Form-2
APPLICATION FOR PRIOR ENVIRONMENTAL CLEARANCE
S. No.Item Details
1.
Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? No
Details of Project:
(a)Name of the project(s) M/s Shree Narmada Khand Udyog Sahakari Mandli Ltd.
(b)Name of the Company / Organisation M/S SHREE NARMADA KHAND UDYOG SAHAKARI MANDLI LTD.
(c)Registered Address Gat No. 141, 142, 143, Dharikheda village, P.O. Timbi, Tal - Rajpipla Nandod, Dist. - Narmada, Gujarat.,,Narmada,Gujarat-393140
(d)Legal Status of the Company Private
(e)Joint Venture No
2.
Address for the correspondence:
(a)Name of the Applicant Narendrabhai A Patel
(b)Designation (Owner/ Partner/ CEO) MD
(c)Address Gat no. 141, 142, 143, Dharikheda village, P.O. - Timbi, Tal-Rajpipla Nandod, Dist. - Narmada, Gujarat.,,Nandod,Narmada,Gujarat-393140
(d)Pin code 393140
(e)E-mail narmadagujarat2017@gmail.com
(f)STD Code. 20(f)Telephone No. 25652900
(g)Fax No.
(h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . Annexure-Uploaded Copy of documents in support of the competence/authority
3.
Category of the Project/Activity as per Schedule of EIA Notification,2006:
(a.I)Project/Activity5(g) Distilleries
Minor Activity
(b)Category A
(c)Proposal Number IA/GJ/IND2/66997/2017
(d)Master Proposal Number(Single Window) SW/77402/2018
(e)EAC concerned (for category A Projects only) Industrial Projects - 2
(f)Project Type Fresh EC
4.
Location of the Project:
(a)Plot/Survey/Khasra No. Survey No. 141, 142, 143
(b)Pincode 393140
(c)Bounded Latitudes (North)
From
Degree 21.829289
Minutes
Second
From
Degree 73.382765
Minutes
Second
(d)Bounded Longitudes (East)
From
Degree 21.829884
Minutes
Second
From
Degree 73.388677
Minutes
Second
(e)Survey of India Topo Sheet No. F43N5
(f)Uploaded Topo Sheet File Copy of Topo Sheet File
(g)Maximum Elevation Above Means Sea Level(AMSL) 70
(h)Uploaded (kml) File Copy of Kml File      
(i)Distance of Nearest HFL from the project boundary within the study area 0
(j)Seismic Zone 3
5.
(a)Number of States in which Project will be Executed 1
(b)Main State of the project Gujarat
Details of State(s) of the project
S. No. State Name District Name Tehsil Name Village Name
(1.)GujaratNarmadaNandod
6.
Details of Terms of Reference (ToR):
(a)MoEF&CC / SEIAA File Number IA-J-11011/384/2017-IA-II(I)
(b)Date of Apply of TOR 16 Sep 2017
(c)Date of Issue of TOR / Standard ToR 26 Oct 2017
(d)Previous TOR Letter Copy of Previous TOR letter
7.
Details of Public Consultation:
(a)Whether the Project Exempted from Public Hearing?No
(b)Whether details of Public Hearing available? Yes
(c)Whether Public hearing was presided over by an officer of the rank of Additional District Magistrate or above Yes
     7.1.       Details of Public Hearing
S. No.Details of Advertisement Details of Public Hearing Venue Location DetailsNo. of People AttendedIssues RaisedDesignation of Presiding OfficerOther Designation of Presiding Officer
(1.)
Date of Advertisement :02 Jun 2018
Copy of advertisement :Copy of Advertisement
Copy of Public Hearing :Copy of Public Hearing
Date :20 Jul 2018
Distance of Public Hearing Venue from the Proposed Project :0
At project site
State :Gujarat
District :Narmada
Tehsil :Nandod
Village :Dharikheda
140Details are attachedOthersAdditional District magistrate
8.
Details of Project Configuration/Product:
     8.1.       Project Configuration
S. No.Plant/Equipment/FacilityConfigurationRemarks
(1.)Proposed 45 KLPD Distillery unit45 KLPD DistilleryNA
     8.2.       Product
S. No.Product/Activity (Capacity/Area)QuantityUnitOther UnitMode of Transport / Transmission of ProductOther Mode of Transport / Transmission of Product
(1.)Fusel oil0.09Kilo Litre per DayRoad
(2.)Fuel alcohol40.71Kilo Litre per DayRoad
(3.)Impure spirit2.25Kilo Litre per DayRoad
(4.)Biogas20365Cubic Meter per DayPipe Conveyor
(5.)Biocompost19141Tons per AnnumRoad
(6.)Rectified spirit OR42.75Kilo Litre per DayRoad
9.
In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii):
Details Not Applicable
9.1.
Details of Consent to Operate
(i)Whether Consent to operate obtained ? NA
(ii)Copies of all Consent to operate obtained since inception NA
(iii)Date of Issue N/A
(iv)Valid Upto N/A
(v)File No. NA
(vi)Application No. NA
(vii)Copy of Consent to operate valid as on date NA
10.
Project Cost:
(a)Total Cost of the Project at current price level (in Crores) 50.0484
(b) Funds Allocated for Environment Management (Capital) (in Crores) 22.5025
(c) Funds Allocated Towards CER (Corporate Environment Responsibility) (in Crores) 1.411
(d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in Crores) 1.411
11.
Whether project attracts the General Condition specified in the Schedule of EIA Notification ? No
12.
Whether project attract the Specific Condition specified in the Schedule of EIA Notification ? No
13.
Raw Material / Fuel Requirement:
(a)Proposed quantity of raw material/fuel 51840
(b)Existing quantity of raw material/fuel N/A
(c)Total quantity of raw material/fuel 51840
    13.1.        Raw Material / Fuel Profile
S. No.Raw Material / Fuel QuantityUnitOther UnitSource (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received )Mode of TransportOther Mode of TransportDistance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received)Type of Linkage Other Type of Linkage Uploaded Copy of Linkage
(1.)RAW11840Tons per AnnumMolasses - 11840 TPA from Sitaram Sugars LadhodRoad55 MoUCopy of Linkage
(2.)RAW121.5Tons per AnnumLime from Local VendorRoad13 Open MarketCopy of Linkage
(3.)RAW13.5Tons per AnnumAntifoam - Local VendorRoad13 Open MarketCopy of Linkage
(4.)RAW25.92Tons per AnnumCulture for composting unit from local vendorRoad13 Open MarketCopy of Linkage
(5.)Raw material40000Tons per AnnumMolasses from Own sugar factoryOthersPipeline0 OthersInternal transportation within own factoryCopy of Linkage
(6.)RAW0.05Tons per AnnumDAP for Distillery & Biogas unitRoad13 OthersNACopy of Linkage
(7.)RAW20.25Tons per AnnumUrea- Local VendorRoad13 OthersNACopy of Linkage
(8.)RAW130140Tons per AnnumBiomethanated spentwash froom own distillery unitOthersHDPE Pipeline0 OthersNACopy of Linkage
(9.)RAW25920Tons per AnnumPress mud from own sugar factoryOthersInternal transportation by tractor or trolley0 OthersNACopy of Linkage
(10.)RAW25920Tons per Annumconc biomethanated spentwash from evaporation unitOthersHDPE pipeline0 OthersInternal transportation by HDPE pipelineCopy of Linkage
(11.)RAW0.135Kilo Litre per DaySulphuric acid- Local vendorRoad13 Open MarketCopy of Linkage
14.
Baseline Data :
(a)Period of Base Line Data Collection FROM 01 Oct 2017 To 31 Dec 2017
(b)Season Winter
    14.1.     No. of ambient Air Quality (AAQ) monitoring locations : 8
S. No.Criteria Pollutants Other Criteria PollutantsUnitMaximum ValueMinimum Value98 Percentile ValuePrescribed Standard
(1.)NOxMicro Gram per Meter Cube19.088.8213.4180
(2.)PM2.5Micro Gram per Meter Cube33.9715.5427.4360
(3.)PM10Micro Gram per Meter Cube81.240.963.09100
(4.)SO2Micro Gram per Meter Cube10.565.037.7280
    14.2.     No. of Ground Water monitoring locations : 8
S. No.Criteria Pollutants Other Criteria PollutantsHeavy MetalUnitOther UnitMaximum ValueMinimum ValueDesirable LimitMaximum Permissible Limit
(1.)pHNA7.537.066.58
(2.)TDSmg/l8473535002000
(3.)Total Hardnessmg/l596260200600
(4.)Chloridesmg/l187182501000
(5.)Heavy MetalsLeadmg/l0.0010.00100.01
(6.)TSSmg/l0000
(7.)Fluoridemg/l0.40.411.5
    14.3.     No. of Surface Water monitoring locations : 8
S. No.Criteria Pollutants Other Criteria PollutantsUnitOther UnitMaximum ValueMinimum ValueClassification of inland water body
(1.)DOmg/l00E
(2.)pHNA8.27.63E
(3.)BODmg/l84E
(4.)CODmg/l88E
    14.4.     No. of Ambient Noise monitoring locations : 8
S. No.Parameter UnitMaximum ValueMinimum ValuePrescribed Standard
(1.)Leq(Night)A-weighted decibels(dB(A))60.333.870
(2.)Leq(Day)A-weighted decibels(dB(A))69.436.475
    14.5.     No. of Soil Sample Monitored locations : 8
S. No.Parameter UnitOther UnitMaximum ValueMinimum Value
(1.)K(Potassium)Milligram per Kilogram72.4440.84
(2.)pHOthersNA7.927.16
(3.)N(Nitrogen)Milligram per Kilogram1637.721207.29
(4.)P(Phosphorus)Milligram per Kilogram247.9827.79
(5.)Electric ConductivityMillisiemens per Centimetre1.7090.103
14.6.
Details of Ground Water Table:
(a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) From 10 To 40
(b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) From 05 To 40
(c)Whether Ground Water Intersection will be there ? NA
     15.      Details of Water Requirement (During Operation)
S. No.Source Source Other Required Quantity (Kilolitre per Day (Kld))Distance from SourceCopy of Permission from Competent Authority Mode of TransportOther Mode of TransportMethod of Water WithdrawalOther Method of Water WithdrawalLetter No.Date of IssuePermitted Quantity
(1.)GroundWater3240Copy of Permission LetterPipelineOthersExisting bore wellNS/MFG/2017-18/2.4103 Nov 2017000
15.1.
(a)Whether Desalination is proposed No
    16.       Waste Water Management(During Operation)
S. No.Type/Source Quantity of Waste Water Generated (Kilolitre per Day)Treatment Capacity (Kilolitre per Day) Treatment MethodMode of DisposalOther Mode of DisposalQuantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day)Quantity of Discharged Water (Kilolitre per Day)
(1.)liquid waste streams515515CPUOthersRecycle5150
(2.)Spent Wash9696Spentwash treatment will be as biomethanation followed by concentration of biomethanated spentwash with integrated evaporation and standalone evaporation system to concentrate biomethanated spent wash (6% to 30%, i.e. from 482 TPD to 96 TPD) followed by composting system.OthersZero Liquid Discharge960
16.1.
(a)Total Waste Water Generation (Kilolitre per Day) 611
(b)Total Discharged Water (Kilolitre per Day) 0
(c)Total Reused Water (Kilolitre per Day) 611
    17.       Solid Waste Generation/Management
S. No.Name of Waste Item Other ItemQuantity per AnnumUnitDistance from Site(KM)Mode of TransportOther Mode of TransportMode of DisposalOther Mode of Disposal
(1.)CPU sludgeIndustrial Waste67.5Tons0RoadOthersWill be composted & used in Own garden
(2.)Canteen wasteMunicipal Solid Waste270Tons0RoadOthersWill be composted & used in
(3.)Waste from Packing sectionOthersWaste papers135Tons0RoadOthersSale to authorized dealer
(4.)Yeast sludgeIndustrial Waste4050Tons0RoadOthersWill be Composted & used in factory farm
(5.)Colony wasteMunicipal Solid Waste540Tons0RoadOthersWill be Composted & used in factory farm
(6.)Office wasteMunicipal Solid Waste135Tons0RoadOthersSale to authorized dealer
(7.)Boiler AshIndustrial Waste3924Tons0RoadOthersAs a soil conditioner to member farmers
18.
    18.1.     Air Quality Impact Prediction
S. No.Criteria Pollutants Other Criteria PollutantsUnitBaseline ConcentrationDistance GLCIncremental ConcentrationTotal GLCPrescribed Standard
(1.)PM2.5Microgram per Meter Cube31.6721.4433.1160
(2.)NOxMicrogram per Meter Cube19.0827.2226.380
(3.)SO2Microgram per Meter Cube10.5624.0614.6280
(4.)PM10Microgram per Meter Cube81.222.3883.58100
    18.2.     Stack Details
S. No.Source FuelStack Height(m)Stack Diameter(m)PollutantsOther PollutantsEmission (GLS)
(1.)Existing sugar factory boiler I & II of 35 TPH980 TPD bagasse463PM1083.58
(2.)Existing sugar factory boiler III of 65 TPHBagasse 655 TPD603PM1083.58
(3.)No New Boiler. Hence no proposed stackNA00OthersNANA
19.
Power Requirement:
(a)Quantity (Kilo Volt Amps (kVA)) 825
(b)Source Existing captive power plant of 9 MW during season
(c)Uploaded Copy of Agreement Copy of Agreement
(d)Standby Arrangement (Details of DG Sets) Proposed DG set of 600 KVA
(e)Stack Height (in m) 3
20.
Land Ownership Pattern:
(a)Forest Land (ha.) 0
(b)Private Land (ha.) 43.7060
(c)Government Land (ha.) 0
(d)Revenue Land (ha.) 0
(e)Other Land (ha.) 0
    Total Land (ha.) 43.7060
21.
Present Land Use Breakup of the Study Area in Ha:
(a)Agriculture Area (ha.) 0
(b)Waste/Barren Land (ha.) 0
(c)Grazing/ Community Land (ha.) 0
(d)Surface Water Bodies (ha.) 0
(e)Settlements (ha.) 0
(f)Industrial (ha.) 29.0106
(g)Forest (ha.) 0
(h)Mangroves (ha.) 0
(i)Marine Area (ha.) 0
(j)Others (ha.) : Total Green Belt 14.6954
    Total (ha.) 43.706
    22.     Land requirement for various activities
S. No.Description of Activity / Facility / Plant / Others OthersLand Requirement (ha.)Remarks
(1.)Green belt14.6954NA
(2.)OthersExisting sugar unit area10.4397NA
(3.)Main Plant1.0958NA
Total (ha.) 26.2309
23.
Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Sanctuaries; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones :
    23.1.     Details of Ecological Sensitivity :
S. No.Details of Ecological Sensitivity NameDistance from the Project (Km)Remarks
(1.)Critically Polluted AreaNil within 10 km area0Nil within 10 km area
(2.)WLSNil within 10 km area0Nil within 10 km area
(3.)NPANil within 10 km area0Nil within 10 km area
(4.)ESAsNil within 10 km area0Nil within 10 km area
(5.)Wildlife CorridorsNil within 10 km area0Nil within 10 km area
(6.)ESZsNil within 10 km area0Nil within 10 km area
(7.)CorridorsNil within 10 km area0Nil within 10 km area
    23.2.     Details of Environmental Sensitivity :
S. No.Details of Environmental Sensitivity Other Details of Environmental Sensitivity NameDistance from the Project (Km)Remarks
(1.)Defence InstallationsNil within 10 km area0Nil within 10 km area
(2.)OthersNANA0Nil within 10 km area
(3.)ForestNil within 10 km area0Nil within 10 km area
(4.)Archaeological SitesNil within 10 km area0Nil within 10 km area
23.3.
(a)Whether Noc / Permission from the competent authority is required? No
(b)Whether NBWL recommendation is required? No
24.
Forest Land:
Whether any Forest Land involved? No
25.
Tree Cutting:
(a)No. of Trees Cut for the Project (if Forest Land not Involved) 0
(b)Details of Tree Cutting and Planting of Trees Not Applicable
26.
Land Acquisition Status:
(a)Acquired Land(Ha) 43.7060
(b)Land yet to be acquired(Ha) 0
(c)Status of Land acquisition if not acquired Land is already in possession of industry
27.
Rehabilitation and Resettlement (R&R):
(a)No. of Villages 0
(b)No. of Households 0
(c)No. of PDFs (Project Displaced Families) 0
(d)No. of PAFs (Project Affected Families) 0
(e)Funds Allocated for R&R(in INR) (in Lacs) 0
(f)Status of R&R Completed
28.
Details of Presence of Schedule-I Species:
(a)Whether there is Presence of Schedule-I Species ? No
(b)Whether conservation plan for Schedule-I Species has been prepared ? No
(c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? No
29.
Details of Presence of Water Bodies in Core Area:
(a)Whether there is Presence of Water Bodies in Core Area ? Yes
(i)Details of Water Bodies in Core Area Narmada river flows from east to west direction at a distance of 7.5 km from the project site. Karjan River flow along eastern periphery of project site at a distance of 10 km
(b)Whether there is Diversion Required ? No
(c)Whether permission has been obtained from competent authority ? No
30.
Details of Presence of Water Bodies in Buffer Area:
(a)Whether there is Presence of Water Bodies in Buffer Area ? No
31.
Manpower Requirement:
(a)Permanent Employment-During Construction 0
(b)Permanent Employment-During Operation 83
(c)Temporary Employment- During Construction 0
(d)Temporary Employment- During Operation 0
(e)No. of working days 270
(f)Total Manpower 83
32.
Green Belt in Ha:
(a)Total Area of Green Belt 14.6954
(b)Percentage of Total Project Area 33.62
(c)No. of Plants to be Planted 11431
(d)Funds Allocated for Plantation 2000000
(e)Uploaded Green Belt plan Copy of Green Belt Plan
    33.       Project Benefits
S. No. Type of Project BenefitsDetails of Project Benefits
NIL
   34.   CRZ Specific Details : Not Applicable
   35.   Sector Specific Details : NOT APPLICABLE
   35.   Sector Specific Details For Industrial Projects - 2
S. No.Item Details
S. No.Item Details
36.
Details of Court Cases:
(a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? No
37.
Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act:
(a)Whether any Direction issued under EPA Act/Air Act/Water Act ? No
38.
Details of EIA Consultant:
(a)Have you hired Consultant for preparing document? Yes
(i)Accreditation No. QCI/NABET/EIA/ACO/18/0618
(ii)Name of the EIA Consultant SGM corporate consultants Pvt. Ltd.
(iii)Address Saahil Apartments,1102/A/4B,Model Colony Lakaki Road,Opp. Kirloskar Bunglow, Shivaji Nagar , Pune -411016
(iv)Mobile No. 9552589304
(v)Landline No. 0202565290
(vi)Email Id sgm_pune@yahoo.com
(vii)Category of Accreditation A
(viii)Sector of Accreditation Industrial Projects - 2
(ix)Validity of Accreditation 07 Nov 2018
(x)Uploaded Certificate of Accreditation certified by QCI/NABET Copy of Certificate of Accreditation
39.
Documents to be Attached:
(a)Uploaded Copy of EIA/EMP Report Copy of EIA/EMP
Copy of EIA/EMP(Annexures)
Copy of EIA/EMP(Plans/Figures)
(b)Uploaded Copy of Risk Assessment Report Copy of Risk Assessment
(c)Uploaded Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan
(d)Uploaded Copy of Final Layout Plan Copy of Final Layout Plan
(e)Uploaded Cover Letter Copy of Cover Letter
(f)Uploaded Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency
(g)Uploaded Additional File Copy of Additional File
(h)Uploaded Proposal Presentation (To be given in EAC meeting) NA
            Essential Detail Sought:
Sno. EDS Letter Remarks Date of EDS
1.NAPlease inform/clarify the following:- - Whether the proposed industrial operations are permitted at the identified project site and/or in conformity with land use of the area. That needs to be confirmed along with supporting documents. This was asked earlier also vide query dated 15/9/2017, but no reply was submitted. - Entry in Form-2 against item 6, ToR details are shown as Nil. - Status of clearances required from CGWA for ground water withdrawal of 324 cum/day. 09 Sep 2018
2.NAThe correction have been made as per the instruction received 14 Sep 2018
3.NAPlease submit the information desired vide query dated 9/9/2018 for consideration of the proposal. 21 Sep 2018
4.NAThe correction have been made as per the instruction received 27 Sep 2018
5.NAReply to the query dated 9/9/2018, reiterated on 21/9/2018, is yet to be provided for further consideration of the proposal. In case of clarifications, if any, the matter may be discussed with us in the Ministry. 29 Sep 2018
6.NAReply to the query dated 9/9/2018, reiterated on 21/9/2018, is yet to be provided for further consideration of the proposal. In case of clarifications, if any, the matter may be discussed with us in the Ministry. 29 Sep 2018
7.NAThe correction have been made as per the instruction received 03 Oct 2018
8.NAPlease see our earlier observations vide queries dated 9/9/2018, 21/9/2018 & 29/9/2018 for the needful. Also please inform whether extension of validity of accreditation as communicated vide QCI-NABET letter dated 8/5/2018 still stands. 06 Oct 2018
9.NAThe correction have been made as per the instruction received 09 Oct 2018
            Additional Detail Sought:
Sno. ADS Letter Remarks Date of ADS
1. ADS Reply LetterDear sir/ Madam, Our project for proposed 45 KLPD molasses based distillery was considered in 42nd EAC meeting held on 31st October 2018 (Agenda Item No.42.7.3). As per the minutes of this meeting submitting herewith compliance of the points raised in MoM. Kindly consider & grant us EC at your earliest. Thanks & Regard M/s Shree Narmada Khand Udyog Sahakari Mandli Ltd. 07 Jan 2019
2.NADeferred 26 Nov 2018
Undertaking
I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief. And I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity/ construction/ expansion has since been taken up.
Name of ApplicantNarendrabhai A Patel
DesignationMD
Name of Company (Applicant Name should not be given here)M/S SHREE NARMADA KHAND UDYOG SAHAKARI MANDLI LTD.
AddressGat No. 141, 142, 143, Dharikheda village, P.O. Timbi, Tal - Rajpipla Nandod, Dist. - Narmada, Gujarat.