Form-2
APPLICATION FOR PRIOR ENVIRONMENTAL CLEARANCE
S. No.Item Details
1.
Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? No
Details of Project:
(a)Name of the project(s) Expansion of DAP and Proposal of Coal Handling Plant, Ammonia, Ammonium Nitrate, Urea, GSSP, Ammonium Fluoride, Nitric Acid. By M/s Paradeep Phosphate Limited
(b)Name of the Company / Organisation EXPANSION OF DAP AND PROPOSAL OF COAL HANDLING PLANT, AMMONIA, AMMONIUM NITRATE, UREA, GSSP, AMMONIUM FLUORIDE, NITRIC ACID. BY M/S PARADEEP PHOSPHATE LIMITED
(c)Registered Address Sarpanch gram panchayat kopra. Tah.-Rajim, Dist.-Gariaband ,,Gariaband,Chhattisgarh-493887
(d)Legal Status of the Company Private
(e)Joint Venture No
2.
Address for the correspondence:
(a)Name of the Applicant Ambikesh Kumar Mishra
(b)Designation (Owner/ Partner/ CEO) Dy General Manager
(c)Address Paradeep Phosphates Limited,PPL township,,Jagatsinghapur,Orissa-754145
(d)Pin code 754145
(e)E-mail yashwantbordia@gmail.com
(f)STD Code. 672(f)Telephone No. 259600
(g)Fax No.
(h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . Annexure-Uploaded Copy of documents in support of the competence/authority
3.
Category of the Project/Activity as per Schedule of EIA Notification,2006:
(a.I)Project/Activity5(a) Chemical fertilizers
Minor Activity
(b)Category A
(c)Proposal Number IA/OR/IND2/77891/2018
(d)Master Proposal Number(Single Window) SW/77777/2018
(e)EAC concerned (for category A Projects only) Industrial Projects - 2
(f)Project Type Fresh EC
4.
Location of the Project:
(a)Plot/Survey/Khasra No. 9,10,14,16,19,21,24,25,46,52,71
(b)Pincode 754145
(c)Bounded Latitudes (North)
From
Degree 20.268101
Minutes
Second
From
Degree 20.280022
Minutes
Second
(d)Bounded Longitudes (East)
From
Degree 86.608243
Minutes
Second
From
Degree 86.649256
Minutes
Second
(e)Survey of India Topo Sheet No. 73 L/11, 73 L/12
(f)Uploaded Topo Sheet File Copy of Topo Sheet File
(g)Maximum Elevation Above Means Sea Level(AMSL) 10
(h)Uploaded (kml) File Copy of Kml File      
(i)Distance of Nearest HFL from the project boundary within the study area 1
(j)Seismic Zone 3
5.
(a)Number of States in which Project will be Executed 1
(b)Main State of the project Orissa
Details of State(s) of the project
S. No. State Name District Name Tehsil Name Village Name
(1.)OrissaJagatsinghapurJagatsinghapurPPL township
6.
Details of Terms of Reference (ToR):
(a)MoEF&CC / SEIAA File Number J-11011/370/2009-IA-II(I)
(b)Date of Apply of TOR 19 Apr 2018
(c)Date of Issue of TOR / Standard ToR 19 Jun 2018
(d)Previous TOR Letter Copy of Previous TOR letter
7.
Details of Public Consultation:
(a)Whether the Project Exempted from Public Hearing?No
(b)Whether details of Public Hearing available? Yes
(c)Whether Public hearing was presided over by an officer of the rank of Additional District Magistrate or above Yes
     7.1.       Details of Public Hearing
S. No.Details of Advertisement Details of Public Hearing Venue Location DetailsNo. of People AttendedIssues RaisedDesignation of Presiding OfficerOther Designation of Presiding Officer
(1.)
Date of Advertisement :13 Apr 2017
Copy of advertisement :Copy of Advertisement
Copy of Public Hearing :Copy of Public Hearing
Date :19 May 2017
Distance of Public Hearing Venue from the Proposed Project :0.500
D A V School PPL premises
State :Orissa
District :Jagatsinghapur
Tehsil :Jagatsinghapur
Village :PPL Township
150Employment , PollutionDistrict Collector
8.
Details of Project Configuration/Product:
     8.1.       Project Configuration
S. No.Plant/Equipment/FacilityConfigurationRemarks
(1.)SAP0.792 MMTPAExisitng capcacity
(2.)coal handling plant7mmtpaproposed capacity
(3.)Urea1.3 MMTPAProposed Capacity
(4.)Ammonium Nitrate0.35 MTPDProposed Capacity
(5.)GSSP0.5 MTPDProposed capacity
(6.)PAP0.42 MMTPAExisting Capacity
(7.)DAP1.5 MMTPA (existing) + 0.4 MMTPA (Proposed)1.9 MMTPA (Total capacity after expansion)
(8.)Aluminium Fluoride9500 MTPAProposed capacity
(9.)Ammonia2.178 MMTPAProposed capacity
(10.)Nitric Acid0.33 MTPA (0.05 MMTPA Con. Nit. Acid)Proposed Capacity
(11.)Urea1.3 MMTPAProposed Capacity
     8.2.       Product
S. No.Product/Activity (Capacity/Area)QuantityUnitOther UnitMode of Transport / Transmission of ProductOther Mode of Transport / Transmission of Product
(1.)SAP0.792OthersMMTPAOthersSea
(2.)Urea1.3OthersMMTPARoad,Rail
(3.)Ammonium Nitrate0.35OthersMTPDRoad,Rail
(4.)Coal Handling Plant7OthersMMTPAConveyor Belt
(5.)PAP0.42OthersMMTPARoad,Rail
(6.)DAP1.9OthersMMTPARoad,Rail
(7.)Aluminium Fluoride9500Tons per AnnumRoad
(8.)Nitric Acid0.33OthersMMTPARoad
(9.)Ammonia2.178OthersMMTPARoad
9.
In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii):
Details Not Applicable
9.1.
Details of Consent to Operate
(i)Whether Consent to operate obtained ? NA
(ii)Copies of all Consent to operate obtained since inception NA
(iii)Date of Issue 31 Mar 2017
(iv)Valid Upto 31 Mar 2022
(v)File No. 4898/IND-I-CON-779
(vi)Application No. 1453865
(vii)Copy of Consent to operate valid as on date Copy of Consent to Operate
10.
Project Cost:
(a)Total Cost of the Project at current price level (in Crores) 9459
(b) Funds Allocated for Environment Management (Capital) (in Crores) 473
(c) Funds Allocated Towards CER (Corporate Environment Responsibility) (in Crores) 47
(d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in Crores) 100
11.
Whether project attracts the General Condition specified in the Schedule of EIA Notification ? No
12.
Whether project attract the Specific Condition specified in the Schedule of EIA Notification ? No
13.
Raw Material / Fuel Requirement:
(a)Proposed quantity of raw material/fuel 379500
(b)Existing quantity of raw material/fuel N/A
(c)Total quantity of raw material/fuel 379500
    13.1.        Raw Material / Fuel Profile
S. No.Raw Material / Fuel QuantityUnitOther UnitSource (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received )Mode of TransportOther Mode of TransportDistance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received)Type of Linkage Other Type of Linkage Uploaded Copy of Linkage
(1.)ammonia379500Tons per AnnumIMPORTRoad0.500 LinkageCopy of Linkage
14.
Baseline Data :
(a)Period of Base Line Data Collection FROM 01 Mar 2018 To 31 May 2018
(b)Season Summer
    14.1.     No. of ambient Air Quality (AAQ) monitoring locations : 8
S. No.Criteria Pollutants Other Criteria PollutantsUnitMaximum ValueMinimum Value98 Percentile ValuePrescribed Standard
(1.)PM10Micro Gram per Meter Cube1055488100
(2.)PM2.5Micro Gram per Meter Cube492242.360
(3.)NOxMicro Gram per Meter Cube389.528.180
(4.)OthersCOMili Gram per Meter Cube1.050.350.86400
(5.)SO2Micro Gram per Meter Cube20.24.817.080
    14.2.     No. of Ground Water monitoring locations : 8
S. No.Criteria Pollutants Other Criteria PollutantsHeavy MetalUnitOther UnitMaximum ValueMinimum ValueDesirable LimitMaximum Permissible Limit
(1.)Total Hardnessmg/l344160200600
(2.)pHNA7.996.486.58.5
(3.)Chloridesmg/l415662501000
(4.)Fluoridemg/l0.520.2811.5
(5.)Heavy MetalsIronmg/l0.360.220.300
(6.)TSSmg/l1.81.000
(7.)TDSmg/l9923665002000
    14.3.     No. of Surface Water monitoring locations : 8
S. No.Criteria Pollutants Other Criteria PollutantsUnitOther UnitMaximum ValueMinimum ValueClassification of inland water body
(1.)pHmg/l7.846.85C
(2.)DOmg/l7.04.6C
(3.)CODmg/l57810C
(4.)BODmg/l1722.8C
(5.)Othersironmg/l0.560.26C
    14.4.     No. of Ambient Noise monitoring locations : 8
S. No.Parameter UnitMaximum ValueMinimum ValuePrescribed Standard
(1.)Leq(Night)A-weighted decibels(dB(A))63.243.255
(2.)Leq(Day)A-weighted decibels(dB(A))70.653.865
    14.5.     No. of Soil Sample Monitored locations : 8
S. No.Parameter UnitOther UnitMaximum ValueMinimum Value
(1.)N(Nitrogen)Kilogram per hectare376.5275.6
(2.)Electric ConductivityOthersµmhos/cm415358
(3.)pHOthersna7.887.18
(4.)P(Phosphorus)Kilogram per hectare24.516.2
(5.)K(Potassium)Kilogram per hectare175.487.6
14.6.
Details of Ground Water Table:
(a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) From 2.0 To 5.0
(b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) From 2.0 To 4.0
(c)Whether Ground Water Intersection will be there ? No
     15.      Details of Water Requirement (During Operation)
S. No.Source Source Other Required Quantity (Kilolitre per Day (Kld))Distance from SourceCopy of Permission from Competent Authority Mode of TransportOther Mode of TransportMethod of Water WithdrawalOther Method of Water WithdrawalLetter No.Date of IssuePermitted Quantity
(1.)Surface227300.760Copy of Permission LetterPipelineOthersPIPE IINE WITH PUMPING STATION246227 Mar 201818927
15.1.
(a)Whether Desalination is proposed No
    16.       Waste Water Management(During Operation)
S. No.Type/Source Quantity of Waste Water Generated (Kilolitre per Day)Treatment Capacity (Kilolitre per Day) Treatment MethodMode of DisposalOther Mode of DisposalQuantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day)Quantity of Discharged Water (Kilolitre per Day)
(1.)FROM PLANT8422400ETPReuse within the Plant & Recycling842
16.1.
(a)Total Waste Water Generation (Kilolitre per Day) 842
(b)Total Discharged Water (Kilolitre per Day) 0
(c)Total Reused Water (Kilolitre per Day) 842
    17.       Solid Waste Generation/Management
S. No.Name of Waste Item Other ItemQuantity per AnnumUnitDistance from Site(KM)Mode of TransportOther Mode of TransportMode of DisposalOther Mode of Disposal
(1.)SPENT CATALYSTIndustrial Waste600Tons1000RoadAuthorized Recyclers
(2.)ETP SludgeIndustrial Waste1320Tons0.0OthersUse in DAP/PAPOthersUse as a Filler
(3.)Sulpher MuckIndustrial Waste3000Tons0.0OthersUse in DAP PlantOthersUsed as a filler
(4.)STP SludgeIndustrial Waste660Tons0.0OthersUse in Greenbelt developmentOthersUse as Manure
18.
    18.1.     Air Quality Impact Prediction
S. No.Criteria Pollutants Other Criteria PollutantsUnitBaseline ConcentrationDistance GLCIncremental ConcentrationTotal GLCPrescribed Standard
(1.)PM2.5Microgram per Meter Cube47.000.012.1859.1860.00
(2.)SO2Microgram per Meter Cube24.460.010.9648.9680
(3.)NOxMicrogram per Meter Cube31.220.08.9429.1480
(4.)Others(Specify)NH3Microgram per Meter Cube24.000.058.4982.49400
(5.)PM10Microgram per Meter Cube74.760.030.35126.35100
    18.2.     Stack Details
S. No.Source FuelStack Height(m)Stack Diameter(m)PollutantsOther PollutantsEmission (GLS)
(1.)WHRU/Auxiliary boilerFO305.5NOx64.7 kg/hr
(2.)GSSP BALL MILLPOWER400.8OthersSPM3.6
(3.)GSSP HOT AIR GENERATORFO300.5OthersSPM2.06
(4.)DAP A,B,C,D(Each)POWER502.8OthersSPM100 mg/Nm3
(5.)Sulphur RecoveryPower300.6SO20.8
(6.)DAP- A,B,C,DPOWER502.8OthersSPM, NH3, F100 MG/NH3, 150 MG/NM3,LESS THAN 10 MG/NM3
(7.)DAP - A,B,C.D (EACH)POWER502.8OthersSPM,NH3,F100MG/NM3, 150 MG/NM3, <10 MG//NM3
(8.)NITRIC ACIDPOWER501.25NOx100
(9.)GSSP SCRUBBERPOWER401.0OthersFLUORINE0.68
(10.)ALUMINIUM FLUORIDEFO2.80.25OthersFLUORIDE0.0I36
(11.)AMMONIUM NITRATEPOWER401.8OthersSPM20.25
(12.)DAP- A, B, C, Dpower502.8OthersSPM, NH3, F100 mg/nm3, 150 mg/nm3, 10mg/nm3
(13.)UREA PTPOWER13030OthersSPM75
19.
Power Requirement:
(a)Quantity (Kilo Volt Amps (kVA)) 238584
(b)Source GRID
(c)Uploaded Copy of Agreement Copy of Agreement
(d)Standby Arrangement (Details of DG Sets) 5mva DG SETS,2 NO 1KVA DG SETS
(e)Stack Height (in m) 12
20.
Land Ownership Pattern:
(a)Forest Land (ha.) 0.0
(b)Private Land (ha.) 950
(c)Government Land (ha.) 0.0
(d)Revenue Land (ha.) 0.0
(e)Other Land (ha.) 0.0
    Total Land (ha.) 950
21.
Present Land Use Breakup of the Study Area in Ha:
(a)Agriculture Area (ha.) 0.0
(b)Waste/Barren Land (ha.) 0.0
(c)Grazing/ Community Land (ha.) 0.0
(d)Surface Water Bodies (ha.) 84.58
(e)Settlements (ha.) 121.41
(f)Industrial (ha.) 372.08
(g)Forest (ha.) 0.0
(h)Mangroves (ha.) 0.0
(i)Marine Area (ha.) 0.0
(j)Others (ha.) : Green Belt Area 347.61
    Total (ha.) 925.68
    22.     Land requirement for various activities
S. No.Description of Activity / Facility / Plant / Others OthersLand Requirement (ha.)Remarks
(1.)Main Plant70.5
Total (ha.) 70.5
23.
Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Sanctuaries; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones :
    23.1.     Details of Ecological Sensitivity :
S. No.Details of Ecological Sensitivity NameDistance from the Project (Km)Remarks
(1.)Critically Polluted AreaNone00Not Applicable
(2.)NPANone00Not Applicable
(3.)ESZsNone00Not Applicable
(4.)Wildlife CorridorsNone00Not Applicable
(5.)ESAsNone00Not Applicable
(6.)WLSNone00Not Applicable
(7.)CorridorsNone00Not Applicable
    23.2.     Details of Environmental Sensitivity :
S. No.Details of Environmental Sensitivity Other Details of Environmental Sensitivity NameDistance from the Project (Km)Remarks
(1.)Defence InstallationsNone00Not Applicable
(2.)Archaeological SitesNone00Not Applicable
(3.)ForestNone00Not Applicable
23.3.
(a)Whether Noc / Permission from the competent authority is required? No
(b)Whether NBWL recommendation is required? No
24.
Forest Land:
Whether any Forest Land involved? No
25.
Tree Cutting:
(a)No. of Trees Cut for the Project (if Forest Land not Involved) 00
(b)Details of Tree Cutting and Planting of Trees Not Applicable
26.
Land Acquisition Status:
(a)Acquired Land(Ha) 00
(b)Land yet to be acquired(Ha) 00
(c)Status of Land acquisition if not acquired Not Applicable as land is already acquired and is
27.
Rehabilitation and Resettlement (R&R):
(a)No. of Villages 00
(b)No. of Households 00
(c)No. of PDFs (Project Displaced Families) 00
(d)No. of PAFs (Project Affected Families) 00
(e)Funds Allocated for R&R(in INR) (in Lacs) 00
(f)Status of R&R Completed
28.
Details of Presence of Schedule-I Species:
(a)Whether there is Presence of Schedule-I Species ? No
(b)Whether conservation plan for Schedule-I Species has been prepared ? No
(c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? No
29.
Details of Presence of Water Bodies in Core Area:
(a)Whether there is Presence of Water Bodies in Core Area ? Yes
(i)Details of Water Bodies in Core Area There are 17 no of ponds in the township as core zone
(b)Whether there is Diversion Required ? No
(c)Whether permission has been obtained from competent authority ? No
30.
Details of Presence of Water Bodies in Buffer Area:
(a)Whether there is Presence of Water Bodies in Buffer Area ? Yes
(i)Details of Water Bodies in Buffer Area Mahanadi River and Atharbanki Creek in along the boundary wall of the site
(ii)Direction of Water Bodies in Buffer Area North East
(iii)Distance of Water Bodies in Buffer Area 5.0
31.
Manpower Requirement:
(a)Permanent Employment-During Construction 50
(b)Permanent Employment-During Operation 150
(c)Temporary Employment- During Construction 617
(d)Temporary Employment- During Operation 200
(e)No. of working days 365
(f)Total Manpower 1017
32.
Green Belt in Ha:
(a)Total Area of Green Belt 345.61
(b)Percentage of Total Project Area 36.38
(c)No. of Plants to be Planted 675647
(d)Funds Allocated for Plantation 7000000
(e)Uploaded Green Belt plan Copy of Green Belt Plan
    33.         Project Benefits
S. No.Type of Project Benefits Details of Project Benefits
(1.)SocialHelp to get fertilizers easily
   34.   CRZ Specific Details : Not Applicable
   35.   Sector Specific Details : NOT APPLICABLE
   35.   Sector Specific Details For Industrial Projects - 2
S. No.Item Details
S. No.Item Details
36.
Details of Court Cases:
(a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? No
37.
Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act:
(a)Whether any Direction issued under EPA Act/Air Act/Water Act ? No
38.
Details of EIA Consultant:
(a)Have you hired Consultant for preparing document? Yes
(i)Accreditation No. NABET/EIA/1619/SA 070; July 17, 2018
(ii)Name of the EIA Consultant M/s EQMS India Pvt. Ltd.
(iii)Address 304-305, 3rd Floor, Plot No. 16, Rishabh Corporate Tower, Community Centre, Karkardooma, Delhi-110092
(iv)Mobile No. 8890836012
(v)Landline No. 0113000320
(vi)Email Id eqms@eqmsindia.org
(vii)Category of Accreditation A
(viii)Sector of Accreditation Industrial Projects - 2
(ix)Validity of Accreditation 23 May 2019
(x)Uploaded Certificate of Accreditation certified by QCI/NABET Copy of Certificate of Accreditation
39.
Documents to be Attached:
(a)Uploaded Copy of EIA/EMP Report Copy of EIA/EMP
Copy of EIA/EMP(Annexures)
Copy of EIA/EMP(Plans/Figures)
(b)Uploaded Copy of Risk Assessment Report Copy of Risk Assessment
(c)Uploaded Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan
(d)Uploaded Copy of Final Layout Plan Copy of Final Layout Plan
(e)Uploaded Cover Letter Copy of Cover Letter
(f)Uploaded Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency
(g)Uploaded Additional File Copy of Additional File
(h)Uploaded Proposal Presentation (To be given in EAC meeting) NA
            Essential Detail Sought:
Sno. EDS Letter Remarks Date of EDS
1.NAPlease clarify/inform the following:- - Statutory clearances required/obtained for the existing capacities of SAP, PAP, DAP. - Applicability of the EIA Notification, 2006 for coal handling plant, Nitric Acid, Aluminium Fluoride, etc, and their categorization. - Water withdrawal permission only for one year the period from 1/12/2017 to 30/11/2018. - Baseline and the predicted air quality for PM10 are higher than the prescribed standards. 21 Sep 2018
2.NAThe correction have been made as per the instruction received 01 Oct 2018
3.NAOur earlier observations regarding applicability of EIA Notification, 2006 to certain products/activities (coal handling plant) and the higher PM10 values, are yet to be resolved. Further, in case of the proposal for expansion, certified compliance reports for the earlier ECs dated 23/7/1990, 2/12/2004 & 5/10/2010 need to be necessarily submitted. 04 Oct 2018
4.NAThe correction have been made as per the instruction received 11 Oct 2018
5.NA- Product list needs to be revised vis-a-vis the applicability of the EIA Notification, 2006. - Being the expansion project, please submit CCR for the ECs dated 2/12/2004 also. 16 Oct 2018
6.NAThe correction have been made as per the instruction received 13 Nov 2018
7.NAAs per the norms, proposals for expansion projects are to be considered with the compliance status of the CCRs. Needful may please be done accordingly for consideration of the proposal. 23 Nov 2018
8.NAThe correction have been made as per the instruction received 05 Dec 2018
            Additional Detail Sought:
Sno. ADS Letter Remarks Date of ADS
1. ADS Reply LetterReply to ADS as per 4th EAC meeting. 12 Jun 2020
2.NANA 20 Mar 2019
Undertaking
I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief. And I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity/ construction/ expansion has since been taken up.
Name of ApplicantAmbikesh Kumar Mishra
DesignationDy General Manager
Name of Company (Applicant Name should not be given here)EXPANSION OF DAP AND PROPOSAL OF COAL HANDLING PLANT, AMMONIA, AMMONIUM NITRATE, UREA, GSSP, AMMONIUM FLUORIDE, NITRIC ACID. BY M/S PARADEEP PHOSPHATE LIMITED
AddressPPL Township , Jagatsinghpur
Print