1. | Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? | No | Details of Project: | (a)Name of the project(s) | JSW STEEL LTD., SALEM WORKS | (b)Name of the Company / Organisation | JSW STEEL LTD. | (c)Registered Address | POTTANERI , MECHERI
SALEM WORKS TAMILNADU,POTTANERI , MECHERI
SALEM WORKS TAMILNADU,Salem,Lakshadweep-636453 | (d)Legal Status of the Company | Private | (e)Joint Venture | No | |
|
2. | Address for the correspondence: | (a)Name of the Applicant | PRAKASH RAO BNS | (b)Designation (Owner/ Partner/ CEO) | SENIOR VICE PRESIDENT | (c)Address | POTTANERI , MECHERI SALEM WORKS TAMILNADU,POTTANERI , MECHERI SALEM WORKS TAMILNADU,Mettur,Salem,Tamil Nadu-636453 | (d)Pin code | 636453 | (e)E-mail | bns.prakashrao@jsw.in | (f)STD Code. | 4298(f)Telephone No. | 272801 | (g)Fax No. | 272272 | (h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . | Annexure-Uploaded Copy of documents in support of the competence/authority | |
|
3. | Category of the Project/Activity as per Schedule of EIA Notification,2006: | (a.I)Project/Activity | 3(a) Metallurgical industries (ferrous & non ferrous)
| Minor Activity | | (b)Category | A | (c)Proposal Number | IA/TN/IND/78015/2018 | (d)Master Proposal Number(Single Window) | SW/77928/2018 | (e)EAC concerned (for category A Projects only) | NIL | (f)Project Type | Modernization under para 7(ii) |
|
|
4. | Location of the Project: | (a)Plot/Survey/Khasra No. | 89-90,93-98,303-321 etc., at Potaneri and 189,190, | (b)Pincode | 636453 | (c)Bounded Latitudes (North) | | From | | Degree | 114816 | Minutes | | Second | | From | | Degree | 114920 | Minutes | | Second | | (d)Bounded Longitudes (East) | | From | | Degree | 770054 | Minutes | | Second | | From | | Degree | 77543 | Minutes | | Second | | (e)Survey of India Topo Sheet No. | 58E/13,58E/14,58I/1,58I/2 | (f)Uploaded Topo Sheet File | Copy of Topo Sheet File | (g)Maximum Elevation Above Means Sea Level(AMSL) | 368 | (h)Uploaded (kml) File | Copy of Kml File | (i)Distance of Nearest HFL from the project boundary within the study area | 12 | (j)Seismic Zone | 2 | |
|
5. | (a)Number of States in which Project will be Executed | 1 | (b)Main State of the project | Tamil Nadu | |
|
|
Details of State of the project |
---|
S. No. | State Name | District Name | Tehsil Name | Village Name |
---|
NIL | |
|
6. | Details of Terms of Reference (ToR)/EC: | Not Applicable | |
|
4. | Whether the Project Exempted from Public Hearing? | Details Not Applicable | |
|
8. | Details of Project Configuration/Product: | Details Not Applicable | |
|
9. | In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii): | (a)Details of certified report on compliance of earlier environmental clearance condition | (i)Certified Compliance By | Regional | (ii)Details of Regional Office of MoEFCC / Zonal Office of CPCB / SPCB / UTPCC from which certified report on | Chennai | (iii)Letter No. | EP/12.1/152TN&2016-17/20/TN | (iv)Status of Compliance | Compiled | (v)Certified report on compliance of earlier environmental clearance conditions (Including Monitoring Report) | Copy of Certified Compliance Report | (vi)Date of site visit | Aug 23 2017 12:00AM | (b)Details of Capacity Expansion | |
|
S. No. | Product/Activity (Capacity/Area) | Quantity From | Quantity To | Total | Unit | Other Unit | Mode of Transport / Transmission of Product | Other Mode of Transport / Transmission of Product |
---|
(1.) | SALEM | 1.30 | 1.30 | 2 | Others | Million Tons Per Annum | Road,Rail | | |
| (c)Details of Configuration | |
|
S. No. | Plant / Equipment / Facility | Existing Configuration | Proposed Configuration | Final configuration after expansion | Remarks |
---|
(1.) | special alloy steel production | Blast furnace - EOF - LRF-CCM- Rolling Mills | Blast furnace - EOF - LRF-CCM- Rolling Mills | Blast furnace - EOF - LRF-CCM- Rolling Mills | Amendment is requested in the existing EC | |
9.1. | Details of Consent to Operate | (i)Whether Consent to operate obtained ? | NA | (ii)Copies of all Consent to operate obtained since inception | NA | (iii)Date of Issue | 21 Apr 2017 | (iv)Valid Upto | 31 Mar 2022 | (v)File No. | 170827952301 | (vi)Application No. | 7952301 | (vii)Copy of Consent to operate valid as on date | Copy of Consent to Operate | |
|
|
10. | Project Cost: | (a)Total Cost of the Project at current price level (in Crores) | 1025 | (b) Funds Allocated for Environment Management (Capital) (in Crores) | 50.5 | (c) Funds Allocated Towards CER (Corporate Environment Responsibility) (in Crores) | 13.0 | (d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in Crores) | 8.05 | |
|
11. | Whether project attracts the General Condition specified in the Schedule of EIA Notification ? | No | | |
12. | Whether project attract the Specific Condition specified in the Schedule of EIA Notification ? | No | | |
13. | Raw Material / Fuel Requirement: | (a)Proposed quantity of raw material/fuel | 1.47 | (b)Existing quantity of raw material/fuel | N/A | (c)Total quantity of raw material/fuel | 1 | |
|
  13.1. Raw Material / Fuel Profile |
---|
S. No. | Raw Material / Fuel | Quantity | Unit | Other Unit | Source (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received ) | Mode of Transport | Other Mode of Transport | Distance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received) | Type of Linkage | Other Type of Linkage | Uploaded Copy of Linkage |
---|
(1.) | Non coking coal for PCI | 0.215 | Others | MTPA | Imported, Russia | Others | Ship and rail | 500 | Fuel Supply Agreement | | Copy of Linkage | (2.) | Coking coal | 0.585 | Others | MTPA | Imported, Australia | Others | Ship and rail | 450 | Fuel Supply Agreement | | Copy of Linkage | (3.) | Non coking coal for COP | 0.147 | Others | MTPA | Imported, Russia | Others | Ship and rail | 600 | Fuel Supply Agreement | | Copy of Linkage | (4.) | Power Plant coal | 0.324 | Others | MTPA | Imported, Indonesia | Others | Ship and rail | 500 | Fuel Supply Agreement | | Copy of Linkage | (5.) | Limestone | 0.135 | Others | MTPA | Imported, UAE | Others | Ship and rail | 600 | Fuel Supply Agreement | NA | Copy of Linkage | (6.) | Quartz | 0.039 | Others | MTPA | Indigenous | Road | | 300 | Others | Purchase Order | Copy of Linkage | (7.) | Lime powder | 0.0945 | Others | MTPA | Imported, Oman | Others | Ship and rail | 400 | Others | Purchase Order | Copy of Linkage | (8.) | Mill Scale | 0.158 | Others | MTPA | Indigenous | Road | | 200 | Others | Purchase Order | Copy of Linkage | (9.) | Anthracite coal | 0.095 | Others | MTPA | Imported, Russia | Others | Ship and rail | 600 | Fuel Supply Agreement | Purchase Order | Copy of Linkage | (10.) | Iron Ore fines | 1.47 | Others | MTPA | Indigenous | Rail | | 1200 | Others | Purchase Order | Copy of Linkage | (11.) | Dolomite | 0.147 | Others | MTPA | Indigenous | Road | | 400 | Others | Purchase Order | Copy of Linkage | (12.) | Dunite | 0.039 | Others | MTPA | Indigenous | Road | | 50 | Others | Purchase Order | Copy of Linkage | (13.) | Lump ore | 0.705 | Others | MTPA | Indigenous | Rail | | 600 | Others | Purchase Order | Copy of Linkage | (14.) | Iron ore pellets | 0.50 | Others | MTPA | Indigenous | Rail | | 600 | Others | Purchase Order | Copy of Linkage | (15.) | Purchase coke | 0.156 | Others | MTPA | Indigenous | Rail | | 1000 | Others | Purchase Order | Copy of Linkage | |
|
16. | Baseline Data | Not Applicable | |
|
|
14.6. | Details of Ground Water Table: | (a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) | From 3.0 To 85.2 | (b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) | From 1.0 To 68.3 | (c)Whether Ground Water Intersection will be there ? | No | |
|
15. Details of Water Requirement (During Operation) |
---|
S. No. | Source | Source Other | Required Quantity (Kilolitre per Day (Kld)) | Distance from Source | Copy of Permission from Competent Authority | Mode of Transport | Other Mode of Transport | Method of Water Withdrawal | Other Method of Water Withdrawal | Letter No. | Date of Issue | Permitted Quantity |
---|
(1.) | Surface | | 20245 | 16 | Copy of Permission Letter | Pipeline | | Intake Well | | A2/2018/Royalty acknowledgement | 20 Apr 2018 | 22730 | |
|
15.1. | (a)Whether Desalination is proposed | No | |
|
16. Waste Water Management(During Operation) |
---|
S. No. | Type/Source | Quantity of Waste Water Generated (Kilolitre per Day) | Treatment Capacity (Kilolitre per Day) | Treatment Method | Mode of Disposal | Other Mode of Disposal | Quantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day) | Quantity of Discharged Water (Kilolitre per Day) |
---|
(1.) | Waste water from plant process | 2225 | 5500 | PTP with filtration | Reuse within the Plant & Recycling | | 2225 | | |
|
16.1. | (a)Total Waste Water Generation (Kilolitre per Day) | 2225 | (b)Total Discharged Water (Kilolitre per Day) | 0 | (c)Total Reused Water (Kilolitre per Day) | 2225 | |
|
17. Solid Waste Generation/Management |
---|
S. No. | Name of Waste | Item | Other Item | Quantity per Annum | Unit | Distance from Site(KM) | Mode of Transport | Other Mode of Transport | Mode of Disposal | Other Mode of Disposal |
---|
(1.) | SMS slag | Industrial Waste | | 238000 | Tons | 100 | Road | | Others | Internal and supplying to cement industries | (2.) | coke breeze | Industrial Waste | | 29750 | Tons | 1.0 | Road | | Others | Internal use | (3.) | used oil | Hazardous Waste (as per Hazardous and Other Waste Management rules 2016) | | 35 | Tons | 200 | Road | | Authorized Recyclers | | (4.) | Wastes or residues containing oil | Hazardous Waste (as per Hazardous and Other Waste Management rules 2016) | | 40 | Tons | 200 | Road | | Treatment, Storage and Disposal Facility(TSDF) | | (5.) | Bio medical waste | Bio-Medical Waste | | 0.054 | Tons | 100 | Road | | Treatment, Storage and Disposal Facility(TSDF) | | (6.) | BF granulated slag | Industrial Waste | | 600000 | Tons | 100 | Road | | Others | supplying cement industries | (7.) | Fly Ash | Fly Ash | | 18000 | Tons | 100 | Road | | Others | Fly Ash brick manufactures | (8.) | Empty barrels contaminated with waste | Hazardous Waste (as per Hazardous and Other Waste Management rules 2016) | | 15.0 | Tons | 200 | Road | | Authorized Recyclers | | |
|
|
18.1. Air Quality Impact Prediction |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Unit | Baseline Concentration | Distance GLC | Incremental Concentration | Total GLC | Prescribed Standard |
---|
(1.) | SO2 | | Microgram per Meter Cube | 10.6 | 2 | 7.75 | 18.35 | 80 | (2.) | PM10 | | Microgram per Meter Cube | 86.47 | 2 | 2.86 | 89.33 | 100 | (3.) | PM2.5 | | Microgram per Meter Cube | 0 | 0 | 0 | 0 | 0 | (4.) | NOx | | Microgram per Meter Cube | 46.38 | 2 | 3.38 | 49.76 | 80 | |
|
18.2. Stack Details |
---|
S. No. | Source | Fuel | Stack Height(m) | Stack Diameter(m) | Pollutants | Other Pollutants | Emission (GLS) |
---|
(1.) | Sinter plant 1 machine | coke coal bf gas | 45 | 1.60 | PM10 | | 96.4 | (2.) | Blast Furnace I - hot stove | coke | 60 | 1.8 | PM10 | | 21.4 | (3.) | Blast furnace I - Hot stove | coke | 60 | 1.8 | NOx | | 36.8 | (4.) | Blast Furnace I - GCP flare | NA | 40 | 0.72 | PM10 | | 20.3 | (5.) | Blast Furnace I - Cast house dedusting system | NA | 41 | 3.0 | PM10 | | 30.3 | (6.) | SMS 1 - EOF | Oxygen | 43 | 1.45 | PM10 | | 41.8 | (7.) | SMS I - LRF | NA | 40 | 0.90 | PM10 | | 45.8 | (8.) | SMS I - CCM (Billet cast) | NA | 24 | 1.05 | PM10 | | 29.10 | (9.) | SMS II - EOF | Oxygen | 38.7 | 1.7 | PM10 | | 40.2 | (10.) | SMS II - Secondary dedusting system (Common stack) | NA | 43 | 3.5 | PM10 | | 47.2 | (11.) | SMS II - Cut fumes exhaust | NA | 20.9 | 1.5 | PM10 | | 31.40 | (12.) | BRM - Reheating Furnace (2 stacks) | BF gas | 30 | 1.5 | PM10 | | 38.3 | (13.) | BLM - Reheating furnace (2 stacks) | BF gas | 30 | 1.5 | PM10 | | 30.1 | (14.) | COP - quenching Tower | NA | 32 | 15.43.5 | Others | Not applicable | 0 | (15.) | COP battery II - Emergency stack | coking coal | 80 | 3.78 | Others | No flow | 0 | (16.) | WHRB 2 | coke oven waste gas | 35 | 1.38 | PM10 | | 33.3 | (17.) | WHRB 3 | coke oven waste gas | 30 | 1.40 | PM10 | | 33.6 | (18.) | WHRB 3 | coke oven waste gas | 30 | 1.4 | NOx | | 179.8 | (19.) | WHRB 4 | coke oven waste gas | 35 | 1.55 | PM10 | | 32.8 | (20.) | WHRB 4 | coke oven waste gas | 35 | 1.55 | NOx | | 172.4 | (21.) | WHRB 5 | coke oven waste gas | 35 | 1.55 | NOx | | 174.8 | (22.) | BF gas fired boiler | BF gas | 35 | 1.38 | PM10 | | 27.50 | (23.) | sinter Plant II - sinter machine | coke coal Bf gas | 85 | 4.0 | PM10 | | 107.5 | (24.) | Sinter Plant II - Crushing of raw materail | NA | 32 | 1.75 | PM10 | | 42.4 | (25.) | Blast Furnace II - Hot stove | coke | 52 | 2.75 | NOx | | 35.8 | (26.) | Blast Furnace II - Hot stove | coke | 52 | 2.75 | NOx | | 35.8 | (27.) | Blast Furnace II - Hot stove | coke | 52 | 2.75 | NOx | | 35.8 | (28.) | Blast Furnace II - Hot stove | coke | 52 | 2.75 | NOx | | 35.8 | (29.) | Blast Furnace II - Cast house dedusting system | NA | 43.5 | 3.6 | PM10 | | 39.5 | (30.) | Blast furnace II - PCI plant | coal and BF gas | 51 | 1.1 | PM10 | | 43.2 | (31.) | DG set 625 KVA | HSD | 12 | 0.2 | PM10 | | 29.3 | (32.) | Blast furnace I - Hot stove | coke | 60 | 1.8 | SO2 | | 44.69 | (33.) | SMS - Vacuum Degassing unit | BF gas | 42 | 0.8 | PM10 | | 28.2 | (34.) | COP battery III - Emergency stack | cocking coal | 60 | 65 | Others | No flow | 0 | (35.) | Sinter plant 1 cooling system | NA | 35 | 2.0 | PM10 | | 44.2 | (36.) | Sinter Plant I - dedusting system | NA | 30 | 2.2 | PM10 | | 41.3 | (37.) | Sinter Plant I dust extraction system | NA | 34 | 1.0 | PM10 | | 30.8 | (38.) | Blast furnace I - Hot stove | coke | 60 | 1.8 | Others | CO | 2000 | (39.) | Blast Furnace I - RMHS dust extraction | NA | 30 | 1.0 | PM10 | | 31.1 | (40.) | Power Plant - I - Boiler 2 Nos each 25 TPH | BF gas | 61 | 1.85 | NOx | | 63.40 | (41.) | SMS II - CCM - steam exhaust 2 Nos | NA | 26.2 | 1.0 | PM10 | | 26.5 | (42.) | COP Battery I - Emergency stack | coking coal | 80 | 3.78 | Others | No flow | 0 | (43.) | WHRB 1 | Coke oven waste gas | 35 | 1.38 | PM10 | | 31.30 | (44.) | WHRB 1 | coke oven waste gas | 35 | 1.38 | SO2 | | 193.1 | (45.) | WHRB 1 | coke oven waste gas | 35 | 1.38 | NOx | | 175.4 | (46.) | WHRB 2 | coke oven waste gas | 35 | 1.38 | SO2 | | 192 | (47.) | WHRB 2 | coke oven waste gas | 35 | 1.38 | NOx | | 173.8 | (48.) | WHRB 4 | coke oven waste gas | 35 | 1.55 | SO2 | | 194.1 | (49.) | BRM - Intermediate furnace | NA | 39 | 1.40 | Others | Not in operation | 0 | (50.) | Lime kiln plant | NA | 48 | 1.0 | Others | Not in operation | 0 | (51.) | Blast Furnace II - Hot stove | coke | 52 | 2.75 | NOx | | 35.8 | (52.) | Blast Furnace II - Hot stove | coke | 52 | 2.75 | NOx | | 35.8 | (53.) | Blast Furnace II - Hot stove | coke | 52 | 2.75 | NOx | | 35.8 | (54.) | Blast Furnace II - Stock house dedusting | NA | 35 | 2.5 | PM10 | | 54.2 | (55.) | DG set 625 KVA | HSD | 12 | 0.2 | PM10 | | 30.6 | (56.) | DG set 625 KVA | HSD | 12 | 0.2 | PM10 | | 28.10 | (57.) | Blast Furnace I - Stock house dedusting | NA | 36 | 1.6 | PM10 | | 37.4 | (58.) | Power plant - I 2 Nos of 25 TPH capacity | BF gas | 61 | 1.85 | PM10 | | 31.7 | (59.) | Power plant I- Boiler 2 Nos each 25 TPH | BF gas | 61 | 1.85 | SO2 | | 77.8 | (60.) | SMS - secondary dedusting of LRF 1 to 4 | NA | 43 | 3.5 | PM10 | | 22.6 | (61.) | SMS II - LRF common stack | NA | 40 | 1.6 | PM10 | | 45.8 | (62.) | WHRB 3 | coke oven waste gas | 30 | 1.40 | SO2 | | 192.5 | (63.) | WHRB 5 | coke oven waste gas | 35 | 1.55 | PM10 | | 32.1 | (64.) | Sinter Plant II - Cooling and dedusting | NA | 52 | 3.80 | PM10 | | 53.5 | (65.) | Blast Furnace II - Hot stove | coke | 52 | 2.75 | PM10 | | 27 | (66.) | Blast furnace II - Hot stove | Coke | 52 | 2.75 | SO2 | | 53.5 | (67.) | Blast Furnace II - Hot stove | coke | 52 | 2.75 | NOx | | 35.8 | (68.) | Blast Furnace II - GCP flare | NA | 50 | 1.2 | PM10 | | 21.1 | (69.) | WHRB 5 | coke oven waste gas | 35 | 1.55 | SO2 | | 191.4 | |
|
19. | Power Requirement: | (a)Quantity (Kilo Volt Amps (kVA)) | 900000 | (b)Source | Captive generation and EB grid | (c)Uploaded Copy of Agreement | Copy of Agreement | (d)Standby Arrangement (Details of DG Sets) | DG sets installed for emergency requirement | (e)Stack Height (in m) | 12 | |
|
20. | Land Ownership Pattern: | (a)Forest Land (ha.) | 0 | (b)Private Land (ha.) | 237.28 | (c)Government Land (ha.) | 0 | (d)Revenue Land (ha.) | 0 | (e)Other Land (ha.) | 0 | Total Land (ha.) | 237.28 | |
|
21. | Present Land Use Breakup of the Study Area in Ha: | (a)Agriculture Area (ha.) | 0 | (b)Waste/Barren Land (ha.) | 0 | (c)Grazing/ Community Land (ha.) | 0 | (d)Surface Water Bodies (ha.) | 0 | (e)Settlements (ha.) | 0 | (f)Industrial (ha.) | 237.28 | (g)Forest (ha.) | 0 | (h)Mangroves (ha.) | 0 | (i)Marine Area (ha.) | 0.0 | (j)Others (ha.) : NA | 0 | Total (ha.) | 237 | |
|
22. Land requirement for various activities |
---|
S. No. | Description of Activity / Facility / Plant / Others | Others | Land Requirement (ha.) | Remarks |
---|
(1.) | Main Plant | | 69.27 | | (2.) | Green belt | | 73.55 | | (3.) | Township | | 30.80 | | (4.) | Water Reservoir | | 5.34 | | (5.) | Others | Roads,Material yards,etc., | 89.12 | | |
|
|
23. | Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Sanctuaries; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones : | |
|
23.1. Details of Ecological Sensitivity : |
---|
S. No. | Details of Ecological Sensitivity | Name | Distance from the Project (Km) | Remarks |
---|
(1.) | WLS | NA | 0 | Nil | (2.) | ESZs | NA | 0 | Nil | (3.) | Wildlife Corridors | NA | 0 | Nil | (4.) | Critically Polluted Area | NA | 0 | NA | (5.) | NPA | NA | 0 | Nil | (6.) | ESAs | NA | 0 | Nil | (7.) | Corridors | NA | 0 | Nil | |
23.2. Details of Environmental Sensitivity : |
---|
S. No. | Details of Environmental Sensitivity | Other Details of Environmental Sensitivity | Name | Distance from the Project (Km) | Remarks |
---|
(1.) | Forest | | NA | 0 | Nil | (2.) | Archaeological Sites | | NA | 0 | Nil | (3.) | Defence Installations | | NA | 0 | Nil | |
|
23.3. | (a)Whether Noc / Permission from the competent authority is required? | No | (b)Whether NBWL recommendation is required? | No | |
|
24. | Forest Land: | Whether any Forest Land involved? | No | |
|
25. | Tree Cutting: | (a)No. of Trees Cut for the Project (if Forest Land not Involved) | 0 | (b)Details of Tree Cutting and Planting of Trees | Not Applicable | |
|
26. | Land Acquisition Status: | (a)Acquired Land(Ha) | 0 | (b)Land yet to be acquired(Ha) | 0 | (c)Status of Land acquisition if not acquired | EXISTING LAND | |
|
27. | Rehabilitation and Resettlement (R&R): | (a)No. of Villages | 0 | (b)No. of Households | 0 | (c)No. of PDFs (Project Displaced Families) | 0 | (d)No. of PAFs (Project Affected Families) | 0 | (e)Funds Allocated for R&R(in INR) (in Lacs) | 0 | (f)Status of R&R | Completed | |
|
28. | Details of Presence of Schedule-I Species: | (a)Whether there is Presence of Schedule-I Species ? | No | (b)Whether conservation plan for Schedule-I Species has been prepared ? | No | (c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? | No | |
|
29. | Details of Presence of Water Bodies in Core Area: | (a)Whether there is Presence of Water Bodies in Core Area ? | No | (b)Whether there is Diversion Required ? | No | (c)Whether permission has been obtained from competent authority ? | No | |
|
30. | Details of Presence of Water Bodies in Buffer Area: | (a)Whether there is Presence of Water Bodies in Buffer Area ? | No | |
|
31. | Manpower Requirement: | (a)Permanent Employment-During Construction | 0 | (b)Permanent Employment-During Operation | 15 | (c)Temporary Employment- During Construction | 0 | (d)Temporary Employment- During Operation | 35 | (e)No. of working days | 365 | (f)Total Manpower | 50 | |
|
|
S. No. | Description | Existing | Proposed | Total |
---|
(1.) | Total Area of Green Belt | 73.55 | 1.11 | 74 | (2.) | Percentage of Total Project Area | 34.14 | 1.56 | 35 | (3.) | No. of Plants | 195000 | 1650 | 196650 | (4.) | Funds Allocated | 5500000 | 300000 | 5800000 | |
|
33. Project Benefits |
---|
S. No. | Type of Project Benefits | Details of Project Benefits |
---|
NIL | |
|
34. CRZ Specific Details : Not Applicable |
35. Sector Specific Details : NOT APPLICABLE |
35. Sector Specific Details For Industrial Projects - 1 |
|
|
36. | Details of Court Cases: | (a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? | No | |
|
37. | Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act: | (a)Whether any Direction issued under EPA Act/Air Act/Water Act ? | No | |
|
38. | Details of EIA Consultant: | (a)Have you hired Consultant for preparing document? | Yes | (i)Accreditation No. | NABET/EIA/1619/RA0068 | (ii)Name of the EIA Consultant | MECON LIMITED | (iii)Address | MECON LIMITED,89 SOUTH END ROAD , BASAVANGUDI, BENGALURU-560004 | (iv)Mobile No. | 9448396968 | (v)Landline No. | 26252042 | (vi)Email Id | sveezhi@meconlimited.co.in | (vii)Category of Accreditation | A | (viii)Sector of Accreditation | Industrial Projects - 1 | (ix)Validity of Accreditation | 02 Oct 2019 | (x)Uploaded Certificate of Accreditation certified by QCI/NABET | Copy of Certificate of Accreditation | |
|
|
Essential Detail Sought : NIL |
Additional Detail Sought : NIL |
| Undertaking |
| I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief. And I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity/ construction/ expansion has since been taken up. |
| Name of Applicant | PRAKASH RAO BNS | Designation | SENIOR VICE PRESIDENT | Name of Company (Applicant Name should not be given here) | JSW STEEL LTD. | Address | POTTANERI , MECHERI
SALEM WORKS TAMILNADU |
|