(a)Name of the project(s) Expansion of Residential Group Housing Project of M/s Pioneer Urban Land & Infrastructure Ltd. at Sector 62, Gurugram District, Haryana
(b)Name of the Company / Organisation PIONEER URBAN LAND AND INFRASTRUCTURE LTD
(c)Registered Address Paras Down Town Centre, Floor 7, Golf Course Road, Sector-53, Gurgaon, Haryana-122002,,Gurgaon,Haryana-122002
(d)Legal Status of the Company Private
(e)Joint Venture No
2.
Address for the correspondence:
(a)Name of the Applicant ANIL KUMAR
(b)Designation (Owner/ Partner/ CEO) GM
(c)Address Paras Down Town Centre, Floor No. 7, Golf Course Road, Sector 53, Gurgaon, Haryana-122002,,Sohna,Gurgaon,Haryana-122002
(d)Pin code 122002
(e)E-mail anilk@pioneerurban.in
(f)STD Code. 124(f)Telephone No. 4322300
(g)Fax No.
(h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . Annexure-Uploaded Copy of documents in support of the competence/authority
3.
Category of the Project/Activity as per Schedule of EIA Notification,2006:
(a.I)Project/Activity8(b) Townships and Area Development projects.
Minor Activity7(c) Industrial estates/ parks/ complexes/ areas, export processing Zones
(b)Category B2
   Reason for Applying at Ministry SEIAA
(c)Proposal Number IA/HR/MIS/78059/2017
(d)Master Proposal Number(Single Window) SW/78058/2018
(e)EAC concerned (for category A Projects only) INFRA-2
(f)Project Type Expansion
4.
Location of the Project:
(a)Plot/Survey/Khasra No. Sector-62, Village Ghatta, Sohna Tehsil, Gurugram
(b)Pincode 122002
(c)Bounded Latitudes (North)
From
Degree 28243776
Minutes
Second
From
Degree 28245058
Minutes
Second
(d)Bounded Longitudes (East)
From
Degree 77051066
Minutes
Second
From
Degree 77052896
Minutes
Second
(e)Survey of India Topo Sheet No. H43X3
(f)Uploaded Topo Sheet File Copy of Topo Sheet File
(g)Maximum Elevation Above Means Sea Level(AMSL) 2096
(h)Uploaded (kml) File Copy of Kml File      
(i)Distance of Nearest HFL from the project boundary within the study area 900
(j)Seismic Zone 3
5.
(a)Number of States in which Project will be Executed 1
(b)Main State of the project Haryana
Details of State of the project
S. No. State Name District Name Tehsil Name Village Name
NIL
6.
Details of Terms of Reference (ToR)/EC:
(a)MoEF&CC / SEIAA File Number 21-219/2017-IA-III
(c)Date of Issue of TOR 12 Jul 2017
(f)Previous TOR Letter Copy of Previous TOR letter
(b)Date of Apply of EC 06 Sep 2018
(c)Date of Issue of EC 12 Jul 2019
(d)Previous EC Letter Copy of Previous EC letter
7.
Details of Public Consultation:
(a)Whether the Project Exempted from Public Hearing?Yes
(b)Reason Construction projects are exempted from Public Hea
(c)Supporting Document Copy of Supporting Document
8.
Details of Project Configuration/Product:
Details Not Applicable
9.
In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii):
(a)Details of certified report on compliance of earlier environmental clearance condition
(i)Certified Compliance By Regional
(ii)Details of Regional Office of MoEFCC / Zonal Office of CPCB / SPCB / UTPCC from which certified report on Chandigarh
(iii)Letter No. 4-536/2008-RO(NZ)/406-407
(iv)Status of Compliance Compiled
(v)Certified report on compliance of earlier environmental clearance conditions (Including Monitoring Report) Copy of Certified Compliance Report
(vi)Date of site visit Aug 4 2017 12:00AM
(b)Details of Capacity Expansion
S. No.Product/Activity (Capacity/Area)Quantity FromQuantity ToTotal UnitOther UnitMode of Transport / Transmission of ProductOther Mode of Transport / Transmission of Product
(1.)304562297320.957241.05304561Otherssq. m.Road
(c)Details of Configuration
S. No.Plant / Equipment / Facility Existing ConfigurationProposed ConfigurationFinal configuration after expansionRemarks
(1.)Total Built-up Area297320.957241.053,04,562 sq. m.Expansion in built-up area of the residential project
9.1.
Details of Consent to Operate
(i)Whether Consent to operate obtained ? NA
(ii)Copies of all Consent to operate obtained since inception NA
(iii)Date of Issue 12 Aug 2014
(iv)Valid Upto 11 Aug 2016
(v)File No. 2821214GUNOCTE1130517
(vi)Application No. 2821214gunocte1130517
(vii)Copy of Consent to operate valid as on date Copy of Consent to Operate
10.
Project Cost:
(a)Total Cost of the Project at current price level (in Crores) 1193
(b) Funds Allocated for Environment Management (Capital) (in Crores) 11.52
(c) Funds Allocated Towards CER (Corporate Environment Responsibility) (in Crores) 2.982
(d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in Crores) 1.91
11.
Whether project attracts the General Condition specified in the Schedule of EIA Notification ? No
12.
Whether project attract the Specific Condition specified in the Schedule of EIA Notification ? No
13.
Raw Material / Fuel Requirement:
(a)Proposed quantity of raw material/fuel 7241.05
(b)Existing quantity of raw material/fuel 297320.95
(c)Total quantity of raw material/fuel 304561
    13.1.        Raw Material / Fuel Profile
S. No.Raw Material / Fuel QuantityUnitOther UnitSource (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received )Mode of TransportOther Mode of TransportDistance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received)Type of Linkage Other Type of Linkage Uploaded Copy of Linkage
(1.)Not Applicable304562Otherssq. m.Construction material purchased from local marketRoad0.600 Open MarketCopy of Linkage
14.
Baseline Data :
(a)Period of Base Line Data Collection FROM 01 Dec 2017 To 28 Feb 2018
(b)Season Winter
    14.1.     No. of ambient Air Quality (AAQ) monitoring locations : 12
S. No.Criteria Pollutants Other Criteria PollutantsUnitMaximum ValueMinimum Value98 Percentile ValuePrescribed Standard
(1.)SO2Micro Gram per Meter Cube10.147.859.8280 as per National Ambient Air Quality Standards
(2.)PM2.5Micro Gram per Meter Cube71.4547.3171.3360
(3.)NOxMicro Gram per Meter Cube19.7714.4419.6780 as per National Ambient Air Quality Standards
(4.)PM10Micro Gram per Meter Cube129.5582.19126.44100 as per National Ambient Air Quality Standards
    14.2.     No. of Ground Water monitoring locations : 1
S. No.Criteria Pollutants Other Criteria PollutantsHeavy MetalUnitOther UnitMaximum ValueMinimum ValueDesirable LimitMaximum Permissible Limit
(1.)TDSmg/l6686685002000
(2.)TSSmg/l363630100
(3.)Total Hardnessmg/l353353200600
(4.)OthersCoppermg/l00000.051.5
(5.)Chloridesmg/l54542501000
(6.)Fluoridemg/l0.130.131.01.50
(7.)Heavy MetalsLeadmg/l00000.010.01
(8.)pHNA7.177.176.508.50
    14.3.     No. of Surface Water monitoring locations : 1
S. No.Criteria Pollutants Other Criteria PollutantsUnitOther UnitMaximum ValueMinimum ValueClassification of inland water body
(1.)DOmg/l7.607.60A
(2.)BODmg/l11A
(3.)CODmg/l2.02.0A
(4.)pHNA7.147.14A
    14.4.     No. of Ambient Noise monitoring locations : 4
S. No.Parameter UnitMaximum ValueMinimum ValuePrescribed Standard
(1.)Leq(Night)A-weighted decibels(dB(A))46.542.545
(2.)Leq(Day)A-weighted decibels(dB(A))55.653.555
    14.5.     No. of Soil Sample Monitored locations : 1
S. No.Parameter UnitOther UnitMaximum ValueMinimum Value
(1.)pHOthersNot applicable7.927.92
(2.)N(Nitrogen)Milligram per Kilogram7272
(3.)P(Phosphorus)Milligram per Kilogram8.18.1
(4.)K(Potassium)Milligram per Kilogram8585
(5.)Electric ConductivityMillisiemens per Centimetre816816
14.6.
Details of Ground Water Table:
(a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) From 42 To 46
(b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) From 41 To 43
(c)Whether Ground Water Intersection will be there ? No
     15.      Details of Water Requirement (During Operation)
S. No.Source Source Other Required Quantity (Kilolitre per Day (Kld))Distance from SourceCopy of Permission from Competent Authority Mode of TransportOther Mode of TransportMethod of Water WithdrawalOther Method of Water WithdrawalLetter No.Date of IssuePermitted Quantity
(1.)OthersHUDA Supply and treated water from STP2710.150Copy of Permission LetterPipelineOthersPublic supply through pipelineMemo No. 175823 Jan 2018250
15.1.
(a)Whether Desalination is proposed No
    16.       Waste Water Management(During Operation)
S. No.Type/Source Quantity of Waste Water Generated (Kilolitre per Day)Treatment Capacity (Kilolitre per Day) Treatment MethodMode of DisposalOther Mode of DisposalQuantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day)Quantity of Discharged Water (Kilolitre per Day)
(1.)Domestic waste water from the residential units217261STP with Tertiary TreatmentReuse within the Plant & Recycling217
16.1.
(a)Total Waste Water Generation (Kilolitre per Day) 217
(b)Total Discharged Water (Kilolitre per Day) 0
(c)Total Reused Water (Kilolitre per Day) 217
    17.       Solid Waste Generation/Management
S. No.Name of Waste Item Other ItemQuantity per AnnumUnitDistance from Site(KM)Mode of TransportOther Mode of TransportMode of DisposalOther Mode of Disposal
(1.)Domestic solid waste from residential unitsMunicipal Solid Waste472.31Tons0.450RoadCo-Processing
18.
    18.1.     Air Quality Impact Prediction
S. No.Criteria Pollutants Other Criteria PollutantsUnitBaseline ConcentrationDistance GLCIncremental ConcentrationTotal GLCPrescribed Standard
(1.)PM2.5Microgram per Meter Cube59.380.400.0159.3960 as per National Ambient Air Quality Standard
(2.)NOxMicrogram per Meter Cube17.4150.402.3319.74580 as per National Ambient Air Quality Standard
(3.)PM10Microgram per Meter Cube105.870.400.03105.90100 as per National Ambient Air Quality Standard
(4.)SO2Microgram per Meter Cube8.9950.401.8010.7980 as per National Ambient Air Quality Standard
    18.2.     Stack Details
S. No.Source FuelStack Height(m)Stack Diameter(m)PollutantsOther PollutantsEmission (GLS)
(1.)DG Sets of 1010 KVAHSD6.500.4PM100.003
(2.)DG Sets of 1250 KVAHSD7.500.5PM100.004
(3.)DG Sets of 1010 KVAHSD6.500.4SO20.08
(4.)DG Sets of 500 KVAHSD4.50.2NOx0.05
(5.)DG Set of 1010 KVAHSD6.50.4NOx0.1
(6.)DG Sets of 1250 KVAHSD7.50.5NOx0.13
(7.)DG Sets of 500 KVAHSD4.500.2PM100.002
(8.)DG Sets of 500 KVAHSD4.500.5SO20.04
(9.)DG Sets 1250 KVAHSD7.500.5SO20.1
19.
Power Requirement:
(a)Quantity (Kilo Volt Amps (kVA)) 7849
(b)Source Dakshin Haryana Bijli Vitran Nigam and DG Sets as
(c)Uploaded Copy of Agreement Copy of Agreement
(d)Standby Arrangement (Details of DG Sets) 1010 KVA X 5 + 500 KVA X2 + 1250 KVA X 2 Nos.
(e)Stack Height (in m) 7.50
20.
Land Ownership Pattern:
(a)Forest Land (ha.) 0
(b)Private Land (ha.) 9.9605
(c)Government Land (ha.) 0
(d)Revenue Land (ha.) 0
(e)Other Land (ha.) 0
    Total Land (ha.) 9.9605
21.
Present Land Use Breakup of the Study Area in Ha:
(a)Agriculture Area (ha.) 0
(b)Waste/Barren Land (ha.) 0
(c)Grazing/ Community Land (ha.) 0
(d)Surface Water Bodies (ha.) 0
(e)Settlements (ha.) 0
(f)Industrial (ha.) 0
(g)Forest (ha.) 0
(h)Mangroves (ha.) 0
(i)Marine Area (ha.) 0
(j)Others (ha.) : Plot area 9.9605
    Total (ha.) 9
    22.     Land requirement for various activities
S. No.Description of Activity / Facility / Plant / Others OthersLand Requirement (ha.)Remarks
(1.)Main Plant9.9605Plot area for the group housing project
(2.)Built Up Area304562total builtup area
Total (ha.) 304571.9605
23.
Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Sanctuaries; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones :
    23.1.     Details of Ecological Sensitivity :
S. No.Details of Ecological Sensitivity NameDistance from the Project (Km)Remarks
(1.)Critically Polluted AreaNone within 10 km radius10None
(2.)ESZsNone within 10 km radius10None
(3.)Wildlife CorridorsNone within 10 km radius10None
(4.)ESAsBadshahpur Jheen about 5 km, West5Badhshahpur Jheel about 5 km, West
(5.)WLSNone within 10 km radius10None
(6.)NPANone within 10 km radius10None
(7.)CorridorsNone within 10 km radius10None
    23.2.     Details of Environmental Sensitivity :
S. No.Details of Environmental Sensitivity Other Details of Environmental Sensitivity NameDistance from the Project (Km)Remarks
(1.)ForestNone within 10 km radius10Not applicable
(2.)OthersEcological and wetland areaBadhshahpur Jheel about 5 km towards West5Towards West side
(3.)Archaeological SitesNone within 10 km radius10Not applicable
(4.)Defence InstallationsNone within 10 km radius10Not applicable
23.3.
(a)Whether Noc / Permission from the competent authority is required? No
(b)Whether NBWL recommendation is required? No
24.
Forest Land:
Whether any Forest Land involved? No
25.
Tree Cutting:
(a)No. of Trees Cut for the Project (if Forest Land not Involved) 00
(b)Details of Tree Cutting and Planting of Trees Copy of Details of Tree Cutting and Planting of Trees
26.
Land Acquisition Status:
(a)Acquired Land(Ha) 00
(b)Land yet to be acquired(Ha) 00
(c)Status of Land acquisition if not acquired 00
27.
Rehabilitation and Resettlement (R&R):
(a)No. of Villages 00
(b)No. of Households 00
(c)No. of PDFs (Project Displaced Families) 00
(d)No. of PAFs (Project Affected Families) 00
(e)Funds Allocated for R&R(in INR) (in Lacs) 00
(f)Status of R&R Completed
28.
Details of Presence of Schedule-I Species:
(a)Whether there is Presence of Schedule-I Species ? No
(b)Whether conservation plan for Schedule-I Species has been prepared ? No
(c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? No
29.
Details of Presence of Water Bodies in Core Area:
(a)Whether there is Presence of Water Bodies in Core Area ? No
(b)Whether there is Diversion Required ? No
(c)Whether permission has been obtained from competent authority ? No
30.
Details of Presence of Water Bodies in Buffer Area:
(a)Whether there is Presence of Water Bodies in Buffer Area ? Yes
(i)Details of Water Bodies in Buffer Area Bahshahpur Jheel at 5 km towards West
(ii)Direction of Water Bodies in Buffer Area West
(iii)Distance of Water Bodies in Buffer Area 5
31.
Manpower Requirement:
(a)Permanent Employment-During Construction 200
(b)Permanent Employment-During Operation 200
(c)Temporary Employment- During Construction 100
(d)Temporary Employment- During Operation 100
(e)No. of working days 300
(f)Total Manpower 600
32.
Green Belt in Ha:
(a)Uploaded Green Belt plan Copy of Green Belt Plan
S. No.Description ExistingProposedTotal
(1.)Total Area of Green Belt003287032870
(2.)Percentage of Total Project Area003333
(3.)No. of Plants00550550
(4.)Funds Allocated00295295
    33.         Project Benefits
S. No.Type of Project Benefits Details of Project Benefits
(1.)SocialThe expansion of group housing project would provide better and economical residential facilities with some jobs during construction phase and operation phase.
   34.   CRZ Specific Details : Not Applicable
   35.   Sector Specific Details For INFRA-2
S. No.Item Details
1.
Details of Building Construction:
(a)Maximum Height of the Building (Meters) 116.95
(b)Total No. of Flats to be Build 570
(c)No. of Buildings 18
(d)Total plot area (sqm) 99605
(e)Total built up area (sqm) 304562
2.
Foreshore Facilities and/or Marine Disposal:
(a)Whether Project Involves Foreshore Activities and/or marine Disposal? No
3.
Rain Water Harvesting:
(a)No. of Storage 1
(b)Capacity 130
(c)No. of Recharge Pits 12
(d)Capacity 60
4.
Parking:
(a)Details of 4 Wheeler/ 2 Wheeler Parking 1596 ECS
5.
Energy Saving Measures:
(a)Source/Mode Dakshin Haryana Bijli Vitran Nigam and DG Sets
(b)Percentage 21
(c)Quantity 1480
6.
Other details:
(a)Details of impact on Water Bodies and Drainage patters of catchment area There is no water body within the project site and
(b)Details of Traffic Density Impact Assessment and Modelling Study Copy of Details of Traffic Density Impact Assessment and Modelling Study
(c)In case Underground Tunnel Project below the Forest Land - Subsidence Impact Study report Copy of Underground Tunnel Project below the Forest Land - Subsidence Impact Study report
     7.       Type of Industries to be established with Industrial Estate as per their category A/B
S. No.Type of IndustryNo. of UnitsCategory A/B
NIL
8.
Length of the alignment N/A
9.
Details Bridges/ROB/Interchanges,Flyovers,Vehicle Underpass and Pedestrian Underpass
Details Not Applicable
S. No.Item Details
36.
Details of Court Cases:
(a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? No
37.
Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act:
(a)Whether any Direction issued under EPA Act/Air Act/Water Act ? No
38.
Details of EIA Consultant:
(a)Have you hired Consultant for preparing document? Yes
(i)Accreditation No. NABET/EIA/1518/SA032
(ii)Name of the EIA Consultant M/s Environmental Engineers & Consultants Pvt. Ltd
(iii)Address A1-198, Janak Puri, New Delhi-110058
(iv)Mobile No. 9350873385
(v)Landline No. 0112550719
(vi)Email Id eecnewdelhi@gmail.com
(vii)Category of Accreditation A
(viii)Sector of Accreditation INFRA-2
(ix)Validity of Accreditation 17 Sep 2018
(x)Uploaded Certificate of Accreditation certified by QCI/NABET Copy of Certificate of Accreditation
39.
Documents to be Attached:
(a)Uploaded Copy of EIA/EMP Report Copy of EIA/EMP
Copy of EIA/EMP(Annexures)
Copy of EIA/EMP(Plans/Figures)
(b)Uploaded Copy of Risk Assessment Report Copy of Risk Assessment
(c)Uploaded Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan
(d)Uploaded Copy of Final Layout Plan Copy of Final Layout Plan
(e)Uploaded Cover Letter Copy of Cover Letter
(f)Uploaded Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency
(g)Uploaded Additional File NA
(h)Uploaded Proposal Presentation (To be given in EAC meeting) NA
      Essential Detail Sought : NIL
            Additional Detail Sought:
Sno. ADS Letter Remarks Date of ADS
1. ADS Reply LetterAttached herewith is the point wise reply to the queries raised in the minutes of the 34th Meeting of EAC (Infra-2) held on 24th - 26th September, 2018. 05 Dec 2018
2.NAThe Committee after deliberation on the proposal, sought following documents/certificates: (i) Provide comparative project detail (area, building no., height, parking space et al.) along with environmental statement showing existing, proposed and total details of the project. (ii) Submit Action taken report submitted to Regional Office, MoEFCC, Chandigarh on non compliance of EC Conditions along with response of Regional Office on the submission. (iii) Submit revised water balance for the project along with the quantitative commitment of fresh water supply from HUDA. (iv) Submit details of solid waste generated and plan for management of solid waste. (v) A certificate of adequacy of available power from the agency supplying power to the project along with the load allowed for the proj 03 Oct 2018
Undertaking
I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief. And I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity/ construction/ expansion has since been taken up.
Name of ApplicantANIL KUMAR
DesignationGM
Name of Company (Applicant Name should not be given here)PIONEER URBAN LAND AND INFRASTRUCTURE LTD
AddressParas Down Town Centre, Floor 7, Golf Course Road, Sector-53, Gurgaon, Haryana-122002
Print