Form-2
APPLICATION FOR PRIOR ENVIRONMENTAL CLEARANCE
S. No.Item Details
1.
Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? No
Details of Project:
(a)Name of the project(s) V A POWER AND STEELS PRIVATE LIMITED
(b)Name of the Company / Organisation V A POWER AND STEEL PVT LTD
(c)Registered Address c/o, Dr. G. S. Agrawal, Civil Lines, Raigarh,,Raigarh,Chhattisgarh-496001
(d)Legal Status of the Company Private
(e)Joint Venture No
2.
Address for the correspondence:
(a)Name of the Applicant Sunil Agrawal
(b)Designation (Owner/ Partner/ CEO) Director
(c)Address C/o. Dr. G S Agrawal, Civil Lines, Raigarh 496001,,Raigarh,Raigarh,Chhattisgarh-496001
(d)Pin code 496001
(e)E-mail vapowermoef@gmail.com
(f)STD Code. 98932(f)Telephone No. 37422
(g)Fax No.
(h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . Annexure-Uploaded Copy of documents in support of the competence/authority
3.
Category of the Project/Activity as per Schedule of EIA Notification,2006:
(a.I)Project/Activity3(a) Metallurgical industries (ferrous & non ferrous)
Minor Activity
(b)Category A
(c)Proposal Number IA/CG/IND/77598/2006
(d)Master Proposal Number(Single Window) SW/77594/2018
(e)EAC concerned (for category A Projects only) Industrial Projects - 1
(f)Project Type Expansion
4.
Location of the Project:
(a)Plot/Survey/Khasra No. 143, 144 & 145
(b)Pincode 496001
(c)Bounded Latitudes (North)
From
Degree 22.054975
Minutes
Second
From
Degree 22.057411
Minutes
Second
(d)Bounded Longitudes (East)
From
Degree 83.340769
Minutes
Second
From
Degree 83.342044
Minutes
Second
(e)Survey of India Topo Sheet No. 64 N/8
(f)Uploaded Topo Sheet File Copy of Topo Sheet File
(g)Maximum Elevation Above Means Sea Level(AMSL) 315
(h)Uploaded (kml) File Copy of Kml File      
(i)Distance of Nearest HFL from the project boundary within the study area 5.6
(j)Seismic Zone 2
5.
(a)Number of States in which Project will be Executed 1
(b)Main State of the project Chhattisgarh
Details of State of the project
S. No. State Name District Name Tehsil Name Village Name
NIL
6.
Details of Terms of Reference (ToR)/EC:
(a)MoEF&CC / SEIAA File Number 1779/TS/CECB/2006
(c)Date of Issue of TOR 07 Apr 2006
(f)Previous TOR Letter Copy of Previous TOR letter
(b)Date of Apply of EC 03 Sep 2018
(c)Date of Issue of EC 06 Mar 2019
(d)Previous EC Letter Copy of Previous EC letter
7.
Details of Public Consultation:
(a)Whether the Project Exempted from Public Hearing?No
(b)Whether details of Public Hearing available? Yes
(c)Whether Public hearing was presided over by an officer of the rank of Additional District Magistrate or above Yes
     7.1.       Details of Public Hearing
S. No.Details of Advertisement Details of Public Hearing Venue Location DetailsNo. of People AttendedIssues RaisedDesignation of Presiding OfficerOther Designation of Presiding Officer
(1.)
Date of Advertisement :13 Apr 2018
Copy of advertisement :Copy of Advertisement
Copy of Public Hearing :Copy of Public Hearing
Date :15 May 2018
Distance of Public Hearing Venue from the Proposed Project :2.9
Banjari Mata Temple premises
State :Chhattisgarh
District :Raigarh
Tehsil :Gharghoda
Village :Punjipathra
500regarding Environment Pollution, Solid waste disposal, Ground water permission, Crop damage, presence of Elephant Corridor, Silicosis, Employment.OthersAdditional District Magistrate
8.
Details of Project Configuration/Product:
Details Not Applicable
9.
In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii):
(a)Details of certified report on compliance of earlier environmental clearance condition
(i)Certified Compliance By SPCB
(ii)Details of Regional Office of MoEFCC / Zonal Office of CPCB / SPCB / UTPCC from which certified report on
(iii)Letter No. 3846/Tech-69/HO/CECB/2017
(iv)Status of Compliance Compiled
(v)Certified report on compliance of earlier environmental clearance conditions (Including Monitoring Report) Copy of Certified Compliance Report
(vi)Date of site visit Sep 12 2017 12:00AM
(b)Details of Capacity Expansion
S. No.Product/Activity (Capacity/Area)Quantity FromQuantity ToTotal UnitOther UnitMode of Transport / Transmission of ProductOther Mode of Transport / Transmission of Product
(1.)4.88144001440028800Tons per Annum(TPA)Road
(2.)4.8803000030000Tons per Annum(TPA)Road
(3.)4.88144001440028800Tons per Annum(TPA)Road
(4.)4.8801400014000Tons per Annum(TPA)Road
(c)Details of Configuration
S. No.Plant / Equipment / Facility Existing ConfigurationProposed ConfigurationFinal configuration after expansionRemarks
(1.)Ferro Alloys Unit1 x 9 mva SEAF1 x 9 mva SEAF2 x 9 mva SEAFNote : Briquetting plant is also proposed in the present proposal
9.1.
Details of Consent to Operate
(i)Whether Consent to operate obtained ? NA
(ii)Copies of all Consent to operate obtained since inception NA
(iii)Date of Issue 09 May 2018
(iv)Valid Upto 31 Oct 2020
(v)File No. 1458/TS/CECB/2018
(vi)Application No. 770696
(vii)Copy of Consent to operate valid as on date Copy of Consent to Operate
10.
Project Cost:
(a)Total Cost of the Project at current price level (in Crores) 13
(b) Funds Allocated for Environment Management (Capital) (in Crores) 2.51
(c) Funds Allocated Towards CER (Corporate Environment Responsibility) (in Crores) 0.325
(d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in Crores) 0.372
11.
Whether project attracts the General Condition specified in the Schedule of EIA Notification ? No
12.
Whether project attract the Specific Condition specified in the Schedule of EIA Notification ? No
13.
Raw Material / Fuel Requirement:
(a)Proposed quantity of raw material/fuel 40000
(b)Existing quantity of raw material/fuel 40000
(c)Total quantity of raw material/fuel 80000
    13.1.        Raw Material / Fuel Profile
S. No.Raw Material / Fuel QuantityUnitOther UnitSource (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received )Mode of TransportOther Mode of TransportDistance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received)Type of Linkage Other Type of Linkage Uploaded Copy of Linkage
(1.)Quartz8450Tons per AnnumLocalRoad50 Open MarketCopy of Linkage
(2.)Chrome Ore40000Tons per AnnumSukinda (Odisha) Import (Indonesia)Road400 Open MarketCopy of Linkage
(3.)Mn ore42500Tons per AnnumBalaghat (M.P.) Imported from South AfricaRoad,Rail500 Open MarketCopy of Linkage
14.
Baseline Data :
(a)Period of Base Line Data Collection FROM 01 Mar 2017 To 31 May 2017
(b)Season Summer
    14.1.     No. of ambient Air Quality (AAQ) monitoring locations : 8
S. No.Criteria Pollutants Other Criteria PollutantsUnitMaximum ValueMinimum Value98 Percentile ValuePrescribed Standard
(1.)SO2Micro Gram per Meter Cube20.56.920.580
(2.)OthersCOMicro Gram per Meter Cube120546012052000
(3.)NOxMicro Gram per Meter Cube27.17.227.180
(4.)PM2.5Micro Gram per Meter Cube41.317.541.360
(5.)PM10Micro Gram per Meter Cube72.631.872.6100
    14.2.     No. of Ground Water monitoring locations : 8
S. No.Criteria Pollutants Other Criteria PollutantsHeavy MetalUnitOther UnitMaximum ValueMinimum ValueDesirable LimitMaximum Permissible Limit
(1.)pHOthersNA7.77.200
(2.)Fluoridemg/l0.50.351.01.5
(3.)Heavy MetalsArsenicmg/l0.0010.0010.010.01
(4.)TDSmg/l4052595002000
(5.)Total Hardnessmg/l273217300600
(6.)TSSmg/l1.51510
(7.)Chloridesmg/l1921192501000
    14.3.     No. of Surface Water monitoring locations : 6
S. No.Criteria Pollutants Other Criteria PollutantsUnitOther UnitMaximum ValueMinimum ValueClassification of inland water body
(1.)pHmg/l8.07.2A
(2.)DOmg/l5.03.8A
(3.)CODmg/l198A
(4.)BODmg/l21.5A
    14.4.     No. of Ambient Noise monitoring locations : 8
S. No.Parameter UnitMaximum ValueMinimum ValuePrescribed Standard
(1.)Leq(Day)A-weighted decibels(dB(A))614075
(2.)Leq(Night)A-weighted decibels(dB(A))463270
    14.5.     No. of Soil Sample Monitored locations : 8
S. No.Parameter UnitOther UnitMaximum ValueMinimum Value
(1.)pHOthersNA7.47.2
(2.)K(Potassium)Kilogram per hectare310158
(3.)N(Nitrogen)Kilogram per hectare265139
(4.)P(Phosphorus)Kilogram per hectare7536
(5.)Electric ConductivityMillisiemens per Centimetre162112
14.6.
Details of Ground Water Table:
(a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) From 14 To 3
(b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) From 2 To 6
(c)Whether Ground Water Intersection will be there ? Yes
(d)Upload Copy of Central Ground Water Authority Letter Copy of Central Ground Water Authority Letter
(e)Letter No. 21-4/613/CT/IND/2017
(f)Date of Issue 03 Aug 2018
     15.      Details of Water Requirement (During Operation)
S. No.Source Source Other Required Quantity (Kilolitre per Day (Kld))Distance from SourceCopy of Permission from Competent Authority Mode of TransportOther Mode of TransportMethod of Water WithdrawalOther Method of Water WithdrawalLetter No.Date of IssuePermitted Quantity
(1.)GroundWater600Copy of Permission LetterPipelineTube Well21-4/613/CT/IND/201703 Aug 201860
15.1.
(a)Whether Desalination is proposed No
    16.       Waste Water Management(During Operation)
S. No.Type/Source Quantity of Waste Water Generated (Kilolitre per Day)Treatment Capacity (Kilolitre per Day) Treatment MethodMode of DisposalOther Mode of DisposalQuantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day)Quantity of Discharged Water (Kilolitre per Day)
(1.)Sanitary wastewater000OthersSeptic Tank followed by Subsurface dispersion00
16.1.
(a)Total Waste Water Generation (Kilolitre per Day) 0
(b)Total Discharged Water (Kilolitre per Day) 0
(c)Total Reused Water (Kilolitre per Day) 0
    17.       Solid Waste Generation/Management
S. No.Name of Waste Item Other ItemQuantity per AnnumUnitDistance from Site(KM)Mode of TransportOther Mode of TransportMode of DisposalOther Mode of Disposal
(1.)SiMn SlagIndustrial Waste11300Tons100RoadOthersEnd users
(2.)FeMn SlagIndustrial Waste9000Tons0RoadCo-Processing
(3.)FeCr SlagIndustrial Waste12000Tons5RoadOtherscommon disposal yard within the Industrial Park
(4.)FeSi SlagIndustrial Waste238Tons100RoadOthersEnd users
18.
    18.1.     Air Quality Impact Prediction
S. No.Criteria Pollutants Other Criteria PollutantsUnitBaseline ConcentrationDistance GLCIncremental ConcentrationTotal GLCPrescribed Standard
(1.)PM10Microgram per Meter Cube72.45000.9373.88100
(2.)PM2.5Microgram per Meter Cube41.35000.9342.2360
(3.)SO2Microgram per Meter Cube20.4500020.480
(4.)NOxMicrogram per Meter Cube27.05009.036.080
(5.)Others(Specify)COMicrogram per Meter Cube11955000.71195.72000
    18.2.     Stack Details
S. No.Source FuelStack Height(m)Stack Diameter(m)PollutantsOther PollutantsEmission (GLS)
(1.)FurnaceElectricity301.2SO20
(2.)FurnaceElectricity301.2NOx6.0
(3.)FurnaceElectricity301.2PM100.6
19.
Power Requirement:
(a)Quantity (Kilo Volt Amps (kVA)) 9000
(b)Source Power required for existing as well proposed Subme
(c)Uploaded Copy of Agreement Copy of Agreement
(d)Standby Arrangement (Details of DG Sets) 125 kva
(e)Stack Height (in m) 7
20.
Land Ownership Pattern:
(a)Forest Land (ha.) 0
(b)Private Land (ha.) 0
(c)Government Land (ha.) 0
(d)Revenue Land (ha.) 0
(e)Other Land (ha.) 4.88
    Total Land (ha.) 4.88
21.
Present Land Use Breakup of the Study Area in Ha:
(a)Agriculture Area (ha.) 0
(b)Waste/Barren Land (ha.) 0
(c)Grazing/ Community Land (ha.) 0
(d)Surface Water Bodies (ha.) 0
(e)Settlements (ha.) 0
(f)Industrial (ha.) 4.88
(g)Forest (ha.) 0
(h)Mangroves (ha.) 0
(i)Marine Area (ha.) 0
(j)Others (ha.) : Industrial land 0
    Total (ha.) 4
    22.     Land requirement for various activities
S. No.Description of Activity / Facility / Plant / Others OthersLand Requirement (ha.)Remarks
(1.)Main Plant1.21
(2.)OthersInternal Road0.61Internal Road
(3.)Green belt1.62
(4.)Built Up Area1.44
Total (ha.) 4.88
23.
Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Sanctuaries; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones :
    23.1.     Details of Ecological Sensitivity :
S. No.Details of Ecological Sensitivity NameDistance from the Project (Km)Remarks
(1.)Critically Polluted AreaNil0None within 10 Kms. radius
(2.)NPANil0None within 10 Kms. radius
(3.)ESAsNil0None within 10 Kms. radius
(4.)ESZsNil0None within 10 Kms. radius
(5.)CorridorsNil0None within 10 Kms. radius
(6.)Wildlife CorridorsElephant movement10movement of Elephants is observed within 10 Kms. radius of the plant, as per the secondary source. Conservation plan is prepared
(7.)WLSNil0None within 10 Kms. radius
    23.2.     Details of Environmental Sensitivity :
S. No.Details of Environmental Sensitivity Other Details of Environmental Sensitivity NameDistance from the Project (Km)Remarks
(1.)Archaeological SitesNil0None within 10 Kms. radius
(2.)ForestTaraimal RF0.3Reserved Forest
(3.)Defence InstallationsNil0None within 10 Kms. radius
23.3.
(a)Whether Noc / Permission from the competent authority is required? No
(b)Whether NBWL recommendation is required? No
24.
Forest Land:
Whether any Forest Land involved? No
25.
Tree Cutting:
(a)No. of Trees Cut for the Project (if Forest Land not Involved) 0
(b)Details of Tree Cutting and Planting of Trees Not Applicable
26.
Land Acquisition Status:
(a)Acquired Land(Ha) 4.88
(b)Land yet to be acquired(Ha) 0
(c)Status of Land acquisition if not acquired total land is in possession of managment
27.
Rehabilitation and Resettlement (R&R):
(a)No. of Villages 0
(b)No. of Households 0
(c)No. of PDFs (Project Displaced Families) 0
(d)No. of PAFs (Project Affected Families) 0
(e)Funds Allocated for R&R(in INR) (in Lacs) 0
(f)Status of R&R Completed
28.
Details of Presence of Schedule-I Species:
(a)Whether there is Presence of Schedule-I Species ? Yes
(i)Details of Schedule-I Species Elephant movement
(b)Whether conservation plan for Schedule-I Species has been prepared ? Yes
(i)Uploaded copy of conservation plan Copy of conservation plan
(ii)Fund Provision made Rs. 30 Lakhs
(iii)Period of Implementation 2018-19 & 2019-20
(c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? Yes
(i)Uploaded copy of approval Copy of approval
(ii)Letter No. WL/Management-432/18/1829
(iii)Date of issue 07 Mar 2018
(iv)Recommendation NA
29.
Details of Presence of Water Bodies in Core Area:
(a)Whether there is Presence of Water Bodies in Core Area ? No
(b)Whether there is Diversion Required ? No
(c)Whether permission has been obtained from competent authority ? No
30.
Details of Presence of Water Bodies in Buffer Area:
(a)Whether there is Presence of Water Bodies in Buffer Area ? Yes
(i)Details of Water Bodies in Buffer Area Kelo River
(ii)Direction of Water Bodies in Buffer Area East
(iii)Distance of Water Bodies in Buffer Area 6.0
31.
Manpower Requirement:
(a)Permanent Employment-During Construction 0
(b)Permanent Employment-During Operation 40
(c)Temporary Employment- During Construction 75
(d)Temporary Employment- During Operation 25
(e)No. of working days 365
(f)Total Manpower 140
32.
Green Belt in Ha:
(a)Uploaded Green Belt plan Copy of Green Belt Plan
S. No.Description ExistingProposedTotal
(1.)Total Area of Green Belt1.010.611
(2.)Percentage of Total Project Area211233
(3.)No. of Plants150025254025
(4.)Funds Allocated50000150000200000
    33.       Project Benefits
S. No. Type of Project BenefitsDetails of Project Benefits
NIL
   34.   CRZ Specific Details : Not Applicable
   35.   Sector Specific Details : NOT APPLICABLE
   35.   Sector Specific Details For Industrial Projects - 1
S. No.Item Details
S. No.Item Details
36.
Details of Court Cases:
(a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? No
37.
Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act:
(a)Whether any Direction issued under EPA Act/Air Act/Water Act ? No
38.
Details of EIA Consultant:
(a)Have you hired Consultant for preparing document? Yes
(i)Accreditation No. NABET/ EIA/ 1619/ RA 026
(ii)Name of the EIA Consultant Pioneer Enviro and Consultants Private Limited
(iii)Address 6-3-652, Flat # 7-3, Dhruvatara Apartments, Amrutha Estates, Erramanjil, Somajiguda, Hyderabad- 500082
(iv)Mobile No. 9440677333
(v)Landline No. 0402331427
(vi)Email Id pelcpl@yahoo.co.in
(vii)Category of Accreditation A
(viii)Sector of Accreditation Industrial Projects - 1
(ix)Validity of Accreditation 22 Jun 2019
(x)Uploaded Certificate of Accreditation certified by QCI/NABET Copy of Certificate of Accreditation
39.
Documents to be Attached:
(a)Uploaded Copy of EIA/EMP Report Copy of EIA/EMP
(b)Uploaded Copy of Risk Assessment Report Copy of Risk Assessment
(c)Uploaded Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan
(d)Uploaded Copy of Final Layout Plan Copy of Final Layout Plan
(e)Uploaded Cover Letter Copy of Cover Letter
(f)Uploaded Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency
(g)Uploaded Additional File NA
(h)Uploaded Proposal Presentation (To be given in EAC meeting) NA
      Essential Detail Sought : NIL
            Additional Detail Sought:
Sno. ADS Letter Remarks Date of ADS
1. ADS Reply LetterRespected sir, With reference to the ADS letter vide dated 12th November 2018, we are here with submitting reply to the same for your kind perusal. 20 Dec 2018
2.NAAfter detailed deliberation, the Committee sought following additional information for further consideration of the proposal: 1. Revised time bound action plan on the issues raised during the public consultation along with budgetary provisions. 2. Revised Corporate Environment Responsibility based on the issues raised during the public hearing and Social Impact Assessment study. 3. Ambient Air Quality Data of OP Jindal Park for 2014-15 carried by Central Pollution Control Board and Comparison with the existing data. 4. Action plan for the recharging of ground water shall be submitted 5. Briquetting plant shall be envisaged for recycling of the fines generated during the operation. 6. Revised Corporate Environmental Policy prescribing standard procedure and hierarchal system for repor 12 Oct 2018
Undertaking
I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief. And I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity/ construction/ expansion has since been taken up.
Name of ApplicantSunil Agrawal
DesignationDirector
Name of Company (Applicant Name should not be given here)V A POWER AND STEEL PVT LTD
Addressc/o, Dr. G. S. Agrawal, Civil Lines, Raigarh