Form-2
APPLICATION FOR PRIOR ENVIRONMENTAL CLEARANCE
S. No.Item Details
1.
Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? No
Details of Project:
(a)Name of the project(s) Integrated Common Hazardous Waste Treatment Storage & Disposal Facility at EPIP SIPCOT, Pappankuppam (V) Gummidipoondi (T), Tiruvallur (D), Tamil Nadu by Tamil Nadu Waste Management Limited
(b)Name of the Company / Organisation TAMIL NADU WASTE MANAGEMENT LIMITED
(c)Registered Address Tamil Nadu Waste Management Limited, Level- 4, Diamond Dune, 323, NH 4, Aminjikarai, Chennai,,Chennai,Tamil Nadu-600029
(d)Legal Status of the Company Private
(e)Joint Venture No
2.
Address for the correspondence:
(a)Name of the Applicant CHINATIRUPATIREDDY EEVURI
(b)Designation (Owner/ Partner/ CEO) PROJECTINCHARGE
(c)Address Tamil Nadu Waste Management Limited, Level - 4, Diamond Dune, 323, NH 4, Aminjikarai, Chennai,,Egmore Numgambakkam,Chennai,Tamil Nadu-600029
(d)Pin code 600029
(e)E-mail treddy@ramky.com
(f)STD Code. 44(f)Telephone No. 48563998
(g)Fax No.
(h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . Annexure-Uploaded Copy of documents in support of the competence/authority
3.
Category of the Project/Activity as per Schedule of EIA Notification,2006:
(a.I)Project/Activity7(d) Common hazardous waste treatment, storage and disposal facilities (TSDFs)
Minor Activity7(d) Common hazardous waste treatment, storage and disposal facilities (TSDFs)
(b)Category A
(c)Proposal Number IA/TN/MIS/74913/2018
(d)Master Proposal Number(Single Window) SW/77473/2018
(e)EAC concerned (for category A Projects only) INFRA-2
(f)Project Type Fresh EC
4.
Location of the Project:
(a)Plot/Survey/Khasra No. 1 to 33 and 124 to 150
(b)Pincode 601201
(c)Bounded Latitudes (North)
From
Degree 13.412
Minutes
Second
From
Degree 13.419
Minutes
Second
(d)Bounded Longitudes (East)
From
Degree 80.107
Minutes
Second
From
Degree 80.109
Minutes
Second
(e)Survey of India Topo Sheet No. D44O03
(f)Uploaded Topo Sheet File Copy of Topo Sheet File
(g)Maximum Elevation Above Means Sea Level(AMSL) 20
(h)Uploaded (kml) File Copy of Kml File      
(i)Distance of Nearest HFL from the project boundary within the study area 6.45
(j)Seismic Zone 3
5.
(a)Number of States in which Project will be Executed 1
(b)Main State of the project Tamil Nadu
Details of State(s) of the project
S. No. State Name District Name Tehsil Name Village Name
(1.)Tamil NaduTiruvallurGummidipoondi
6.
Details of Terms of Reference (ToR):
(a)Whether TOR is mandatory for submitting application Yes
(b)MoEF&CC / SEIAA File Number 10-43/2018-IA-III
(c)Date of Apply of TOR 09 May 2018
(d)Date of Issue of TOR / Standard ToR 27 Aug 2018
(e)Previous TOR Letter Copy of Previous TOR letter
7.
Details of Public Consultation:
(a)Whether the Project Exempted from Public Hearing?Yes
(b)Reason Project site is located in SIPCOT Industrial area
(c)Supporting Document Copy of Supporting Document
8.
Details of Project Configuration/Product:
     8.1.       Project Configuration
S. No.Plant/Equipment/FacilityConfigurationRemarks
(1.)ICHWTSDF66 acresArea
     8.2.       Product
S. No.Product/Activity (Capacity/Area)QuantityUnitOther UnitMode of Transport / Transmission of ProductOther Mode of Transport / Transmission of Product
(1.)Secured Landfill and Landfill After Treatment300000Tons per AnnumRoad
(2.)Incinerator HW and BMW1.5OthersTons per HourRoad
(3.)E Waste recycling facility16OthersTons per DayRoad
(4.)Plastic recycling facility2OthersTons per DayRoad
(5.)Spent solvent recovery facility5Kilo Litre per DayRoad
(6.)Alternative Fuel and Raw Material Waste50000Tons per AnnumRoad
(7.)Paper recycling facility2OthersTons per DayRoad
(8.)Waste oil or used oil recovery facility2Kilo Litre per DayRoad
(9.)Bio medical waste facility5OthersTons per DayRoad
9.
In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii):
Details Not Applicable
9.1.
Details of Consent to Operate
(i)Whether Consent to operate obtained ? NA
(ii)Copies of all Consent to operate obtained since inception NA
(iii)Date of Issue 02 Mar 2018
(iv)Valid Upto 31 Mar 2019
(v)File No. 180827833091
(vi)Application No. T2/TNPCB/F.0086GMP/RL/GMP/A/2018
(vii)Copy of Consent to operate valid as on date Copy of Consent to Operate
10.
Project Cost:
(a)Total Cost of the Project at current price level (in Crores) 80
(b) Funds Allocated for Environment Management (Capital) (in Crores) 9
(c) Funds Allocated Towards CER (Corporate Environment Responsibility) (in Crores) 0.8
(d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in Crores) 1.50
11.
Whether project attracts the General Condition specified in the Schedule of EIA Notification ? No
12.
Whether project attract the Specific Condition specified in the Schedule of EIA Notification ? No
13.
Raw Material / Fuel Requirement:
(a)Proposed quantity of raw material/fuel 1.2
(b)Existing quantity of raw material/fuel N/A
(c)Total quantity of raw material/fuel 1
    13.1.        Raw Material / Fuel Profile
S. No.Raw Material / Fuel QuantityUnitOther UnitSource (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received )Mode of TransportOther Mode of TransportDistance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received)Type of Linkage Other Type of Linkage Uploaded Copy of Linkage
(1.)Diesel1.2Kilo Litre per DayLocal DealersRoad5 Open MarketCopy of Linkage
14.
Baseline Data :
(a)Period of Base Line Data Collection FROM 02 Apr 2018 To 30 Jun 2018
(b)Season Summer
    14.1.     No. of ambient Air Quality (AAQ) monitoring locations : 10
S. No.Criteria Pollutants Other Criteria PollutantsUnitMaximum ValueMinimum Value98 Percentile ValuePrescribed Standard
(1.)SO2Micro Gram per Meter Cube22.910.322.980
(2.)OthersCOMicro Gram per Meter Cube7903907902000
(3.)PM10Micro Gram per Meter Cube74.548.674.5100
(4.)PM2.5Micro Gram per Meter Cube40.225.440.260
(5.)NOxMicro Gram per Meter Cube27.318.827.380
    14.2.     No. of Ground Water monitoring locations : 10
S. No.Criteria Pollutants Other Criteria PollutantsHeavy MetalUnitOther UnitMaximum ValueMinimum ValueDesirable LimitMaximum Permissible Limit
(1.)pHNA7.86.86.58.5
(2.)TDSmg/l10557255002000
(3.)Fluoridemg/l0.820.541.01.5
(4.)Heavy MetalsIronmg/l0.20.20.30.3
(5.)Total Hardnessmg/l398265200600
(6.)TSSmg/l5500
(7.)Chloridesmg/l2651232501000
    14.3.     No. of Surface Water monitoring locations : 1
S. No.Criteria Pollutants Other Criteria PollutantsUnitOther UnitMaximum ValueMinimum ValueClassification of inland water body
(1.)pHNA8.28.2A
(2.)DOmg/l2.52.5E
(3.)BODmg/l6565E
(4.)OthersTDSmg/l3934539345E
(5.)CODmg/l180180E
    14.4.     No. of Ambient Noise monitoring locations : 10
S. No.Parameter UnitMaximum ValueMinimum ValuePrescribed Standard
(1.)Leq(Day)A-weighted decibels(dB(A))61.752.655/65
(2.)Leq(Night)A-weighted decibels(dB(A))44.441.645/55
    14.5.     No. of Soil Sample Monitored locations : 10
S. No.Parameter UnitOther UnitMaximum ValueMinimum Value
(1.)pHOthersNA7.66.5
(2.)N(Nitrogen)Kilogram per hectare9454
(3.)Electric ConductivityMillisiemens per Centimetre385275
(4.)P(Phosphorus)Kilogram per hectare4019
(5.)K(Potassium)Kilogram per hectare211170
14.6.
Details of Ground Water Table:
(a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) From 10 To 13
(b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) From 10 To 4
(c)Whether Ground Water Intersection will be there ? No
     15.      Details of Water Requirement (During Operation)
S. No.Source Source Other Required Quantity (Kilolitre per Day (Kld))Distance from SourceCopy of Permission from Competent Authority Mode of TransportOther Mode of TransportMethod of Water WithdrawalOther Method of Water WithdrawalLetter No.Date of IssuePermitted Quantity
(1.)OthersSIPCOT Industrial Complex2500.5Copy of Permission LetterPipelineOthersBorewell/Tankers63021 Jul 2018250
15.1.
(a)Whether Desalination is proposed No
    16.       Waste Water Management(During Operation)
S. No.Type/Source Quantity of Waste Water Generated (Kilolitre per Day)Treatment Capacity (Kilolitre per Day) Treatment MethodMode of DisposalOther Mode of DisposalQuantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day)Quantity of Discharged Water (Kilolitre per Day)
(1.)Industrial6470Chemical treatment, sand filter and activated carbon filterReuse within the Plant & Recycling64
(2.)Domestic1820Soakpit/Mobile STPGreen Belt Renewal Plant18
16.1.
(a)Total Waste Water Generation (Kilolitre per Day) 82
(b)Total Discharged Water (Kilolitre per Day) 0
(c)Total Reused Water (Kilolitre per Day) 82
    17.       Solid Waste Generation/Management
S. No.Name of Waste Item Other ItemQuantity per AnnumUnitDistance from Site(KM)Mode of TransportOther Mode of TransportMode of DisposalOther Mode of Disposal
(1.)Incinerator AshHazardous Waste (as per Hazardous and Other Waste Management rules 2016)1600Tons0RoadSanitary Landfills
18.
    18.1.     Air Quality Impact Prediction
S. No.Criteria Pollutants Other Criteria PollutantsUnitBaseline ConcentrationDistance GLCIncremental ConcentrationTotal GLCPrescribed Standard
(1.)SO2Microgram per Meter Cube22.903.42580
(2.)NOxMicrogram per Meter Cube27.307.629.780
(3.)PM2.5Microgram per Meter Cube40.211.441.260
(4.)PM10Microgram per Meter Cube74.511.475.5100
    18.2.     Stack Details
S. No.Source FuelStack Height(m)Stack Diameter(m)PollutantsOther PollutantsEmission (GLS)
(1.)IncineratorHazardous/Biomedical Waste300.85PM100.97
(2.)DG SetHSD100.2PM100.04
(3.)DG SetHSD100.2SO20.034
(4.)Used oil recycling BoilerCoal300.5PM100.09
(5.)Used oil recycling BoilerCoal300.5SO20.58
(6.)Used oil BoilerCoal300.5NOx0.39
(7.)Spent solvent BoilerCoal300.5PM100.09
(8.)E Waste facilityE Waste30.2NOx0.004
(9.)IncineratorHazardous/Biomedical Waste300.85SO22.13
(10.)IncineratorHazardous/Biomedical Waste300.85NOx4.25
(11.)Spent solvent BoilerCoal300.5NOx0.39
(12.)E Waste facilityE Waste30.2SO20
(13.)DG SetHSD100.2NOx0.88
(14.)Spent solvent BoilerCoal300.5SO20.58
(15.)E Waste facilityE Waste30.2PM100.04
19.
Power Requirement:
(a)Quantity (Kilo Volt Amps (kVA)) 1750
(b)Source TANGEDCO/TNEB
(c)Uploaded Copy of Agreement Not Applicable
(d)Standby Arrangement (Details of DG Sets) 2*500 kVA
(e)Stack Height (in m) 10
20.
Land Ownership Pattern:
(a)Forest Land (ha.) 0
(b)Private Land (ha.) 0
(c)Government Land (ha.) 26.7
(d)Revenue Land (ha.) 0
(e)Other Land (ha.) 0
    Total Land (ha.) 26.7
21.
Present Land Use Breakup of the Study Area in Ha:
(a)Agriculture Area (ha.) 0
(b)Waste/Barren Land (ha.) 0
(c)Grazing/ Community Land (ha.) 0
(d)Surface Water Bodies (ha.) 0
(e)Settlements (ha.) 0
(f)Industrial (ha.) 26.7
(g)Forest (ha.) 0
(h)Mangroves (ha.) 0
(i)Marine Area (ha.) 0
(j)Others (ha.) : Other 0
    Total (ha.) 26
    22.     Land requirement for various activities
S. No.Description of Activity / Facility / Plant / Others OthersLand Requirement (ha.)Remarks
(1.)LandFill11.5
(2.)Built Up Area1.8
(3.)Green belt8.8
(4.)OthersRoads and Parking4.6
Total (ha.) 26.7
23.
Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Sanctuaries; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones :
    23.1.     Details of Ecological Sensitivity :
S. No.Details of Ecological Sensitivity NameDistance from the Project (Km)Remarks
(1.)ESZsPulicat Bird Sanctuary7.4North direction
(2.)Wildlife CorridorsNil0None in 10 km radius
(3.)WLSPulicat Bird Sanctuary7.4North direction
(4.)Critically Polluted AreaNil0None in 10 km radius
(5.)NPANil0None in 10 km radius
(6.)ESAsPulicat Bird Sanctuary7.4North direction
(7.)CorridorsNil0None in 10 km radius
    23.2.     Details of Environmental Sensitivity :
S. No.Details of Environmental Sensitivity Other Details of Environmental Sensitivity NameDistance from the Project (Km)Remarks
(1.)ForestManali RF6.8South direction
(2.)Archaeological SitesNil0None in 10 km radius
(3.)Defence InstallationsNil0None in 10 km radius
23.3.
(a)Whether Noc / Permission from the competent authority is required? No
(b)Whether NBWL recommendation is required? No
24.
Forest Land:
Whether any Forest Land involved? No
25.
Tree Cutting:
(a)No. of Trees Cut for the Project (if Forest Land not Involved) 0
(b)Details of Tree Cutting and Planting of Trees Copy of Details of Tree Cutting and Planting of Trees
26.
Land Acquisition Status:
(a)Acquired Land(Ha) 26.7
(b)Land yet to be acquired(Ha) 0
(c)Status of Land acquisition if not acquired 0
27.
Rehabilitation and Resettlement (R&R):
(a)No. of Villages 0
(b)No. of Households 0
(c)No. of PDFs (Project Displaced Families) 0
(d)No. of PAFs (Project Affected Families) 0
(e)Funds Allocated for R&R(in INR) (in Lacs) 0
(f)Status of R&R Completed
28.
Details of Presence of Schedule-I Species:
(a)Whether there is Presence of Schedule-I Species ? No
(b)Whether conservation plan for Schedule-I Species has been prepared ? No
(c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? No
29.
Details of Presence of Water Bodies in Core Area:
(a)Whether there is Presence of Water Bodies in Core Area ? No
(b)Whether there is Diversion Required ? No
(c)Whether permission has been obtained from competent authority ? No
30.
Details of Presence of Water Bodies in Buffer Area:
(a)Whether there is Presence of Water Bodies in Buffer Area ? Yes
(i)Details of Water Bodies in Buffer Area Arani River
(ii)Direction of Water Bodies in Buffer Area South
(iii)Distance of Water Bodies in Buffer Area 6.5
31.
Manpower Requirement:
(a)Permanent Employment-During Construction 15
(b)Permanent Employment-During Operation 15
(c)Temporary Employment- During Construction 25
(d)Temporary Employment- During Operation 30
(e)No. of working days 365
(f)Total Manpower 85
32.
Green Belt in Ha:
(a)Total Area of Green Belt 8.81
(b)Percentage of Total Project Area 33.00
(c)No. of Plants to be Planted 12000
(d)Funds Allocated for Plantation 5000000
(e)Uploaded Green Belt plan Copy of Green Belt Plan
    33.         Project Benefits
S. No.Type of Project Benefits Details of Project Benefits
(1.)EnvironmentalFacilitating better management of hazardous wastes. Provides a one stop solution for the management of various types of wastes. Minimizes pollution load on environment with an additional benefit of green and clean surroundings. Possibility for recovery of materials thereby conserving the natural resources. Management of wastes is relatively easier and economically viable at a common facility Reduced environmental liability due to captive storage of hazardous waste in the premises of industries
(2.)SocialThe proposed project would proactively promote the public interest through provision of basic amenities such as roads, transportation, electricity, education, sanitation and healthcare facilities. This would also encourage community growth, development and improved socio-economic conditions and quality of life of the people living in the project area. • Better standards of living and greater social awareness
   34.   CRZ Specific Details : Not Applicable
   35.   Sector Specific Details For INFRA-2
S. No.Item Details
1.
Details of Building Construction:
(a)Maximum Height of the Building (Meters) 10
(b)Total No. of Flats to be Build 0
(c)No. of Buildings 1
(d)Total plot area (sqm) 267000
(e)Total built up area (sqm) 18000
2.
Foreshore Facilities and/or Marine Disposal:
(a)Whether Project Involves Foreshore Activities and/or marine Disposal? No
3.
Rain Water Harvesting:
(a)No. of Storage 1
(b)Capacity 1000
(c)No. of Recharge Pits 0
(d)Capacity 0
4.
Parking:
(a)Details of 4 Wheeler/ 2 Wheeler Parking 204 sqm
5.
Energy Saving Measures:
(a)Source/Mode LED bulbs shall be used for Street lights
(b)Percentage 10
(c)Quantity 100
6.
Other details:
(a)Details of impact on Water Bodies and Drainage patters of catchment area No discharge to water bodies
(b)Details of Traffic Density Impact Assessment and Modelling Study Copy of Details of Traffic Density Impact Assessment and Modelling Study
(c)In case Underground Tunnel Project below the Forest Land - Subsidence Impact Study report Copy of Underground Tunnel Project below the Forest Land - Subsidence Impact Study report
     7.       Type of Industries to be established with Industrial Estate as per their category A/B
S. No.Type of IndustryNo. of UnitsCategory A/B
NIL
8.
Length of the alignment N/A
9.
Details Bridges/ROB/Interchanges,Flyovers,Vehicle Underpass and Pedestrian Underpass
Details Not Applicable
S. No.Item Details
36.
Details of Court Cases:
(a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? No
37.
Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act:
(a)Whether any Direction issued under EPA Act/Air Act/Water Act ? No
38.
Details of EIA Consultant:
(a)Have you hired Consultant for preparing document? Yes
(i)Accreditation No. NABET/EIA/1518/SA 061
(ii)Name of the EIA Consultant Ramky Enviro Services Private Limited
(iii)Address Ramky Grandiose, Ramky Tower Complex, Gachibowli, Hyderabad 500032
(iv)Mobile No. 9949991029
(v)Landline No. 0402301535
(vi)Email Id drchakradhar@ramky.com
(vii)Category of Accreditation A
(viii)Sector of Accreditation INFRA-2
(ix)Validity of Accreditation 20 May 2019
(x)Uploaded Certificate of Accreditation certified by QCI/NABET Copy of Certificate of Accreditation
39.
Documents to be Attached:
(a)Uploaded Copy of EIA/EMP Report Copy of EIA/EMP
Copy of EIA/EMP(Annexures)
Copy of EIA/EMP(Plans/Figures)
(b)Uploaded Copy of Risk Assessment Report Copy of Risk Assessment
(c)Uploaded Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan
(d)Uploaded Copy of Final Layout Plan Copy of Final Layout Plan
(e)Uploaded Cover Letter Copy of Cover Letter
(f)Uploaded Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency
(g)Uploaded Additional File NA
(h)Uploaded Proposal Presentation (To be given in EAC meeting) NA
      Essential Detail Sought : NIL
      Additional Detail Sought : NIL
Undertaking
I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief. And I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity/ construction/ expansion has since been taken up.
Name of ApplicantCHINATIRUPATIREDDY EEVURI
DesignationPROJECTINCHARGE
Name of Company (Applicant Name should not be given here)TAMIL NADU WASTE MANAGEMENT LIMITED
AddressTamil Nadu Waste Management Limited, Level- 4, Diamond Dune, 323, NH 4, Aminjikarai, Chennai