1.
Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? No
Details of Project:
(a)Name of the project(s) Common Effluent Treatment Plant (CETP)
(b)Name of the Company / Organisation SIKARIA MEGA FOODPARK PRIVATE LIMITED
(c)Registered Address TRIPURA MEGA FOOD PARK, TULAKONA BYE PASS,,West Tripura,Tripura-799008
(d)Legal Status of the Company Private
(e)Joint Venture No
2.
Address for the correspondence:
(a)Name of the Applicant ANIL KUMAR BARIK
(b)Designation (Owner/ Partner/ CEO) CFO
(c)Address CF-9, SECTOR-I, SALT LAKE CITY, KOLKATA,,Barasat - I,North 24 Parganas,West Bengal-700064
(d)Pin code 700064
(e)E-mail cfo.sikariagroup@gmail.com
(f)STD Code. 33(f)Telephone No. 40669256
(g)Fax No. 23346524
(h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . Annexure-Uploaded Copy of documents in support of the competence/authority
3.
Category of the Project/Activity as per Schedule of EIA Notification,2006:
(a.I)Project/Activity7(h) Common Effluent Treatment Plants (CETPs)
Minor Activity7(h) Common Effluent Treatment Plants (CETPs)
(b)Category A
(c)Proposal Number IA/TR/MIS/77794/2018
(d)Master Proposal Number(Single Window) SW/77791/2018
(e)EAC concerned (for category A Projects only) INFRA-2
(f)Project Type Fresh EC
4.
Location of the Project:
(a)Plot/Survey/Khasra No. 585,586,587,601,588,590,600,591/2903,593,594/2902,
(b)Pincode 799008
(c)Bounded Latitudes (North)
From
Degree 23
Minutes
Second
From
Degree 50
Minutes
Second
(d)Bounded Longitudes (East)
From
Degree 20
Minutes
Second
From
Degree 91
Minutes
Second
(e)Survey of India Topo Sheet No. N/A
(f)Uploaded Topo Sheet File Copy of Topo Sheet File
(g)Maximum Elevation Above Means Sea Level(AMSL) 12.8
(h)Uploaded (kml) File Copy of Kml File      
(i)Distance of Nearest HFL from the project boundary within the study area 4
(j)Seismic Zone 5
5.
(a)Number of States in which Project will be Executed 1
(b)Main State of the project Tripura
Details of State of the project
S. No. State Name District Name Tehsil Name Village Name
NIL
6.
Details of Terms of Reference (ToR):
(a)Whether TOR is mandatory for submitting application Yes
(b)MoEF&CC / SEIAA File Number 10-25/2018-IA-III
(c)Date of Apply of TOR 22 Mar 2018
(d)Date of Issue of TOR / Standard ToR 12 Jun 2018
(e)Previous TOR Letter Copy of Previous TOR letter
7.
Details of Public Consultation:
(a)Whether the Project Exempted from Public Hearing?Yes
(b)Reason SPCB exempted PH
(c)Supporting Document Copy of Supporting Document
8.
Details of Project Configuration/Product:
     8.1.       Project Configuration
S. No.Plant/Equipment/FacilityConfigurationRemarks
(1.)CETPCOLLECTION, BIO-REACTOR, SETTELING, SDB, ACF
     8.2.       Product
S. No.Product/Activity (Capacity/Area)QuantityUnitOther UnitMode of Transport / Transmission of ProductOther Mode of Transport / Transmission of Product
(1.)CETP1000Kilo Litre per DayPipe Conveyor
(2.)CETP1000Kilo Litre per DayPipe Conveyor
9.
In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii):
Details Not Applicable
9.1.
Details of Consent to Operate
(i)Whether Consent to operate obtained ? NA
(ii)Copies of all Consent to operate obtained since inception NA
(iii)Date of Issue N/A
(iv)Valid Upto N/A
(v)File No. NA
(vi)Application No. NA
(vii)Copy of Consent to operate valid as on date NA
10.
Project Cost:
(a)Total Cost of the Project at current price level (in Crores) 2
(b) Funds Allocated for Environment Management (Capital) (in Crores) 0.15
(c) Funds Allocated Towards CER (Corporate Environment Responsibility) (in Crores) 0.10
(d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in Crores) 0.196
11.
Whether project attracts the General Condition specified in the Schedule of EIA Notification ? Yes
d)Inter-State boundaries and international boundaries Yes
12.
Whether project attract the Specific Condition specified in the Schedule of EIA Notification ? No
13.
Raw Material / Fuel Requirement:
(a)Proposed quantity of raw material/fuel 1000
(b)Existing quantity of raw material/fuel N/A
(c)Total quantity of raw material/fuel 1000
    13.1.        Raw Material / Fuel Profile
S. No.Raw Material / Fuel QuantityUnitOther UnitSource (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received )Mode of TransportOther Mode of TransportDistance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received)Type of Linkage Other Type of Linkage Uploaded Copy of Linkage
(1.)EFFLUENT1000Kilo Litre per DayINDUSTRIESPipe Conveyor1 OthersEFFLUENTCopy of Linkage
14.
Baseline Data :
(a)Period of Base Line Data Collection FROM 01 Mar 2018 To 31 May 2018
(b)Season Pre-Monsoon
    14.1.     No. of ambient Air Quality (AAQ) monitoring locations : 05
S. No.Criteria Pollutants Other Criteria PollutantsUnitMaximum ValueMinimum Value98 Percentile ValuePrescribed Standard
(1.)PM10Micro Gram per Meter Cube72217049
(2.)PM2.5Micro Gram per Meter Cube39143730
(3.)SO2Micro Gram per Meter Cube86760
(4.)NOxMicro Gram per Meter Cube4073860
    14.2.     No. of Ground Water monitoring locations : 10
S. No.Criteria Pollutants Other Criteria PollutantsHeavy MetalUnitOther UnitMaximum ValueMinimum ValueDesirable LimitMaximum Permissible Limit
(1.)pHNA95.55.59
(2.)Fluoridemg/l0.90.041.01.5
(3.)Total Hardnessmg/l10412200600
(4.)Chloridesmg/l2012501000
(5.)TSSmg/l2031100100
(6.)TDSmg/l16536200600
    14.3.     No. of Surface Water monitoring locations : 10
S. No.Criteria Pollutants Other Criteria PollutantsUnitOther UnitMaximum ValueMinimum ValueClassification of inland water body
(1.)DOmg/l9.48.1A
(2.)BODmg/l5.73.2A
(3.)CODmg/l6028A
(4.)pHmg/l95.5A
    14.4.     No. of Ambient Noise monitoring locations : 8
S. No.Parameter UnitMaximum ValueMinimum ValuePrescribed Standard
(1.)Leq(Day)A-weighted decibels(dB(A))77.351.355
(2.)Leq(Night)A-weighted decibels(dB(A))70.642.545
    14.5.     No. of Soil Sample Monitored locations : 6
S. No.Parameter UnitOther UnitMaximum ValueMinimum Value
(1.)K(Potassium)Milligram per Kilogramgm/KG1.980.18
(2.)pHOthersNA8.77.4
(3.)N(Nitrogen)Milligram per Kilogram10.15.6
(4.)Electric ConductivityOthersµs/cm6917.1
(5.)P(Phosphorus)Milligram per Kilogram00
14.6.
Details of Ground Water Table:
(a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) From 6.37 To 6.37
(b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) From 4 To 4
(c)Whether Ground Water Intersection will be there ? NA
     15.      Details of Water Requirement (During Operation)
S. No.Source Source Other Required Quantity (Kilolitre per Day (Kld))Distance from SourceCopy of Permission from Competent Authority Mode of TransportOther Mode of TransportMethod of Water WithdrawalOther Method of Water WithdrawalLetter No.Date of IssuePermitted Quantity
(1.)GroundWater2.50.1 Not Appliacble PipelineTube Wellna08 Aug 20183.5
15.1.
(a)Whether Desalination is proposed No
    16.       Waste Water Management(During Operation)
S. No.Type/Source Quantity of Waste Water Generated (Kilolitre per Day)Treatment Capacity (Kilolitre per Day) Treatment MethodMode of DisposalOther Mode of DisposalQuantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day)Quantity of Discharged Water (Kilolitre per Day)
(1.)CETP10001000UASB + MBBRReuse within the Plant & Recycling,Green Belt Renewal Plant1000
16.1.
(a)Total Waste Water Generation (Kilolitre per Day) 1000
(b)Total Discharged Water (Kilolitre per Day) 0
(c)Total Reused Water (Kilolitre per Day) 1000
    17.       Solid Waste Generation/Management
S. No.Name of Waste Item Other ItemQuantity per AnnumUnitDistance from Site(KM)Mode of TransportOther Mode of TransportMode of DisposalOther Mode of Disposal
(1.)SLUDGEIndustrial Waste1200Tons0.1RoadCo-Processing
18.
    18.1.     Air Quality Impact Prediction
S. No.Criteria Pollutants Other Criteria PollutantsUnitBaseline ConcentrationDistance GLCIncremental ConcentrationTotal GLCPrescribed Standard
(1.)PM10Microgram per Meter Cube00000
(2.)PM2.5Microgram per Meter Cube00000
(3.)SO2Microgram per Meter Cube00000
(4.)NOxNA00000
    18.2.     Stack Details
S. No.Source FuelStack Height(m)Stack Diameter(m)PollutantsOther PollutantsEmission (GLS)
(1.)NANA00OthersNA0
19.
Power Requirement:
(a)Quantity (Kilo Volt Amps (kVA)) 300
(b)Source STATE POWER SUPPLY
(c)Uploaded Copy of Agreement Not Applicable
(d)Standby Arrangement (Details of DG Sets) 250 KVA
(e)Stack Height (in m) 3
20.
Land Ownership Pattern:
(a)Forest Land (ha.) 0
(b)Private Land (ha.) 0
(c)Government Land (ha.) 0.404686
(d)Revenue Land (ha.) 0
(e)Other Land (ha.) 0
    Total Land (ha.) 0.404686
21.
Present Land Use Breakup of the Study Area in Ha:
(a)Agriculture Area (ha.) 0
(b)Waste/Barren Land (ha.) 0
(c)Grazing/ Community Land (ha.) 0
(d)Surface Water Bodies (ha.) 0
(e)Settlements (ha.) 0
(f)Industrial (ha.) 0.404686
(g)Forest (ha.) 0
(h)Mangroves (ha.) 0
(i)Marine Area (ha.) 0
(j)Others (ha.) : NA 0
    Total (ha.) 0.404686
    22.     Land requirement for various activities
S. No.Description of Activity / Facility / Plant / Others OthersLand Requirement (ha.)Remarks
(1.)OthersCETP0.404686
Total (ha.) 0.404686
23.
Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Sanctuaries; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones :
    23.1.     Details of Ecological Sensitivity :
S. No.Details of Ecological Sensitivity NameDistance from the Project (Km)Remarks
(1.)WLSNA0DOES NOT FALL
(2.)NPANA0DOES NOT FALL
(3.)ESAsNA0DOES NOT FALL
(4.)ESZsNA0DOES NOT FALL
(5.)Wildlife CorridorsNA0DOES NOT FALL
(6.)CorridorsNA0DOES NOT FALL
(7.)Critically Polluted AreaNA0DOES NOT FALL
    23.2.     Details of Environmental Sensitivity :
S. No.Details of Environmental Sensitivity Other Details of Environmental Sensitivity NameDistance from the Project (Km)Remarks
(1.)ForestNA0DOES NOT FALL
(2.)Defence InstallationsNA0DOES NOT FALL
(3.)OthersNANA0DOES NOT FALL
(4.)Archaeological SitesNA0DOES NOT FALL
23.3.
(a)Whether Noc / Permission from the competent authority is required? No
(b)Whether NBWL recommendation is required? No
24.
Forest Land:
Whether any Forest Land involved? No
25.
Tree Cutting:
(a)No. of Trees Cut for the Project (if Forest Land not Involved) 0
(b)Details of Tree Cutting and Planting of Trees Copy of Details of Tree Cutting and Planting of Trees
26.
Land Acquisition Status:
(a)Acquired Land(Ha) 0.404686
(b)Land yet to be acquired(Ha) 0
(c)Status of Land acquisition if not acquired 0
27.
Rehabilitation and Resettlement (R&R):
(a)No. of Villages 1
(b)No. of Households 0
(c)No. of PDFs (Project Displaced Families) 0
(d)No. of PAFs (Project Affected Families) 0
(e)Funds Allocated for R&R(in INR) (in Lacs) 0
(f)Status of R&R Yet To Start
28.
Details of Presence of Schedule-I Species:
(a)Whether there is Presence of Schedule-I Species ? No
(b)Whether conservation plan for Schedule-I Species has been prepared ? No
(c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? No
29.
Details of Presence of Water Bodies in Core Area:
(a)Whether there is Presence of Water Bodies in Core Area ? No
(b)Whether there is Diversion Required ? No
(c)Whether permission has been obtained from competent authority ? No
30.
Details of Presence of Water Bodies in Buffer Area:
(a)Whether there is Presence of Water Bodies in Buffer Area ? No
31.
Manpower Requirement:
(a)Permanent Employment-During Construction 0
(b)Permanent Employment-During Operation 20
(c)Temporary Employment- During Construction 10
(d)Temporary Employment- During Operation 0
(e)No. of working days 365
(f)Total Manpower 30
32.
Green Belt in Ha:
(a)Total Area of Green Belt 0.12
(b)Percentage of Total Project Area 29.65
(c)No. of Plants to be Planted 50
(d)Funds Allocated for Plantation 100000
(e)Uploaded Green Belt plan Copy of Green Belt Plan
    33.         Project Benefits
S. No.Type of Project Benefits Details of Project Benefits
(1.)SocialEmployement will be generated
   34.   CRZ Specific Details : Not Applicable
   35.   Sector Specific Details For INFRA-2
S. No.Item Details
1.
Details of Building Construction:
(a)Maximum Height of the Building (Meters) 0
(b)Total No. of Flats to be Build 0
(c)No. of Buildings 0
(d)Total plot area (sqm) 4046.86
(e)Total built up area (sqm) 0
2.
Foreshore Facilities and/or Marine Disposal:
(a)Whether Project Involves Foreshore Activities and/or marine Disposal? No
3.
Rain Water Harvesting:
(a)No. of Storage 0
(b)Capacity 0
(c)No. of Recharge Pits 1
(d)Capacity 3.5
4.
Parking:
(a)Details of 4 Wheeler/ 2 Wheeler Parking 0
5.
Energy Saving Measures:
(a)Source/Mode NA
(b)Percentage 0
(c)Quantity 0
6.
Other details:
(a)Details of impact on Water Bodies and Drainage patters of catchment area NA
(b)Details of Traffic Density Impact Assessment and Modelling Study Copy of Details of Traffic Density Impact Assessment and Modelling Study
(c)In case Underground Tunnel Project below the Forest Land - Subsidence Impact Study report Copy of Underground Tunnel Project below the Forest Land - Subsidence Impact Study report
     7.       Type of Industries to be established with Industrial Estate as per their category A/B
S. No.Type of IndustryNo. of UnitsCategory A/B
NIL
8.
Length of the alignment N/A
9.
Details Bridges/ROB/Interchanges,Flyovers,Vehicle Underpass and Pedestrian Underpass
Details Not Applicable
S. No.Item Details
36.
Details of Court Cases:
(a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? No
37.
Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act:
(a)Whether any Direction issued under EPA Act/Air Act/Water Act ? No
38.
Details of EIA Consultant:
(a)Have you hired Consultant for preparing document? Yes
(i)Accreditation No. HIGH COURT STAY
(ii)Name of the EIA Consultant SHRI ENVIRONMENT TECHNOLOGY INSTITUTE
(iii)Address WZ-679 NANGAL RAYA NEW DELHI
(iv)Mobile No. 9810166815
(v)Landline No. 0112557237
(vi)Email Id setinewdelhi@gmail.com
(vii)Category of Accreditation A
(viii)Sector of Accreditation INFRA-2
(ix)Validity of Accreditation 30 Nov 2018
(x)Uploaded Certificate of Accreditation certified by QCI/NABET Copy of Certificate of Accreditation
39.
Documents to be Attached:
(a)Uploaded Copy of EIA/EMP Report Copy of EIA/EMP
Copy of EIA/EMP(Annexures)
Copy of EIA/EMP(Plans/Figures)
(b)Uploaded Copy of Risk Assessment Report Copy of Risk Assessment
(c)Uploaded Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan
(d)Uploaded Copy of Final Layout Plan Copy of Final Layout Plan
(e)Uploaded Cover Letter Copy of Cover Letter
(f)Uploaded Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency
(g)Uploaded Additional File Copy of Additional File
(h)Uploaded Proposal Presentation (To be given in EAC meeting) NA
            Essential Detail Sought:
Sno. EDS Letter Remarks Date of EDS
1.NAThe proposal is not visible on the web portal of MoEF&CC, kindly upload all the documents. 11 Sep 2018
2.NAThe correction have been made as per the instruction received 28 Sep 2018
3.NAThe proposal has several shortcomings. Kindly submit the following: (i) Layout Plan of CETP (as annexure) (ii) Process Flow Diagram (as annexure) (iii) Details on member units, its production capacity, waste generation, characteristic and details of primary treatment provided by member units (iv) Details on quantification and characterization of inlet characteristics including methodology adopted (v) Details on option to recycle the treated effluent to individual industrial unit (vi) Details of effluents/solid waste generation and management (vii) CER Plan (viii) Copy of MoU with member units (ix) Details of sludge/solid waste generated and method of disposal. MoU in this regard (x) Details of green belt (xi) Details of water meters for inflow and outflow monitoring (xii) Water usage to include non-domestic use as well (xiii) Notification for Industrial Area (xiv) Discrepancy in Cost (200 Lacs in EIA, 2 Lacs in Form 2) (xv) Final EIA report (nowhere should say draft rep 04 Oct 2018
4.NAThe correction have been made as per the instruction received 08 Oct 2018
      Additional Detail Sought : NIL
Undertaking
I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief. And I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity/ construction/ expansion has since been taken up.
Name of ApplicantANIL KUMAR BARIK
DesignationCFO
Name of Company (Applicant Name should not be given here)SIKARIA MEGA FOODPARK PRIVATE LIMITED
AddressTRIPURA MEGA FOOD PARK, TULAKONA BYE PASS