6.
Details of Ground Water Table:
(a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) From 3 To 3.5
(b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) From 3 To 3.5
(c)Whether Ground Water Intersection will be there ? No
     15.      Details of Water Requirement (During Operation)
S. No.Source Source Other Required Quantity (Kilolitre per Day (Kld))Distance from SourceCopy of Permission from Competent Authority Mode of TransportOther Mode of TransportMethod of Water WithdrawalOther Method of Water WithdrawalLetter No.Date of IssuePermitted Quantity
(1.)Surface3383324Copy of Permission LetterPipelineIntake Well4/594/201607 Feb 201646660
15.1.
(a)Whether Desalination is proposed No
    16.       Waste Water Management(During Operation)
S. No.Type/Source Quantity of Waste Water Generated (Kilolitre per Day)Treatment Capacity (Kilolitre per Day) Treatment MethodMode of DisposalOther Mode of DisposalQuantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day)Quantity of Discharged Water (Kilolitre per Day)
(1.)Industrial Waste Water77767776ZLDReuse within the Plant & Recycling7776
16.1.
(a)Total Waste Water Generation (Kilolitre per Day) 7776
(b)Total Discharged Water (Kilolitre per Day) 0
(c)Total Reused Water (Kilolitre per Day) 7776
    17.       Solid Waste Generation/Management
S. No.Name of Waste Item Other ItemQuantity per AnnumUnitDistance from Site(KM)Mode of TransportOther Mode of TransportMode of DisposalOther Mode of Disposal
(1.)HSM SludgeIndustrial Waste60000Tons1RoadCo-Processing
(2.)SMS SlagIndustrial Waste1240000Tons1Road,RailCo-Processing
(3.)SMS SludgeIndustrial Waste30000Tons1RoadCo-Processing
(4.)WWTP SludgeIndustrial Waste48000Tons1RoadCo-Processing
(5.)Mill ScalesIndustrial Waste60000Tons1RoadCo-Processing
(6.)DE DustIndustrial Waste2741301Tons1Road,Conveyor BeltCo-Processing
(7.)BF SlagIndustrial Waste1600000Tons1RoadCo-Processing
18.
    18.1.     Air Quality Impact Prediction
S. No.Criteria Pollutants Other Criteria PollutantsUnitBaseline ConcentrationDistance GLCIncremental ConcentrationTotal GLCPrescribed Standard
(1.)PM2.5Microgram per Meter Cube441.51.245.260
(2.)NOxMicrogram per Meter Cube37.11.38.9746.0780
(3.)SO2Microgram per Meter Cube9.31.31.9311.2380
(4.)PM10Microgram per Meter Cube67.81.54.8372.63100
    18.2.     Stack Details
S. No.Source FuelStack Height(m)Stack Diameter(m)PollutantsOther PollutantsEmission (GLS)
(1.)SP3 ProcessMixed Gas1306OthersPM, SO2 , NOx17, 25.5, 20.4 g/s
(2.)Bar Mill Reheating FurnaceMixed Gas602OthersPM, SO2, NOx0.4,0.42,1.04 g/s
(3.)Lime Kiln 6 ProcessMixed Gas452OthersPM, SO2, NOx1.7,0.67,1.67 g/s
(4.)DRI2 Reduction Furnace-300.9OthersPM, NOx0.3, 0.13 g/s
(5.)DRI2 Product Silo Dust CollectorNA300.9OthersPM0.4 g/s
(6.)BF2 StoveMixed Gas604.8OthersPM, SO2, NOx2.8,2.08,6.9 g/s
(7.)BF2 Cast House DedustingNA405.5OthersPM20.8 g/s
(8.)HSM2 Reheating FurnaceMixed Gas1004.2OthersPM, SO2, NOx1.3,1.26,3.14
(9.)CRM2NA301.2OthersPM0.1
(10.)CPP2Mixed Gas855.5OthersPM, SO2, NOx20.8,6.25,31.25 g/s
(11.)Pellet Plant 2 ProcessMixed Gas809.7OthersPM, SO2, NOx7,17.4,69.6 g/s
(12.)Lime Kiln 5 ProcessMixed Gas452OthersPM, SO2, NOx1.7,0.67,1.67 g/s
(13.)DRI2 Fuel Gas InjectorMixed gas404.5OthersPM, NOx0.7,95.9 g/s
(14.)BF2 Stock House DedustingNA404OthersPM2.3 g/s
(15.)Pellet Plant 2 Space DedustingNA502.6OthersPM0.6 g/s
(16.)Pellet Plant 2 Product Storage DedustingNA452.2OthersPM0.5 g/s
(17.)SP3 Space DedustingNA654OthersPM7.5 g/s
(18.)Lime Kiln 7 ProcessMixed Gas452OthersPM, SO2, NOx1.7,0.67,1.67 g/s
(19.)SMS2 Fume Extraction SystemNA405.5OthersPM20.8 g/s
19.
Power Requirement:
(a)Quantity (Kilo Volt Amps (kVA)) 500000
(b)Source MSEB Grid
(c)Uploaded Copy of Agreement Not Applicable
(d)Standby Arrangement (Details of DG Sets) DG sets have been provided as backup
(e)Stack Height (in m) 30
20.
Land Ownership Pattern:
(a)Forest Land (ha.) 0
(b)Private Land (ha.) 0
(c)Government Land (ha.) 0
(d)Revenue Land (ha.) 0
(e)Other Land (ha.) 729
    Total Land (ha.) 729
21.
Present Land Use Breakup of the Study Area in Ha:
(a)Agriculture Area (ha.) 14035800
(b)Waste/Barren Land (ha.) 4207600
(c)Grazing/ Community Land (ha.) 0
(d)Surface Water Bodies (ha.) 3485400
(e)Settlements (ha.) 628000
(f)Industrial (ha.) 729
(g)Forest (ha.) 7002200
(h)Mangroves (ha.) 0
(i)Marine Area (ha.) 0
(j)Others (ha.) : NA 2041000
    Total (ha.) 31400729
    22.     Land requirement for various activities
S. No.Description of Activity / Facility / Plant / Others OthersLand Requirement (ha.)Remarks
(1.)Township60.7
(2.)Main Plant668.3
Total (ha.) 729
23.
Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Sanctuaries; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones :
    23.1.     Details of Ecological Sensitivity :
S. No.Details of Ecological Sensitivity NameDistance from the Project (Km)Remarks
(1.)ESZsNone0-
(2.)Critically Polluted AreaNone0-
(3.)CorridorsNone0-
(4.)NPANone0-
(5.)WLSNone0-
(6.)Wildlife CorridorsNone0-
(7.)ESAsNone0-
    23.2.     Details of Environmental Sensitivity :
S. No.Details of Environmental Sensitivity Other Details of Environmental Sensitivity NameDistance from the Project (Km)Remarks
(1.)ForestReserve Forest15near Kharkhara, Katkariwadi,Turmal, Katvira & Dhavte village
(2.)Archaeological SitesNone0-
(3.)Defence InstallationsNone0-
23.3.
(a)Whether Noc / Permission from the competent authority is required? No
(b)Whether NBWL recommendation is required? No
24.
Forest Land:
Whether any Forest Land involved? No
25.
Tree Cutting:
(a)No. of Trees Cut for the Project (if Forest Land not Involved) Not Applicable
(b)Details of Tree Cutting and Planting of Trees Not Applicable
26.
Land Acquisition Status:
(a)Acquired Land(Ha) 729
(b)Land yet to be acquired(Ha) 0
(c)Status of Land acquisition if not acquired NA
27.
Rehabilitation and Resettlement (R&R):
(a)No. of Villages 0
(b)No. of Households 0
(c)No. of PDFs (Project Displaced Families) 0
(d)No. of PAFs (Project Affected Families) 0
(e)Funds Allocated for R&R(in INR) (in Lacs) 0
(f)Status of R&R In-Progress
28.
Details of Presence of Schedule-I Species:
(a)Whether there is Presence of Schedule-I Species ? No
(b)Whether conservation plan for Schedule-I Species has been prepared ? No
(c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? No
29.
Details of Presence of Water Bodies in Core Area:
(a)Whether there is Presence of Water Bodies in Core Area ? No
(b)Whether there is Diversion Required ? No
(c)Whether permission has been obtained from competent authority ? No
30.
Details of Presence of Water Bodies in Buffer Area:
(a)Whether there is Presence of Water Bodies in Buffer Area ? Yes
(i)Details of Water Bodies in Buffer Area Amba River, Dharamtar Creek
(ii)Direction of Water Bodies in Buffer Area West
(iii)Distance of Water Bodies in Buffer Area 1
31.
Manpower Requirement:
(a)Permanent Employment-During Construction 2000
(b)Permanent Employment-During Operation 1000
(c)Temporary Employment- During Construction 1000
(d)Temporary Employment- During Operation 1000
(e)No. of working days 365
(f)Total Manpower 5000
32.
Green Belt in Ha:
(a)Uploaded Green Belt plan Copy of Green Belt Plan
S. No.Description ExistingProposedTotal
(1.)Total Area of Green Belt104137241
(2.)Percentage of Total Project Area14.31933
(3.)No. of Plants201203152275353478
(4.)Funds Allocated201203006091000081030300
    33.         Project Benefits
S. No.Type of Project Benefits Details of Project Benefits
(1.)EnvironmentalReduction in Air Pollutant loads due to implementation of latest technologies in proposed new Pellet Plant of 9 MTPA
   34.   CRZ Specific Details : Not Applicable
   35.   Sector Specific Details : NOT APPLICABLE
   35.   Sector Specific Details For Industrial Projects - 1
S. No.Item Details
S. No.Item Details
36.
Details of Court Cases:
(a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? No
37.
Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act:
(a)Whether any Direction issued under EPA Act/Air Act/Water Act ? No
38.
Details of EIA Consultant:
(a)Have you hired Consultant for preparing document? Yes
(i)Accreditation No. NABET/EIA/1619/RA 0068
(ii)Name of the EIA Consultant MECON LIMITED
(iii)Address VIVEKANAND PATH, DORANDA, RANCHI-02
(iv)Mobile No. 9470193793
(v)Landline No. 0651248324
(vi)Email Id envenggranchi@mecon.co.in
(vii)Category of Accreditation A
(viii)Sector of Accreditation Industrial Projects - 1
(ix)Validity of Accreditation 02 Oct 2019
(x)Uploaded Certificate of Accreditation certified by QCI/NABET Copy of Certificate of Accreditation
39.
Documents to be Attached:
(a)Uploaded Copy of EIA/EMP Report Copy of EIA/EMP
Copy of EIA/EMP(Annexures)
Copy of EIA/EMP(Plans/Figures)
(b)Uploaded Copy of Risk Assessment Report Copy of Risk Assessment
(c)Uploaded Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan
(d)Uploaded Copy of Final Layout Plan Copy of Final Layout Plan
(e)Uploaded Cover Letter Copy of Cover Letter
(f)Uploaded Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency
(g)Uploaded Additional File Copy of Additional File
(h)Uploaded Proposal Presentation (To be given in EAC meeting) NA
            Essential Detail Sought:
Sno. EDS Letter Remarks Date of EDS
1.NAThe Original EC has been trifurcated and accordingly ministry has amended the original EC in recent past. May kindly refer to the certificate of compliance which was submitted was of earlier EC which was superseded by amendment/ trifurcation. Therefore, kindly submit certificate of compliance against the latest clearance 25 Sep 2018
2.NAThe correction have been made as per the instruction received 02 Nov 2018
            Additional Detail Sought:
Sno. ADS Letter Remarks Date of ADS
1. ADS Raise LetterTOR Granted with exemption of Public hearing 26 Dec 2018
Undertaking
I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief. And I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity/ construction/ expansion has since been taken up.
Name of ApplicantVitthal Waghchaure
DesignationGeneral Manager
Name of Company (Applicant Name should not be given here)JSW STEEL LTD.
AddressJSW Steel Ltd., Dolvi, Village - Wadkhal, Taluka - Pen, Raigad District, Maharashtra
Print