1. | Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? | No | Details of Project: | (a)Name of the project(s) | Environmental Impact Assessment for the Proposed Green field API and Intermediate Bulk Drug Manufacturing Unit at Village Nimbuan, Hadbast No. 1, Derabassi Taluk, , Sahibzada Ajit Singh Nagar Distt, | (b)Name of the Company / Organisation | SAURAV CHEMICALS LIMITED | (c)Registered Address | Saurav Chemicals Ltd, DeraBassi- Barwada Road, Saidpura, Dera Bassi, Sahibzada Ajit Singh Nagar, Punjab,,SAS Nagar,Punjab-140507 | (d)Legal Status of the Company | Private | (e)Joint Venture | No | |
|
2. | Address for the correspondence: | (a)Name of the Applicant | Parveen Kumar Goyal | (b)Designation (Owner/ Partner/ CEO) | CMD | (c)Address | Plot No. 370, Industrial Area, Phase-II, Panchkula, Haryana,,Panchkula,Panchkula,Haryana-134109 | (d)Pin code | 134109 | (e)E-mail | prit@sauravchemicals.com | (f)STD Code. | 172(f)Telephone No. | 5054949 | (g)Fax No. | | (h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . | Annexure-Uploaded Copy of documents in support of the competence/authority | |
|
3. | Category of the Project/Activity as per Schedule of EIA Notification,2006: | (a.I)Project/Activity | 5(f) Synthetic organic chemicals industry (dyes & dye intermediates; bulk
| Minor Activity | | (b)Category | A | (c)Proposal Number | IA/PB/IND2/67822/2017 | (d)Master Proposal Number(Single Window) | SW/77689/2018 | (e)EAC concerned (for category A Projects only) | Industrial Projects - 2 | (f)Project Type | Fresh EC |
|
|
4. | Location of the Project: | (a)Plot/Survey/Khasra No. | 28//16/1 28//17 28//18 28//21 28//22 28//23 28//24 | (b)Pincode | 140507 | (c)Bounded Latitudes (North) | | From | | Degree | 30.608142 | Minutes | | Second | | From | | Degree | 30.612894 | Minutes | | Second | | (d)Bounded Longitudes (East) | | From | | Degree | 76.909402 | Minutes | | Second | | From | | Degree | 76.911487 | Minutes | | Second | | (e)Survey of India Topo Sheet No. | 53-B/14 | (f)Uploaded Topo Sheet File | Copy of Topo Sheet File | (g)Maximum Elevation Above Means Sea Level(AMSL) | 323 | (h)Uploaded (kml) File | Copy of Kml File | (i)Distance of Nearest HFL from the project boundary within the study area | 5 | (j)Seismic Zone | 3 | |
|
5. | (a)Number of States in which Project will be Executed | 1 | (b)Main State of the project | Punjab | |
|
|
Details of State(s) of the project |
---|
S. No. | State Name | District Name | Tehsil Name | Village Name |
---|
(1.) | Punjab | SAS Nagar | Derabassi | | |
|
6. | Details of Terms of Reference (ToR): | (a)MoEF&CC / SEIAA File Number | IA-J-11011/438/2017-IA-II(I) | (b)Date of Apply of TOR | 20 Sep 2017 | (c)Date of Issue of TOR / Standard ToR | 26 Oct 2017 | (d)Previous TOR Letter | Copy of Previous TOR letter | |
|
7. | Details of Public Consultation: | (a)Whether the Project Exempted from Public Hearing? | No | (b)Whether details of Public Hearing available? | Yes | (c)Whether Public hearing was presided over by an officer of the rank of Additional District Magistrate or above | Yes | |
|
7.1. Details of Public Hearing |
---|
|
S. No. | Details of Advertisement | Details of Public Hearing | Venue | Location Details | No. of People Attended | Issues Raised | Designation of Presiding Officer | Other Designation of Presiding Officer |
---|
(1.) | | Copy of Public Hearing : | Copy of Public Hearing | Date : | 08 Jun 2018 | Distance of Public Hearing Venue from the Proposed Project : | 0 |
| Project Site. Village Nimbua | State : | Punjab | District : | SAS Nagar | Tehsil : | Derabassi | Village : | Nimbuan |
| 265 | 1. The proposed project may be cause hazard to the residents of the village Nimbuan which is situated at 400 m from the facility
2. Concerns regarding the deterioration of quality of ground water if | Deputy Commissioner | | |
8. | Details of Project Configuration/Product: | |
|
8.1. Project Configuration |
---|
S. No. | Plant/Equipment/Facility | Configuration | Remarks |
---|
(1.) | Total land acquired for the project | 22.15438 acres | | (2.) | Proposed Boilers | 10 TPH | 2 boilers of 5 TPH | (3.) | API and Intermediate products | 233.7 TPM | Total 40 products | |
8.2. Product |
---|
S. No. | Product/Activity (Capacity/Area) | Quantity | Unit | Other Unit | Mode of Transport / Transmission of Product | Other Mode of Transport / Transmission of Product |
---|
(1.) | Alpha Lipoic Acid | 30 | Tons per Annum | | Road | | (2.) | Amiodarone Hydrochloride | 9.96 | Tons per Annum | | Road | | (3.) | Chlorzoxazone | 39.96 | Tons per Annum | | Road | | (4.) | Clopi Form-2 | 30 | Tons per Annum | | Road | | (5.) | D-Cycloserene | 30 | Tons per Annum | | Road | | (6.) | Dexketoprofen trometamol | 39.96 | Tons per Annum | | Road | | (7.) | Diethylcarbamazine Citrate | 60 | Tons per Annum | | Road | | (8.) | Febuxostat | 30 | Tons per Annum | | Road | | (9.) | Homatropine Hydrobromide | 0.96 | Tons per Annum | | Road | | (10.) | Homatropine MethylBromide | 5.04 | Tons per Annum | | Road | | (11.) | Ketorolac Tromethamine | 3.48 | Tons per Annum | | Road | | (12.) | Levofloxacin hemihydrate | 39.96 | Tons per Annum | | Road | | (13.) | Loxoprofen Sodium | 99.96 | Tons per Annum | | Road | | (14.) | Rabeprazole Sodium | 9.96 | Tons per Annum | | Road | | (15.) | Atorvastatin | 30 | Tons per Annum | | Road | | (16.) | Strontium Ranelate | 20.04 | Tons per Annum | | Road | | (17.) | Ketoprofen From CEBA | 39.96 | Tons per Annum | | Road | | (18.) | Ketprofen from Keto Nitrile | 39.96 | Tons per Annum | | Road | | (19.) | Sertraline Hydrochloride | 30 | Tons per Annum | | Road | | (20.) | Tris Buffer | 9.96 | Tons per Annum | | Road | | (21.) | Vidagliptin | 30 | Tons per Annum | | Road | | (22.) | Acetoxy EthylBromide | 500.04 | Tons per Annum | | Road | | (23.) | Para Nitro Benzyl Alcohol(PNBA) | 99.96 | Tons per Annum | | Road | | (24.) | HBr 48% | 500.04 | Tons per Annum | | Road | | (25.) | Para nitro benzyl bromide (PNBBr) | 99.96 | Tons per Annum | | Road | | (26.) | Para Nitrobenzyldehyde(PNBD) | 0.42 | Tons per Annum | | Road | | (27.) | 4-Bromomethyl quinolone-2(1H)-one(BMQ) | 99.96 | Tons per Annum | | Road | | (28.) | 4-Bromomethyl -2cynobiphnyl(BMC) | 50.04 | Tons per Annum | | Road | | (29.) | Atropine Sulphate | 0.24 | Tons per Annum | | Road | | (30.) | Clopi Bsylate | 39.96 | Tons per Annum | | Road | | (31.) | Clopi Form-1 | 30 | Tons per Annum | | Road | | (32.) | Pregabalin | 30 | Tons per Annum | | Road | | (33.) | Rebamipide | 99.96 | Tons per Annum | | Road | | (34.) | Celecoxib | 50.04 | Tons per Annum | | Road | | (35.) | Flurbiprofen | 9.96 | Tons per Annum | | Road | | (36.) | Flurbiprofen | 9.96 | Tons per Annum | | Road | | (37.) | Rosuvastatin | 9.96 | Tons per Annum | | Road | | (38.) | BromoButyric Acid | 30 | Tons per Annum | | Road | | (39.) | Mono-P-Nitrobenzyl malonate magnesium salt | 50.04 | Tons per Annum | | Road | | (40.) | Clarithromycin | 50.04 | Tons per Annum | | Road | | (41.) | Cholo Acid | 30 | Tons per Annum | | Road | | |
|
9. | In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii): | Details Not Applicable | |
|
9.1. | Details of Consent to Operate | (i)Whether Consent to operate obtained ? | NA | (ii)Copies of all Consent to operate obtained since inception | NA | (iii)Date of Issue | 01 Nov 2018 | (iv)Valid Upto | 01 Nov 2018 | (v)File No. | Not Applicable | (vi)Application No. | Not Applicable | (vii)Copy of Consent to operate valid as on date | Copy of Consent to Operate | |
|
|
10. | Project Cost: | (a)Total Cost of the Project at current price level (in Crores) | 64 | (b) Funds Allocated for Environment Management (Capital) (in Crores) | 10.64 | (c) Funds Allocated Towards CER (Corporate Environment Responsibility) (in Crores) | 1.28 | (d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in Crores) | 8.4 | |
|
11. | Whether project attracts the General Condition specified in the Schedule of EIA Notification ? | No | | |
12. | Whether project attract the Specific Condition specified in the Schedule of EIA Notification ? | No | | |
13. | Raw Material / Fuel Requirement: | (a)Proposed quantity of raw material/fuel | 6625.25 | (b)Existing quantity of raw material/fuel | N/A | (c)Total quantity of raw material/fuel | 6625.25 | |
|
  13.1. Raw Material / Fuel Profile |
---|
S. No. | Raw Material / Fuel | Quantity | Unit | Other Unit | Source (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received ) | Mode of Transport | Other Mode of Transport | Distance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received) | Type of Linkage | Other Type of Linkage | Uploaded Copy of Linkage |
---|
(1.) | Potassium Carbonate | 7.24 | Tons per Annum | | Import and local market | Road | | 300 | Open Market | | Copy of Linkage | |
|
14. | Baseline Data : | (a)Period of Base Line Data Collection | FROM 25 Nov 2017 To 26 Feb 2018 | (b)Season | Post-Monsoon | |
|
14.1. No. of ambient Air Quality (AAQ) monitoring locations : 8 |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Unit | Maximum Value | Minimum Value | 98 Percentile Value | Prescribed Standard |
---|
(1.) | PM10 | | Micro Gram per Meter Cube | 119.375 | 59 | 115.925 | 100 | (2.) | SO2 | | Micro Gram per Meter Cube | 11.625 | 6.125 | 11.475 | 80 | (3.) | NOx | | Micro Gram per Meter Cube | 16.5 | 9.125 | 15.9875 | 80 | (4.) | Others | CO | Mili Gram per Meter Cube | 1.325 | 0.625 | 1.325 | 2 | (5.) | PM2.5 | | Micro Gram per Meter Cube | 66.375 | 26.375 | 64.8 | 60 | |
14.2. No. of Ground Water monitoring locations : 8 |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Heavy Metal | Unit | Other Unit | Maximum Value | Minimum Value | Desirable Limit | Maximum Permissible Limit |
---|
(1.) | TDS | | | mg/l | | 453 | 224 | 500 | 2000 | (2.) | Chlorides | | | mg/l | | 57 | 9.9 | 250 | 1000 | (3.) | TSS | | | mg/l | | 0 | 0 | 0 | 0 | (4.) | Total Hardness | | | mg/l | | 308 | 126 | 200 | 600 | (5.) | Others | Magnesium | | mg/l | | 32 | 3.8 | 30 | 100 | (6.) | Heavy Metals | | Cadmium | mg/l | | 0 | 0 | 0.003 | 0.003 | (7.) | Fluoride | | | mg/l | | 0 | 0 | 1 | 1.5 | (8.) | pH | | | NA | | 7.97 | 7.36 | 6.5 | 8.5 | |
14.3. No. of Surface Water monitoring locations : 1 |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Unit | Other Unit | Maximum Value | Minimum Value | Classification of inland water body |
---|
(1.) | BOD | | mg/l | | 5 | 5 | D | (2.) | COD | | mg/l | | 17 | 17 | D | (3.) | pH | | NA | | 8.27 | 8.27 | D | (4.) | Others | Hardness | mg/l | | 230 | 230 | D | (5.) | DO | | mg/l | | 4 | 4 | D | |
14.4. No. of Ambient Noise monitoring locations : 8 |
---|
S. No. | Parameter | Unit | Maximum Value | Minimum Value | Prescribed Standard |
---|
(1.) | Leq(Day) | A-weighted decibels(dB(A)) | 59.5 | 52.9 | 55 | (2.) | Leq(Night) | A-weighted decibels(dB(A)) | 48.1 | 41.2 | 45 | |
14.5. No. of Soil Sample Monitored locations : 8 |
---|
S. No. | Parameter | Unit | Other Unit | Maximum Value | Minimum Value |
---|
(1.) | pH | Others | NA | 9.17 | 8.31 | (2.) | N(Nitrogen) | Others | g/cc | 0.17 | 0.08 | (3.) | K(Potassium) | Percent | | 0.09 | 0.06 | (4.) | P(Phosphorus) | Percent | | 0.06 | 0.02 | (5.) | Electric Conductivity | Others | micro mhos/cm | 54 | 37 | |
|
14.6. | Details of Ground Water Table: | (a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) | From 2 To 38 | (b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) | From 2 To 32 | (c)Whether Ground Water Intersection will be there ? | Yes | (d)Upload Copy of Central Ground Water Authority Letter | Copy of Central Ground Water Authority Letter | (e)Letter No. | 1913/Joint Director Agr SAS Nagar 11 July 2018 | (f)Date of Issue | 11 Jul 2018 | |
|
15. Details of Water Requirement (During Operation) |
---|
S. No. | Source | Source Other | Required Quantity (Kilolitre per Day (Kld)) | Distance from Source | Copy of Permission from Competent Authority | Mode of Transport | Other Mode of Transport | Method of Water Withdrawal | Other Method of Water Withdrawal | Letter No. | Date of Issue | Permitted Quantity |
---|
(1.) | GroundWater | | 150 | 0 | Not Appliacble | Pipeline | | Tube Well | | 1913/Joint Director Agr SAS Nagar 11 July 2018 | 11 Jul 2018 | 150 | |
|
15.1. | (a)Whether Desalination is proposed | No | |
|
16. Waste Water Management(During Operation) |
---|
S. No. | Type/Source | Quantity of Waste Water Generated (Kilolitre per Day) | Treatment Capacity (Kilolitre per Day) | Treatment Method | Mode of Disposal | Other Mode of Disposal | Quantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day) | Quantity of Discharged Water (Kilolitre per Day) |
---|
(1.) | Industrial Projects - 2 | 193 | 300 | Biological treatment and Multiple Effect Evaporator | Reuse within the Plant & Recycling | | 193 | | |
|
16.1. | (a)Total Waste Water Generation (Kilolitre per Day) | 193 | (b)Total Discharged Water (Kilolitre per Day) | 0 | (c)Total Reused Water (Kilolitre per Day) | 193 | |
|
17. Solid Waste Generation/Management |
---|
S. No. | Name of Waste | Item | Other Item | Quantity per Annum | Unit | Distance from Site(KM) | Mode of Transport | Other Mode of Transport | Mode of Disposal | Other Mode of Disposal |
---|
(1.) | Spent Catalyst/spent carbon | Hazardous Waste (as per Hazardous and Other Waste Management rules 2016) | | 5 | Tons | 0 | Others | Not Applicable | Others | Incinerator | (2.) | Spent Catalyst/spent carbon | Hazardous Waste (as per Hazardous and Other Waste Management rules 2016) | | 5 | Tons | 0 | Others | Not Applicable | Others | Incinerator | (3.) | Chemical sludge from wastewater treatment | Hazardous Waste (as per Hazardous and Other Waste Management rules 2016) | | 2190 | Tons | 2 | Road | | Treatment, Storage and Disposal Facility(TSDF) | | (4.) | Spent carbon/filter media | Hazardous Waste (as per Hazardous and Other Waste Management rules 2016) | | 8.5 | Tons | 0 | Others | NA | Others | Incinerator | (5.) | Ash from incinerator | Hazardous Waste (as per Hazardous and Other Waste Management rules 2016) | | 150 | Tons | 2 | Road | | Treatment, Storage and Disposal Facility(TSDF) | | (6.) | Process residue and wastes | Hazardous Waste (as per Hazardous and Other Waste Management rules 2016) | | 684 | Tons | 100 | Road | | Co-Processing | | (7.) | Spent solvents | Hazardous Waste (as per Hazardous and Other Waste Management rules 2016) | | 240 | Kilolitre | 100 | Road | | Authorized Recyclers | | (8.) | Off Specification products/expired products | Hazardous Waste (as per Hazardous and Other Waste Management rules 2016) | | 0.5 | Tons | 0 | Others | NA | Others | Incinerator | (9.) | Used/spent oil | Hazardous Waste (as per Hazardous and Other Waste Management rules 2016) | | 7 | Kilolitre | 100 | Road | | Authorized Recyclers | | |
|
|
18.1. Air Quality Impact Prediction |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Unit | Baseline Concentration | Distance GLC | Incremental Concentration | Total GLC | Prescribed Standard |
---|
(1.) | PM10 | | Microgram per Meter Cube | 92 | 0.4 | 8.02 | 100.02 | 100 | (2.) | NOx | | Microgram per Meter Cube | 14.27 | 0.4 | 1.45 | 15.72 | 80 | (3.) | PM2.5 | | Microgram per Meter Cube | 52.8 | 0.4 | 8.02 | 60.8 | 60 | (4.) | SO2 | | Microgram per Meter Cube | 10.5 | 0.4 | 5.10 | 15.6 | 80 | |
|
18.2. Stack Details |
---|
S. No. | Source | Fuel | Stack Height(m) | Stack Diameter(m) | Pollutants | Other Pollutants | Emission (GLS) |
---|
(1.) | Boiler | Bio Briquettes | 30 | 0.5 | PM10 | | 1.1 | (2.) | Boiler | bio briquette | 30 | 0.5 | SO2 | | 0.7 | (3.) | Boiler | Bio briquette | 30 | 0.5 | NOx | | 0.2 | |
|
19. | Power Requirement: | (a)Quantity (Kilo Volt Amps (kVA)) | 3000 | (b)Source | Punjab State Electricity Board | (c)Uploaded Copy of Agreement | Not Applicable | (d)Standby Arrangement (Details of DG Sets) | 3 DG sets of 1000 KVA | (e)Stack Height (in m) | 30 | |
|
20. | Land Ownership Pattern: | (a)Forest Land (ha.) | 0 | (b)Private Land (ha.) | 0 | (c)Government Land (ha.) | 0 | (d)Revenue Land (ha.) | 0 | (e)Other Land (ha.) | 9.23 | Total Land (ha.) | 9.23 | |
|
21. | Present Land Use Breakup of the Study Area in Ha: | (a)Agriculture Area (ha.) | 0 | (b)Waste/Barren Land (ha.) | 0 | (c)Grazing/ Community Land (ha.) | 0 | (d)Surface Water Bodies (ha.) | 0 | (e)Settlements (ha.) | 0 | (f)Industrial (ha.) | 0 | (g)Forest (ha.) | 0 | (h)Mangroves (ha.) | 0 | (i)Marine Area (ha.) | 0 | (j)Others (ha.) : Free Enterprise Zone (FEZ) | 9.23 | Total (ha.) | 9.23 | |
|
22. Land requirement for various activities |
---|
S. No. | Description of Activity / Facility / Plant / Others | Others | Land Requirement (ha.) | Remarks |
---|
(1.) | Built Up Area | | 3.44 | | (2.) | Green belt | | 3.04 | | (3.) | Others | Others | 2.75 | Solvent storage, ETP area, Roads and vacant land | |
|
|
23. | Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Sanctuaries; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones : | |
|
23.1. Details of Ecological Sensitivity : |
---|
S. No. | Details of Ecological Sensitivity | Name | Distance from the Project (Km) | Remarks |
---|
(1.) | WLS | Khol Hi Raitan | 7.16 | Northern Side | (2.) | Wildlife Corridors | NA | 0 | NA | (3.) | Critically Polluted Area | NA | 0 | NA | (4.) | Corridors | NA | 0 | NA | (5.) | NPA | NA | 0 | NA | (6.) | ESAs | NA | 0 | NA | (7.) | ESZs | NA | 0 | NA | |
23.2. Details of Environmental Sensitivity : |
---|
S. No. | Details of Environmental Sensitivity | Other Details of Environmental Sensitivity | Name | Distance from the Project (Km) | Remarks |
---|
(1.) | Archaeological Sites | | NA | 0 | NA | (2.) | Others | Wild Life Sanctuary | Khol Hi Raitan | 7.16 | Northern Side | (3.) | Forest | | NA | 0 | NA | (4.) | Defence Installations | | NA | 0 | NA | |
|
23.3. | (a)Whether Noc / Permission from the competent authority is required? | No | (b)Whether NBWL recommendation is required? | No | |
|
24. | Forest Land: | Whether any Forest Land involved? | No | |
|
25. | Tree Cutting: | (a)No. of Trees Cut for the Project (if Forest Land not Involved) | 0 | (b)Details of Tree Cutting and Planting of Trees | Not Applicable | |
|
26. | Land Acquisition Status: | (a)Acquired Land(Ha) | 7.43 | (b)Land yet to be acquired(Ha) | 0 | (c)Status of Land acquisition if not acquired | Land Aquisition completed | |
|
27. | Rehabilitation and Resettlement (R&R): | (a)No. of Villages | 0 | (b)No. of Households | 0 | (c)No. of PDFs (Project Displaced Families) | 0 | (d)No. of PAFs (Project Affected Families) | 0 | (e)Funds Allocated for R&R(in INR) (in Lacs) | 0 | (f)Status of R&R | Completed | |
|
28. | Details of Presence of Schedule-I Species: | (a)Whether there is Presence of Schedule-I Species ? | No | (b)Whether conservation plan for Schedule-I Species has been prepared ? | No | (c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? | No | |
|
29. | Details of Presence of Water Bodies in Core Area: | (a)Whether there is Presence of Water Bodies in Core Area ? | No | (b)Whether there is Diversion Required ? | No | (c)Whether permission has been obtained from competent authority ? | No | |
|
30. | Details of Presence of Water Bodies in Buffer Area: | (a)Whether there is Presence of Water Bodies in Buffer Area ? | Yes | (i)Details of Water Bodies in Buffer Area | Ghaggar River | (ii)Direction of Water Bodies in Buffer Area | West | (iii)Distance of Water Bodies in Buffer Area | 4.5 | |
|
31. | Manpower Requirement: | (a)Permanent Employment-During Construction | 50 | (b)Permanent Employment-During Operation | 700 | (c)Temporary Employment- During Construction | 100 | (d)Temporary Employment- During Operation | 150 | (e)No. of working days | 340 | (f)Total Manpower | 1000 | |
|
32. | Green Belt in Ha: | (a)Total Area of Green Belt | 3.04 | (b)Percentage of Total Project Area | 32.94 | (c)No. of Plants to be Planted | 3500 | (d)Funds Allocated for Plantation | 200000 | (e)Uploaded Green Belt plan | Copy of Green Belt Plan | |
|
33. Project Benefits |
---|
S. No. | Type of Project Benefits | Details of Project Benefits |
---|
(1.) | Environmental | Zero Liquid Discharge (ZLD) | (2.) | Social | Corporate Environment Responsibility (1.28 crores) | |
|
34. CRZ Specific Details : Not Applicable |
35. Sector Specific Details : NOT APPLICABLE |
35. Sector Specific Details For Industrial Projects - 2 |
|
|
36. | Details of Court Cases: | (a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? | No | |
|
37. | Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act: | (a)Whether any Direction issued under EPA Act/Air Act/Water Act ? | No | |
|
38. | Details of EIA Consultant: | (a)Have you hired Consultant for preparing document? | Yes | (i)Accreditation No. | NABET/EIA/1518/SA 037 | (ii)Name of the EIA Consultant | Cholamandalam MS Risk Services Limited | (iii)Address | Parry House, 3rd Floor, 2, NSC Bose Road, Parrys, Chennai-600001 | (iv)Mobile No. | 9677003778 | (v)Landline No. | 0443044545 | (vi)Email Id | bhaskarvs@cholams.murugappa.com | (vii)Category of Accreditation | A | (viii)Sector of Accreditation | Industrial Projects - 2 | (ix)Validity of Accreditation | 16 Nov 2018 | (x)Uploaded Certificate of Accreditation certified by QCI/NABET | Copy of Certificate of Accreditation | |
|
|
Essential Detail Sought: |
---|
Sno. | EDS Letter | Remarks | Date of EDS |
---|
1. | NA | Please inform/clarify the following:-
- Whether the proposed industrial operations are permitted at the project site and/or in conformity with land use of the area. That needs to be confirmed along with supporting documents.
- Baseline air quality in terms of PM10 & PM2.5 is already exceeding the prescribed standards, which is bound to increase further due to the proposed unit.
- Present status of accreditation of the EIA consultant. | 07 Nov 2018 | 2. | NA | The correction have been made as per the instruction received | 09 Nov 2018 | 3. | NA | - Please confirm incremental GLC (ambient) for PM10 & PM2.5 due to the proposed industrial operations.
- As per attached NABET letter dated 16/8/2018, extension for accreditation till 16/11/2018 is subject to submission of required information/documents related to assessment on time to NABET. Please confirm the desired status through NABET. | 13 Nov 2018 | 4. | NA | The correction have been made as per the instruction received | 16 Nov 2018 | |
Additional Detail Sought : NIL |
| Undertaking |
| I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief. And I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity/ construction/ expansion has since been taken up. |
| Name of Applicant | Parveen Kumar Goyal | Designation | CMD | Name of Company (Applicant Name should not be given here) | SAURAV CHEMICALS LIMITED | Address | Saurav Chemicals Ltd, DeraBassi- Barwada Road, Saidpura, Dera Bassi, Sahibzada Ajit Singh Nagar, Punjab |
|