1. | Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? | No | Details of Project: | (a)Name of the project(s) | M/s Shree Narmada Khand Udyog Sahakari Mandli Ltd. | (b)Name of the Company / Organisation | M/S SHREE NARMADA KHAND UDYOG SAHAKARI MANDLI LTD. | (c)Registered Address | Gat No. 141, 142, 143, Dharikheda village, P.O. Timbi, Tal - Rajpipla Nandod, Dist. - Narmada, Gujarat.,,Narmada,Gujarat-393140 | (d)Legal Status of the Company | Private | (e)Joint Venture | No | |
|
2. | Address for the correspondence: | (a)Name of the Applicant | Narendrabhai A Patel | (b)Designation (Owner/ Partner/ CEO) | MD | (c)Address | Gat no. 141, 142, 143, Dharikheda village, P.O. - Timbi, Tal-Rajpipla Nandod, Dist. - Narmada, Gujarat.,,Nandod,Narmada,Gujarat-393140 | (d)Pin code | 393140 | (e)E-mail | narmadagujarat2017@gmail.com | (f)STD Code. | 20(f)Telephone No. | 25652900 | (g)Fax No. | | (h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . | Annexure-Uploaded Copy of documents in support of the competence/authority | |
|
3. | Category of the Project/Activity as per Schedule of EIA Notification,2006: | (a.I)Project/Activity | 5(g) Distilleries
| Minor Activity | | (b)Category | A | (c)Proposal Number | IA/GJ/IND2/66997/2017 | (d)Master Proposal Number(Single Window) | SW/77402/2018 | (e)EAC concerned (for category A Projects only) | Industrial Projects - 2 | (f)Project Type | Fresh EC |
|
|
4. | Location of the Project: | (a)Plot/Survey/Khasra No. | Survey No. 141, 142, 143 | (b)Pincode | 393140 | (c)Bounded Latitudes (North) | | From | | Degree | 21.829289 | Minutes | | Second | | From | | Degree | 73.382765 | Minutes | | Second | | (d)Bounded Longitudes (East) | | From | | Degree | 21.829884 | Minutes | | Second | | From | | Degree | 73.388677 | Minutes | | Second | | (e)Survey of India Topo Sheet No. | F43N5 | (f)Uploaded Topo Sheet File | Copy of Topo Sheet File | (g)Maximum Elevation Above Means Sea Level(AMSL) | 70 | (h)Uploaded (kml) File | Copy of Kml File | (i)Distance of Nearest HFL from the project boundary within the study area | 0 | (j)Seismic Zone | 3 | |
|
5. | (a)Number of States in which Project will be Executed | 1 | (b)Main State of the project | Gujarat | |
|
|
Details of State(s) of the project |
---|
S. No. | State Name | District Name | Tehsil Name | Village Name |
---|
(1.) | Gujarat | Narmada | Nandod | | |
|
6. | Details of Terms of Reference (ToR): | (a)MoEF&CC / SEIAA File Number | IA-J-11011/384/2017-IA-II(I) | (b)Date of Apply of TOR | 16 Sep 2017 | (c)Date of Issue of TOR / Standard ToR | 26 Oct 2017 | (d)Previous TOR Letter | Copy of Previous TOR letter | |
|
7. | Details of Public Consultation: | (a)Whether the Project Exempted from Public Hearing? | No | (b)Whether details of Public Hearing available? | Yes | (c)Whether Public hearing was presided over by an officer of the rank of Additional District Magistrate or above | Yes | |
|
7.1. Details of Public Hearing |
---|
|
S. No. | Details of Advertisement | Details of Public Hearing | Venue | Location Details | No. of People Attended | Issues Raised | Designation of Presiding Officer | Other Designation of Presiding Officer |
---|
(1.) | | Copy of Public Hearing : | Copy of Public Hearing | Date : | 20 Jul 2018 | Distance of Public Hearing Venue from the Proposed Project : | 0 |
| At project site | State : | Gujarat | District : | Narmada | Tehsil : | Nandod | Village : | Dharikheda |
| 140 | Details are attached | Others | Additional District magistrate | |
8. | Details of Project Configuration/Product: | |
|
8.1. Project Configuration |
---|
S. No. | Plant/Equipment/Facility | Configuration | Remarks |
---|
(1.) | Proposed 45 KLPD Distillery unit | 45 KLPD Distillery | NA | |
8.2. Product |
---|
S. No. | Product/Activity (Capacity/Area) | Quantity | Unit | Other Unit | Mode of Transport / Transmission of Product | Other Mode of Transport / Transmission of Product |
---|
(1.) | Fusel oil | 0.09 | Kilo Litre per Day | | Road | | (2.) | Fuel alcohol | 40.71 | Kilo Litre per Day | | Road | | (3.) | Impure spirit | 2.25 | Kilo Litre per Day | | Road | | (4.) | Biogas | 20365 | Cubic Meter per Day | | Pipe Conveyor | | (5.) | Biocompost | 19141 | Tons per Annum | | Road | | (6.) | Rectified spirit OR | 42.75 | Kilo Litre per Day | | Road | | |
|
9. | In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii): | Details Not Applicable | |
|
9.1. | Details of Consent to Operate | (i)Whether Consent to operate obtained ? | NA | (ii)Copies of all Consent to operate obtained since inception | NA | (iii)Date of Issue | N/A | (iv)Valid Upto | N/A | (v)File No. | NA | (vi)Application No. | NA | (vii)Copy of Consent to operate valid as on date | NA | |
|
|
10. | Project Cost: | (a)Total Cost of the Project at current price level (in Crores) | 50.0484 | (b) Funds Allocated for Environment Management (Capital) (in Crores) | 22.5025 | (c) Funds Allocated Towards CER (Corporate Environment Responsibility) (in Crores) | 1.411 | (d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in Crores) | 1.411 | |
|
11. | Whether project attracts the General Condition specified in the Schedule of EIA Notification ? | No | | |
12. | Whether project attract the Specific Condition specified in the Schedule of EIA Notification ? | No | | |
13. | Raw Material / Fuel Requirement: | (a)Proposed quantity of raw material/fuel | 51840 | (b)Existing quantity of raw material/fuel | N/A | (c)Total quantity of raw material/fuel | 51840 | |
|
  13.1. Raw Material / Fuel Profile |
---|
S. No. | Raw Material / Fuel | Quantity | Unit | Other Unit | Source (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received ) | Mode of Transport | Other Mode of Transport | Distance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received) | Type of Linkage | Other Type of Linkage | Uploaded Copy of Linkage |
---|
(1.) | RAW | 11840 | Tons per Annum | | Molasses - 11840 TPA from Sitaram Sugars Ladhod | Road | | 55 | MoU | | Copy of Linkage | (2.) | RAW | 121.5 | Tons per Annum | | Lime from Local Vendor | Road | | 13 | Open Market | | Copy of Linkage | (3.) | RAW | 13.5 | Tons per Annum | | Antifoam - Local Vendor | Road | | 13 | Open Market | | Copy of Linkage | (4.) | RAW | 25.92 | Tons per Annum | | Culture for composting unit from local vendor | Road | | 13 | Open Market | | Copy of Linkage | (5.) | Raw material | 40000 | Tons per Annum | | Molasses from Own sugar factory | Others | Pipeline | 0 | Others | Internal transportation within own factory | Copy of Linkage | (6.) | RAW | 0.05 | Tons per Annum | | DAP for Distillery & Biogas unit | Road | | 13 | Others | NA | Copy of Linkage | (7.) | RAW | 20.25 | Tons per Annum | | Urea- Local Vendor | Road | | 13 | Others | NA | Copy of Linkage | (8.) | RAW | 130140 | Tons per Annum | | Biomethanated spentwash froom own distillery unit | Others | HDPE Pipeline | 0 | Others | NA | Copy of Linkage | (9.) | RAW | 25920 | Tons per Annum | | Press mud from own sugar factory | Others | Internal transportation by tractor or trolley | 0 | Others | NA | Copy of Linkage | (10.) | RAW | 25920 | Tons per Annum | | conc biomethanated spentwash from evaporation unit | Others | HDPE pipeline | 0 | Others | Internal transportation by HDPE pipeline | Copy of Linkage | (11.) | RAW | 0.135 | Kilo Litre per Day | | Sulphuric acid- Local vendor | Road | | 13 | Open Market | | Copy of Linkage | |
|
14. | Baseline Data : | (a)Period of Base Line Data Collection | FROM 01 Oct 2017 To 31 Dec 2017 | (b)Season | Winter | |
|
14.1. No. of ambient Air Quality (AAQ) monitoring locations : 8 |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Unit | Maximum Value | Minimum Value | 98 Percentile Value | Prescribed Standard |
---|
(1.) | NOx | | Micro Gram per Meter Cube | 19.08 | 8.82 | 13.41 | 80 | (2.) | PM2.5 | | Micro Gram per Meter Cube | 33.97 | 15.54 | 27.43 | 60 | (3.) | PM10 | | Micro Gram per Meter Cube | 81.2 | 40.9 | 63.09 | 100 | (4.) | SO2 | | Micro Gram per Meter Cube | 10.56 | 5.03 | 7.72 | 80 | |
14.2. No. of Ground Water monitoring locations : 8 |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Heavy Metal | Unit | Other Unit | Maximum Value | Minimum Value | Desirable Limit | Maximum Permissible Limit |
---|
(1.) | pH | | | NA | | 7.53 | 7.06 | 6.5 | 8 | (2.) | TDS | | | mg/l | | 847 | 353 | 500 | 2000 | (3.) | Total Hardness | | | mg/l | | 596 | 260 | 200 | 600 | (4.) | Chlorides | | | mg/l | | 187 | 18 | 250 | 1000 | (5.) | Heavy Metals | | Lead | mg/l | | 0.001 | 0.001 | 0 | 0.01 | (6.) | TSS | | | mg/l | | 0 | 0 | 0 | 0 | (7.) | Fluoride | | | mg/l | | 0.4 | 0.4 | 1 | 1.5 | |
14.3. No. of Surface Water monitoring locations : 8 |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Unit | Other Unit | Maximum Value | Minimum Value | Classification of inland water body |
---|
(1.) | DO | | mg/l | | 0 | 0 | E | (2.) | pH | | NA | | 8.2 | 7.63 | E | (3.) | BOD | | mg/l | | 8 | 4 | E | (4.) | COD | | mg/l | | 8 | 8 | E | |
14.4. No. of Ambient Noise monitoring locations : 8 |
---|
S. No. | Parameter | Unit | Maximum Value | Minimum Value | Prescribed Standard |
---|
(1.) | Leq(Night) | A-weighted decibels(dB(A)) | 60.3 | 33.8 | 70 | (2.) | Leq(Day) | A-weighted decibels(dB(A)) | 69.4 | 36.4 | 75 | |
14.5. No. of Soil Sample Monitored locations : 8 |
---|
S. No. | Parameter | Unit | Other Unit | Maximum Value | Minimum Value |
---|
(1.) | K(Potassium) | Milligram per Kilogram | | 72.44 | 40.84 | (2.) | pH | Others | NA | 7.92 | 7.16 | (3.) | N(Nitrogen) | Milligram per Kilogram | | 1637.72 | 1207.29 | (4.) | P(Phosphorus) | Milligram per Kilogram | | 247.98 | 27.79 | (5.) | Electric Conductivity | Millisiemens per Centimetre | | 1.709 | 0.103 | |
|
14.6. | Details of Ground Water Table: | (a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) | From 10 To 40 | (b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) | From 05 To 40 | (c)Whether Ground Water Intersection will be there ? | NA | |
|
15. Details of Water Requirement (During Operation) |
---|
S. No. | Source | Source Other | Required Quantity (Kilolitre per Day (Kld)) | Distance from Source | Copy of Permission from Competent Authority | Mode of Transport | Other Mode of Transport | Method of Water Withdrawal | Other Method of Water Withdrawal | Letter No. | Date of Issue | Permitted Quantity |
---|
(1.) | GroundWater | | 324 | 0 | Copy of Permission Letter | Pipeline | | Others | Existing bore well | NS/MFG/2017-18/2.41 | 03 Nov 2017 | 000 | |
|
15.1. | (a)Whether Desalination is proposed | No | |
|
16. Waste Water Management(During Operation) |
---|
S. No. | Type/Source | Quantity of Waste Water Generated (Kilolitre per Day) | Treatment Capacity (Kilolitre per Day) | Treatment Method | Mode of Disposal | Other Mode of Disposal | Quantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day) | Quantity of Discharged Water (Kilolitre per Day) |
---|
(1.) | liquid waste streams | 515 | 515 | CPU | Others | Recycle | 515 | 0 | (2.) | Spent Wash | 96 | 96 | Spentwash treatment will be as biomethanation followed by concentration of biomethanated spentwash with integrated evaporation and standalone evaporation system to concentrate biomethanated spent wash (6% to 30%, i.e. from 482 TPD to 96 TPD) followed by composting system. | Others | Zero Liquid Discharge | 96 | 0 | |
|
16.1. | (a)Total Waste Water Generation (Kilolitre per Day) | 611 | (b)Total Discharged Water (Kilolitre per Day) | 0 | (c)Total Reused Water (Kilolitre per Day) | 611 | |
|
17. Solid Waste Generation/Management |
---|
S. No. | Name of Waste | Item | Other Item | Quantity per Annum | Unit | Distance from Site(KM) | Mode of Transport | Other Mode of Transport | Mode of Disposal | Other Mode of Disposal |
---|
(1.) | CPU sludge | Industrial Waste | | 67.5 | Tons | 0 | Road | | Others | Will be composted & used in Own garden | (2.) | Canteen waste | Municipal Solid Waste | | 270 | Tons | 0 | Road | | Others | Will be composted & used in | (3.) | Waste from Packing section | Others | Waste papers | 135 | Tons | 0 | Road | | Others | Sale to authorized dealer | (4.) | Yeast sludge | Industrial Waste | | 4050 | Tons | 0 | Road | | Others | Will be Composted & used in factory farm | (5.) | Colony waste | Municipal Solid Waste | | 540 | Tons | 0 | Road | | Others | Will be Composted & used in factory farm | (6.) | Office waste | Municipal Solid Waste | | 135 | Tons | 0 | Road | | Others | Sale to authorized dealer | (7.) | Boiler Ash | Industrial Waste | | 3924 | Tons | 0 | Road | | Others | As a soil conditioner to member farmers | |
|
|
18.1. Air Quality Impact Prediction |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Unit | Baseline Concentration | Distance GLC | Incremental Concentration | Total GLC | Prescribed Standard |
---|
(1.) | PM2.5 | | Microgram per Meter Cube | 31.67 | 2 | 1.44 | 33.11 | 60 | (2.) | NOx | | Microgram per Meter Cube | 19.08 | 2 | 7.22 | 26.3 | 80 | (3.) | SO2 | | Microgram per Meter Cube | 10.56 | 2 | 4.06 | 14.62 | 80 | (4.) | PM10 | | Microgram per Meter Cube | 81.2 | 2 | 2.38 | 83.58 | 100 | |
|
18.2. Stack Details |
---|
S. No. | Source | Fuel | Stack Height(m) | Stack Diameter(m) | Pollutants | Other Pollutants | Emission (GLS) |
---|
(1.) | Existing sugar factory boiler I & II of 35 TPH | 980 TPD bagasse | 46 | 3 | PM10 | | 83.58 | (2.) | Existing sugar factory boiler III of 65 TPH | Bagasse 655 TPD | 60 | 3 | PM10 | | 83.58 | (3.) | No New Boiler. Hence no proposed stack | NA | 0 | 0 | Others | NA | NA | |
|
19. | Power Requirement: | (a)Quantity (Kilo Volt Amps (kVA)) | 825 | (b)Source | Existing captive power plant of 9 MW during season | (c)Uploaded Copy of Agreement | Copy of Agreement | (d)Standby Arrangement (Details of DG Sets) | Proposed DG set of 600 KVA | (e)Stack Height (in m) | 3 | |
|
20. | Land Ownership Pattern: | (a)Forest Land (ha.) | 0 | (b)Private Land (ha.) | 43.7060 | (c)Government Land (ha.) | 0 | (d)Revenue Land (ha.) | 0 | (e)Other Land (ha.) | 0 | Total Land (ha.) | 43.7060 | |
|
21. | Present Land Use Breakup of the Study Area in Ha: | (a)Agriculture Area (ha.) | 0 | (b)Waste/Barren Land (ha.) | 0 | (c)Grazing/ Community Land (ha.) | 0 | (d)Surface Water Bodies (ha.) | 0 | (e)Settlements (ha.) | 0 | (f)Industrial (ha.) | 29.0106 | (g)Forest (ha.) | 0 | (h)Mangroves (ha.) | 0 | (i)Marine Area (ha.) | 0 | (j)Others (ha.) : Total Green Belt | 14.6954 | Total (ha.) | 43.706 | |
|
22. Land requirement for various activities |
---|
S. No. | Description of Activity / Facility / Plant / Others | Others | Land Requirement (ha.) | Remarks |
---|
(1.) | Green belt | | 14.6954 | NA | (2.) | Others | Existing sugar unit area | 10.4397 | NA | (3.) | Main Plant | | 1.0958 | NA | |
|
|
23. | Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Sanctuaries; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones : | |
|
23.1. Details of Ecological Sensitivity : |
---|
S. No. | Details of Ecological Sensitivity | Name | Distance from the Project (Km) | Remarks |
---|
(1.) | Critically Polluted Area | Nil within 10 km area | 0 | Nil within 10 km area | (2.) | WLS | Nil within 10 km area | 0 | Nil within 10 km area | (3.) | NPA | Nil within 10 km area | 0 | Nil within 10 km area | (4.) | ESAs | Nil within 10 km area | 0 | Nil within 10 km area | (5.) | Wildlife Corridors | Nil within 10 km area | 0 | Nil within 10 km area | (6.) | ESZs | Nil within 10 km area | 0 | Nil within 10 km area | (7.) | Corridors | Nil within 10 km area | 0 | Nil within 10 km area | |
23.2. Details of Environmental Sensitivity : |
---|
S. No. | Details of Environmental Sensitivity | Other Details of Environmental Sensitivity | Name | Distance from the Project (Km) | Remarks |
---|
(1.) | Defence Installations | | Nil within 10 km area | 0 | Nil within 10 km area | (2.) | Others | NA | NA | 0 | Nil within 10 km area | (3.) | Forest | | Nil within 10 km area | 0 | Nil within 10 km area | (4.) | Archaeological Sites | | Nil within 10 km area | 0 | Nil within 10 km area | |
|
23.3. | (a)Whether Noc / Permission from the competent authority is required? | No | (b)Whether NBWL recommendation is required? | No | |
|
24. | Forest Land: | Whether any Forest Land involved? | No | |
|
25. | Tree Cutting: | (a)No. of Trees Cut for the Project (if Forest Land not Involved) | 0 | (b)Details of Tree Cutting and Planting of Trees | Not Applicable | |
|
26. | Land Acquisition Status: | (a)Acquired Land(Ha) | 43.7060 | (b)Land yet to be acquired(Ha) | 0 | (c)Status of Land acquisition if not acquired | Land is already in possession of industry | |
|
27. | Rehabilitation and Resettlement (R&R): | (a)No. of Villages | 0 | (b)No. of Households | 0 | (c)No. of PDFs (Project Displaced Families) | 0 | (d)No. of PAFs (Project Affected Families) | 0 | (e)Funds Allocated for R&R(in INR) (in Lacs) | 0 | (f)Status of R&R | Completed | |
|
28. | Details of Presence of Schedule-I Species: | (a)Whether there is Presence of Schedule-I Species ? | No | (b)Whether conservation plan for Schedule-I Species has been prepared ? | No | (c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? | No | |
|
29. | Details of Presence of Water Bodies in Core Area: | (a)Whether there is Presence of Water Bodies in Core Area ? | Yes | (i)Details of Water Bodies in Core Area | Narmada river flows from east to west direction at a distance of 7.5 km from the project site. Karjan River flow along eastern periphery of project site at a distance of 10 km | (b)Whether there is Diversion Required ? | No | (c)Whether permission has been obtained from competent authority ? | No | |
|
30. | Details of Presence of Water Bodies in Buffer Area: | (a)Whether there is Presence of Water Bodies in Buffer Area ? | No | |
|
31. | Manpower Requirement: | (a)Permanent Employment-During Construction | 0 | (b)Permanent Employment-During Operation | 83 | (c)Temporary Employment- During Construction | 0 | (d)Temporary Employment- During Operation | 0 | (e)No. of working days | 270 | (f)Total Manpower | 83 | |
|
32. | Green Belt in Ha: | (a)Total Area of Green Belt | 14.6954 | (b)Percentage of Total Project Area | 33.62 | (c)No. of Plants to be Planted | 11431 | (d)Funds Allocated for Plantation | 2000000 | (e)Uploaded Green Belt plan | Copy of Green Belt Plan | |
|
33. Project Benefits |
---|
S. No. | Type of Project Benefits | Details of Project Benefits |
---|
NIL | |
|
34. CRZ Specific Details : Not Applicable |
35. Sector Specific Details : NOT APPLICABLE |
35. Sector Specific Details For Industrial Projects - 2 |
|
|
36. | Details of Court Cases: | (a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? | No | |
|
37. | Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act: | (a)Whether any Direction issued under EPA Act/Air Act/Water Act ? | No | |
|
38. | Details of EIA Consultant: | (a)Have you hired Consultant for preparing document? | Yes | (i)Accreditation No. | QCI/NABET/EIA/ACO/18/0618 | (ii)Name of the EIA Consultant | SGM corporate consultants Pvt. Ltd. | (iii)Address | Saahil Apartments,1102/A/4B,Model Colony Lakaki Road,Opp. Kirloskar Bunglow, Shivaji Nagar , Pune -411016 | (iv)Mobile No. | 9552589304 | (v)Landline No. | 0202565290 | (vi)Email Id | sgm_pune@yahoo.com | (vii)Category of Accreditation | A | (viii)Sector of Accreditation | Industrial Projects - 2 | (ix)Validity of Accreditation | 07 Nov 2018 | (x)Uploaded Certificate of Accreditation certified by QCI/NABET | Copy of Certificate of Accreditation | |
|
|
Essential Detail Sought: |
---|
Sno. | EDS Letter | Remarks | Date of EDS |
---|
1. | NA | Please inform/clarify the following:-
- Whether the proposed industrial operations are permitted at the identified project site and/or in conformity with land use of the area. That needs to be confirmed along with supporting documents. This was asked earlier also vide query dated 15/9/2017, but no reply was submitted.
- Entry in Form-2 against item 6, ToR details are shown as Nil.
- Status of clearances required from CGWA for ground water withdrawal of 324 cum/day. | 09 Sep 2018 | 2. | NA | The correction have been made as per the instruction received | 14 Sep 2018 | 3. | NA | Please submit the information desired vide query dated 9/9/2018 for consideration of the proposal. | 21 Sep 2018 | 4. | NA | The correction have been made as per the instruction received | 27 Sep 2018 | 5. | NA | Reply to the query dated 9/9/2018, reiterated on 21/9/2018, is yet to be provided for further consideration of the proposal. In case of clarifications, if any, the matter may be discussed with us in the Ministry. | 29 Sep 2018 | 6. | NA | Reply to the query dated 9/9/2018, reiterated on 21/9/2018, is yet to be provided for further consideration of the proposal. In case of clarifications, if any, the matter may be discussed with us in the Ministry. | 29 Sep 2018 | 7. | NA | The correction have been made as per the instruction received | 03 Oct 2018 | 8. | NA | Please see our earlier observations vide queries dated 9/9/2018, 21/9/2018 & 29/9/2018 for the needful.
Also please inform whether extension of validity of accreditation as communicated vide QCI-NABET letter dated 8/5/2018 still stands. | 06 Oct 2018 | 9. | NA | The correction have been made as per the instruction received | 09 Oct 2018 | |
Additional Detail Sought: |
---|
Sno. | ADS Letter | Remarks | Date of ADS |
---|
1. | ADS Reply Letter | Dear sir/ Madam,
Our project for proposed 45 KLPD molasses based distillery was considered in 42nd EAC meeting held on 31st October 2018 (Agenda Item No.42.7.3).
As per the minutes of this meeting submitting herewith compliance of the points raised in MoM.
Kindly consider & grant us EC at your earliest.
Thanks & Regard
M/s Shree Narmada Khand Udyog Sahakari Mandli Ltd. | 07 Jan 2019 | 2. | NA | Deferred | 26 Nov 2018 | |
| Undertaking |
| I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief. And I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity/ construction/ expansion has since been taken up. |
| Name of Applicant | Narendrabhai A Patel | Designation | MD | Name of Company (Applicant Name should not be given here) | M/S SHREE NARMADA KHAND UDYOG SAHAKARI MANDLI LTD. | Address | Gat No. 141, 142, 143, Dharikheda village, P.O. Timbi, Tal - Rajpipla Nandod, Dist. - Narmada, Gujarat. |
|