Form-2
APPLICATION FOR PRIOR ENVIRONMENTAL CLEARANCE
S. No.Item Details
1.
Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? No
Details of Project:
(a)Name of the project(s) Environmental Impact Assessment for the Proposed Green field API and Intermediate Bulk Drug Manufacturing Unit at Village Nimbuan, Hadbast No. 1, Derabassi Taluk, , Sahibzada Ajit Singh Nagar Distt,
(b)Name of the Company / Organisation SAURAV CHEMICALS LIMITED
(c)Registered Address Saurav Chemicals Ltd, DeraBassi- Barwada Road, Saidpura, Dera Bassi, Sahibzada Ajit Singh Nagar, Punjab,,SAS Nagar,Punjab-140507
(d)Legal Status of the Company Private
(e)Joint Venture No
2.
Address for the correspondence:
(a)Name of the Applicant Parveen Kumar Goyal
(b)Designation (Owner/ Partner/ CEO) CMD
(c)Address Plot No. 370, Industrial Area, Phase-II, Panchkula, Haryana,,Panchkula,Panchkula,Haryana-134109
(d)Pin code 134109
(e)E-mail prit@sauravchemicals.com
(f)STD Code. 172(f)Telephone No. 5054949
(g)Fax No.
(h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . Annexure-Uploaded Copy of documents in support of the competence/authority
3.
Category of the Project/Activity as per Schedule of EIA Notification,2006:
(a.I)Project/Activity5(f) Synthetic organic chemicals industry (dyes & dye intermediates; bulk
Minor Activity
(b)Category A
(c)Proposal Number IA/PB/IND2/67822/2017
(d)Master Proposal Number(Single Window) SW/77689/2018
(e)EAC concerned (for category A Projects only) Industrial Projects - 2
(f)Project Type Fresh EC
4.
Location of the Project:
(a)Plot/Survey/Khasra No. 28//16/1 28//17 28//18 28//21 28//22 28//23 28//24
(b)Pincode 140507
(c)Bounded Latitudes (North)
From
Degree 30.608142
Minutes
Second
From
Degree 30.612894
Minutes
Second
(d)Bounded Longitudes (East)
From
Degree 76.909402
Minutes
Second
From
Degree 76.911487
Minutes
Second
(e)Survey of India Topo Sheet No. 53-B/14
(f)Uploaded Topo Sheet File Copy of Topo Sheet File
(g)Maximum Elevation Above Means Sea Level(AMSL) 323
(h)Uploaded (kml) File Copy of Kml File      
(i)Distance of Nearest HFL from the project boundary within the study area 5
(j)Seismic Zone 3
5.
(a)Number of States in which Project will be Executed 1
(b)Main State of the project Punjab
Details of State(s) of the project
S. No. State Name District Name Tehsil Name Village Name
(1.)PunjabSAS NagarDerabassi
6.
Details of Terms of Reference (ToR):
(a)MoEF&CC / SEIAA File Number IA-J-11011/438/2017-IA-II(I)
(b)Date of Apply of TOR 20 Sep 2017
(c)Date of Issue of TOR / Standard ToR 26 Oct 2017
(d)Previous TOR Letter Copy of Previous TOR letter
7.
Details of Public Consultation:
(a)Whether the Project Exempted from Public Hearing?No
(b)Whether details of Public Hearing available? Yes
(c)Whether Public hearing was presided over by an officer of the rank of Additional District Magistrate or above Yes
     7.1.       Details of Public Hearing
S. No.Details of Advertisement Details of Public Hearing Venue Location DetailsNo. of People AttendedIssues RaisedDesignation of Presiding OfficerOther Designation of Presiding Officer
(1.)
Date of Advertisement :09 May 2018
Copy of advertisement :Copy of Advertisement
Copy of Public Hearing :Copy of Public Hearing
Date :08 Jun 2018
Distance of Public Hearing Venue from the Proposed Project :0
Project Site. Village Nimbua
State :Punjab
District :SAS Nagar
Tehsil :Derabassi
Village :Nimbuan
2651. The proposed project may be cause hazard to the residents of the village Nimbuan which is situated at 400 m from the facility 2. Concerns regarding the deterioration of quality of ground water ifDeputy Commissioner
8.
Details of Project Configuration/Product:
     8.1.       Project Configuration
S. No.Plant/Equipment/FacilityConfigurationRemarks
(1.)Total land acquired for the project22.15438 acres
(2.)Proposed Boilers10 TPH2 boilers of 5 TPH
(3.)API and Intermediate products233.7 TPMTotal 40 products
     8.2.       Product
S. No.Product/Activity (Capacity/Area)QuantityUnitOther UnitMode of Transport / Transmission of ProductOther Mode of Transport / Transmission of Product
(1.)Alpha Lipoic Acid30Tons per AnnumRoad
(2.)Amiodarone Hydrochloride9.96Tons per AnnumRoad
(3.)Chlorzoxazone39.96Tons per AnnumRoad
(4.)Clopi Form-230Tons per AnnumRoad
(5.)D-Cycloserene30Tons per AnnumRoad
(6.)Dexketoprofen trometamol39.96Tons per AnnumRoad
(7.)Diethylcarbamazine Citrate60Tons per AnnumRoad
(8.)Febuxostat30Tons per AnnumRoad
(9.)Homatropine Hydrobromide0.96Tons per AnnumRoad
(10.)Homatropine MethylBromide5.04Tons per AnnumRoad
(11.)Ketorolac Tromethamine3.48Tons per AnnumRoad
(12.)Levofloxacin hemihydrate39.96Tons per AnnumRoad
(13.)Loxoprofen Sodium99.96Tons per AnnumRoad
(14.)Rabeprazole Sodium9.96Tons per AnnumRoad
(15.)Atorvastatin30Tons per AnnumRoad
(16.)Strontium Ranelate20.04Tons per AnnumRoad
(17.)Ketoprofen From CEBA39.96Tons per AnnumRoad
(18.)Ketprofen from Keto Nitrile39.96Tons per AnnumRoad
(19.)Sertraline Hydrochloride30Tons per AnnumRoad
(20.)Tris Buffer9.96Tons per AnnumRoad
(21.)Vidagliptin30Tons per AnnumRoad
(22.)Acetoxy EthylBromide500.04Tons per AnnumRoad
(23.)Para Nitro Benzyl Alcohol(PNBA)99.96Tons per AnnumRoad
(24.)HBr 48%500.04Tons per AnnumRoad
(25.)Para nitro benzyl bromide (PNBBr)99.96Tons per AnnumRoad
(26.)Para Nitrobenzyldehyde(PNBD)0.42Tons per AnnumRoad
(27.)4-Bromomethyl quinolone-2(1H)-one(BMQ)99.96Tons per AnnumRoad
(28.)4-Bromomethyl -2cynobiphnyl(BMC)50.04Tons per AnnumRoad
(29.)Atropine Sulphate0.24Tons per AnnumRoad
(30.)Clopi Bsylate39.96Tons per AnnumRoad
(31.)Clopi Form-130Tons per AnnumRoad
(32.)Pregabalin30Tons per AnnumRoad
(33.)Rebamipide99.96Tons per AnnumRoad
(34.)Celecoxib50.04Tons per AnnumRoad
(35.)Flurbiprofen9.96Tons per AnnumRoad
(36.)Flurbiprofen9.96Tons per AnnumRoad
(37.)Rosuvastatin9.96Tons per AnnumRoad
(38.)BromoButyric Acid30Tons per AnnumRoad
(39.)Mono-P-Nitrobenzyl malonate magnesium salt50.04Tons per AnnumRoad
(40.)Clarithromycin50.04Tons per AnnumRoad
(41.)Cholo Acid30Tons per AnnumRoad
9.
In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii):
Details Not Applicable
9.1.
Details of Consent to Operate
(i)Whether Consent to operate obtained ? NA
(ii)Copies of all Consent to operate obtained since inception NA
(iii)Date of Issue 01 Nov 2018
(iv)Valid Upto 01 Nov 2018
(v)File No. Not Applicable
(vi)Application No. Not Applicable
(vii)Copy of Consent to operate valid as on date Copy of Consent to Operate
10.
Project Cost:
(a)Total Cost of the Project at current price level (in Crores) 64
(b) Funds Allocated for Environment Management (Capital) (in Crores) 10.64
(c) Funds Allocated Towards CER (Corporate Environment Responsibility) (in Crores) 1.28
(d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in Crores) 8.4
11.
Whether project attracts the General Condition specified in the Schedule of EIA Notification ? No
12.
Whether project attract the Specific Condition specified in the Schedule of EIA Notification ? No
13.
Raw Material / Fuel Requirement:
(a)Proposed quantity of raw material/fuel 6625.25
(b)Existing quantity of raw material/fuel N/A
(c)Total quantity of raw material/fuel 6625.25
    13.1.        Raw Material / Fuel Profile
S. No.Raw Material / Fuel QuantityUnitOther UnitSource (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received )Mode of TransportOther Mode of TransportDistance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received)Type of Linkage Other Type of Linkage Uploaded Copy of Linkage
(1.)Potassium Carbonate7.24Tons per AnnumImport and local marketRoad300 Open MarketCopy of Linkage
14.
Baseline Data :
(a)Period of Base Line Data Collection FROM 25 Nov 2017 To 26 Feb 2018
(b)Season Post-Monsoon
    14.1.     No. of ambient Air Quality (AAQ) monitoring locations : 8
S. No.Criteria Pollutants Other Criteria PollutantsUnitMaximum ValueMinimum Value98 Percentile ValuePrescribed Standard
(1.)PM10Micro Gram per Meter Cube119.37559115.925100
(2.)SO2Micro Gram per Meter Cube11.6256.12511.47580
(3.)NOxMicro Gram per Meter Cube16.59.12515.987580
(4.)OthersCOMili Gram per Meter Cube1.3250.6251.3252
(5.)PM2.5Micro Gram per Meter Cube66.37526.37564.860
    14.2.     No. of Ground Water monitoring locations : 8
S. No.Criteria Pollutants Other Criteria PollutantsHeavy MetalUnitOther UnitMaximum ValueMinimum ValueDesirable LimitMaximum Permissible Limit
(1.)TDSmg/l4532245002000
(2.)Chloridesmg/l579.92501000
(3.)TSSmg/l0000
(4.)Total Hardnessmg/l308126200600
(5.)OthersMagnesiummg/l323.830100
(6.)Heavy MetalsCadmiummg/l000.0030.003
(7.)Fluoridemg/l0011.5
(8.)pHNA7.977.366.58.5
    14.3.     No. of Surface Water monitoring locations : 1
S. No.Criteria Pollutants Other Criteria PollutantsUnitOther UnitMaximum ValueMinimum ValueClassification of inland water body
(1.)BODmg/l55D
(2.)CODmg/l1717D
(3.)pHNA8.278.27D
(4.)OthersHardnessmg/l230230D
(5.)DOmg/l44D
    14.4.     No. of Ambient Noise monitoring locations : 8
S. No.Parameter UnitMaximum ValueMinimum ValuePrescribed Standard
(1.)Leq(Day)A-weighted decibels(dB(A))59.552.955
(2.)Leq(Night)A-weighted decibels(dB(A))48.141.245
    14.5.     No. of Soil Sample Monitored locations : 8
S. No.Parameter UnitOther UnitMaximum ValueMinimum Value
(1.)pHOthersNA9.178.31
(2.)N(Nitrogen)Othersg/cc0.170.08
(3.)K(Potassium)Percent0.090.06
(4.)P(Phosphorus)Percent0.060.02
(5.)Electric ConductivityOthersmicro mhos/cm5437
14.6.
Details of Ground Water Table:
(a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) From 2 To 38
(b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) From 2 To 32
(c)Whether Ground Water Intersection will be there ? Yes
(d)Upload Copy of Central Ground Water Authority Letter Copy of Central Ground Water Authority Letter
(e)Letter No. 1913/Joint Director Agr SAS Nagar 11 July 2018
(f)Date of Issue 11 Jul 2018
     15.      Details of Water Requirement (During Operation)
S. No.Source Source Other Required Quantity (Kilolitre per Day (Kld))Distance from SourceCopy of Permission from Competent Authority Mode of TransportOther Mode of TransportMethod of Water WithdrawalOther Method of Water WithdrawalLetter No.Date of IssuePermitted Quantity
(1.)GroundWater1500 Not Appliacble PipelineTube Well1913/Joint Director Agr SAS Nagar 11 July 201811 Jul 2018150
15.1.
(a)Whether Desalination is proposed No
    16.       Waste Water Management(During Operation)
S. No.Type/Source Quantity of Waste Water Generated (Kilolitre per Day)Treatment Capacity (Kilolitre per Day) Treatment MethodMode of DisposalOther Mode of DisposalQuantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day)Quantity of Discharged Water (Kilolitre per Day)
(1.)Industrial Projects - 2193300Biological treatment and Multiple Effect EvaporatorReuse within the Plant & Recycling193
16.1.
(a)Total Waste Water Generation (Kilolitre per Day) 193
(b)Total Discharged Water (Kilolitre per Day) 0
(c)Total Reused Water (Kilolitre per Day) 193
    17.       Solid Waste Generation/Management
S. No.Name of Waste Item Other ItemQuantity per AnnumUnitDistance from Site(KM)Mode of TransportOther Mode of TransportMode of DisposalOther Mode of Disposal
(1.)Spent Catalyst/spent carbonHazardous Waste (as per Hazardous and Other Waste Management rules 2016)5Tons0OthersNot ApplicableOthersIncinerator
(2.)Spent Catalyst/spent carbonHazardous Waste (as per Hazardous and Other Waste Management rules 2016)5Tons0OthersNot ApplicableOthersIncinerator
(3.)Chemical sludge from wastewater treatmentHazardous Waste (as per Hazardous and Other Waste Management rules 2016)2190Tons2RoadTreatment, Storage and Disposal Facility(TSDF)
(4.)Spent carbon/filter mediaHazardous Waste (as per Hazardous and Other Waste Management rules 2016)8.5Tons0OthersNAOthersIncinerator
(5.)Ash from incineratorHazardous Waste (as per Hazardous and Other Waste Management rules 2016)150Tons2RoadTreatment, Storage and Disposal Facility(TSDF)
(6.)Process residue and wastesHazardous Waste (as per Hazardous and Other Waste Management rules 2016)684Tons100RoadCo-Processing
(7.)Spent solventsHazardous Waste (as per Hazardous and Other Waste Management rules 2016)240Kilolitre100RoadAuthorized Recyclers
(8.)Off Specification products/expired productsHazardous Waste (as per Hazardous and Other Waste Management rules 2016)0.5Tons0OthersNAOthersIncinerator
(9.)Used/spent oilHazardous Waste (as per Hazardous and Other Waste Management rules 2016)7Kilolitre100RoadAuthorized Recyclers
18.
    18.1.     Air Quality Impact Prediction
S. No.Criteria Pollutants Other Criteria PollutantsUnitBaseline ConcentrationDistance GLCIncremental ConcentrationTotal GLCPrescribed Standard
(1.)PM10Microgram per Meter Cube920.48.02100.02100
(2.)NOxMicrogram per Meter Cube14.270.41.4515.7280
(3.)PM2.5Microgram per Meter Cube52.80.48.0260.860
(4.)SO2Microgram per Meter Cube10.50.45.1015.680
    18.2.     Stack Details
S. No.Source FuelStack Height(m)Stack Diameter(m)PollutantsOther PollutantsEmission (GLS)
(1.)BoilerBio Briquettes300.5PM101.1
(2.)Boilerbio briquette300.5SO20.7
(3.)BoilerBio briquette300.5NOx0.2
19.
Power Requirement:
(a)Quantity (Kilo Volt Amps (kVA)) 3000
(b)Source Punjab State Electricity Board
(c)Uploaded Copy of Agreement Not Applicable
(d)Standby Arrangement (Details of DG Sets) 3 DG sets of 1000 KVA
(e)Stack Height (in m) 30
20.
Land Ownership Pattern:
(a)Forest Land (ha.) 0
(b)Private Land (ha.) 0
(c)Government Land (ha.) 0
(d)Revenue Land (ha.) 0
(e)Other Land (ha.) 9.23
    Total Land (ha.) 9.23
21.
Present Land Use Breakup of the Study Area in Ha:
(a)Agriculture Area (ha.) 0
(b)Waste/Barren Land (ha.) 0
(c)Grazing/ Community Land (ha.) 0
(d)Surface Water Bodies (ha.) 0
(e)Settlements (ha.) 0
(f)Industrial (ha.) 0
(g)Forest (ha.) 0
(h)Mangroves (ha.) 0
(i)Marine Area (ha.) 0
(j)Others (ha.) : Free Enterprise Zone (FEZ) 9.23
    Total (ha.) 9.23
    22.     Land requirement for various activities
S. No.Description of Activity / Facility / Plant / Others OthersLand Requirement (ha.)Remarks
(1.)Built Up Area3.44
(2.)Green belt3.04
(3.)OthersOthers2.75Solvent storage, ETP area, Roads and vacant land
Total (ha.) 9.23
23.
Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Sanctuaries; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones :
    23.1.     Details of Ecological Sensitivity :
S. No.Details of Ecological Sensitivity NameDistance from the Project (Km)Remarks
(1.)WLSKhol Hi Raitan7.16Northern Side
(2.)Wildlife CorridorsNA0NA
(3.)Critically Polluted AreaNA0NA
(4.)CorridorsNA0NA
(5.)NPANA0NA
(6.)ESAsNA0NA
(7.)ESZsNA0NA
    23.2.     Details of Environmental Sensitivity :
S. No.Details of Environmental Sensitivity Other Details of Environmental Sensitivity NameDistance from the Project (Km)Remarks
(1.)Archaeological SitesNA0NA
(2.)OthersWild Life SanctuaryKhol Hi Raitan7.16Northern Side
(3.)ForestNA0NA
(4.)Defence InstallationsNA0NA
23.3.
(a)Whether Noc / Permission from the competent authority is required? No
(b)Whether NBWL recommendation is required? No
24.
Forest Land:
Whether any Forest Land involved? No
25.
Tree Cutting:
(a)No. of Trees Cut for the Project (if Forest Land not Involved) 0
(b)Details of Tree Cutting and Planting of Trees Not Applicable
26.
Land Acquisition Status:
(a)Acquired Land(Ha) 7.43
(b)Land yet to be acquired(Ha) 0
(c)Status of Land acquisition if not acquired Land Aquisition completed
27.
Rehabilitation and Resettlement (R&R):
(a)No. of Villages 0
(b)No. of Households 0
(c)No. of PDFs (Project Displaced Families) 0
(d)No. of PAFs (Project Affected Families) 0
(e)Funds Allocated for R&R(in INR) (in Lacs) 0
(f)Status of R&R Completed
28.
Details of Presence of Schedule-I Species:
(a)Whether there is Presence of Schedule-I Species ? No
(b)Whether conservation plan for Schedule-I Species has been prepared ? No
(c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? No
29.
Details of Presence of Water Bodies in Core Area:
(a)Whether there is Presence of Water Bodies in Core Area ? No
(b)Whether there is Diversion Required ? No
(c)Whether permission has been obtained from competent authority ? No
30.
Details of Presence of Water Bodies in Buffer Area:
(a)Whether there is Presence of Water Bodies in Buffer Area ? Yes
(i)Details of Water Bodies in Buffer Area Ghaggar River
(ii)Direction of Water Bodies in Buffer Area West
(iii)Distance of Water Bodies in Buffer Area 4.5
31.
Manpower Requirement:
(a)Permanent Employment-During Construction 50
(b)Permanent Employment-During Operation 700
(c)Temporary Employment- During Construction 100
(d)Temporary Employment- During Operation 150
(e)No. of working days 340
(f)Total Manpower 1000
32.
Green Belt in Ha:
(a)Total Area of Green Belt 3.04
(b)Percentage of Total Project Area 32.94
(c)No. of Plants to be Planted 3500
(d)Funds Allocated for Plantation 200000
(e)Uploaded Green Belt plan Copy of Green Belt Plan
    33.         Project Benefits
S. No.Type of Project Benefits Details of Project Benefits
(1.)EnvironmentalZero Liquid Discharge (ZLD)
(2.)SocialCorporate Environment Responsibility (1.28 crores)
   34.   CRZ Specific Details : Not Applicable
   35.   Sector Specific Details : NOT APPLICABLE
   35.   Sector Specific Details For Industrial Projects - 2
S. No.Item Details
S. No.Item Details
36.
Details of Court Cases:
(a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? No
37.
Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act:
(a)Whether any Direction issued under EPA Act/Air Act/Water Act ? No
38.
Details of EIA Consultant:
(a)Have you hired Consultant for preparing document? Yes
(i)Accreditation No. NABET/EIA/1518/SA 037
(ii)Name of the EIA Consultant Cholamandalam MS Risk Services Limited
(iii)Address Parry House, 3rd Floor, 2, NSC Bose Road, Parrys, Chennai-600001
(iv)Mobile No. 9677003778
(v)Landline No. 0443044545
(vi)Email Id bhaskarvs@cholams.murugappa.com
(vii)Category of Accreditation A
(viii)Sector of Accreditation Industrial Projects - 2
(ix)Validity of Accreditation 16 Nov 2018
(x)Uploaded Certificate of Accreditation certified by QCI/NABET Copy of Certificate of Accreditation
39.
Documents to be Attached:
(a)Uploaded Copy of EIA/EMP Report Copy of EIA/EMP
Copy of EIA/EMP(Annexures)
Copy of EIA/EMP(Plans/Figures)
(b)Uploaded Copy of Risk Assessment Report Copy of Risk Assessment
(c)Uploaded Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan
(d)Uploaded Copy of Final Layout Plan Copy of Final Layout Plan
(e)Uploaded Cover Letter Copy of Cover Letter
(f)Uploaded Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency
(g)Uploaded Additional File Copy of Additional File
(h)Uploaded Proposal Presentation (To be given in EAC meeting) NA
            Essential Detail Sought:
Sno. EDS Letter Remarks Date of EDS
1.NAPlease inform/clarify the following:- - Whether the proposed industrial operations are permitted at the project site and/or in conformity with land use of the area. That needs to be confirmed along with supporting documents. - Baseline air quality in terms of PM10 & PM2.5 is already exceeding the prescribed standards, which is bound to increase further due to the proposed unit. - Present status of accreditation of the EIA consultant. 07 Nov 2018
2.NAThe correction have been made as per the instruction received 09 Nov 2018
3.NA- Please confirm incremental GLC (ambient) for PM10 & PM2.5 due to the proposed industrial operations. - As per attached NABET letter dated 16/8/2018, extension for accreditation till 16/11/2018 is subject to submission of required information/documents related to assessment on time to NABET. Please confirm the desired status through NABET. 13 Nov 2018
4.NAThe correction have been made as per the instruction received 16 Nov 2018
      Additional Detail Sought : NIL
Undertaking
I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief. And I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity/ construction/ expansion has since been taken up.
Name of ApplicantParveen Kumar Goyal
DesignationCMD
Name of Company (Applicant Name should not be given here)SAURAV CHEMICALS LIMITED