1. | Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? | No | Details of Project: | (a)Name of the project(s) | Capacity Addition of Integrated Steel Plant from 5.0 Mtpa To 10.0 Mtpa and Captive Power Plant from 300 MW To 600 MW at JSW Steel Ltd., Dolvi Works, Dolvi Village, Raigad District, Maharashtra. -- Re | (b)Name of the Company / Organisation | JSW STEEL LTD. | (c)Registered Address | JSW Steel Ltd., Dolvi, Village - Wadkhal, Taluka - Pen, Raigad District, Maharashtra,India,Raigad,Maharashtra-402107 | (d)Legal Status of the Company | Private | (e)Joint Venture | No | |
|
2. | Address for the correspondence: | (a)Name of the Applicant | Vitthal Waghchaure | (b)Designation (Owner/ Partner/ CEO) | General Manager | (c)Address | JSW Steel Ltd.
Dolvi, Village - Wadkhal,
Taluka - Pen, District Raigad. Maharashtra,,Pen,Raigad,Maharashtra-402107 | (d)Pin code | 402107 | (e)E-mail | vitthal.waghchaure@jsw.in | (f)STD Code. | 0(f)Telephone No. | 277501 | (g)Fax No. | 02143277533 | (h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . | Annexure-Uploaded Copy of documents in support of the competence/authority | |
|
3. | Category of the Project/Activity as per Schedule of EIA Notification,2006: | (a.I)Project/Activity | 3(a) Metallurgical industries (ferrous & non ferrous)
| Minor Activity | 7(c) Industrial estates/ parks/ complexes/ areas, export processing Zones
| (b)Category | A | (c)Proposal Number | IA/MH/IND/78340/2018 | (d)Master Proposal Number(Single Window) | SW/78339/2018 | (e)EAC concerned (for category A Projects only) | NIL | (f)Project Type | Modernization under para 7(ii) |
|
|
4. | Location of the Project: | (a)Plot/Survey/Khasra No. | Dolvi Village | (b)Pincode | 402107 | (c)Bounded Latitudes (North) | | From | | Degree | 18.665484 | Minutes | | Second | | From | | Degree | 18.701469 | Minutes | | Second | | (d)Bounded Longitudes (East) | | From | | Degree | 73.027861 | Minutes | | Second | | From | | Degree | 73.056086 | Minutes | | Second | | (e)Survey of India Topo Sheet No. | E43H2 | (f)Uploaded Topo Sheet File | Copy of Topo Sheet File | (g)Maximum Elevation Above Means Sea Level(AMSL) | 1.7 | (h)Uploaded (kml) File | Copy of Kml File | (i)Distance of Nearest HFL from the project boundary within the study area | 1 | (j)Seismic Zone | 4 | |
|
5. | (a)Number of States in which Project will be Executed | 1 | (b)Main State of the project | Maharashtra | |
|
|
Details of State of the project |
---|
S. No. | State Name | District Name | Tehsil Name | Village Name |
---|
NIL | |
|
6. | Details of Terms of Reference (ToR)/EC: | Not Applicable | |
|
4. | Whether the Project Exempted from Public Hearing? | Details Not Applicable | |
|
8. | Details of Project Configuration/Product: | Details Not Applicable | |
|
9. | In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii): | (a)Details of certified report on compliance of earlier environmental clearance condition | (i)Certified Compliance By | Regional | (ii)Details of Regional Office of MoEFCC / Zonal Office of CPCB / SPCB / UTPCC from which certified report on | Nagpur | (iii)Letter No. | 5-71/2015(ENV)/4529 | (iv)Status of Compliance | Partially Complied | (v)Certified report on compliance of earlier environmental clearance conditions (Including Monitoring Report) | Copy of Certified Compliance Report | (vi)Date of site visit | Oct 12 2018 12:00AM | (b)Details of Capacity Expansion | |
|
S. No. | Product/Activity (Capacity/Area) | Quantity From | Quantity To | Total | Unit | Other Unit | Mode of Transport / Transmission of Product | Other Mode of Transport / Transmission of Product |
---|
(1.) | 1 | 5 | 5 | 10 | Others | MTPA Finished Product | Rail | | |
| (c)Details of Configuration | |
|
S. No. | Plant / Equipment / Facility | Existing Configuration | Proposed Configuration | Final configuration after expansion | Remarks |
---|
(1.) | Sinter Plant | 6 MTPA Existing + 2 X 4.0 MTPA Proposed | 6 MTPA Existing + 1 X 4.0 MTPA Proposed | 6 MTPA Existing + 1 X 4.0 MTPA Proposed | Decrease by 4 MTPA | (2.) | Coke Oven | Existing 1 MTPA | Existing 1 MTPA | Existing 1 MTPA | No Change | (3.) | DRI Plant | Existing 2 MTPA + Proposed 2 MTPA | Existing 2 MTPA + Proposed 2 MTPA | Existing 2 MTPA + Proposed 2 MTPA | No Change | (4.) | SMS BOF | 6.0 MTPA Proposed | 6.0 MTPA Proposed | 6.0 MTPA Proposed | No Change | (5.) | Ladle Furnace | 2X200T + 250 T Existing + 2X300 T Proposed | 2X200T + 250 T Existing + 2X300 T Proposed | 2X200T + 250 T Existing + 2X300 T Proposed | No Change | (6.) | VD/VOD & RH-TP | 1X200T + 1X205 T Existing + 2 X 300 T Proposed | 1X200T + 1X205 T Existing + 2 X 300 T Proposed | 1X200T + 1X205 T Existing + 2 X 300 T Proposed | No Change | (7.) | Thin Caster | 3.5 MTPA Existing | 3.5 MTPA Existing | 3.5 MTPA Existing | No Change | (8.) | Slab Caster | 3.68 MTPA Existing + 5.73 MTPA Proposed | 3.68 MTPA Existing + 5.73 MTPA Proposed | 3.68 MTPA Existing + 5.73 MTPA Proposed | No Change | (9.) | Plate Mill | 1.5 MTPA Existing | 1.5 MTPA Existing | 1.5 MTPA Existing | No Change | (10.) | Cold Rolling Mill | 1 MTPA Existing + 1.5 MTPA Proposed | 1 MTPA Existing + 1.5 MTPA Proposed | 1 MTPA Existing + 1.5 MTPA Proposed | No Change | (11.) | Electrical Steel CRGO Line | 0.4 MTPA | 0.4 MTPA | 0.4 MTPA | No Change | (12.) | Lime & Dolo Plant | 1800 TPD Existing + 1800 TPD Proposed | 1800 TPD Existing + 1800 TPD Proposed | 1800 TPD Existing + 1800 TPD Proposed | No Change | (13.) | Captive Power Plant | 300 MW + New 300 MW Additional Proposed | 300 MW + New 300 MW Additional Proposed | 300 MW + New 300 MW Additional Proposed | No Change | (14.) | Pellet Plant | 1 X 4.0 MTPA Existing + 1 X 4.0 MTPA Proposed | 1 X 4.0 MTPA Existing + 1 X 9.0 MTPA Proposed | 1 X 4.0 MTPA Existing + 1 X 9.0 MTPA Proposed | Increase by 5 MTPA | (15.) | Blast Furnace | 3.6 MTPA Existing + 4.5 MTPA Proposed | 3.6 MTPA Existing + 4.5 MTPA Proposed | 3.6 MTPA Existing + 4.5 MTPA Proposed | No Change | (16.) | SMS CONARC | 5.2 MTPA Existing | 5.2 MTPA Existing | 5.2 MTPA Existing | No Change | (17.) | Billet Caster | 1 X 6 Strands Proposed | 1 X 6 Strands Proposed | 1 X 6 Strands Proposed | No Change | (18.) | Hot Rolling Mill | 5.0 MTPA Proposed | 5.0 MTPA Proposed | 5.0 MTPA Proposed | No Change | (19.) | Colour Coating Line | 0.5 MTPA | 0.5 MTPA | 0.5 MTPA | No Change | (20.) | Township | 150 Acre Township for 7500 Dwellings | 150 Acre Township for 7500 Dwellings | 150 Acre Township for 7500 Dwellings | No Change | (21.) | Bar Mill | 1.4 MTPA Proposed | 1.4 MTPA Proposed | 1.4 MTPA Proposed | No Change | (22.) | Oxygen Plant | 4100 TPD Existing + 3500 TPD Proposed | 4100 TPD Existing + 3500 TPD Proposed | 4100 TPD Existing + 3500 TPD Proposed | No Change | (23.) | Tin Plate Mill | 0.4 MTPA | 0.4 MTPA | 0.4 MTPA | No Change | |
9.1. | Details of Consent to Operate | (i)Whether Consent to operate obtained ? | NA | (ii)Copies of all Consent to operate obtained since inception | NA | (iii)Date of Issue | 07 Feb 2018 | (iv)Valid Upto | 06 Feb 2023 | (v)File No. | NA | (vi)Application No. | NA | (vii)Copy of Consent to operate valid as on date | Copy of Consent to Operate | |
|
|
10. | Project Cost: | (a)Total Cost of the Project at current price level (in Crores) | 17000 | (b) Funds Allocated for Environment Management (Capital) (in Crores) | 850 | (c) Funds Allocated Towards CER (Corporate Environment Responsibility) (in Crores) | 650 | (d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in Crores) | 120 | |
|
11. | Whether project attracts the General Condition specified in the Schedule of EIA Notification ? | No | | |
12. | Whether project attract the Specific Condition specified in the Schedule of EIA Notification ? | No | | |
13. | Raw Material / Fuel Requirement: | (a)Proposed quantity of raw material/fuel | 13650000 | (b)Existing quantity of raw material/fuel | N/A | (c)Total quantity of raw material/fuel | 13650000 | |
|
  13.1. Raw Material / Fuel Profile |
---|
S. No. | Raw Material / Fuel | Quantity | Unit | Other Unit | Source (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received ) | Mode of Transport | Other Mode of Transport | Distance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received) | Type of Linkage | Other Type of Linkage | Uploaded Copy of Linkage |
---|
(1.) | Iron ore | 13650000 | Tons per Annum | | Dharamtar Jetty / Imported | Conveyor Belt,Others | Sea | 1 | MoU | | Copy of Linkage | |
|
16. | Baseline Data | Not Applicable | |
|
|
14.6. | Details of Ground Water Table: | (a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) | From 3 To 3.5 | (b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) | From 3 To 3.5 | (c)Whether Ground Water Intersection will be there ? | No | |
|
15. Details of Water Requirement (During Operation) |
---|
S. No. | Source | Source Other | Required Quantity (Kilolitre per Day (Kld)) | Distance from Source | Copy of Permission from Competent Authority | Mode of Transport | Other Mode of Transport | Method of Water Withdrawal | Other Method of Water Withdrawal | Letter No. | Date of Issue | Permitted Quantity |
---|
(1.) | Surface | | 33833 | 24 | Copy of Permission Letter | Pipeline | | Intake Well | | 4/594/2016 | 07 Feb 2016 | 46660 | |
|
15.1. | (a)Whether Desalination is proposed | No | |
|
16. Waste Water Management(During Operation) |
---|
S. No. | Type/Source | Quantity of Waste Water Generated (Kilolitre per Day) | Treatment Capacity (Kilolitre per Day) | Treatment Method | Mode of Disposal | Other Mode of Disposal | Quantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day) | Quantity of Discharged Water (Kilolitre per Day) |
---|
(1.) | Industrial Waste Water | 7776 | 7776 | ZLD | Reuse within the Plant & Recycling | | 7776 | | |
|
16.1. | (a)Total Waste Water Generation (Kilolitre per Day) | 7776 | (b)Total Discharged Water (Kilolitre per Day) | 0 | (c)Total Reused Water (Kilolitre per Day) | 7776 | |
|
17. Solid Waste Generation/Management |
---|
S. No. | Name of Waste | Item | Other Item | Quantity per Annum | Unit | Distance from Site(KM) | Mode of Transport | Other Mode of Transport | Mode of Disposal | Other Mode of Disposal |
---|
(1.) | HSM Sludge | Industrial Waste | | 60000 | Tons | 1 | Road | | Co-Processing | | (2.) | SMS Slag | Industrial Waste | | 1240000 | Tons | 1 | Road,Rail | | Co-Processing | | (3.) | SMS Sludge | Industrial Waste | | 30000 | Tons | 1 | Road | | Co-Processing | | (4.) | WWTP Sludge | Industrial Waste | | 48000 | Tons | 1 | Road | | Co-Processing | | (5.) | Mill Scales | Industrial Waste | | 60000 | Tons | 1 | Road | | Co-Processing | | (6.) | DE Dust | Industrial Waste | | 2741301 | Tons | 1 | Road,Conveyor Belt | | Co-Processing | | (7.) | BF Slag | Industrial Waste | | 1600000 | Tons | 1 | Road | | Co-Processing | | |
|
|
18.1. Air Quality Impact Prediction |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Unit | Baseline Concentration | Distance GLC | Incremental Concentration | Total GLC | Prescribed Standard |
---|
(1.) | PM2.5 | | Microgram per Meter Cube | 44 | 1.5 | 1.2 | 45.2 | 60 | (2.) | NOx | | Microgram per Meter Cube | 37.1 | 1.3 | 8.97 | 46.07 | 80 | (3.) | SO2 | | Microgram per Meter Cube | 9.3 | 1.3 | 1.93 | 11.23 | 80 | (4.) | PM10 | | Microgram per Meter Cube | 67.8 | 1.5 | 4.83 | 72.63 | 100 | |
|
18.2. Stack Details |
---|
S. No. | Source | Fuel | Stack Height(m) | Stack Diameter(m) | Pollutants | Other Pollutants | Emission (GLS) |
---|
(1.) | SP3 Process | Mixed Gas | 130 | 6 | Others | PM, SO2 , NOx | 17, 25.5, 20.4 g/s | (2.) | Bar Mill Reheating Furnace | Mixed Gas | 60 | 2 | Others | PM, SO2, NOx | 0.4,0.42,1.04 g/s | (3.) | Lime Kiln 6 Process | Mixed Gas | 45 | 2 | Others | PM, SO2, NOx | 1.7,0.67,1.67 g/s | (4.) | DRI2 Reduction Furnace | - | 30 | 0.9 | Others | PM, NOx | 0.3, 0.13 g/s | (5.) | DRI2 Product Silo Dust Collector | NA | 30 | 0.9 | Others | PM | 0.4 g/s | (6.) | BF2 Stove | Mixed Gas | 60 | 4.8 | Others | PM, SO2, NOx | 2.8,2.08,6.9 g/s | (7.) | BF2 Cast House Dedusting | NA | 40 | 5.5 | Others | PM | 20.8 g/s | (8.) | HSM2 Reheating Furnace | Mixed Gas | 100 | 4.2 | Others | PM, SO2, NOx | 1.3,1.26,3.14 | (9.) | CRM2 | NA | 30 | 1.2 | Others | PM | 0.1 | (10.) | CPP2 | Mixed Gas | 85 | 5.5 | Others | PM, SO2, NOx | 20.8,6.25,31.25 g/s | (11.) | Pellet Plant 2 Process | Mixed Gas | 80 | 9.7 | Others | PM, SO2, NOx | 7,17.4,69.6 g/s | (12.) | Lime Kiln 5 Process | Mixed Gas | 45 | 2 | Others | PM, SO2, NOx | 1.7,0.67,1.67 g/s | (13.) | DRI2 Fuel Gas Injector | Mixed gas | 40 | 4.5 | Others | PM, NOx | 0.7,95.9 g/s | (14.) | BF2 Stock House Dedusting | NA | 40 | 4 | Others | PM | 2.3 g/s | (15.) | Pellet Plant 2 Space Dedusting | NA | 50 | 2.6 | Others | PM | 0.6 g/s | (16.) | Pellet Plant 2 Product Storage Dedusting | NA | 45 | 2.2 | Others | PM | 0.5 g/s | (17.) | SP3 Space Dedusting | NA | 65 | 4 | Others | PM | 7.5 g/s | (18.) | Lime Kiln 7 Process | Mixed Gas | 45 | 2 | Others | PM, SO2, NOx | 1.7,0.67,1.67 g/s | (19.) | SMS2 Fume Extraction System | NA | 40 | 5.5 | Others | PM | 20.8 g/s | |
|
19. | Power Requirement: | (a)Quantity (Kilo Volt Amps (kVA)) | 500000 | (b)Source | MSEB Grid | (c)Uploaded Copy of Agreement | Not Applicable | (d)Standby Arrangement (Details of DG Sets) | DG sets have been provided as backup | (e)Stack Height (in m) | 30 | |
|
20. | Land Ownership Pattern: | (a)Forest Land (ha.) | 0 | (b)Private Land (ha.) | 0 | (c)Government Land (ha.) | 0 | (d)Revenue Land (ha.) | 0 | (e)Other Land (ha.) | 729 | Total Land (ha.) | 729 | |
|
21. | Present Land Use Breakup of the Study Area in Ha: | (a)Agriculture Area (ha.) | 14035800 | (b)Waste/Barren Land (ha.) | 4207600 | (c)Grazing/ Community Land (ha.) | 0 | (d)Surface Water Bodies (ha.) | 3485400 | (e)Settlements (ha.) | 628000 | (f)Industrial (ha.) | 729 | (g)Forest (ha.) | 7002200 | (h)Mangroves (ha.) | 0 | (i)Marine Area (ha.) | 0 | (j)Others (ha.) : NA | 2041000 | Total (ha.) | 31400729 | |
|
22. Land requirement for various activities |
---|
S. No. | Description of Activity / Facility / Plant / Others | Others | Land Requirement (ha.) | Remarks |
---|
(1.) | Township | | 60.7 | | (2.) | Main Plant | | 668.3 | | |
|
|
23. | Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Sanctuaries; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones : | |
|
23.1. Details of Ecological Sensitivity : |
---|
S. No. | Details of Ecological Sensitivity | Name | Distance from the Project (Km) | Remarks |
---|
(1.) | ESZs | None | 0 | - | (2.) | Critically Polluted Area | None | 0 | - | (3.) | Corridors | None | 0 | - | (4.) | NPA | None | 0 | - | (5.) | WLS | None | 0 | - | (6.) | Wildlife Corridors | None | 0 | - | (7.) | ESAs | None | 0 | - | |
23.2. Details of Environmental Sensitivity : |
---|
S. No. | Details of Environmental Sensitivity | Other Details of Environmental Sensitivity | Name | Distance from the Project (Km) | Remarks |
---|
(1.) | Forest | | Reserve Forest | 15 | near Kharkhara, Katkariwadi,Turmal, Katvira & Dhavte village | (2.) | Archaeological Sites | | None | 0 | - | (3.) | Defence Installations | | None | 0 | - | |
|
23.3. | (a)Whether Noc / Permission from the competent authority is required? | No | (b)Whether NBWL recommendation is required? | No | |
|
24. | Forest Land: | Whether any Forest Land involved? | No | |
|
25. | Tree Cutting: | (a)No. of Trees Cut for the Project (if Forest Land not Involved) | Not Applicable | (b)Details of Tree Cutting and Planting of Trees | Not Applicable | |
|
26. | Land Acquisition Status: | (a)Acquired Land(Ha) | 729 | (b)Land yet to be acquired(Ha) | 0 | (c)Status of Land acquisition if not acquired | NA | |
|
27. | Rehabilitation and Resettlement (R&R): | (a)No. of Villages | 0 | (b)No. of Households | 0 | (c)No. of PDFs (Project Displaced Families) | 0 | (d)No. of PAFs (Project Affected Families) | 0 | (e)Funds Allocated for R&R(in INR) (in Lacs) | 0 | (f)Status of R&R | In-Progress | |
|
28. | Details of Presence of Schedule-I Species: | (a)Whether there is Presence of Schedule-I Species ? | No | (b)Whether conservation plan for Schedule-I Species has been prepared ? | No | (c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? | No | |
|
29. | Details of Presence of Water Bodies in Core Area: | (a)Whether there is Presence of Water Bodies in Core Area ? | No | (b)Whether there is Diversion Required ? | No | (c)Whether permission has been obtained from competent authority ? | No | |
|
30. | Details of Presence of Water Bodies in Buffer Area: | (a)Whether there is Presence of Water Bodies in Buffer Area ? | Yes | (i)Details of Water Bodies in Buffer Area | Amba River, Dharamtar Creek | (ii)Direction of Water Bodies in Buffer Area | West | (iii)Distance of Water Bodies in Buffer Area | 1 | |
|
31. | Manpower Requirement: | (a)Permanent Employment-During Construction | 2000 | (b)Permanent Employment-During Operation | 1000 | (c)Temporary Employment- During Construction | 1000 | (d)Temporary Employment- During Operation | 1000 | (e)No. of working days | 365 | (f)Total Manpower | 5000 | |
|
|
S. No. | Description | Existing | Proposed | Total |
---|
(1.) | Total Area of Green Belt | 104 | 137 | 241 | (2.) | Percentage of Total Project Area | 14.3 | 19 | 33 | (3.) | No. of Plants | 201203 | 152275 | 353478 | (4.) | Funds Allocated | 20120300 | 60910000 | 81030300 | |
|
33. Project Benefits |
---|
S. No. | Type of Project Benefits | Details of Project Benefits |
---|
(1.) | Environmental | Reduction in Air Pollutant loads due to implementation of latest technologies in proposed new Pellet Plant of 9 MTPA | |
|
34. CRZ Specific Details : Not Applicable |
35. Sector Specific Details : NOT APPLICABLE |
35. Sector Specific Details For Industrial Projects - 1 |
|
|
36. | Details of Court Cases: | (a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? | No | |
|
37. | Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act: | (a)Whether any Direction issued under EPA Act/Air Act/Water Act ? | No | |
|
38. | Details of EIA Consultant: | (a)Have you hired Consultant for preparing document? | Yes | (i)Accreditation No. | NABET/EIA/1619/RA 0068 | (ii)Name of the EIA Consultant | MECON LIMITED | (iii)Address | VIVEKANAND PATH, DORANDA, RANCHI-02 | (iv)Mobile No. | 9470193793 | (v)Landline No. | 0651248324 | (vi)Email Id | envenggranchi@mecon.co.in | (vii)Category of Accreditation | A | (viii)Sector of Accreditation | Industrial Projects - 1 | (ix)Validity of Accreditation | 02 Oct 2019 | (x)Uploaded Certificate of Accreditation certified by QCI/NABET | Copy of Certificate of Accreditation | |
|
|
Essential Detail Sought: |
---|
Sno. | EDS Letter | Remarks | Date of EDS |
---|
1. | NA | The Original EC has been trifurcated and accordingly ministry has amended the original EC in recent past. May kindly refer to the certificate of compliance which was submitted was of earlier EC which was superseded by amendment/ trifurcation. Therefore, kindly submit certificate of compliance against the latest clearance | 25 Sep 2018 | 2. | NA | The correction have been made as per the instruction received | 02 Nov 2018 | |
Additional Detail Sought: |
---|
Sno. | ADS Letter | Remarks | Date of ADS |
---|
1. | ADS Raise Letter | TOR Granted with exemption of Public hearing | 26 Dec 2018 | |
| Undertaking |
| I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief. And I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity/ construction/ expansion has since been taken up. |
| Name of Applicant | Vitthal Waghchaure | Designation | General Manager | Name of Company (Applicant Name should not be given here) | JSW STEEL LTD. | Address | JSW Steel Ltd., Dolvi, Village - Wadkhal, Taluka - Pen, Raigad District, Maharashtra |
|