Form-2
APPLICATION FOR PRIOR ENVIRONMENTAL CLEARANCE
S. No.Item Details
1.
Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? No
Details of Project:
(a)Name of the project(s) JSW STEEL LTD., SALEM WORKS
(b)Name of the Company / Organisation JSW STEEL LTD.
(c)Registered Address POTTANERI , MECHERI SALEM WORKS TAMILNADU,POTTANERI , MECHERI SALEM WORKS TAMILNADU,Salem,Lakshadweep-636453
(d)Legal Status of the Company Private
(e)Joint Venture No
2.
Address for the correspondence:
(a)Name of the Applicant PRAKASH RAO BNS
(b)Designation (Owner/ Partner/ CEO) SENIOR VICE PRESIDENT
(c)Address POTTANERI , MECHERI SALEM WORKS TAMILNADU,POTTANERI , MECHERI SALEM WORKS TAMILNADU,Mettur,Salem,Tamil Nadu-636453
(d)Pin code 636453
(e)E-mail bns.prakashrao@jsw.in
(f)STD Code. 4298(f)Telephone No. 272801
(g)Fax No. 272272
(h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . Annexure-Uploaded Copy of documents in support of the competence/authority
3.
Category of the Project/Activity as per Schedule of EIA Notification,2006:
(a.I)Project/Activity3(a) Metallurgical industries (ferrous & non ferrous)
Minor Activity
(b)Category A
(c)Proposal Number IA/TN/IND/78015/2018
(d)Master Proposal Number(Single Window) SW/77928/2018
(e)EAC concerned (for category A Projects only) NIL
(f)Project Type Modernization under para 7(ii)
4.
Location of the Project:
(a)Plot/Survey/Khasra No. 89-90,93-98,303-321 etc., at Potaneri and 189,190,
(b)Pincode 636453
(c)Bounded Latitudes (North)
From
Degree 114816
Minutes
Second
From
Degree 114920
Minutes
Second
(d)Bounded Longitudes (East)
From
Degree 770054
Minutes
Second
From
Degree 77543
Minutes
Second
(e)Survey of India Topo Sheet No. 58E/13,58E/14,58I/1,58I/2
(f)Uploaded Topo Sheet File Copy of Topo Sheet File
(g)Maximum Elevation Above Means Sea Level(AMSL) 368
(h)Uploaded (kml) File Copy of Kml File      
(i)Distance of Nearest HFL from the project boundary within the study area 12
(j)Seismic Zone 2
5.
(a)Number of States in which Project will be Executed 1
(b)Main State of the project Tamil Nadu
Details of State of the project
S. No. State Name District Name Tehsil Name Village Name
NIL
6.
Details of Terms of Reference (ToR)/EC: Not Applicable
4.
Whether the Project Exempted from Public Hearing? Details Not Applicable
8.
Details of Project Configuration/Product:
Details Not Applicable
9.
In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii):
(a)Details of certified report on compliance of earlier environmental clearance condition
(i)Certified Compliance By Regional
(ii)Details of Regional Office of MoEFCC / Zonal Office of CPCB / SPCB / UTPCC from which certified report on Chennai
(iii)Letter No. EP/12.1/152TN&2016-17/20/TN
(iv)Status of Compliance Compiled
(v)Certified report on compliance of earlier environmental clearance conditions (Including Monitoring Report) Copy of Certified Compliance Report
(vi)Date of site visit Aug 23 2017 12:00AM
(b)Details of Capacity Expansion
S. No.Product/Activity (Capacity/Area)Quantity FromQuantity ToTotal UnitOther UnitMode of Transport / Transmission of ProductOther Mode of Transport / Transmission of Product
(1.)SALEM1.301.302OthersMillion Tons Per AnnumRoad,Rail
(c)Details of Configuration
S. No.Plant / Equipment / Facility Existing ConfigurationProposed ConfigurationFinal configuration after expansionRemarks
(1.)special alloy steel productionBlast furnace - EOF - LRF-CCM- Rolling MillsBlast furnace - EOF - LRF-CCM- Rolling MillsBlast furnace - EOF - LRF-CCM- Rolling MillsAmendment is requested in the existing EC
9.1.
Details of Consent to Operate
(i)Whether Consent to operate obtained ? NA
(ii)Copies of all Consent to operate obtained since inception NA
(iii)Date of Issue 21 Apr 2017
(iv)Valid Upto 31 Mar 2022
(v)File No. 170827952301
(vi)Application No. 7952301
(vii)Copy of Consent to operate valid as on date Copy of Consent to Operate
10.
Project Cost:
(a)Total Cost of the Project at current price level (in Crores) 1025
(b) Funds Allocated for Environment Management (Capital) (in Crores) 50.5
(c) Funds Allocated Towards CER (Corporate Environment Responsibility) (in Crores) 13.0
(d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in Crores) 8.05
11.
Whether project attracts the General Condition specified in the Schedule of EIA Notification ? No
12.
Whether project attract the Specific Condition specified in the Schedule of EIA Notification ? No
13.
Raw Material / Fuel Requirement:
(a)Proposed quantity of raw material/fuel 1.47
(b)Existing quantity of raw material/fuel N/A
(c)Total quantity of raw material/fuel 1
    13.1.        Raw Material / Fuel Profile
S. No.Raw Material / Fuel QuantityUnitOther UnitSource (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received )Mode of TransportOther Mode of TransportDistance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received)Type of Linkage Other Type of Linkage Uploaded Copy of Linkage
(1.)Non coking coal for PCI0.215OthersMTPAImported, RussiaOthersShip and rail500 Fuel Supply AgreementCopy of Linkage
(2.)Coking coal0.585OthersMTPAImported, AustraliaOthersShip and rail450 Fuel Supply AgreementCopy of Linkage
(3.)Non coking coal for COP0.147OthersMTPAImported, RussiaOthersShip and rail600 Fuel Supply AgreementCopy of Linkage
(4.)Power Plant coal0.324OthersMTPAImported, IndonesiaOthersShip and rail500 Fuel Supply AgreementCopy of Linkage
(5.)Limestone0.135OthersMTPAImported, UAEOthersShip and rail600 Fuel Supply AgreementNACopy of Linkage
(6.)Quartz0.039OthersMTPAIndigenousRoad300 OthersPurchase OrderCopy of Linkage
(7.)Lime powder0.0945OthersMTPAImported, OmanOthersShip and rail400 OthersPurchase OrderCopy of Linkage
(8.)Mill Scale0.158OthersMTPAIndigenousRoad200 OthersPurchase OrderCopy of Linkage
(9.)Anthracite coal0.095OthersMTPAImported, RussiaOthersShip and rail600 Fuel Supply AgreementPurchase OrderCopy of Linkage
(10.)Iron Ore fines1.47OthersMTPAIndigenousRail1200 OthersPurchase OrderCopy of Linkage
(11.)Dolomite0.147OthersMTPAIndigenousRoad400 OthersPurchase OrderCopy of Linkage
(12.)Dunite0.039OthersMTPAIndigenousRoad50 OthersPurchase OrderCopy of Linkage
(13.)Lump ore0.705OthersMTPAIndigenousRail600 OthersPurchase OrderCopy of Linkage
(14.)Iron ore pellets0.50OthersMTPAIndigenousRail600 OthersPurchase OrderCopy of Linkage
(15.)Purchase coke0.156OthersMTPAIndigenousRail1000 OthersPurchase OrderCopy of Linkage
16.
Baseline Data Not Applicable
14.6.
Details of Ground Water Table:
(a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) From 3.0 To 85.2
(b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) From 1.0 To 68.3
(c)Whether Ground Water Intersection will be there ? No
     15.      Details of Water Requirement (During Operation)
S. No.Source Source Other Required Quantity (Kilolitre per Day (Kld))Distance from SourceCopy of Permission from Competent Authority Mode of TransportOther Mode of TransportMethod of Water WithdrawalOther Method of Water WithdrawalLetter No.Date of IssuePermitted Quantity
(1.)Surface2024516Copy of Permission LetterPipelineIntake WellA2/2018/Royalty acknowledgement20 Apr 201822730
15.1.
(a)Whether Desalination is proposed No
    16.       Waste Water Management(During Operation)
S. No.Type/Source Quantity of Waste Water Generated (Kilolitre per Day)Treatment Capacity (Kilolitre per Day) Treatment MethodMode of DisposalOther Mode of DisposalQuantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day)Quantity of Discharged Water (Kilolitre per Day)
(1.)Waste water from plant process22255500PTP with filtrationReuse within the Plant & Recycling2225
16.1.
(a)Total Waste Water Generation (Kilolitre per Day) 2225
(b)Total Discharged Water (Kilolitre per Day) 0
(c)Total Reused Water (Kilolitre per Day) 2225
    17.       Solid Waste Generation/Management
S. No.Name of Waste Item Other ItemQuantity per AnnumUnitDistance from Site(KM)Mode of TransportOther Mode of TransportMode of DisposalOther Mode of Disposal
(1.)SMS slagIndustrial Waste238000Tons100RoadOthersInternal and supplying to cement industries
(2.)coke breezeIndustrial Waste29750Tons1.0RoadOthersInternal use
(3.)used oilHazardous Waste (as per Hazardous and Other Waste Management rules 2016)35Tons200RoadAuthorized Recyclers
(4.)Wastes or residues containing oilHazardous Waste (as per Hazardous and Other Waste Management rules 2016)40Tons200RoadTreatment, Storage and Disposal Facility(TSDF)
(5.)Bio medical wasteBio-Medical Waste0.054Tons100RoadTreatment, Storage and Disposal Facility(TSDF)
(6.)BF granulated slagIndustrial Waste600000Tons100RoadOtherssupplying cement industries
(7.)Fly AshFly Ash18000Tons100RoadOthersFly Ash brick manufactures
(8.)Empty barrels contaminated with wasteHazardous Waste (as per Hazardous and Other Waste Management rules 2016)15.0Tons200RoadAuthorized Recyclers
18.
    18.1.     Air Quality Impact Prediction
S. No.Criteria Pollutants Other Criteria PollutantsUnitBaseline ConcentrationDistance GLCIncremental ConcentrationTotal GLCPrescribed Standard
(1.)SO2Microgram per Meter Cube10.627.7518.3580
(2.)PM10Microgram per Meter Cube86.4722.8689.33100
(3.)PM2.5Microgram per Meter Cube00000
(4.)NOxMicrogram per Meter Cube46.3823.3849.7680
    18.2.     Stack Details
S. No.Source FuelStack Height(m)Stack Diameter(m)PollutantsOther PollutantsEmission (GLS)
(1.)Sinter plant 1 machinecoke coal bf gas451.60PM1096.4
(2.)Blast Furnace I - hot stovecoke601.8PM1021.4
(3.)Blast furnace I - Hot stovecoke601.8NOx36.8
(4.)Blast Furnace I - GCP flareNA400.72PM1020.3
(5.)Blast Furnace I - Cast house dedusting systemNA413.0PM1030.3
(6.)SMS 1 - EOFOxygen431.45PM1041.8
(7.)SMS I - LRFNA400.90PM1045.8
(8.)SMS I - CCM (Billet cast)NA241.05PM1029.10
(9.)SMS II - EOFOxygen38.71.7PM1040.2
(10.)SMS II - Secondary dedusting system (Common stack)NA433.5PM1047.2
(11.)SMS II - Cut fumes exhaustNA20.91.5PM1031.40
(12.)BRM - Reheating Furnace (2 stacks)BF gas301.5PM1038.3
(13.)BLM - Reheating furnace (2 stacks)BF gas301.5PM1030.1
(14.)COP - quenching TowerNA3215.43.5OthersNot applicable0
(15.)COP battery II - Emergency stackcoking coal803.78OthersNo flow0
(16.)WHRB 2coke oven waste gas351.38PM1033.3
(17.)WHRB 3coke oven waste gas301.40PM1033.6
(18.)WHRB 3coke oven waste gas301.4NOx179.8
(19.)WHRB 4coke oven waste gas351.55PM1032.8
(20.)WHRB 4coke oven waste gas351.55NOx172.4
(21.)WHRB 5coke oven waste gas351.55NOx174.8
(22.)BF gas fired boilerBF gas351.38PM1027.50
(23.)sinter Plant II - sinter machinecoke coal Bf gas854.0PM10107.5
(24.)Sinter Plant II - Crushing of raw materailNA321.75PM1042.4
(25.)Blast Furnace II - Hot stovecoke522.75NOx35.8
(26.)Blast Furnace II - Hot stovecoke522.75NOx35.8
(27.)Blast Furnace II - Hot stovecoke522.75NOx35.8
(28.)Blast Furnace II - Hot stovecoke522.75NOx35.8
(29.)Blast Furnace II - Cast house dedusting systemNA43.53.6PM1039.5
(30.)Blast furnace II - PCI plantcoal and BF gas511.1PM1043.2
(31.)DG set 625 KVAHSD120.2PM1029.3
(32.)Blast furnace I - Hot stovecoke601.8SO244.69
(33.)SMS - Vacuum Degassing unitBF gas420.8PM1028.2
(34.)COP battery III - Emergency stackcocking coal6065OthersNo flow0
(35.)Sinter plant 1 cooling systemNA352.0PM1044.2
(36.)Sinter Plant I - dedusting systemNA302.2PM1041.3
(37.)Sinter Plant I dust extraction systemNA341.0PM1030.8
(38.)Blast furnace I - Hot stovecoke601.8OthersCO2000
(39.)Blast Furnace I - RMHS dust extractionNA301.0PM1031.1
(40.)Power Plant - I - Boiler 2 Nos each 25 TPHBF gas611.85NOx63.40
(41.)SMS II - CCM - steam exhaust 2 NosNA26.21.0PM1026.5
(42.)COP Battery I - Emergency stackcoking coal803.78OthersNo flow0
(43.)WHRB 1Coke oven waste gas351.38PM1031.30
(44.)WHRB 1coke oven waste gas351.38SO2193.1
(45.)WHRB 1coke oven waste gas351.38NOx175.4
(46.)WHRB 2coke oven waste gas351.38SO2192
(47.)WHRB 2coke oven waste gas351.38NOx173.8
(48.)WHRB 4coke oven waste gas351.55SO2194.1
(49.)BRM - Intermediate furnaceNA391.40OthersNot in operation0
(50.)Lime kiln plantNA481.0OthersNot in operation0
(51.)Blast Furnace II - Hot stovecoke522.75NOx35.8
(52.)Blast Furnace II - Hot stovecoke522.75NOx35.8
(53.)Blast Furnace II - Hot stovecoke522.75NOx35.8
(54.)Blast Furnace II - Stock house dedustingNA352.5PM1054.2
(55.)DG set 625 KVAHSD120.2PM1030.6
(56.)DG set 625 KVAHSD120.2PM1028.10
(57.)Blast Furnace I - Stock house dedustingNA361.6PM1037.4
(58.)Power plant - I 2 Nos of 25 TPH capacityBF gas611.85PM1031.7
(59.)Power plant I- Boiler 2 Nos each 25 TPHBF gas611.85SO277.8
(60.)SMS - secondary dedusting of LRF 1 to 4NA433.5PM1022.6
(61.)SMS II - LRF common stackNA401.6PM1045.8
(62.)WHRB 3coke oven waste gas301.40SO2192.5
(63.)WHRB 5coke oven waste gas351.55PM1032.1
(64.)Sinter Plant II - Cooling and dedustingNA523.80PM1053.5
(65.)Blast Furnace II - Hot stovecoke522.75PM1027
(66.)Blast furnace II - Hot stoveCoke522.75SO253.5
(67.)Blast Furnace II - Hot stovecoke522.75NOx35.8
(68.)Blast Furnace II - GCP flareNA501.2PM1021.1
(69.)WHRB 5coke oven waste gas351.55SO2191.4
19.
Power Requirement:
(a)Quantity (Kilo Volt Amps (kVA)) 900000
(b)Source Captive generation and EB grid
(c)Uploaded Copy of Agreement Copy of Agreement
(d)Standby Arrangement (Details of DG Sets) DG sets installed for emergency requirement
(e)Stack Height (in m) 12
20.
Land Ownership Pattern:
(a)Forest Land (ha.) 0
(b)Private Land (ha.) 237.28
(c)Government Land (ha.) 0
(d)Revenue Land (ha.) 0
(e)Other Land (ha.) 0
    Total Land (ha.) 237.28
21.
Present Land Use Breakup of the Study Area in Ha:
(a)Agriculture Area (ha.) 0
(b)Waste/Barren Land (ha.) 0
(c)Grazing/ Community Land (ha.) 0
(d)Surface Water Bodies (ha.) 0
(e)Settlements (ha.) 0
(f)Industrial (ha.) 237.28
(g)Forest (ha.) 0
(h)Mangroves (ha.) 0
(i)Marine Area (ha.) 0.0
(j)Others (ha.) : NA 0
    Total (ha.) 237
    22.     Land requirement for various activities
S. No.Description of Activity / Facility / Plant / Others OthersLand Requirement (ha.)Remarks
(1.)Main Plant69.27
(2.)Green belt73.55
(3.)Township30.80
(4.)Water Reservoir5.34
(5.)OthersRoads,Material yards,etc.,89.12
Total (ha.) 268.08
23.
Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Sanctuaries; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones :
    23.1.     Details of Ecological Sensitivity :
S. No.Details of Ecological Sensitivity NameDistance from the Project (Km)Remarks
(1.)WLSNA0Nil
(2.)ESZsNA0Nil
(3.)Wildlife CorridorsNA0Nil
(4.)Critically Polluted AreaNA0NA
(5.)NPANA0Nil
(6.)ESAsNA0Nil
(7.)CorridorsNA0Nil
    23.2.     Details of Environmental Sensitivity :
S. No.Details of Environmental Sensitivity Other Details of Environmental Sensitivity NameDistance from the Project (Km)Remarks
(1.)ForestNA0Nil
(2.)Archaeological SitesNA0Nil
(3.)Defence InstallationsNA0Nil
23.3.
(a)Whether Noc / Permission from the competent authority is required? No
(b)Whether NBWL recommendation is required? No
24.
Forest Land:
Whether any Forest Land involved? No
25.
Tree Cutting:
(a)No. of Trees Cut for the Project (if Forest Land not Involved) 0
(b)Details of Tree Cutting and Planting of Trees Not Applicable
26.
Land Acquisition Status:
(a)Acquired Land(Ha) 0
(b)Land yet to be acquired(Ha) 0
(c)Status of Land acquisition if not acquired EXISTING LAND
27.
Rehabilitation and Resettlement (R&R):
(a)No. of Villages 0
(b)No. of Households 0
(c)No. of PDFs (Project Displaced Families) 0
(d)No. of PAFs (Project Affected Families) 0
(e)Funds Allocated for R&R(in INR) (in Lacs) 0
(f)Status of R&R Completed
28.
Details of Presence of Schedule-I Species:
(a)Whether there is Presence of Schedule-I Species ? No
(b)Whether conservation plan for Schedule-I Species has been prepared ? No
(c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? No
29.
Details of Presence of Water Bodies in Core Area:
(a)Whether there is Presence of Water Bodies in Core Area ? No
(b)Whether there is Diversion Required ? No
(c)Whether permission has been obtained from competent authority ? No
30.
Details of Presence of Water Bodies in Buffer Area:
(a)Whether there is Presence of Water Bodies in Buffer Area ? No
31.
Manpower Requirement:
(a)Permanent Employment-During Construction 0
(b)Permanent Employment-During Operation 15
(c)Temporary Employment- During Construction 0
(d)Temporary Employment- During Operation 35
(e)No. of working days 365
(f)Total Manpower 50
32.
Green Belt in Ha:
(a)Uploaded Green Belt plan Copy of Green Belt Plan
S. No.Description ExistingProposedTotal
(1.)Total Area of Green Belt73.551.1174
(2.)Percentage of Total Project Area34.141.5635
(3.)No. of Plants1950001650196650
(4.)Funds Allocated55000003000005800000
    33.       Project Benefits
S. No. Type of Project BenefitsDetails of Project Benefits
NIL
   34.   CRZ Specific Details : Not Applicable
   35.   Sector Specific Details : NOT APPLICABLE
   35.   Sector Specific Details For Industrial Projects - 1
S. No.Item Details
S. No.Item Details
36.
Details of Court Cases:
(a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? No
37.
Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act:
(a)Whether any Direction issued under EPA Act/Air Act/Water Act ? No
38.
Details of EIA Consultant:
(a)Have you hired Consultant for preparing document? Yes
(i)Accreditation No. NABET/EIA/1619/RA0068
(ii)Name of the EIA Consultant MECON LIMITED
(iii)Address MECON LIMITED,89 SOUTH END ROAD , BASAVANGUDI, BENGALURU-560004
(iv)Mobile No. 9448396968
(v)Landline No. 26252042
(vi)Email Id sveezhi@meconlimited.co.in
(vii)Category of Accreditation A
(viii)Sector of Accreditation Industrial Projects - 1
(ix)Validity of Accreditation 02 Oct 2019
(x)Uploaded Certificate of Accreditation certified by QCI/NABET Copy of Certificate of Accreditation
39.
Documents to be Attached:
(a)Uploaded Copy of EIA/EMP Report Copy of EIA/EMP
Copy of EIA/EMP(Annexures)
Copy of EIA/EMP(Plans/Figures)
(b)Uploaded Copy of Risk Assessment Report Copy of Risk Assessment
(c)Uploaded Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan
(d)Uploaded Copy of Final Layout Plan Copy of Final Layout Plan
(e)Uploaded Cover Letter Copy of Cover Letter
(f)Uploaded Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency
(g)Uploaded Additional File NA
(h)Uploaded Proposal Presentation (To be given in EAC meeting) NA
      Essential Detail Sought : NIL
      Additional Detail Sought : NIL
Undertaking
I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief. And I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity/ construction/ expansion has since been taken up.
Name of ApplicantPRAKASH RAO BNS
DesignationSENIOR VICE PRESIDENT
Name of Company (Applicant Name should not be given here)JSW STEEL LTD.
AddressPOTTANERI , MECHERI SALEM WORKS TAMILNADU