1.
Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? No
Details of Project:
(a)Name of the project(s) Harsha Sugars Ltd
(b)Name of the Company / Organisation HARSHA SUGARS LIMITED
(c)Registered Address Sy No 411/1, 411/2, 413/1, 412 Saundatti Village, Belgaum,,Belgaum,Karnataka-591126
(d)Legal Status of the Company Private
(e)Joint Venture No
2.
Address for the correspondence:
(a)Name of the Applicant Channaraj Hattiholi
(b)Designation (Owner/ Partner/ CEO) Director
(c)Address Plot No 151, 2 nd Stage, Opp Hanuman Temple, Hanuman Nagar, Belagavi,,Belgaum,Belgaum,Karnataka-590001
(d)Pin code 590001
(e)E-mail harshasugarseia@gmail.com
(f)STD Code. 831(f)Telephone No. 2459977
(g)Fax No.
(h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . Annexure-Uploaded Copy of documents in support of the competence/authority
3.
Category of the Project/Activity as per Schedule of EIA Notification,2006:
(a.I)Project/Activity5(g) Distilleries
5(j) Sugar Industry
Minor Activity1(d) Thermal Power Plants
(b)Category A
(c)Proposal Number IA/KA/IND2/64689/2017
(d)Master Proposal Number(Single Window) SW/78241/2018
(e)EAC concerned (for category A Projects only) Industrial Projects - 2
(f)Project Type Fresh EC
4.
Location of the Project:
(a)Plot/Survey/Khasra No. Sy No 411/1, 411/2, 413/1, 412, 411/3 Saundatti Vi
(b)Pincode 591126
(c)Bounded Latitudes (North)
From
Degree 15.71
Minutes
Second
From
Degree 15.72
Minutes
Second
(d)Bounded Longitudes (East)
From
Degree 75.05
Minutes
Second
From
Degree 75.06
Minutes
Second
(e)Survey of India Topo Sheet No. 48M1 48M2 48I13 48I14
(f)Uploaded Topo Sheet File Copy of Topo Sheet File
(g)Maximum Elevation Above Means Sea Level(AMSL) 657
(h)Uploaded (kml) File Copy of Kml File      
(i)Distance of Nearest HFL from the project boundary within the study area 5
(j)Seismic Zone 2
5.
(a)Number of States in which Project will be Executed 1
(b)Main State of the project Karnataka
Details of State(s) of the project
S. No. State Name District Name Tehsil Name Village Name
(1.)Himachal PradeshKangraDharmsala(T)
(2.)KarnatakaBelgaumSaundatti
6.
Details of Terms of Reference (ToR):
(a)MoEF&CC / SEIAA File Number IA-J-11011/236/2017-IA-II(I)
(b)Date of Apply of TOR 20 May 2017
(c)Date of Issue of TOR / Standard ToR 19 Jul 2017
(d)Previous TOR Letter Copy of Previous TOR letter
7.
Details of Public Consultation:
(a)Whether the Project Exempted from Public Hearing?No
(b)Whether details of Public Hearing available? Yes
(c)Whether Public hearing was presided over by an officer of the rank of Additional District Magistrate or above Yes
     7.1.       Details of Public Hearing
S. No.Details of Advertisement Details of Public Hearing Venue Location DetailsNo. of People AttendedIssues RaisedDesignation of Presiding OfficerOther Designation of Presiding Officer
(1.)
Date of Advertisement :18 Jun 2018
Copy of advertisement :Copy of Advertisement
Copy of Public Hearing :Copy of Public Hearing
Date :18 Jul 2018
Distance of Public Hearing Venue from the Proposed Project :0
Project site
State :Karnataka
District :Belgaum
Tehsil :Saundatti
Village :Saundatti
215Positive reposnse by the publicDeputy Commissioner
8.
Details of Project Configuration/Product:
     8.1.       Project Configuration
S. No.Plant/Equipment/FacilityConfigurationRemarks
(1.)Distillery60 KLPD
(2.)Sugar cane crushing7500 TCD
(3.)Cogeneration Power33 MW/hrinclusive of 3 MW/hr from incineration boiler
     8.2.       Product
S. No.Product/Activity (Capacity/Area)QuantityUnitOther UnitMode of Transport / Transmission of ProductOther Mode of Transport / Transmission of Product
(1.)Sugar7500Tons Crushed per DayRoad
(2.)Power33Mega Watt(MW)OthersTransferred to grid
(3.)Distillery (Ethanol/ ENA/RS)60Kilo Litre per DayRoad
9.
In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii):
Details Not Applicable
9.1.
Details of Consent to Operate
(i)Whether Consent to operate obtained ? NA
(ii)Copies of all Consent to operate obtained since inception NA
(iii)Date of Issue 15 Sep 2018
(iv)Valid Upto 30 Jun 2022
(v)File No. 307796 4098
(vi)Application No. 35496
(vii)Copy of Consent to operate valid as on date Copy of Consent to Operate
10.
Project Cost:
(a)Total Cost of the Project at current price level (in Crores) 307.32
(b) Funds Allocated for Environment Management (Capital) (in Crores) 9.39
(c) Funds Allocated Towards CER (Corporate Environment Responsibility) (in Crores) 7.7
(d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in Crores) 0.87
11.
Whether project attracts the General Condition specified in the Schedule of EIA Notification ? No
12.
Whether project attract the Specific Condition specified in the Schedule of EIA Notification ? No
13.
Raw Material / Fuel Requirement:
(a)Proposed quantity of raw material/fuel 7500
(b)Existing quantity of raw material/fuel N/A
(c)Total quantity of raw material/fuel 7500
    13.1.        Raw Material / Fuel Profile
S. No.Raw Material / Fuel QuantityUnitOther UnitSource (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received )Mode of TransportOther Mode of TransportDistance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received)Type of Linkage Other Type of Linkage Uploaded Copy of Linkage
(1.)Sugar cane1350000Tons Crushed per DayCane Allotted areaRoad15 OthersCane allotmentCopy of Linkage
(2.)Molasses72000Tons per AnnumInhousePipe Conveyor0 CaptiveCopy of Linkage
(3.)bio fuel as rice husk/bagasse362400Tons per AnnumInhouseConveyor Belt0 CaptiveCopy of Linkage
(4.)Sulphur powder900Tons per AnnumMumbaiRoad430 Open MarketCopy of Linkage
(5.)limestone/hydrated lime2880Tons per AnnumLokapurRoad57 Open MarketCopy of Linkage
(6.)Nutrients18Tons per AnnumMumbaiRoad430 Open MarketCopy of Linkage
14.
Baseline Data :
(a)Period of Base Line Data Collection FROM 01 Oct 2017 To 31 Dec 2017
(b)Season Winter
    14.1.     No. of ambient Air Quality (AAQ) monitoring locations : 8
S. No.Criteria Pollutants Other Criteria PollutantsUnitMaximum ValueMinimum Value98 Percentile ValuePrescribed Standard
(1.)PM10Micro Gram per Meter Cube804780100
(2.)OthersCOMili Gram per Meter Cube0.990.620.984
(3.)PM2.5Micro Gram per Meter Cube241123.5460
(4.)SO2Micro Gram per Meter Cube13.877.1012.2180
(5.)NOxMicro Gram per Meter Cube19.8714.3218.6480
    14.2.     No. of Ground Water monitoring locations : 6
S. No.Criteria Pollutants Other Criteria PollutantsHeavy MetalUnitOther UnitMaximum ValueMinimum ValueDesirable LimitMaximum Permissible Limit
(1.)pHNA7.77.246.58.5
(2.)TDSmg/l18524525002000
(3.)TSSmg/l140600
(4.)Heavy MetalsCOPPERmg/l0.0130.0070.051.5
(5.)Fluoridemg/l0.860.201.01.5
(6.)Total Hardnessmg/l650174200600
(7.)Chloridesmg/l649.6762.612501000
    14.3.     No. of Surface Water monitoring locations : 3
S. No.Criteria Pollutants Other Criteria PollutantsUnitOther UnitMaximum ValueMinimum ValueClassification of inland water body
(1.)pHNA8.17.8E
(2.)DOmg/l5.65.2E
(3.)BODmg/l64E
(4.)CODmg/l2416E
(5.)OthersTDSmg/l938214E
    14.4.     No. of Ambient Noise monitoring locations : 8
S. No.Parameter UnitMaximum ValueMinimum ValuePrescribed Standard
(1.)Leq(Day)A-weighted decibels(dB(A))52.1546.2855
(2.)Leq(Night)A-weighted decibels(dB(A))50.5436.145
    14.5.     No. of Soil Sample Monitored locations : 7
S. No.Parameter UnitOther UnitMaximum ValueMinimum Value
(1.)pHOthersNo unit9.88.77
(2.)N(Nitrogen)Kilogram per hectare220.71147.14
(3.)P(Phosphorus)Kilogram per hectare120.0653.64
(4.)Electric ConductivityMillisiemens per Centimetre20782.6
(5.)K(Potassium)Milliequivalents per 100 Gram95.7739.90
14.6.
Details of Ground Water Table:
(a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) From 10 To 5
(b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) From 2 To 5
(c)Whether Ground Water Intersection will be there ? No
     15.      Details of Water Requirement (During Operation)
S. No.Source Source Other Required Quantity (Kilolitre per Day (Kld))Distance from SourceCopy of Permission from Competent Authority Mode of TransportOther Mode of TransportMethod of Water WithdrawalOther Method of Water WithdrawalLetter No.Date of IssuePermitted Quantity
(1.)Surface141712.2Copy of Permission LetterPipelineJack Well364503 Oct 20183000
15.1.
(a)Whether Desalination is proposed No
    16.       Waste Water Management(During Operation)
S. No.Type/Source Quantity of Waste Water Generated (Kilolitre per Day)Treatment Capacity (Kilolitre per Day) Treatment MethodMode of DisposalOther Mode of DisposalQuantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day)Quantity of Discharged Water (Kilolitre per Day)
(1.)Cogenration Effluent during Offseason6191000UASBGreen Belt Renewal Plant619
(2.)Sugar unit Effluent during season7721000UASBGreen Belt Renewal Plant772
16.1.
(a)Total Waste Water Generation (Kilolitre per Day) 1391
(b)Total Discharged Water (Kilolitre per Day) 0
(c)Total Reused Water (Kilolitre per Day) 1391
    17.       Solid Waste Generation/Management
S. No.Name of Waste Item Other ItemQuantity per AnnumUnitDistance from Site(KM)Mode of TransportOther Mode of TransportMode of DisposalOther Mode of Disposal
(1.)Boiler ashFly Ash3000Tons10RoadOthersFlyash Brick Manufacturers
(2.)PressmudIndustrial Waste54000Tons15RoadOthersMember Farmers
(3.)DomesticMunicipal Solid Waste28Tons6.5RoadAuthorized Recyclers
(4.)Incineration flyashFly Ash1550Tons10RoadOthersFlyash Brick Manufacturers
(5.)Sludge from ETP and CPUOthersSludge10Tons15RoadOthersMember Farmers
(6.)Lime GritIndustrial Waste54Tons0RoadOthersUsed inhouse
(7.)Yeast sludgeIndustrial Waste1800Tons15RoadOthersMember farmers
18.
    18.1.     Air Quality Impact Prediction
S. No.Criteria Pollutants Other Criteria PollutantsUnitBaseline ConcentrationDistance GLCIncremental ConcentrationTotal GLCPrescribed Standard
(1.)PM10Microgram per Meter Cube80.05000.77280.772100
(2.)PM2.5NA00000
(3.)NOxMicrogram per Meter Cube16.425000.18716.80780
(4.)SO2Microgram per Meter Cube9.515000.1489.65880
    18.2.     Stack Details
S. No.Source FuelStack Height(m)Stack Diameter(m)PollutantsOther PollutantsEmission (GLS)
(1.)140 TPH BoilerBagasse853.2SO24.47
(2.)22 TPH IBSlop+Bagasse702.8NOx48.4
(3.)140 TPH BoilerBagasse853.2PM10125.8
(4.)22 TPH IBSlop+Bagasse702.8SO220.62
(5.)140 TPH boilerBagasse853.2NOx22.93
(6.)22 TPH IBSlop+Bagasse702.8PM1058.5
19.
Power Requirement:
(a)Quantity (Kilo Volt Amps (kVA)) 9500
(b)Source Captive
(c)Uploaded Copy of Agreement Copy of Agreement
(d)Standby Arrangement (Details of DG Sets) 2 X 1250 KVA
(e)Stack Height (in m) 15
20.
Land Ownership Pattern:
(a)Forest Land (ha.) 0
(b)Private Land (ha.) 20.7
(c)Government Land (ha.) 0
(d)Revenue Land (ha.) 0
(e)Other Land (ha.) 0
    Total Land (ha.) 20.7
21.
Present Land Use Breakup of the Study Area in Ha:
(a)Agriculture Area (ha.) 29632
(b)Waste/Barren Land (ha.) 5
(c)Grazing/ Community Land (ha.) 1047
(d)Surface Water Bodies (ha.) 2299
(e)Settlements (ha.) 1031
(f)Industrial (ha.) 0
(g)Forest (ha.) 10
(h)Mangroves (ha.) 0
(i)Marine Area (ha.) 0
(j)Others (ha.) : Eucalyptus Plantation 30
    Total (ha.) 34054
    22.     Land requirement for various activities
S. No.Description of Activity / Facility / Plant / Others OthersLand Requirement (ha.)Remarks
(1.)Main Plant9.7Sugar + Cogen + Distillery
(2.)Green belt6.9
(3.)OthersStorage yard+ internal road + parking4.1
Total (ha.) 20.7
23.
Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Sanctuaries; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones :
    23.1.     Details of Ecological Sensitivity :
S. No.Details of Ecological Sensitivity NameDistance from the Project (Km)Remarks
(1.)ESAsNA0No EAS
(2.)Wildlife CorridorsNA0No WL Corridor
(3.)Critically Polluted AreaNA0No Critically Polluted area
(4.)WLSNA0No WLS
(5.)NPANA0No NPA
(6.)ESZsNA0No ESZ
(7.)CorridorsNA0No Corridor
    23.2.     Details of Environmental Sensitivity :
S. No.Details of Environmental Sensitivity Other Details of Environmental Sensitivity NameDistance from the Project (Km)Remarks
(1.)Defence InstallationsNA0No Defence Installations
(2.)ForestYellamma Gudda Open Scrub Forest7.09Towards NE
(3.)Archaeological SitesSrine of Godess Yellamma10.2Yellamma Temple located at Yelamma Gudda which is located at 7.09 kms
23.3.
(a)Whether Noc / Permission from the competent authority is required? No
(b)Whether NBWL recommendation is required? No
24.
Forest Land:
Whether any Forest Land involved? No
25.
Tree Cutting:
(a)No. of Trees Cut for the Project (if Forest Land not Involved) 0
(b)Details of Tree Cutting and Planting of Trees Not Applicable
26.
Land Acquisition Status:
(a)Acquired Land(Ha) 20.7
(b)Land yet to be acquired(Ha) 0
(c)Status of Land acquisition if not acquired Land already in the name of Harsha Sugars Ltd
27.
Rehabilitation and Resettlement (R&R):
(a)No. of Villages 0
(b)No. of Households 0
(c)No. of PDFs (Project Displaced Families) 0
(d)No. of PAFs (Project Affected Families) 0
(e)Funds Allocated for R&R(in INR) (in Lacs) 0
(f)Status of R&R Completed
28.
Details of Presence of Schedule-I Species:
(a)Whether there is Presence of Schedule-I Species ? Yes
(i)Details of Schedule-I Species 3 species found in study area
(b)Whether conservation plan for Schedule-I Species has been prepared ? Yes
(i)Uploaded copy of conservation plan Copy of conservation plan
(ii)Fund Provision made 100000
(iii)Period of Implementation 3 years
(c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? No
29.
Details of Presence of Water Bodies in Core Area:
(a)Whether there is Presence of Water Bodies in Core Area ? No
(b)Whether there is Diversion Required ? No
(c)Whether permission has been obtained from competent authority ? No
30.
Details of Presence of Water Bodies in Buffer Area:
(a)Whether there is Presence of Water Bodies in Buffer Area ? Yes
(i)Details of Water Bodies in Buffer Area Renuka Sagar Reservoir
(ii)Direction of Water Bodies in Buffer Area North
(iii)Distance of Water Bodies in Buffer Area 5.0
31.
Manpower Requirement:
(a)Permanent Employment-During Construction 50
(b)Permanent Employment-During Operation 250
(c)Temporary Employment- During Construction 350
(d)Temporary Employment- During Operation 120
(e)No. of working days 300
(f)Total Manpower 770
32.
Green Belt in Ha:
(a)Total Area of Green Belt 9.8
(b)Percentage of Total Project Area 47.34
(c)No. of Plants to be Planted 10158
(d)Funds Allocated for Plantation 2500000
(e)Uploaded Green Belt plan Copy of Green Belt Plan
    33.         Project Benefits
S. No.Type of Project Benefits Details of Project Benefits
(1.)EnvironmentalGreen belt will be developed within the plant premises covering a total area of about 17 acres (33 % of total area) and also in the buffer zone. This will not only help to create healthy environment in the area but also acts as pollution sink. Further avi-fauna population of the area will increase.
(2.)SocialWith the implementation of the total project, the socio-economic status of the local people will improve and infrastructure facilities like roads, communication systems, drinking water, etc. will also develop. The land rates in the area will escalate due to the project. This will help in upliftment of the social status of the people in the area. Educational institutions will also come-up and will lead to improvement of educational status of the people in the area. Medical facilities will certai
(3.)FinancialThe company’s management will recruit semi skilled & unskilled workers from the nearby villages, thereby improving in the social status of the villagers. It creates employment opportunities to 100-110 No's directly &200 No's indirectly. Further, the management will support the local administration and provide other form of assistance for the development of public amenities viz., water distribution, building of school rooms, health centres, Education programme, Health camps, Agricultural program
   34.   CRZ Specific Details : Not Applicable
   35.   Sector Specific Details : NOT APPLICABLE
   35.   Sector Specific Details For Industrial Projects - 2
S. No.Item Details
S. No.Item Details
36.
Details of Court Cases:
(a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? No
37.
Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act:
(a)Whether any Direction issued under EPA Act/Air Act/Water Act ? No
38.
Details of EIA Consultant:
(a)Have you hired Consultant for preparing document? Yes
(i)Accreditation No. QCI/NABET/EIA/ACO/18/00732
(ii)Name of the EIA Consultant M/s Environmental Health and Safety Consultants Pv
(iii)Address No 174/New No .13/2, 14th 'E' Cross, Industrial Town, Agrahara Dasarahalli, Bangalore - 560 044
(iv)Mobile No. 8971871282
(v)Landline No. 0802301620
(vi)Email Id ehscblr@yahoo.com
(vii)Category of Accreditation A
(viii)Sector of Accreditation Industrial Projects - 2
(ix)Validity of Accreditation 14 Feb 2019
(x)Uploaded Certificate of Accreditation certified by QCI/NABET Copy of Certificate of Accreditation
39.
Documents to be Attached:
(a)Uploaded Copy of EIA/EMP Report Copy of EIA/EMP
Copy of EIA/EMP(Annexures)
Copy of EIA/EMP(Plans/Figures)
(b)Uploaded Copy of Risk Assessment Report Copy of Risk Assessment
(c)Uploaded Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan
(d)Uploaded Copy of Final Layout Plan Copy of Final Layout Plan
(e)Uploaded Cover Letter Copy of Cover Letter
(f)Uploaded Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency
(g)Uploaded Additional File Copy of Additional File
(h)Uploaded Proposal Presentation (To be given in EAC meeting) NA
            Essential Detail Sought:
Sno. EDS Letter Remarks Date of EDS
1.NAPlease inform/provide the following:- - Copy of Consent to Operate issued by SPCB is not attached. - Details of clearances to meet the requirement of surface water of 1567 cum/day during off season from Malprabha river. 15 Sep 2018
2.NAThe correction have been made as per the instruction received 17 Sep 2018
3.NA- No document attached to support the details in item 9.1. - No confirmation regarding surface water requirement of 1567 cum/day. The letter dated 18/3/2015 and that too, for 1000 cum/day, hence not meaningful. 21 Sep 2018
4.NAThe correction have been made as per the instruction received 04 Oct 2018
5.NAIn continuation to our earlier observations, please inform/clarify the following:- - CTO dated 15/9/2018 is for sugar cane crushing capacity of 3750 TCD. How the proposed expansion would be from 4500 TCD to 7500 TCD. - No progress towards clearance required for meeting the surface water requirement of 1567 cum/day. - Rationale for the proposed expansion when the project envisaged earlier is yet to be implemented. 09 Oct 2018
6.NAThe correction have been made as per the instruction received 12 Nov 2018
      Additional Detail Sought : NIL
Undertaking
I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief. And I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity/ construction/ expansion has since been taken up.
Name of ApplicantChannaraj Hattiholi
DesignationDirector
Name of Company (Applicant Name should not be given here)HARSHA SUGARS LIMITED
AddressSy No 411/1, 411/2, 413/1, 412 Saundatti Village, Belgaum
Print