Form-2
APPLICATION FOR PRIOR ENVIRONMENTAL CLEARANCE
S. No.Item Details
1.
Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? No
Details of Project:
(a)Name of the project(s) JSW Steel Limited
(b)Name of the Company / Organisation JSW STEEL LTD.
(c)Registered Address JSW Steel Ltd., Dolvi, Village - Wadkhal, Taluka - Pen, Raigad District, Maharashtra,India,Raigad,Maharashtra-402107
(d)Legal Status of the Company Private
(e)Joint Venture No
2.
Address for the correspondence:
(a)Name of the Applicant Vitthal Waghchaure
(b)Designation (Owner/ Partner/ CEO) General Manager
(c)Address JSW Steel Ltd. Dolvi, Village - Wadkhal, Taluka - Pen, District Raigad. Maharashtra,,Pen,Raigad,Maharashtra-402107
(d)Pin code 402107
(e)E-mail vitthal.waghchaure@jsw.in
(f)STD Code. 0(f)Telephone No. 277501
(g)Fax No. 02143277533
(h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . Annexure-Uploaded Copy of documents in support of the competence/authority
3.
Category of the Project/Activity as per Schedule of EIA Notification,2006:
(a.I)Project/Activity3(a) Metallurgical industries (ferrous & non ferrous)
Minor Activity1(a) Mining of minerals
(b)Category A
(c)Proposal Number IA/MH/IND/78011/2018
(d)Master Proposal Number(Single Window) SW/77993/2018
(e)EAC concerned (for category A Projects only) Industrial Projects - 1
(f)Project Type Modernization under para 7(ii)
4.
Location of the Project:
(a)Plot/Survey/Khasra No. Dolvi
(b)Pincode 402107
(c)Bounded Latitudes (North)
From
Degree 18.3900
Minutes
Second
From
Degree 18.4500
Minutes
Second
(d)Bounded Longitudes (East)
From
Degree 73.0000
Minutes
Second
From
Degree 73.0500
Minutes
Second
(e)Survey of India Topo Sheet No. E43 H2
(f)Uploaded Topo Sheet File Copy of Topo Sheet File
(g)Maximum Elevation Above Means Sea Level(AMSL) 1.7
(h)Uploaded (kml) File Copy of Kml File      
(i)Distance of Nearest HFL from the project boundary within the study area 1
(j)Seismic Zone 4
5.
(a)Number of States in which Project will be Executed 1
(b)Main State of the project Maharashtra
Details of State of the project
S. No. State Name District Name Tehsil Name Village Name
NIL
6.
Details of Terms of Reference (ToR)/EC: Not Applicable
4.
Whether the Project Exempted from Public Hearing? Details Not Applicable
8.
Details of Project Configuration/Product:
Details Not Applicable
9.
In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii):
(a)Details of certified report on compliance of earlier environmental clearance condition
(i)Certified Compliance By Regional
(ii)Details of Regional Office of MoEFCC / Zonal Office of CPCB / SPCB / UTPCC from which certified report on Nagpur
(iii)Letter No. F.NO 5-4/2013/(ENV)
(iv)Status of Compliance Compiled
(v)Certified report on compliance of earlier environmental clearance conditions (Including Monitoring Report) Copy of Certified Compliance Report
(vi)Date of site visit Aug 3 2017 12:00AM
(b)Details of Capacity Expansion
S. No.Product/Activity (Capacity/Area)Quantity FromQuantity ToTotal UnitOther UnitMode of Transport / Transmission of ProductOther Mode of Transport / Transmission of Product
(1.)PEN459OthersMTPARoad,Rail,Conveyor Belt,Pipe Conveyor
(c)Details of Configuration
S. No.Plant / Equipment / Facility Existing ConfigurationProposed ConfigurationFinal configuration after expansionRemarks
(1.)PELLET PLANT4 MTPA5 MTPA9 MTPA
9.1.
Details of Consent to Operate
(i)Whether Consent to operate obtained ? NA
(ii)Copies of all Consent to operate obtained since inception NA
(iii)Date of Issue 07 Feb 2018
(iv)Valid Upto 06 Feb 2023
(v)File No. NA
(vi)Application No. NA
(vii)Copy of Consent to operate valid as on date Copy of Consent to Operate
10.
Project Cost:
(a)Total Cost of the Project at current price level (in Crores) 17000
(b) Funds Allocated for Environment Management (Capital) (in Crores) 2370
(c) Funds Allocated Towards CER (Corporate Environment Responsibility) (in Crores) 650
(d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in Crores) 300
11.
Whether project attracts the General Condition specified in the Schedule of EIA Notification ? No
12.
Whether project attract the Specific Condition specified in the Schedule of EIA Notification ? No
13.
Raw Material / Fuel Requirement:
(a)Proposed quantity of raw material/fuel 13650000
(b)Existing quantity of raw material/fuel N/A
(c)Total quantity of raw material/fuel 13650000
    13.1.        Raw Material / Fuel Profile
S. No.Raw Material / Fuel QuantityUnitOther UnitSource (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received )Mode of TransportOther Mode of TransportDistance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received)Type of Linkage Other Type of Linkage Uploaded Copy of Linkage
(1.)Ferro Alloys103600Tons per AnnumDharamtar jettyConveyor Belt1.5 LinkageCopy of Linkage
(2.)Iron Ore fines8528614Tons per AnnumDharamtar jettyConveyor Belt1.5 LinkageCopy of Linkage
(3.)Iron ore lump (BF grade)380000Tons per AnnumDharamtar jettyConveyor Belt1.5 LinkageCopy of Linkage
(4.)Dolomite909500Tons per AnnumDharamtar jettyConveyor Belt1.5 LinkageCopy of Linkage
(5.)Limestone750441Tons per AnnumDharamtar jettyConveyor Belt1.5 LinkageCopy of Linkage
(6.)Lime powder for SMS860000Tons per AnnumDharamtar jettyConveyor Belt1.5 LinkageCopy of Linkage
(7.)Coal Fines675000Tons per AnnumDharamtar jettyConveyor Belt1.5 LinkageCopy of Linkage
(8.)Coking coal3500000Tons per AnnumDharamtar jettyConveyor Belt1.5 LinkageCopy of Linkage
(9.)Bentonite45000Tons per AnnumDharamtar jettyConveyor Belt1.5 LinkageCopy of Linkage
(10.)Iron ore fines (Sinter grade)3440000Tons per AnnumDharamtar jettyConveyor Belt1.5 LinkageCopy of Linkage
16.
Baseline Data Not Applicable
14.6.
Details of Ground Water Table:
(a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) From 0.9 To 7.1
(b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) From 0 To 0
(c)Whether Ground Water Intersection will be there ? No
     15.      Details of Water Requirement (During Operation)
S. No.Source Source Other Required Quantity (Kilolitre per Day (Kld))Distance from SourceCopy of Permission from Competent Authority Mode of TransportOther Mode of TransportMethod of Water WithdrawalOther Method of Water WithdrawalLetter No.Date of IssuePermitted Quantity
(1.)Surface5528Copy of Permission LetterPipelineJack WellB.C.A 2019/84/C.Y.D28 May 201955
15.1.
(a)Whether Desalination is proposed No
    16.       Waste Water Management(During Operation)
S. No.Type/Source Quantity of Waste Water Generated (Kilolitre per Day)Treatment Capacity (Kilolitre per Day) Treatment MethodMode of DisposalOther Mode of DisposalQuantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day)Quantity of Discharged Water (Kilolitre per Day)
(1.)CTBD1324813248ETPDischarge into Seawater Body13248
(2.)BOD Treated Water98409840Biological TreatmentDischarge into Seawater Body9840
(3.)BF GCP24002400ETPDischarge into Seawater Body2400
16.1.
(a)Total Waste Water Generation (Kilolitre per Day) 25488
(b)Total Discharged Water (Kilolitre per Day) 25488
(c)Total Reused Water (Kilolitre per Day) 0
    17.       Solid Waste Generation/Management
S. No.Name of Waste Item Other ItemQuantity per AnnumUnitDistance from Site(KM)Mode of TransportOther Mode of TransportMode of DisposalOther Mode of Disposal
(1.)BF SLAGIndustrial Waste2701132Tons1.0Conveyor BeltOthersRAW MATERIAL FOR CEMENT PLANT
(2.)GCP DustIndustrial Waste306953Tons1.5RoadCo-Processing
(3.)SINTER FINESIndustrial Waste1748445Tons0RoadCo-Processing
(4.)PP ESP DUSTIndustrial Waste560000Tons0Pipe ConveyorCo-Processing
(5.)USED OILHazardous Waste (as per Hazardous and Other Waste Management rules 2016)265Kilolitre0RoadAuthorized Recyclers
(6.)CHEMICAL SLUDGE FROM WWTPHazardous Waste (as per Hazardous and Other Waste Management rules 2016)4500Tons0RoadCo-Processing
(7.)BF SCRAPEIndustrial Waste216000Tons0RoadCo-Processing
(8.)steel slagIndustrial Waste2108459Tons0RoadOthersland reclamation after processing
(9.)DRI PROCESS WATER SLUDGEIndustrial Waste224066Tons1.5RoadCo-Processing
(10.)COKE BREEZEIndustrial Waste274047Tons0RoadCo-Processing
(11.)LIME STONES FINESIndustrial Waste50000Tons0RoadCo-Processing
(12.)WASTE OR RESIDUES CONTAINING OILHazardous Waste (as per Hazardous and Other Waste Management rules 2016)38.3Tons50RoadTreatment, Storage and Disposal Facility(TSDF)
(13.)SULPHUR PASTEHazardous Waste (as per Hazardous and Other Waste Management rules 2016)1156Tons50RoadTreatment, Storage and Disposal Facility(TSDF)
18.
    18.1.     Air Quality Impact Prediction
S. No.Criteria Pollutants Other Criteria PollutantsUnitBaseline ConcentrationDistance GLCIncremental ConcentrationTotal GLCPrescribed Standard
(1.)PM10Microgram per Meter Cube202.76100.58203.35100
(2.)NOxMicrogram per Meter Cube9.30101.010.3180
(3.)PM2.5Microgram per Meter Cube0000.010
(4.)SO2Microgram per Meter Cube5.23102.387.6280
    18.2.     Stack Details
S. No.Source FuelStack Height(m)Stack Diameter(m)PollutantsOther PollutantsEmission (GLS)
(1.)bf stove stackmixed gas755.0PM1030
(2.)hsm reheating -2COG825.7PM1030
(3.)sinter 3 main espmixed gas129.412.6PM1010
(4.)LCP-5-KILNCOG621.42PM1030
(5.)LCP-7 KILNCOG621.42PM1030
(6.)bf-2mixed gas716.4PM1030
(7.)coke oven -2 battery A & BCOG Gas1509.46PM1030
(8.)HSM-2 reheating-1COG825.7PM1030
(9.)sms-2-----77.62.62PM1030
(10.)LCP -4 KILLN 4COG621.42PM1030
(11.)coke oven -2 Battery C & DCOG Gas1509.46PM1030
(12.)LCP-6 KILNCOG621.42PM1030
(13.)pellet plant -2 ESP -1mixed gas10010.6PM1030
19.
Power Requirement:
(a)Quantity (Kilo Volt Amps (kVA)) 220
(b)Source MSEDCL
(c)Uploaded Copy of Agreement Copy of Agreement
(d)Standby Arrangement (Details of DG Sets) 0
(e)Stack Height (in m) 0
20.
Land Ownership Pattern:
(a)Forest Land (ha.) 0
(b)Private Land (ha.) 728.4
(c)Government Land (ha.) 0
(d)Revenue Land (ha.) 0
(e)Other Land (ha.) 0
    Total Land (ha.) 728.4
21.
Present Land Use Breakup of the Study Area in Ha:
(a)Agriculture Area (ha.) 12798
(b)Waste/Barren Land (ha.) 1774.05
(c)Grazing/ Community Land (ha.) 0
(d)Surface Water Bodies (ha.) 0
(e)Settlements (ha.) 0
(f)Industrial (ha.) 728.4
(g)Forest (ha.) 6434.7
(h)Mangroves (ha.) 1408
(i)Marine Area (ha.) 0
(j)Others (ha.) : NA 0
    Total (ha.) 23143.15
    22.     Land requirement for various activities
S. No.Description of Activity / Facility / Plant / Others OthersLand Requirement (ha.)Remarks
(1.)Main Plant728.4INCLUDES GREEN BELT
Total (ha.) 728.4
23.
Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Sanctuaries; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones :
    23.1.     Details of Ecological Sensitivity :
S. No.Details of Ecological Sensitivity NameDistance from the Project (Km)Remarks
(1.)ESAs000
(2.)Wildlife Corridors000
(3.)ESZs000
(4.)NPA000
(5.)Critically Polluted Area000
(6.)WLS000
(7.)Corridors000
    23.2.     Details of Environmental Sensitivity :
S. No.Details of Environmental Sensitivity Other Details of Environmental Sensitivity NameDistance from the Project (Km)Remarks
(1.)OthersNANA0NA
(2.)Forest000
(3.)Archaeological Sites000
(4.)Defence Installations000
23.3.
(a)Whether Noc / Permission from the competent authority is required? No
(b)Whether NBWL recommendation is required? No
24.
Forest Land:
Whether any Forest Land involved? No
25.
Tree Cutting:
(a)No. of Trees Cut for the Project (if Forest Land not Involved) 0
(b)Details of Tree Cutting and Planting of Trees Not Applicable
26.
Land Acquisition Status:
(a)Acquired Land(Ha) 728.4
(b)Land yet to be acquired(Ha) 0
(c)Status of Land acquisition if not acquired 0
27.
Rehabilitation and Resettlement (R&R):
(a)No. of Villages 0
(b)No. of Households 0
(c)No. of PDFs (Project Displaced Families) 0
(d)No. of PAFs (Project Affected Families) 0
(e)Funds Allocated for R&R(in INR) (in Lacs) 0
(f)Status of R&R Completed
28.
Details of Presence of Schedule-I Species:
(a)Whether there is Presence of Schedule-I Species ? No
(b)Whether conservation plan for Schedule-I Species has been prepared ? No
(c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? No
29.
Details of Presence of Water Bodies in Core Area:
(a)Whether there is Presence of Water Bodies in Core Area ? No
(b)Whether there is Diversion Required ? No
(c)Whether permission has been obtained from competent authority ? No
30.
Details of Presence of Water Bodies in Buffer Area:
(a)Whether there is Presence of Water Bodies in Buffer Area ? No
31.
Manpower Requirement:
(a)Permanent Employment-During Construction 1250
(b)Permanent Employment-During Operation 2000
(c)Temporary Employment- During Construction 1500
(d)Temporary Employment- During Operation 250
(e)No. of working days 365
(f)Total Manpower 5000
32.
Green Belt in Ha:
(a)Uploaded Green Belt plan Copy of Green Belt Plan
S. No.Description ExistingProposedTotal
(1.)Total Area of Green Belt159.88272.33432.21
(2.)Percentage of Total Project Area223759
(3.)No. of Plants201870339508541378
(4.)Funds Allocated4600000060000000106000000
    33.         Project Benefits
S. No.Type of Project Benefits Details of Project Benefits
(1.)Social1.Improvement in Physical infrastructures like Roads and Railways 2.Corporate Social Responsibility benefits like Education, Livelihoods, Agriculture etc 3. Sports and cultural benefits
(2.)Financial1. Employment Potential 2.In come generation due to manufacturing of steel products
(3.)Environmental1. Access of water, sanitation, Health, Skill development, Green Belt development etc
   34.   CRZ Specific Details : Not Applicable
   35.   Sector Specific Details : NOT APPLICABLE
   35.   Sector Specific Details For Industrial Projects - 1
S. No.Item Details
S. No.Item Details
36.
Details of Court Cases:
(a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? No
37.
Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act:
(a)Whether any Direction issued under EPA Act/Air Act/Water Act ? No
38.
Details of EIA Consultant:
(a)Have you hired Consultant for preparing document? Yes
(i)Accreditation No. NABET/EIA/1720/RA0088
(ii)Name of the EIA Consultant national Environment Engineering Research institut
(iii)Address NEERI NAGPUR
(iv)Mobile No. 9422300590
(v)Landline No. 0712224784
(vi)Email Id ms_kumar@neeri.res.in
(vii)Category of Accreditation A
(viii)Sector of Accreditation Industrial Projects - 1
(ix)Validity of Accreditation 17 Feb 2020
(x)Uploaded Certificate of Accreditation certified by QCI/NABET Copy of Certificate of Accreditation
39.
Documents to be Attached:
(a)Uploaded Copy of EIA/EMP Report Copy of EIA/EMP
(b)Uploaded Copy of Risk Assessment Report Copy of Risk Assessment
(c)Uploaded Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan
(d)Uploaded Copy of Final Layout Plan Copy of Final Layout Plan
(e)Uploaded Cover Letter Copy of Cover Letter
(f)Uploaded Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency
(g)Uploaded Additional File Copy of Additional File
(h)Uploaded Proposal Presentation (To be given in EAC meeting) NA
            Essential Detail Sought:
Sno. EDS Letter Remarks Date of EDS
1.NAEIA was undertaken for additional capacity from 5 MTPA to 10 MTPA. Where as the ToRs were prescribed for change in the facilities with specific scope. Compliance of ToRs is not properly furnished. Lay out map is illegible. Certified compliance report is older than a year (i.e., 04.10.2017) Water withdrawal permission is not furnished. EIA Report seems to be prepared cursorily. In view of above, but not limited to above observations only, application is returned in present form. 19 Jul 2019
2.NAThe correction have been made as per the instruction received 22 Jul 2019
      Additional Detail Sought : NIL
Undertaking
I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief. And I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity/ construction/ expansion has since been taken up.
Name of ApplicantVitthal Waghchaure
DesignationGeneral Manager
Name of Company (Applicant Name should not be given here)JSW STEEL LTD.
AddressJSW Steel Ltd., Dolvi, Village - Wadkhal, Taluka - Pen, Raigad District, Maharashtra
Print