|
1. | Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? | No | Details of Project: | (a)Name of the project(s) | Proposed BS VI Project | (b)Name of the Company / Organisation | INDIAN OIL COPERATION LIMITED | (c)Registered Address | Guwahati Refinery,IOCL,Noonmati,
Guwahati,Assam.,,Kamrup,Assam-781020 | (d)Legal Status of the Company | Central PSU | (e)Joint Venture | No | |
|
2. | Address for the correspondence: | (a)Name of the Applicant | Gayatri Laskar | (b)Designation (Owner/ Partner/ CEO) | Deputy Manager (HSE) | (c)Address | Guwahati Refinery,IOCL,
Noonmati,
Guwahati,Assam.,,Guwahati,Kamrup,Assam-781020 | (d)Pin code | 781020 | (e)E-mail | laskargm@indianoil.in | (f)STD Code. | 361(f)Telephone No. | 2597344 | (g)Fax No. | 03612657250 | (h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . | Annexure-Uploaded Copy of documents in support of the competence/authority | |
|
3. | Category of the Project/Activity as per Schedule of EIA Notification,2006: | (a.I)Project/Activity | 4(a) Petroleum refining industry
| Minor Activity | | (b)Category | A | (c)Proposal Number | IA/AS/IND2/78112/2013 | (d)Master Proposal Number(Single Window) | SW/78109/2018 | (e)EAC concerned (for category A Projects only) | Industrial Projects - 2 | (f)Project Type | Modernization |
|
|
4. | Location of the Project: | (a)Plot/Survey/Khasra No. | 1, 10, 54, 101 | (b)Pincode | 781020 | (c)Bounded Latitudes (North) | | From | | Degree | 26.181038 | Minutes | | Second | | From | | Degree | 26.188940 | Minutes | | Second | | (d)Bounded Longitudes (East) | | From | | Degree | 91.803214 | Minutes | | Second | | From | | Degree | 91.815434 | Minutes | | Second | | (e)Survey of India Topo Sheet No. | 0.0 | (f)Uploaded Topo Sheet File | Copy of Topo Sheet File | (g)Maximum Elevation Above Means Sea Level(AMSL) | 300 | (h)Uploaded (kml) File | Copy of Kml File | (i)Distance of Nearest HFL from the project boundary within the study area | 0.0 | (j)Seismic Zone | 5 | |
|
5. | (a)Number of States in which Project will be Executed | 1 | (b)Main State of the project | Assam | |
|
|
Details of State of the project |
---|
S. No. | State Name | District Name | Tehsil Name | Village Name |
---|
NIL | |
|
6. | Details of Terms of Reference (ToR)/EC: | (a)MoEF&CC / SEIAA File Number | J-11011/71/2012-IA.II (I) | (b)Date of Apply of TOR | 09 May 2013 | (c)Date of Issue of TOR / Standard ToR | 10 Sep 2013 | (d)Date of Apply of EC | 29 Aug 2015 | (e)Date of Issue of EC | 18 Apr 2016 | (f)Previous TOR Letter | Copy of Previous TOR letter | (g)Previous EC Letter | Copy of Previous EC letter | |
|
7. | Details of Public Consultation: | (a)Whether the Project Exempted from Public Hearing? | Yes | (b)Reason | As per para 7(ii) of EIA Notification 2006 | (c)Supporting Document | Copy of Supporting Document | |
|
8. | Details of Project Configuration/Product: | Details Not Applicable | |
|
9. | In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii): | (a)Details of certified report on compliance of earlier environmental clearance condition | (i)Certified Compliance By | Regional | (ii)Details of Regional Office of MoEFCC / Zonal Office of CPCB / SPCB / UTPCC from which certified report on | Shillong | (iii)Letter No. | - | (iv)Status of Compliance | Compiled | (v)Certified report on compliance of earlier environmental clearance conditions (Including Monitoring Report) | Copy of Certified Compliance Report | (vi)Date of site visit | Apr 13 2018 12:00AM | (b)Details of Capacity Expansion | |
|
S. No. | Product/Activity (Capacity/Area) | Quantity From | Quantity To | Total | Unit | Other Unit | Mode of Transport / Transmission of Product | Other Mode of Transport / Transmission of Product |
---|
(1.) | 198.3 | 0 | 1000000 | 1000000 | Tons per Annum(TPA) | | Road,Pipe Conveyor | | |
| (c)Details of Configuration | |
|
S. No. | Plant / Equipment / Facility | Existing Configuration | Proposed Configuration | Final configuration after expansion | Remarks |
---|
(1.) | - | 1.0 MTPA CRUDE OIL REFINERY | 1.0 MTPA CRUDE OIL REFINERY | 1.0 MTPA CRUDE OIL REFINERY | FUEL QUALITY UPGRADATION | |
9.1. | Details of Consent to Operate | (i)Whether Consent to operate obtained ? | NA | (ii)Copies of all Consent to operate obtained since inception | NA | (iii)Date of Issue | 26 Apr 2018 | (iv)Valid Upto | 31 Mar 2019 | (v)File No. | WB/GUW/T-3038/15-16/494 | (vi)Application No. | UAIN: PCB/F50/KM/001243/11/2017 | (vii)Copy of Consent to operate valid as on date | Copy of Consent to Operate | |
|
|
10. | Project Cost: | (a)Total Cost of the Project at current price level (in Crores) | 513 | (b) Funds Allocated for Environment Management (Capital) (in Crores) | 0.0 | (c) Funds Allocated Towards CER (Corporate Environment Responsibility) (in Crores) | 0.0 | (d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in Crores) | 0.0 | |
|
11. | Whether project attracts the General Condition specified in the Schedule of EIA Notification ? | No | | |
12. | Whether project attract the Specific Condition specified in the Schedule of EIA Notification ? | No | | |
13. | Raw Material / Fuel Requirement: | (a)Proposed quantity of raw material/fuel | 1000000 | (b)Existing quantity of raw material/fuel | N/A | (c)Total quantity of raw material/fuel | 1000000 | |
|
  13.1. Raw Material / Fuel Profile |
---|
S. No. | Raw Material / Fuel | Quantity | Unit | Other Unit | Source (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received ) | Mode of Transport | Other Mode of Transport | Distance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received) | Type of Linkage | Other Type of Linkage | Uploaded Copy of Linkage |
---|
(1.) | CRUDE OIL | 1000000 | Tons per Annum | | ASSAAM OIL FIELD & IMPORT | Rail,Pipe Conveyor | | 0.0 | MoU | OIL INDIA LIMITED | Copy of Linkage | |
|
14. | Baseline Data : | (a)Period of Base Line Data Collection | FROM 09 Dec 2016 To 08 Mar 2017 | (b)Season | Winter | |
|
14.1. No. of ambient Air Quality (AAQ) monitoring locations : 8 |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Unit | Maximum Value | Minimum Value | 98 Percentile Value | Prescribed Standard |
---|
(1.) | PM10 | | Micro Gram per Meter Cube | 97 | 41 | 91.9 | 100 | (2.) | SO2 | | Micro Gram per Meter Cube | 20 | 4 | 18.7 | 80 | (3.) | PM2.5 | | Micro Gram per Meter Cube | 45 | 14 | 42.5 | 60 | (4.) | NOx | | Micro Gram per Meter Cube | 44 | 12 | 41.7 | 80 | |
14.2. No. of Ground Water monitoring locations : 8 |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Heavy Metal | Unit | Other Unit | Maximum Value | Minimum Value | Desirable Limit | Maximum Permissible Limit |
---|
(1.) | TSS | | | mg/l | | 0.0 | 0.0 | 0.0 | 0.0 | (2.) | TDS | | | mg/l | | 235 | 174 | 500 | 2000 | (3.) | Total Hardness | | | mg/l | | 184 | 122 | 300 | 600 | (4.) | Chlorides | | | mg/l | | 45 | 22 | 250 | 1000 | (5.) | Fluoride | | | mg/l | | 0.24 | 0.1 | 1.0 | 1.5 | (6.) | Heavy Metals | | Fe | mg/l | | 0.21 | 0.09 | 0.3 | 1.0 | (7.) | pH | | | NA | | 7.3 | 6.7 | 5.08.5 | 5.08.5 | |
14.3. No. of Surface Water monitoring locations : 10 |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Unit | Other Unit | Maximum Value | Minimum Value | Classification of inland water body |
---|
(1.) | pH | | NA | | 7.4 | 7.2 | C | (2.) | BOD | | mg/l | | 7.0 | 2.0 | C | (3.) | COD | | mg/l | | 0.0 | 0.0 | C | (4.) | DO | | mg/l | | 6.7 | 6.5 | C | |
14.4. No. of Ambient Noise monitoring locations : 10 |
---|
S. No. | Parameter | Unit | Maximum Value | Minimum Value | Prescribed Standard |
---|
(1.) | Leq(Day) | A-weighted decibels(dB(A)) | 68.2 | 55.8 | 55 | (2.) | Leq(Night) | A-weighted decibels(dB(A)) | 58.4 | 46.5 | 45 | |
14.5. No. of Soil Sample Monitored locations : 4 |
---|
S. No. | Parameter | Unit | Other Unit | Maximum Value | Minimum Value |
---|
(1.) | P(Phosphorus) | Percent | | 0.17 | 0.12 | (2.) | N(Nitrogen) | Percent | | 0.32 | 0.19 | (3.) | K(Potassium) | Percent | | 0.21 | 0.11 | (4.) | Electric Conductivity | Others | Micromhos per cm | 602 | 532 | (5.) | pH | Others | - | 6.2 | 5.1 | |
|
14.6. | Details of Ground Water Table: | (a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) | From 10 To 2 | (b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) | From . To . | (c)Whether Ground Water Intersection will be there ? | NA | |
|
15. Details of Water Requirement (During Operation) |
---|
S. No. | Source | Source Other | Required Quantity (Kilolitre per Day (Kld)) | Distance from Source | Copy of Permission from Competent Authority | Mode of Transport | Other Mode of Transport | Method of Water Withdrawal | Other Method of Water Withdrawal | Letter No. | Date of Issue | Permitted Quantity |
---|
(1.) | Surface | | 240 | 3.0 | Copy of Permission Letter | Pipeline | | Intake Well | | . | 15 Feb 2018 | 240 | |
|
15.1. | (a)Whether Desalination is proposed | No | |
|
16. Waste Water Management(During Operation) |
---|
S. No. | Type/Source | Quantity of Waste Water Generated (Kilolitre per Day) | Treatment Capacity (Kilolitre per Day) | Treatment Method | Mode of Disposal | Other Mode of Disposal | Quantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day) | Quantity of Discharged Water (Kilolitre per Day) |
---|
(1.) | PROCESS | 240 | 550 | ETP | Green Belt Renewal Plant | | 240 | 0.0 | |
|
16.1. | (a)Total Waste Water Generation (Kilolitre per Day) | 240 | (b)Total Discharged Water (Kilolitre per Day) | 0 | (c)Total Reused Water (Kilolitre per Day) | 240 | |
|
17. Solid Waste Generation/Management |
---|
S. No. | Name of Waste | Item | Other Item | Quantity per Annum | Unit | Distance from Site(KM) | Mode of Transport | Other Mode of Transport | Mode of Disposal | Other Mode of Disposal |
---|
(1.) | SPENT CATALYST | Industrial Waste | | 0.0 | Tons | 0.0 | Road | | Authorized Recyclers | | |
|
|
18.1. Air Quality Impact Prediction |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Unit | Baseline Concentration | Distance GLC | Incremental Concentration | Total GLC | Prescribed Standard |
---|
(1.) | SO2 | | Microgram per Meter Cube | 9.1 | 0.0 | 0.0 | 9.1 | 80 | (2.) | NOx | | Microgram per Meter Cube | 26.3 | 0.0 | 0.0 | 26.3 | 80 | (3.) | PM10 | | Microgram per Meter Cube | 63.7 | 0.0 | 0.0 | 63.7 | 100 | (4.) | PM2.5 | | Microgram per Meter Cube | 26.2 | 0.0 | 0.0 | 26.2 | 60 | |
|
18.2. Stack Details |
---|
S. No. | Source | Fuel | Stack Height(m) | Stack Diameter(m) | Pollutants | Other Pollutants | Emission (GLS) |
---|
(1.) | NO STACK | - | 0.0 | 0.0 | PM10 | | 0.0 | |
|
19. | Power Requirement: | (a)Quantity (Kilo Volt Amps (kVA)) | 5.0 | (b)Source | CPP | (c)Uploaded Copy of Agreement | Copy of Agreement | (d)Standby Arrangement (Details of DG Sets) | - | (e)Stack Height (in m) | 0.0 | |
|
20. | Land Ownership Pattern: | (a)Forest Land (ha.) | 0.0 | (b)Private Land (ha.) | 0.0 | (c)Government Land (ha.) | 0.0 | (d)Revenue Land (ha.) | 0.0 | (e)Other Land (ha.) | 198.3 | Total Land (ha.) | 198.3 | |
|
21. | Present Land Use Breakup of the Study Area in Ha: | (a)Agriculture Area (ha.) | 0.0 | (b)Waste/Barren Land (ha.) | 0.0 | (c)Grazing/ Community Land (ha.) | 0.0 | (d)Surface Water Bodies (ha.) | 0.0 | (e)Settlements (ha.) | 0.0 | (f)Industrial (ha.) | 198.0 | (g)Forest (ha.) | 0.0 | (h)Mangroves (ha.) | 0.0 | (i)Marine Area (ha.) | 0.0 | (j)Others (ha.) : - | 0.3 | Total (ha.) | 198.3 | |
|
22. Land requirement for various activities |
---|
S. No. | Description of Activity / Facility / Plant / Others | Others | Land Requirement (ha.) | Remarks |
---|
(1.) | Main Plant | | 198.3 | | |
|
|
23. | Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Sanctuaries; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones : | |
|
23.1. Details of Ecological Sensitivity : |
---|
S. No. | Details of Ecological Sensitivity | Name | Distance from the Project (Km) | Remarks |
---|
(1.) | ESZs | - | 0.0 | - | (2.) | Corridors | - | 0.0 | - | (3.) | NPA | - | 0.0 | - | (4.) | ESAs | - | 0.0 | - | (5.) | Critically Polluted Area | - | 0.0 | - | (6.) | Wildlife Corridors | - | 0.0 | - | (7.) | WLS | AAMCHUNG | . | - | |
23.2. Details of Environmental Sensitivity : |
---|
S. No. | Details of Environmental Sensitivity | Other Details of Environmental Sensitivity | Name | Distance from the Project (Km) | Remarks |
---|
(1.) | Others | - | - | 0.0 | - | (2.) | Forest | | - | 0.0 | - | (3.) | Defence Installations | | - | 0.0 | - | (4.) | Archaeological Sites | | - | 0.0 | - | |
|
23.3. | (a)Whether Noc / Permission from the competent authority is required? | No | (b)Whether NBWL recommendation is required? | No | |
|
24. | Forest Land: | Whether any Forest Land involved? | No | |
|
25. | Tree Cutting: | (a)No. of Trees Cut for the Project (if Forest Land not Involved) | 0.0 | (b)Details of Tree Cutting and Planting of Trees | Not Applicable | |
|
26. | Land Acquisition Status: | (a)Acquired Land(Ha) | 198.3 | (b)Land yet to be acquired(Ha) | 0.0 | (c)Status of Land acquisition if not acquired | 0.0 | |
|
27. | Rehabilitation and Resettlement (R&R): | (a)No. of Villages | 0.0 | (b)No. of Households | 0.0 | (c)No. of PDFs (Project Displaced Families) | 0.0 | (d)No. of PAFs (Project Affected Families) | 0.0 | (e)Funds Allocated for R&R(in INR) (in Lacs) | 0.0 | (f)Status of R&R | Completed | |
|
28. | Details of Presence of Schedule-I Species: | (a)Whether there is Presence of Schedule-I Species ? | No | (b)Whether conservation plan for Schedule-I Species has been prepared ? | No | (c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? | No | |
|
29. | Details of Presence of Water Bodies in Core Area: | (a)Whether there is Presence of Water Bodies in Core Area ? | No | (b)Whether there is Diversion Required ? | No | (c)Whether permission has been obtained from competent authority ? | No | |
|
30. | Details of Presence of Water Bodies in Buffer Area: | (a)Whether there is Presence of Water Bodies in Buffer Area ? | Yes | (i)Details of Water Bodies in Buffer Area | RIVER BRAHMAPUTRA | (ii)Direction of Water Bodies in Buffer Area | North | (iii)Distance of Water Bodies in Buffer Area | 3.0 | |
|
31. | Manpower Requirement: | (a)Permanent Employment-During Construction | 0.0 | (b)Permanent Employment-During Operation | 16 | (c)Temporary Employment- During Construction | 0.0 | (d)Temporary Employment- During Operation | 0.0 | (e)No. of working days | 330 | (f)Total Manpower | 16 | |
|
|
S. No. | Description | Existing | Proposed | Total |
---|
(1.) | Total Area of Green Belt | 0.0 | 0.0 | 0 | (2.) | Percentage of Total Project Area | 0.0 | 0.0 | 0 | (3.) | No. of Plants | 38000 | 0.0 | 38000 | (4.) | Funds Allocated | 0.0 | 0.0 | 0 | |
|
33. Project Benefits |
---|
S. No. | Type of Project Benefits | Details of Project Benefits |
---|
(1.) | Environmental | Fuel Quality upgradation | |
|
34. CRZ Specific Details : Not Applicable |
35. Sector Specific Details : NOT APPLICABLE |
35. Sector Specific Details For Industrial Projects - 2 |
|
|
36. | Details of Court Cases: | (a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? | No | |
|
37. | Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act: | (a)Whether any Direction issued under EPA Act/Air Act/Water Act ? | No | |
|
38. | Details of EIA Consultant: | (a)Have you hired Consultant for preparing document? | Yes | (i)Accreditation No. | NABET/EIA/1011/010 | (ii)Name of the EIA Consultant | Envirotech East Pvt Ltd | (iii)Address | Bengal Ambuja Commercial Complex UN F13, 1050/1, Survey Park, Kolkata-700 075 | (iv)Mobile No. | 9331026867 | (v)Landline No. | 0332418812 | (vi)Email Id | eeplkol@gmail.com | (vii)Category of Accreditation | A | (viii)Sector of Accreditation | Industrial Projects - 2 | (ix)Validity of Accreditation | 31 Dec 2019 | (x)Uploaded Certificate of Accreditation certified by QCI/NABET | Copy of Certificate of Accreditation | |
|
|
Essential Detail Sought: |
---|
Sno. | EDS Letter | Remarks | Date of EDS |
---|
1. | NA | Please inform about earlier ECs for the refinery, and the compliance status thereof. | 09 Sep 2018 | 2. | NA | The correction have been made as per the instruction received | 21 Sep 2018 | 3. | NA | Please see our observations vide query dated 9/9/2018 for the needful. | 23 Sep 2018 | 4. | NA | The correction have been made as per the instruction received | 17 Oct 2018 | 5. | NA | Please clarify/inform the following:-
- Complete copies of the CCR (from the Ministry's Regional Office) for all the ECs including that of dated 22/1/2015.
- Status of compliance of the condition recommended by the Standing Committee of NBWL and stipulated in the Wildlife Clearance for Amchang Wildlife Sanctuary.
- Permission to withdraw 240 cum/day of ground water.
- Any increase in pollution load due to the proposed fuel quality up-gradation, and examination of the proposal vis-a-vis the Ministry's Notification dated 23/11/2016. | 27 Oct 2018 | 6. | NA | The correction have been made as per the instruction received | 28 Nov 2018 | 7. | NA | - Please confirm along with supporting documents whether the engaged EIA consultant was accredited by MABET to enable preparation of EIA/EMP reports for the project.
- There being no change in refining capacity, the proposal requires examination via-a-vis the Ministry's Notification dated 23/11/2016.
- Please ensure entries against all columns of Form-2. | 10 Dec 2018 | 8. | NA | The correction have been made as per the instruction received | 18 Dec 2018 | 9. | NA | Please refer our earlier observations dated 10/12/2018. It is to inform that the Certificate of Accreditation for the EIA Consultant is valid up to 19/5/2011. Further, there is no response to our other observations. Please do the needful to take the proposal forward. | 28 Dec 2018 | 10. | NA | The correction have been made as per the instruction received | 08 Jan 2019 | 11. | NA | In view of the discrepancies still persisting, it is requested to discuss the matter with us in the Ministry to take the proposal forward. | 17 Jan 2019 | |
Additional Detail Sought : NIL |
| Undertaking |
| I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief. And I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity/ construction/ expansion has since been taken up. |
| Name of Applicant | Gayatri Laskar | Designation | Deputy Manager (HSE) | Name of Company (Applicant Name should not be given here) | INDIAN OIL COPERATION LIMITED | Address | Guwahati Refinery,IOCL,Noonmati,
Guwahati,Assam. |
|