Form-2
APPLICATION FOR PRIOR ENVIRONMENTAL CLEARANCE
S. No.Item Details
1.
Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? No
Details of Project:
(a)Name of the project(s) BOULDER, GRAVEL & SAND MINE “RATTEWALI BLOCK – PKL – B – 10”
(b)Name of the Company / Organisation M/S TIRUPATI ROADWAYS
(c)Registered Address 3, Sadashiv properties, Katras Road, Bank More, Dhanbad, Jharkhand,,Dhanbad,Jharkhand-826001
(d)Legal Status of the Company Others
(e)Joint Venture No
2.
Address for the correspondence:
(a)Name of the Applicant Gurpreet Sabharwal
(b)Designation (Owner/ Partner/ CEO) Proprietor
(c)Address 3, sadashiv properties, katras road, Bank More, Dhanbad,,Dhanbad-Cum-Kenduadih-Cum-Jagta,Dhanbad,Jharkhand-826001
(d)Pin code 826001
(e)E-mail sabharwalgurpreet4@gmail.com
(f)STD Code. 124(f)Telephone No. 4291036
(g)Fax No.
(h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . Annexure-Uploaded Copy of documents in support of the competence/authority
3.
Category of the Project/Activity as per Schedule of EIA Notification,2006:
(a.I)Project/Activity1(a) Mining of minerals
Minor Activity
(b)Category A
(c)Proposal Number IA/HR/MIN/66257/2017
(d)Master Proposal Number(Single Window) SW/77340/2018
(e)EAC concerned (for category A Projects only) Non-Coal Mining
(f)Project Type Fresh EC
4.
Location of the Project:
(a)Plot/Survey/Khasra No. Min 141
(b)Pincode 134118
(c)Bounded Latitudes (North)
From
Degree 3391669.13
Minutes
Second
From
Degree 3393271.00
Minutes
Second
(d)Bounded Longitudes (East)
From
Degree 690573.25
Minutes
Second
From
Degree 691333.00
Minutes
Second
(e)Survey of India Topo Sheet No. 53 B/14
(f)Uploaded Topo Sheet File Copy of Topo Sheet File
(g)Maximum Elevation Above Means Sea Level(AMSL) 376
(h)Uploaded (kml) File Copy of Kml File      
(i)Distance of Nearest HFL from the project boundary within the study area 00
(j)Seismic Zone 4
5.
(a)Number of States in which Project will be Executed 1
(b)Main State of the project Haryana
Details of State(s) of the project
S. No. State Name District Name Tehsil Name Village Name
(1.)HaryanaPanchkulaPanchkulaRattewali
(2.)HaryanaPanchkulaPanchkula
6.
Details of Terms of Reference (ToR):
(a)MoEF&CC / SEIAA File Number J-11015/75/2017-IA-II(M)
(b)Date of Apply of TOR 18 Jul 2017
(c)Date of Issue of TOR / Standard ToR 14 Sep 2017
(d)Previous TOR Letter Copy of Previous TOR letter
7.
Details of Public Consultation:
(a)Whether the Project Exempted from Public Hearing?No
(b)Whether details of Public Hearing available? Yes
(c)Whether Public hearing was presided over by an officer of the rank of Additional District Magistrate or above Yes
     7.1.       Details of Public Hearing
S. No.Details of Advertisement Details of Public Hearing Venue Location DetailsNo. of People AttendedIssues RaisedDesignation of Presiding OfficerOther Designation of Presiding Officer
(1.)
Date of Advertisement :14 Mar 2018
Copy of advertisement :Copy of Advertisement
Copy of Public Hearing :Copy of Public Hearing
Date :17 Apr 2018
Distance of Public Hearing Venue from the Proposed Project :0
At site in village - Rattewali, tehsil - Barwala, district - Panchkula
State :Haryana
District :Panchkula
Tehsil :Panchkula
Village :Rattewali
92Provision of road for mineral transportation, measures for dust suppression, employment, CER, compensation to land owners.OthersAdditional District Magistrate
8.
Details of Project Configuration/Product:
     8.1.       Project Configuration
S. No.Plant/Equipment/FacilityConfigurationRemarks
(1.)Water Tanker5000 Lts5
(2.)Light Vehicles--5
(3.)Excavators and Pay Loader0.9 to 1.2m35
(4.)Tippers/ Trucks25 Tonne25
     8.2.       Product
S. No.Product/Activity (Capacity/Area)QuantityUnitOther UnitMode of Transport / Transmission of ProductOther Mode of Transport / Transmission of Product
(1.)Boulder Gravel and Sand/ 1a (1900000 TPA/ 45 Ha.)1900000Tons per AnnumRoad
9.
In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii):
Details Not Applicable
9.1.
Details of Consent to Operate
(i)Whether Consent to operate obtained ? NA
(ii)Copies of all Consent to operate obtained since inception NA
(iii)Date of Issue N/A
(iv)Valid Upto N/A
(v)File No. NA
(vi)Application No. NA
(vii)Copy of Consent to operate valid as on date NA
10.
Project Cost:
(a)Total Cost of the Project at current price level (in Crores) 7.0
(b) Funds Allocated for Environment Management (Capital) (in Crores) 0.44
(c) Funds Allocated Towards CER (Corporate Environment Responsibility) (in Crores) 0.45
(d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in Crores) 0.30
11.
Whether project attracts the General Condition specified in the Schedule of EIA Notification ? Yes
a)Protected areas notified under the wildlife (Protection) Act, 1972 Yes
d)Inter-State boundaries and international boundaries Yes
12.
Whether project attract the Specific Condition specified in the Schedule of EIA Notification ? No
13.
Raw Material / Fuel Requirement:
(a)Proposed quantity of raw material/fuel 0
(b)Existing quantity of raw material/fuel N/A
(c)Total quantity of raw material/fuel 0
    13.1.        Raw Material / Fuel Profile
S. No.Raw Material / Fuel QuantityUnitOther UnitSource (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received )Mode of TransportOther Mode of TransportDistance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received)Type of Linkage Other Type of Linkage Uploaded Copy of Linkage
(1.)HSD134000Kilo Litre per DayNearby Diesel and Petrol PumpRoad1 Open MarketCopy of Linkage
14.
Baseline Data :
(a)Period of Base Line Data Collection FROM 01 Oct 2017 To 31 Dec 2017
(b)Season Post-Monsoon
    14.1.     No. of ambient Air Quality (AAQ) monitoring locations : 7
S. No.Criteria Pollutants Other Criteria PollutantsUnitMaximum ValueMinimum Value98 Percentile ValuePrescribed Standard
(1.)PM10Micro Gram per Meter Cube103.854.2101.35100
(2.)NOxMicro Gram per Meter Cube38.612.735.4580
(3.)PM2.5Micro Gram per Meter Cube64.139.661.7060
(4.)SO2Micro Gram per Meter Cube13.24.312.7580
    14.2.     No. of Ground Water monitoring locations : 6
S. No.Criteria Pollutants Other Criteria PollutantsHeavy MetalUnitOther UnitMaximum ValueMinimum ValueDesirable LimitMaximum Permissible Limit
(1.)TSSmg/l0000
(2.)OthersCoppermg/l0.120.050.0515
(3.)Fluoridemg/l0.940.321.01.5
(4.)Total Hardnessmg/l289.8168.3300600
(5.)Chloridesmg/l98.3730.762501000
(6.)Heavy MetalsZnmg/l0.790.48515
(7.)pHNA8.207.868.59
(8.)TDSmg/l5213075002000
    14.3.     No. of Surface Water monitoring locations : 5
S. No.Criteria Pollutants Other Criteria PollutantsUnitOther UnitMaximum ValueMinimum ValueClassification of inland water body
(1.)pHNA7.867.42C
(2.)OthersTOTAL COALIFORMOthersMPN/100ml348240C
(3.)DOmg/l7.46.7C
(4.)BODmg/l6.125.21C
(5.)CODmg/l20.1312.0C
    14.4.     No. of Ambient Noise monitoring locations : 7
S. No.Parameter UnitMaximum ValueMinimum ValuePrescribed Standard
(1.)Leq(Night)A-weighted decibels(dB(A))56.3242.6670
(2.)Leq(Day)A-weighted decibels(dB(A))63.5651.675
    14.5.     No. of Soil Sample Monitored locations : 6
S. No.Parameter UnitOther UnitMaximum ValueMinimum Value
(1.)pHOthersNA7.827.32
(2.)K(Potassium)Kilogram per hectare116.3589.63
(3.)Electric ConductivityMillisiemens per Centimetre0.4360.398
(4.)N(Nitrogen)Kilogram per hectare263233.26
(5.)P(Phosphorus)Kilogram per hectare19.148.23
14.6.
Details of Ground Water Table:
(a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) From 10.0 To 8.0
(b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) From 10.0 To 8.0
(c)Whether Ground Water Intersection will be there ? NA
     15.      Details of Water Requirement (During Operation)
S. No.Source Source Other Required Quantity (Kilolitre per Day (Kld))Distance from SourceCopy of Permission from Competent Authority Mode of TransportOther Mode of TransportMethod of Water WithdrawalOther Method of Water WithdrawalLetter No.Date of IssuePermitted Quantity
(1.)GroundWater300Copy of Permission LettermodeOthersTankar SupplyTube WellNil26 Apr 201830
15.1.
(a)Whether Desalination is proposed No
    16.       Waste Water Management(During Operation)
S. No.Type/Source Quantity of Waste Water Generated (Kilolitre per Day)Treatment Capacity (Kilolitre per Day) Treatment MethodMode of DisposalOther Mode of DisposalQuantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day)Quantity of Discharged Water (Kilolitre per Day)
(1.)Domestic Waste Water1.8752.5Mobile Sewage Treatment PlantOthersPlantation1.8750
16.1.
(a)Total Waste Water Generation (Kilolitre per Day) 1.875
(b)Total Discharged Water (Kilolitre per Day) 0
(c)Total Reused Water (Kilolitre per Day) 1.875
    17.       Solid Waste Generation/Management
S. No.Name of Waste Item Other ItemQuantity per AnnumUnitDistance from Site(KM)Mode of TransportOther Mode of TransportMode of DisposalOther Mode of Disposal
(1.)Municipal Solid WasteMunicipal Solid Waste1.9564Tons12.14RoadOthersMunicipal Corporation, Panchkula (Haryana)
18.
    18.1.     Air Quality Impact Prediction
S. No.Criteria Pollutants Other Criteria PollutantsUnitBaseline ConcentrationDistance GLCIncremental ConcentrationTotal GLCPrescribed Standard
(1.)SO2Microgram per Meter Cube00000
(2.)PM10Microgram per Meter Cube98.356.42104.7100
(3.)PM2.5Microgram per Meter Cube59.253.80763.060
(4.)NOxMicrogram per Meter Cube38.650.0438.680
    18.2.     Stack Details
S. No.Source FuelStack Height(m)Stack Diameter(m)PollutantsOther PollutantsEmission (GLS)
(1.)0000PM100
19.
Power Requirement:
(a)Quantity (Kilo Volt Amps (kVA)) 0
(b)Source NA
(c)Uploaded Copy of Agreement Not Applicable
(d)Standby Arrangement (Details of DG Sets) NA
(e)Stack Height (in m) 0
20.
Land Ownership Pattern:
(a)Forest Land (ha.) 0
(b)Private Land (ha.) 0
(c)Government Land (ha.) 45
(d)Revenue Land (ha.) 0
(e)Other Land (ha.) 0
    Total Land (ha.) 45.0
21.
Present Land Use Breakup of the Study Area in Ha:
(a)Agriculture Area (ha.) 0
(b)Waste/Barren Land (ha.) 0
(c)Grazing/ Community Land (ha.) 0
(d)Surface Water Bodies (ha.) 0
(e)Settlements (ha.) 0
(f)Industrial (ha.) 0
(g)Forest (ha.) 0
(h)Mangroves (ha.) 0
(i)Marine Area (ha.) 0
(j)Others (ha.) : 45 45
    Total (ha.) 45
    22.     Land requirement for various activities
S. No.Description of Activity / Facility / Plant / Others OthersLand Requirement (ha.)Remarks
(1.)Ash Pond0
(2.)OB Dump Area0
(3.)Tailing Pond0
(4.)LandFill0
(5.)Water Reservoir0
(6.)Desalination Plant0
(7.)Area for Solid Waste Management0
(8.)Quarry Area31.67
(9.)Safety Zone13.33
(10.)Green belt020.97 Ha out side lease area
Total (ha.) 45
23.
Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Sanctuaries; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones :
    23.1.     Details of Ecological Sensitivity :
S. No.Details of Ecological Sensitivity NameDistance from the Project (Km)Remarks
(1.)WLSKhol Hai Raitan1.98Online application submitted vide proposal no. FP/HR/MIN/1851/2017 dated 09.03.2018
(2.)NPANA0None Within the Study Area
(3.)ESZsNA0None Within the Study Area
(4.)CorridorsNA0None Within the Study Area
(5.)Critically Polluted AreaNA0None Within the Study Area
(6.)ESAsNA0None Within the Study Area
(7.)Wildlife CorridorsNA0None Within the Study Area
    23.2.     Details of Environmental Sensitivity :
S. No.Details of Environmental Sensitivity Other Details of Environmental Sensitivity NameDistance from the Project (Km)Remarks
(1.)Archaeological SitesNA0None within study area
(2.)Defence InstallationsNA0None within study area
(3.)ForestPalasra PF2.3NW
23.3.
(a)Whether Noc / Permission from the competent authority is required? No
(b)Whether NBWL recommendation is required? Yes
(i)Status of NBWL NIL
24.
Forest Land:
Whether any Forest Land involved? No
25.
Tree Cutting:
(a)No. of Trees Cut for the Project (if Forest Land not Involved) 0
(b)Details of Tree Cutting and Planting of Trees Not Applicable
26.
Land Acquisition Status:
(a)Acquired Land(Ha) 45
(b)Land yet to be acquired(Ha) 0
(c)Status of Land acquisition if not acquired LOI issued by State Govt.
27.
Rehabilitation and Resettlement (R&R):
(a)No. of Villages 0
(b)No. of Households 0
(c)No. of PDFs (Project Displaced Families) 0
(d)No. of PAFs (Project Affected Families) 0
(e)Funds Allocated for R&R(in INR) (in Lacs) 0
(f)Status of R&R Yet To Start
28.
Details of Presence of Schedule-I Species:
(a)Whether there is Presence of Schedule-I Species ? Yes
(i)Details of Schedule-I Species Pavo cristatus, Python molurus, and Panthera pardus
(b)Whether conservation plan for Schedule-I Species has been prepared ? Yes
(i)Uploaded copy of conservation plan Copy of conservation plan
(ii)Fund Provision made 15 Lacs
(iii)Period of Implementation 5 years
(c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? Yes
(i)Uploaded copy of approval Copy of approval
(ii)Letter No. 1912
(iii)Date of issue 30 Aug 2018
(iv)Recommendation NA
29.
Details of Presence of Water Bodies in Core Area:
(a)Whether there is Presence of Water Bodies in Core Area ? Yes
(i)Details of Water Bodies in Core Area Its a river sand mine project.
(b)Whether there is Diversion Required ? No
(c)Whether permission has been obtained from competent authority ? No
30.
Details of Presence of Water Bodies in Buffer Area:
(a)Whether there is Presence of Water Bodies in Buffer Area ? Yes
(i)Details of Water Bodies in Buffer Area Mattanwali
(ii)Direction of Water Bodies in Buffer Area West
(iii)Distance of Water Bodies in Buffer Area 3.6
31.
Manpower Requirement:
(a)Permanent Employment-During Construction 0
(b)Permanent Employment-During Operation 73
(c)Temporary Employment- During Construction 0
(d)Temporary Employment- During Operation 0
(e)No. of working days 268
(f)Total Manpower 73
32.
Green Belt in Ha:
(a)Total Area of Green Belt 20.97
(b)Percentage of Total Project Area 46.60
(c)No. of Plants to be Planted 31455
(d)Funds Allocated for Plantation 3805813
(e)Uploaded Green Belt plan Copy of Green Belt Plan
    33.         Project Benefits
S. No.Type of Project Benefits Details of Project Benefits
(1.)SocialEmployment to the 63 local people will be provided
(2.)Environmental22300 saplings will be planted
(3.)FinancialAn amount of Rs-11,72,50,000 will be submitted every year to the state govt. as royalty
   34.   CRZ Specific Details : Not Applicable
   35.   Sector Specific Details For Non-Coal Mining
S. No.Item Details
     1.       No. of Mineral(s) to be Mined : 1
S. No.Mineral(s) to be Mined Major or Minor Mineral
(1.)Boulder, Gravel and SandMinor
2.
Mine Capacity in ROM (Run of Mine) 1900000
3.
Uploaded 500 meters Cluster Certificate from State Mines and Geology in case of minor minerals Copy of 500 meters Cluster Certificate from State Mines and Geology
4.
Mining Plan:
(a)Approval Letter No. DMG/HY/MP/RATTEWALI BLOCK/ PKL B 10/ 2017/ 3989-92
(b)Date of Approval 07 Aug 2018
(c)Approved Letter Copy of Approved Letter
(d)Approved By State Mining and Geology Department STATE MINING DEPARTMENT
(e)Approved Mining Lease Area 45
(f)Approved Capacity 1900000
5.
Technical Details:
(a)Total Geological Reserves (Million Ton) 3.51
(b)Mineable Reserves (Million Ton) 2.37
(c)Extractable Reserves(Million Ton) 1.90
(d)Percent(%) of Extraction 100
(e)Grade of Coal /Ore /Mineral 100
(f)Stripping Ratio 0 : 0
(g)Category of Gaseousness (Only for Coal Mining, Others may Write NA) SAND MINING
(h)Average Gradient(Degree) 100
(i)Mining Method Opencast
(j)Life of Mine (Years) 7
6.
Details of Beneficiations:
(a)Whether it is proposed to install beneficiation plant/Coal washery within the mining lease area No
(b)Whether it is proposed to install crusher within the mining lease area No
7.
Details of Seams:
(a)Whether details of seam applicable No
8.
Details of Mining Lease:
(a)Mining Lease Area (in Hectare) 45
(b)Whether obtained Letter of Intent (LOI) from the state government ? Yes
(i)Copy of Letter of Intent Copy of Letter of Intent
(ii)Date of issue of LOI 16 Jun 2017
(iii)Validity of LOI 7
(iv)Reference No. of LOI DMG/HY/CONT./RATTEWALI BLOCK/ PKL B 10/ 2017/ 2658
(c)Whether Lease Deed Executed ? No
(i)Reason thereof IT WILL BE EXECUTED AFTER SANCTION OF EC.
(d)Whether Lease Deed Renewed ? No
(i)Reason thereof IT HAS NOT BEEN GRANTED YET.
9.
OB (Over Burden) Management:
(a) Details of External Dumps:
(i)No. of OB Dumps 0
(ii)Total Area (in Hectare) 0
(iii)Height (in meter) 0
(iv)Quantity (in Million Cubic meter) 0
(v)No. of year back fill up 0
(b) Details of Internal Dumps:
(i)No. of Internal Dumps 0
(ii)Total Area (in Hectare) 0
(iii)Height (in meter) 0
(iv)Quantity (in Million Cubic meter) 0
10.
Details of Topsoil Management:
(a)Quantity of Topsoil excavated during the entire life of the mine (in Million Cubic metre) 0
(b)Quantity of Topsoil proposed for utilization for reclamation during the entire life of the mine (in Million Cubic metre) 0
(c)Quantity of Topsoil proposed for utilization for other activities during the entire life of the mine (in Million Cubic metre) 0
11.
Details of Final Mine Void:
(a)Area (in Hectare) 31.67
(b)Depth (in meter) 3
(c)Volume (in Million Cubic meter) 1900000
12.
Details of Quarry:
(a)Final Void of 31.67 (hectare) at a Depth of 3 meter which is Proposed to be Converted into a Water Body.
(b)Total Quarry Area (ha) 45
13.
Details of Transportation:
(a)In Pit/Underground to Surface by trippers
(b)Surface to Siding/Loading not applicable
(c)Transportation / Conveyor Details by road
     14.      Details of Land Usage (Pre-Mining)
S. No.LAND USE Other LAND USEWITHIN ML AREA (Hectare)OUTSIDE ML AREA (Hectare)TOTAL (Hectare)
(1.)FOREST LAND000
(2.)WASTE LAND000
(3.)GRAZING LAND000
(4.)SURFACE WATER BODIES000
(5.)AGRICULTURE LAND000
(6.)SETTLEMENTS000
TOTAL000
     15.      Details of Land Usage (Post-Mining)
S. No.LAND USE Other LAND USEPlantation (ha)Water Body (ha)Public Use (ha)Undisturbed (ha)Total
(1.)EXCAVATION/QUARRY0000
(2.)TOP SOIL STORAGE0000
(3.)INTERNAL OB DUMPS0000
(4.)ROADS0000
(5.)BUILT UP AREA (COLONY/OFFICE)0000
(6.)VIRGIN AREA0000
(7.)GREEN BELT0000
(8.)EXTERNAL OB DUMPS0000
TOTAL00000
16.
Details of Reclamation:
Total Afforestation Plan shall be Implemented Covering of Mining.
This will Include:
(a)External OB Dump(in hectare) 0
(b)Internal Dump(in hectare) 0
(c)Quarry(in hectare) 31.67
(d)Safety Zone(in hectare) 13.33
(e)Final Void of 0 (hectare) at a Depth of 0 meter which is Proposed to be Converted into a Water Body.
(f)Density of Tree Plantation per ha (in no.) 1500
(g)Others in ha (such as Excavation Area along ML Boundary, along Roads and Infrastructure, Embankment Area and in Township Located Outside the Lease etc) 0
(h)Total afforestation plant (in hectare) 20.97
17.
Status of progressive Mining Closure Plan:
Details Not Applicable
     18.      Details of Actual Coal/ ORE Production vis-a-vis Sanctioned Capacity since the Inception:
S. No.Financial Year Sanctioned Capacity as per EC (MTPA)Sanctioned Capacity as per CTOSanctioned Capacity as per approved mining planActual Production Excess Production Beyond the EC / CTO/ Mining Plan Sanctioned Capacity (MTPA)
(1.)000000
S. No.Item Details
36.
Details of Court Cases:
(a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? No
37.
Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act:
(a)Whether any Direction issued under EPA Act/Air Act/Water Act ? No
38.
Details of EIA Consultant:
(a)Have you hired Consultant for preparing document? Yes
(i)Accreditation No. 45
(ii)Name of the EIA Consultant ENKAY ENVIRO SERVICES PVT. LTD.
(iii)Address # 92, HEERANAGAR -A, NEAR SHALIMAR BAGH, AJMER ORAD, JAIPUR
(iv)Mobile No. 9314363996
(v)Landline No. 0141235499
(vi)Email Id info@enkayenviro.com
(vii)Category of Accreditation A
(viii)Sector of Accreditation Non-Coal Mining
(ix)Validity of Accreditation 06 Nov 2018
(x)Uploaded Certificate of Accreditation certified by QCI/NABET Copy of Certificate of Accreditation
39.
Documents to be Attached:
(a)Uploaded Copy of EIA/EMP Report Copy of EIA/EMP
Copy of EIA/EMP(Annexures)
Copy of EIA/EMP(Plans/Figures)
(b)Uploaded Copy of Risk Assessment Report Copy of Risk Assessment
(c)Uploaded Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan
(d)Uploaded Copy of Final Layout Plan Copy of Final Layout Plan
(e)Uploaded Cover Letter Copy of Cover Letter
(f)Uploaded Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency
(g)Uploaded Copy of District Survey Report Copy of District Survey Report
(h)Uploaded Copy of Replenishment Study Report & Baseline Survey Data Copy of Replenishment Study Report & Baseline Survey Data
(i)Uploaded Additional File Copy of Additional File
(j)Uploaded Proposal Presentation (To be given in EAC meeting) NA
            Essential Detail Sought:
Sno. EDS Letter Remarks Date of EDS
1.NAThe Ministry has sought clarification from DMG, Haryana on 20.08.2018 regarding mining in Rattewali. The reply from DMG is yet to be received by the Ministry. The proposal could only be consider after receiving the reply from DMG. 10 Sep 2018
2.NAThe correction have been made as per the instruction received 02 Nov 2018
3.NAPP vide email dated 27/11/2018 requested to generate an EDS or put the proposal on edit mode so that corrections in the report can be made. 29 Nov 2018
4.NAThe correction have been made as per the instruction received 30 Nov 2018
            Additional Detail Sought:
Sno. ADS Letter Remarks Date of ADS
1. ADS Reply LetterRespected Sir, Point-wise reply to ADS is enclosed. 03 Aug 2019
2.NAIt is requested to upload information as sought by EAC in its meeting held on 20-21 January, 2019 02 Aug 2019
3. ADS Reply LetterDear Sir, enclosed is the reply to query in form of Addendum to EIA. Kindly consider in the forthcoming EAC meeting and oblige. 30 Mar 2019
4.NANA 01 Feb 2019
Undertaking
I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief. And I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity/ construction/ expansion has since been taken up.
Name of ApplicantGurpreet Sabharwal
DesignationProprietor
Name of Company (Applicant Name should not be given here)M/S TIRUPATI ROADWAYS
Address3, Sadashiv properties, Katras Road, Bank More, Dhanbad, Jharkhand