1. | Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? | No | Details of Project: | (a)Name of the project(s) | Expansion of Residential Group Housing Project of M/s Pioneer Urban Land & Infrastructure Ltd. at Sector 62, Gurugram District, Haryana | (b)Name of the Company / Organisation | PIONEER URBAN LAND AND INFRASTRUCTURE LTD | (c)Registered Address | Paras Down Town Centre, Floor 7, Golf Course Road, Sector-53, Gurgaon, Haryana-122002,,Gurgaon,Haryana-122002 | (d)Legal Status of the Company | Private | (e)Joint Venture | No | |
|
2. | Address for the correspondence: | (a)Name of the Applicant | ANIL KUMAR | (b)Designation (Owner/ Partner/ CEO) | GM | (c)Address | Paras Down Town Centre, Floor No. 7, Golf Course Road, Sector 53, Gurgaon, Haryana-122002,,Sohna,Gurgaon,Haryana-122002 | (d)Pin code | 122002 | (e)E-mail | anilk@pioneerurban.in | (f)STD Code. | 124(f)Telephone No. | 4322300 | (g)Fax No. | | (h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . | Annexure-Uploaded Copy of documents in support of the competence/authority | |
|
3. | Category of the Project/Activity as per Schedule of EIA Notification,2006: | (a.I)Project/Activity | 8(b) Townships and Area Development projects.
| Minor Activity | 7(c) Industrial estates/ parks/ complexes/ areas, export processing Zones
| (b)Category | B2 | Reason for Applying at Ministry | SEIAA | (c)Proposal Number | IA/HR/MIS/78059/2017 | (d)Master Proposal Number(Single Window) | SW/78058/2018 | (e)EAC concerned (for category A Projects only) | INFRA-2 | (f)Project Type | Expansion |
|
|
4. | Location of the Project: | (a)Plot/Survey/Khasra No. | Sector-62, Village Ghatta, Sohna Tehsil, Gurugram | (b)Pincode | 122002 | (c)Bounded Latitudes (North) | | From | | Degree | 28243776 | Minutes | | Second | | From | | Degree | 28245058 | Minutes | | Second | | (d)Bounded Longitudes (East) | | From | | Degree | 77051066 | Minutes | | Second | | From | | Degree | 77052896 | Minutes | | Second | | (e)Survey of India Topo Sheet No. | H43X3 | (f)Uploaded Topo Sheet File | Copy of Topo Sheet File | (g)Maximum Elevation Above Means Sea Level(AMSL) | 2096 | (h)Uploaded (kml) File | Copy of Kml File | (i)Distance of Nearest HFL from the project boundary within the study area | 900 | (j)Seismic Zone | 3 | |
|
5. | (a)Number of States in which Project will be Executed | 1 | (b)Main State of the project | Haryana | |
|
|
Details of State of the project |
---|
S. No. | State Name | District Name | Tehsil Name | Village Name |
---|
NIL | |
|
6. | Details of Terms of Reference (ToR)/EC: | (a)MoEF&CC / SEIAA File Number | 21-219/2017-IA-III | (c)Date of Issue of TOR | 12 Jul 2017 | (f)Previous TOR Letter | Copy of Previous TOR letter | (b)Date of Apply of EC | 06 Sep 2018 | (c)Date of Issue of EC | 12 Jul 2019 | (d)Previous EC Letter | Copy of Previous EC letter | |
|
7. | Details of Public Consultation: | (a)Whether the Project Exempted from Public Hearing? | Yes | (b)Reason | Construction projects are exempted from Public Hea | (c)Supporting Document | Copy of Supporting Document | |
|
8. | Details of Project Configuration/Product: | Details Not Applicable | |
|
9. | In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii): | (a)Details of certified report on compliance of earlier environmental clearance condition | (i)Certified Compliance By | Regional | (ii)Details of Regional Office of MoEFCC / Zonal Office of CPCB / SPCB / UTPCC from which certified report on | Chandigarh | (iii)Letter No. | 4-536/2008-RO(NZ)/406-407 | (iv)Status of Compliance | Compiled | (v)Certified report on compliance of earlier environmental clearance conditions (Including Monitoring Report) | Copy of Certified Compliance Report | (vi)Date of site visit | Aug 4 2017 12:00AM | (b)Details of Capacity Expansion | |
|
S. No. | Product/Activity (Capacity/Area) | Quantity From | Quantity To | Total | Unit | Other Unit | Mode of Transport / Transmission of Product | Other Mode of Transport / Transmission of Product |
---|
(1.) | 304562 | 297320.95 | 7241.05 | 304561 | Others | sq. m. | Road | | |
| (c)Details of Configuration | |
|
S. No. | Plant / Equipment / Facility | Existing Configuration | Proposed Configuration | Final configuration after expansion | Remarks |
---|
(1.) | Total Built-up Area | 297320.95 | 7241.05 | 3,04,562 sq. m. | Expansion in built-up area of the residential project | |
9.1. | Details of Consent to Operate | (i)Whether Consent to operate obtained ? | NA | (ii)Copies of all Consent to operate obtained since inception | NA | (iii)Date of Issue | 12 Aug 2014 | (iv)Valid Upto | 11 Aug 2016 | (v)File No. | 2821214GUNOCTE1130517 | (vi)Application No. | 2821214gunocte1130517 | (vii)Copy of Consent to operate valid as on date | Copy of Consent to Operate | |
|
|
10. | Project Cost: | (a)Total Cost of the Project at current price level (in Crores) | 1193 | (b) Funds Allocated for Environment Management (Capital) (in Crores) | 11.52 | (c) Funds Allocated Towards CER (Corporate Environment Responsibility) (in Crores) | 2.982 | (d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in Crores) | 1.91 | |
|
11. | Whether project attracts the General Condition specified in the Schedule of EIA Notification ? | No | | |
12. | Whether project attract the Specific Condition specified in the Schedule of EIA Notification ? | No | | |
13. | Raw Material / Fuel Requirement: | (a)Proposed quantity of raw material/fuel | 7241.05 | (b)Existing quantity of raw material/fuel | 297320.95 | (c)Total quantity of raw material/fuel | 304561 | |
|
  13.1. Raw Material / Fuel Profile |
---|
S. No. | Raw Material / Fuel | Quantity | Unit | Other Unit | Source (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received ) | Mode of Transport | Other Mode of Transport | Distance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received) | Type of Linkage | Other Type of Linkage | Uploaded Copy of Linkage |
---|
(1.) | Not Applicable | 304562 | Others | sq. m. | Construction material purchased from local market | Road | | 0.600 | Open Market | | Copy of Linkage | |
|
14. | Baseline Data : | (a)Period of Base Line Data Collection | FROM 01 Dec 2017 To 28 Feb 2018 | (b)Season | Winter | |
|
14.1. No. of ambient Air Quality (AAQ) monitoring locations : 12 |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Unit | Maximum Value | Minimum Value | 98 Percentile Value | Prescribed Standard |
---|
(1.) | SO2 | | Micro Gram per Meter Cube | 10.14 | 7.85 | 9.82 | 80 as per National Ambient Air Quality Standards | (2.) | PM2.5 | | Micro Gram per Meter Cube | 71.45 | 47.31 | 71.33 | 60 | (3.) | NOx | | Micro Gram per Meter Cube | 19.77 | 14.44 | 19.67 | 80 as per National Ambient Air Quality Standards | (4.) | PM10 | | Micro Gram per Meter Cube | 129.55 | 82.19 | 126.44 | 100 as per National Ambient Air Quality Standards | |
14.2. No. of Ground Water monitoring locations : 1 |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Heavy Metal | Unit | Other Unit | Maximum Value | Minimum Value | Desirable Limit | Maximum Permissible Limit |
---|
(1.) | TDS | | | mg/l | | 668 | 668 | 500 | 2000 | (2.) | TSS | | | mg/l | | 36 | 36 | 30 | 100 | (3.) | Total Hardness | | | mg/l | | 353 | 353 | 200 | 600 | (4.) | Others | Copper | | mg/l | | 00 | 00 | 0.05 | 1.5 | (5.) | Chlorides | | | mg/l | | 54 | 54 | 250 | 1000 | (6.) | Fluoride | | | mg/l | | 0.13 | 0.13 | 1.0 | 1.50 | (7.) | Heavy Metals | | Lead | mg/l | | 00 | 00 | 0.01 | 0.01 | (8.) | pH | | | NA | | 7.17 | 7.17 | 6.50 | 8.50 | |
14.3. No. of Surface Water monitoring locations : 1 |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Unit | Other Unit | Maximum Value | Minimum Value | Classification of inland water body |
---|
(1.) | DO | | mg/l | | 7.60 | 7.60 | A | (2.) | BOD | | mg/l | | 1 | 1 | A | (3.) | COD | | mg/l | | 2.0 | 2.0 | A | (4.) | pH | | NA | | 7.14 | 7.14 | A | |
14.4. No. of Ambient Noise monitoring locations : 4 |
---|
S. No. | Parameter | Unit | Maximum Value | Minimum Value | Prescribed Standard |
---|
(1.) | Leq(Night) | A-weighted decibels(dB(A)) | 46.5 | 42.5 | 45 | (2.) | Leq(Day) | A-weighted decibels(dB(A)) | 55.6 | 53.5 | 55 | |
14.5. No. of Soil Sample Monitored locations : 1 |
---|
S. No. | Parameter | Unit | Other Unit | Maximum Value | Minimum Value |
---|
(1.) | pH | Others | Not applicable | 7.92 | 7.92 | (2.) | N(Nitrogen) | Milligram per Kilogram | | 72 | 72 | (3.) | P(Phosphorus) | Milligram per Kilogram | | 8.1 | 8.1 | (4.) | K(Potassium) | Milligram per Kilogram | | 85 | 85 | (5.) | Electric Conductivity | Millisiemens per Centimetre | | 816 | 816 | |
|
14.6. | Details of Ground Water Table: | (a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) | From 42 To 46 | (b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) | From 41 To 43 | (c)Whether Ground Water Intersection will be there ? | No | |
|
15. Details of Water Requirement (During Operation) |
---|
S. No. | Source | Source Other | Required Quantity (Kilolitre per Day (Kld)) | Distance from Source | Copy of Permission from Competent Authority | Mode of Transport | Other Mode of Transport | Method of Water Withdrawal | Other Method of Water Withdrawal | Letter No. | Date of Issue | Permitted Quantity |
---|
(1.) | Others | HUDA Supply and treated water from STP | 271 | 0.150 | Copy of Permission Letter | Pipeline | | Others | Public supply through pipeline | Memo No. 1758 | 23 Jan 2018 | 250 | |
|
15.1. | (a)Whether Desalination is proposed | No | |
|
16. Waste Water Management(During Operation) |
---|
S. No. | Type/Source | Quantity of Waste Water Generated (Kilolitre per Day) | Treatment Capacity (Kilolitre per Day) | Treatment Method | Mode of Disposal | Other Mode of Disposal | Quantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day) | Quantity of Discharged Water (Kilolitre per Day) |
---|
(1.) | Domestic waste water from the residential units | 217 | 261 | STP with Tertiary Treatment | Reuse within the Plant & Recycling | | 217 | | |
|
16.1. | (a)Total Waste Water Generation (Kilolitre per Day) | 217 | (b)Total Discharged Water (Kilolitre per Day) | 0 | (c)Total Reused Water (Kilolitre per Day) | 217 | |
|
17. Solid Waste Generation/Management |
---|
S. No. | Name of Waste | Item | Other Item | Quantity per Annum | Unit | Distance from Site(KM) | Mode of Transport | Other Mode of Transport | Mode of Disposal | Other Mode of Disposal |
---|
(1.) | Domestic solid waste from residential units | Municipal Solid Waste | | 472.31 | Tons | 0.450 | Road | | Co-Processing | | |
|
|
18.1. Air Quality Impact Prediction |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Unit | Baseline Concentration | Distance GLC | Incremental Concentration | Total GLC | Prescribed Standard |
---|
(1.) | PM2.5 | | Microgram per Meter Cube | 59.38 | 0.40 | 0.01 | 59.39 | 60 as per National Ambient Air Quality Standard | (2.) | NOx | | Microgram per Meter Cube | 17.415 | 0.40 | 2.33 | 19.745 | 80 as per National Ambient Air Quality Standard | (3.) | PM10 | | Microgram per Meter Cube | 105.87 | 0.40 | 0.03 | 105.90 | 100 as per National Ambient Air Quality Standard | (4.) | SO2 | | Microgram per Meter Cube | 8.995 | 0.40 | 1.80 | 10.79 | 80 as per National Ambient Air Quality Standard | |
|
18.2. Stack Details |
---|
S. No. | Source | Fuel | Stack Height(m) | Stack Diameter(m) | Pollutants | Other Pollutants | Emission (GLS) |
---|
(1.) | DG Sets of 1010 KVA | HSD | 6.50 | 0.4 | PM10 | | 0.003 | (2.) | DG Sets of 1250 KVA | HSD | 7.50 | 0.5 | PM10 | | 0.004 | (3.) | DG Sets of 1010 KVA | HSD | 6.50 | 0.4 | SO2 | | 0.08 | (4.) | DG Sets of 500 KVA | HSD | 4.5 | 0.2 | NOx | | 0.05 | (5.) | DG Set of 1010 KVA | HSD | 6.5 | 0.4 | NOx | | 0.1 | (6.) | DG Sets of 1250 KVA | HSD | 7.5 | 0.5 | NOx | | 0.13 | (7.) | DG Sets of 500 KVA | HSD | 4.50 | 0.2 | PM10 | | 0.002 | (8.) | DG Sets of 500 KVA | HSD | 4.50 | 0.5 | SO2 | | 0.04 | (9.) | DG Sets 1250 KVA | HSD | 7.50 | 0.5 | SO2 | | 0.1 | |
|
19. | Power Requirement: | (a)Quantity (Kilo Volt Amps (kVA)) | 7849 | (b)Source | Dakshin Haryana Bijli Vitran Nigam and DG Sets as | (c)Uploaded Copy of Agreement | Copy of Agreement | (d)Standby Arrangement (Details of DG Sets) | 1010 KVA X 5 + 500 KVA X2 + 1250 KVA X 2 Nos. | (e)Stack Height (in m) | 7.50 | |
|
20. | Land Ownership Pattern: | (a)Forest Land (ha.) | 0 | (b)Private Land (ha.) | 9.9605 | (c)Government Land (ha.) | 0 | (d)Revenue Land (ha.) | 0 | (e)Other Land (ha.) | 0 | Total Land (ha.) | 9.9605 | |
|
21. | Present Land Use Breakup of the Study Area in Ha: | (a)Agriculture Area (ha.) | 0 | (b)Waste/Barren Land (ha.) | 0 | (c)Grazing/ Community Land (ha.) | 0 | (d)Surface Water Bodies (ha.) | 0 | (e)Settlements (ha.) | 0 | (f)Industrial (ha.) | 0 | (g)Forest (ha.) | 0 | (h)Mangroves (ha.) | 0 | (i)Marine Area (ha.) | 0 | (j)Others (ha.) : Plot area | 9.9605 | Total (ha.) | 9 | |
|
22. Land requirement for various activities |
---|
S. No. | Description of Activity / Facility / Plant / Others | Others | Land Requirement (ha.) | Remarks |
---|
(1.) | Main Plant | | 9.9605 | Plot area for the group housing project | (2.) | Built Up Area | | 304562 | total builtup area | |
|
|
23. | Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Sanctuaries; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones : | |
|
23.1. Details of Ecological Sensitivity : |
---|
S. No. | Details of Ecological Sensitivity | Name | Distance from the Project (Km) | Remarks |
---|
(1.) | Critically Polluted Area | None within 10 km radius | 10 | None | (2.) | ESZs | None within 10 km radius | 10 | None | (3.) | Wildlife Corridors | None within 10 km radius | 10 | None | (4.) | ESAs | Badshahpur Jheen about 5 km, West | 5 | Badhshahpur Jheel about 5 km, West | (5.) | WLS | None within 10 km radius | 10 | None | (6.) | NPA | None within 10 km radius | 10 | None | (7.) | Corridors | None within 10 km radius | 10 | None | |
23.2. Details of Environmental Sensitivity : |
---|
S. No. | Details of Environmental Sensitivity | Other Details of Environmental Sensitivity | Name | Distance from the Project (Km) | Remarks |
---|
(1.) | Forest | | None within 10 km radius | 10 | Not applicable | (2.) | Others | Ecological and wetland area | Badhshahpur Jheel about 5 km towards West | 5 | Towards West side | (3.) | Archaeological Sites | | None within 10 km radius | 10 | Not applicable | (4.) | Defence Installations | | None within 10 km radius | 10 | Not applicable | |
|
23.3. | (a)Whether Noc / Permission from the competent authority is required? | No | (b)Whether NBWL recommendation is required? | No | |
|
24. | Forest Land: | Whether any Forest Land involved? | No | |
|
|
26. | Land Acquisition Status: | (a)Acquired Land(Ha) | 00 | (b)Land yet to be acquired(Ha) | 00 | (c)Status of Land acquisition if not acquired | 00 | |
|
27. | Rehabilitation and Resettlement (R&R): | (a)No. of Villages | 00 | (b)No. of Households | 00 | (c)No. of PDFs (Project Displaced Families) | 00 | (d)No. of PAFs (Project Affected Families) | 00 | (e)Funds Allocated for R&R(in INR) (in Lacs) | 00 | (f)Status of R&R | Completed | |
|
28. | Details of Presence of Schedule-I Species: | (a)Whether there is Presence of Schedule-I Species ? | No | (b)Whether conservation plan for Schedule-I Species has been prepared ? | No | (c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? | No | |
|
29. | Details of Presence of Water Bodies in Core Area: | (a)Whether there is Presence of Water Bodies in Core Area ? | No | (b)Whether there is Diversion Required ? | No | (c)Whether permission has been obtained from competent authority ? | No | |
|
30. | Details of Presence of Water Bodies in Buffer Area: | (a)Whether there is Presence of Water Bodies in Buffer Area ? | Yes | (i)Details of Water Bodies in Buffer Area | Bahshahpur Jheel at 5 km towards West | (ii)Direction of Water Bodies in Buffer Area | West | (iii)Distance of Water Bodies in Buffer Area | 5 | |
|
31. | Manpower Requirement: | (a)Permanent Employment-During Construction | 200 | (b)Permanent Employment-During Operation | 200 | (c)Temporary Employment- During Construction | 100 | (d)Temporary Employment- During Operation | 100 | (e)No. of working days | 300 | (f)Total Manpower | 600 | |
|
|
S. No. | Description | Existing | Proposed | Total |
---|
(1.) | Total Area of Green Belt | 00 | 32870 | 32870 | (2.) | Percentage of Total Project Area | 00 | 33 | 33 | (3.) | No. of Plants | 00 | 550 | 550 | (4.) | Funds Allocated | 00 | 295 | 295 | |
|
33. Project Benefits |
---|
S. No. | Type of Project Benefits | Details of Project Benefits |
---|
(1.) | Social | The expansion of group housing project would provide better and economical residential facilities with some jobs during construction phase and operation phase. | |
|
34. CRZ Specific Details : Not Applicable |
35. Sector Specific Details For INFRA-2 |
|
1. | Details of Building Construction: | (a)Maximum Height of the Building (Meters) | 116.95 | (b)Total No. of Flats to be Build | 570 | (c)No. of Buildings | 18 | (d)Total plot area (sqm) | 99605 | (e)Total built up area (sqm) | 304562 | |
|
2. | Foreshore Facilities and/or Marine Disposal: | (a)Whether Project Involves Foreshore Activities and/or marine Disposal? | No | |
|
3. | Rain Water Harvesting: | (a)No. of Storage | 1 | (b)Capacity | 130 | (c)No. of Recharge Pits | 12 | (d)Capacity | 60 | |
|
4. | Parking: | (a)Details of 4 Wheeler/ 2 Wheeler Parking | 1596 ECS | |
|
5. | Energy Saving Measures: | (a)Source/Mode | Dakshin Haryana Bijli Vitran Nigam and DG Sets | (b)Percentage | 21 | (c)Quantity | 1480 | |
|
|
7. Type of Industries to be established with Industrial Estate as per their category A/B |
---|
S. No. | Type of Industry | No. of Units | Category A/B |
---|
NIL | |
8. | Length of the alignment | N/A | |
|
9. | Details Bridges/ROB/Interchanges,Flyovers,Vehicle Underpass and Pedestrian Underpass | Details Not Applicable | |
|
|
36. | Details of Court Cases: | (a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? | No | |
|
37. | Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act: | (a)Whether any Direction issued under EPA Act/Air Act/Water Act ? | No | |
|
38. | Details of EIA Consultant: | (a)Have you hired Consultant for preparing document? | Yes | (i)Accreditation No. | NABET/EIA/1518/SA032 | (ii)Name of the EIA Consultant | M/s Environmental Engineers & Consultants Pvt. Ltd | (iii)Address | A1-198, Janak Puri, New Delhi-110058 | (iv)Mobile No. | 9350873385 | (v)Landline No. | 0112550719 | (vi)Email Id | eecnewdelhi@gmail.com | (vii)Category of Accreditation | A | (viii)Sector of Accreditation | INFRA-2 | (ix)Validity of Accreditation | 17 Sep 2018 | (x)Uploaded Certificate of Accreditation certified by QCI/NABET | Copy of Certificate of Accreditation | |
|
|
Essential Detail Sought : NIL |
Additional Detail Sought: |
---|
Sno. | ADS Letter | Remarks | Date of ADS |
---|
1. | ADS Reply Letter | Attached herewith is the point wise reply to the queries raised in the minutes of the 34th Meeting of EAC (Infra-2) held on 24th - 26th September, 2018. | 05 Dec 2018 | 2. | NA | The Committee after deliberation on the proposal, sought following documents/certificates:
(i) Provide comparative project detail (area, building no., height, parking space et al.) along with environmental statement showing existing, proposed and total details of the project.
(ii) Submit Action taken report submitted to Regional Office, MoEFCC, Chandigarh on non compliance of EC Conditions along with response of Regional Office on the submission.
(iii) Submit revised water balance for the project along with the quantitative commitment of fresh water supply from HUDA.
(iv) Submit details of solid waste generated and plan for management of solid waste.
(v) A certificate of adequacy of available power from the agency supplying power to the project along with the load allowed for the proj | 03 Oct 2018 | |
| Undertaking |
| I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief. And I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity/ construction/ expansion has since been taken up. |
| Name of Applicant | ANIL KUMAR | Designation | GM | Name of Company (Applicant Name should not be given here) | PIONEER URBAN LAND AND INFRASTRUCTURE LTD | Address | Paras Down Town Centre, Floor 7, Golf Course Road, Sector-53, Gurgaon, Haryana-122002 |
|