Form-2
APPLICATION FOR PRIOR ENVIRONMENTAL CLEARANCE
S. No.Item Details
1.
Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? No
Details of Project:
(a)Name of the project(s) APPLICATION OF EC IN RESPECT OF TIRINGPAHAR IRON & MANGANESE MINE REQUIRED UNDER THE MoEF & CC NOTIFICATION S.O. 1530(E), DATED 06.04.2018
(b)Name of the Company / Organisation TATA STEEL LIMITED SUKINDA CHROMITE MINE
(c)Registered Address SUKINDA CHROMITE MINE P.O- KALARANGIATTA DIST- JAJPUR ODISHA,,Jajpur,Sikkim-755028
(d)Legal Status of the Company Private
(e)Joint Venture No
2.
Address for the correspondence:
(a)Name of the Applicant Sabyasachy Mishra
(b)Designation (Owner/ Partner/ CEO) Head (Mine & Production Planning, FAMD)
(c)Address Administrative office Manganese group of Mines, ( TATA STEEL LIMITED) At/P.O- Bichakundi Via- Joda District: Keonjhar State – Odisha,,Andheri,Keonjhar,Orissa-758082
(d)Pin code 758082
(e)E-mail sabyasachy_mishra@yahoo.co.in
(f)STD Code. 6726(f)Telephone No. 268763
(g)Fax No. 06726268734
(h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . Annexure-Uploaded Copy of documents in support of the competence/authority
3.
Category of the Project/Activity as per Schedule of EIA Notification,2006:
(a.I)Project/Activity1(a) Mining of minerals
Minor Activity1(a) Mining of minerals
(b)Category A
(c)Proposal Number IA/OR/MIN/77252/1900
(d)Master Proposal Number(Single Window) SW/77249/2018
(e)EAC concerned (for category A Projects only) Non-Coal Mining
(f)Project Type Fresh EC
4.
Location of the Project:
(a)Plot/Survey/Khasra No. Village: Guruda Plotno: 445 P,546 P,547,548 P,549
(b)Pincode 758034
(c)Bounded Latitudes (North)
From
Degree 21
Minutes
Second
From
Degree 21
Minutes
Second
(d)Bounded Longitudes (East)
From
Degree 85
Minutes
Second
From
Degree 85
Minutes
Second
(e)Survey of India Topo Sheet No. F45N/5
(f)Uploaded Topo Sheet File Copy of Topo Sheet File
(g)Maximum Elevation Above Means Sea Level(AMSL) 700
(h)Uploaded (kml) File Copy of Kml File      
(i)Distance of Nearest HFL from the project boundary within the study area 4.5
(j)Seismic Zone 2
5.
(a)Number of States in which Project will be Executed 1
(b)Main State of the project Orissa
Details of State of the project
S. No. State Name District Name Tehsil Name Village Name
NIL
6.
Details of Terms of Reference (ToR):
(a)MoEF&CC / SEIAA File Number NIL
(b)Date of Apply of TOR NIL
(c)Date of Issue of TOR / Standard ToR NIL
(d)Previous TOR Letter NIL
7.
Details of Public Consultation:
(a)Whether the Project Exempted from Public Hearing?Yes
(b)Reason The public consultation for the project was sucess
(c)Supporting Document Copy of Supporting Document
8.
Details of Project Configuration/Product:
     8.1.       Project Configuration
S. No.Plant/Equipment/FacilityConfigurationRemarks
(1.)Excavator0.9 cumUsed for Mining operation
(2.)Excavator2.4 cumUsed for Mining operation
(3.)Dumper9 cumUsed for Mining operation
(4.)Drill100mm 365 CFMUsed for Mining operation
(5.)Placer Dumper3.00 cumUsed for Mining operation
(6.)Water Sprinkler8 KLUsed for Mining operation
(7.)Dozer120 HPUsed for Mining operation
(8.)Water Sprinkler8 KLUsed for Mining operation
(9.)Dumper7 cumUsed for Mining operation
(10.)Explosive van10 TonnesUsed for Mining operation
(11.)Excavator2.1 cumUsed for Mining operation
     8.2.       Product
S. No.Product/Activity (Capacity/Area)QuantityUnitOther UnitMode of Transport / Transmission of ProductOther Mode of Transport / Transmission of Product
(1.)Manganese Ore85000Tons per AnnumRoad
9.
In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii):
Details Not Applicable
9.1.
Details of Consent to Operate
(i)Whether Consent to operate obtained ? Obtained
(ii)Copies of all Consent to operate obtained since inception Copy of Consent to Operate
(iii)Date of Issue 19 Jan 2016
(iv)Valid Upto 31 Mar 2021
(v)File No. 1482/IND-I-CON-190
(vi)Application No. 410096
(vii)Copy of Consent to operate valid as on date Copy of Consent to Operate
10.
Project Cost:
(a)Total Cost of the Project at current price level (in Crores) 1.9
(b) Funds Allocated for Environment Management (Capital) (in Crores) 0.55
(c) Funds Allocated Towards CER (Corporate Environment Responsibility) (in Crores) 0.019
(d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in Crores) 0.109
11.
Whether project attracts the General Condition specified in the Schedule of EIA Notification ? No
12.
Whether project attract the Specific Condition specified in the Schedule of EIA Notification ? No
13.
Raw Material / Fuel Requirement:
(a)Proposed quantity of raw material/fuel 0
(b)Existing quantity of raw material/fuel N/A
(c)Total quantity of raw material/fuel 0
    13.1.        Raw Material / Fuel Profile
S. No.Raw Material / Fuel QuantityUnitOther UnitSource (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received )Mode of TransportOther Mode of TransportDistance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received)Type of Linkage Other Type of Linkage Uploaded Copy of Linkage
(1.)HSD0.3Kilo Litre per DayNearby PSU dealerRoad10 Open MarketCopy of Linkage
14.
Baseline Data :
(a)Period of Base Line Data Collection FROM 02 Dec 2002 To 28 Feb 2003
(b)Season Winter
    14.1.     No. of ambient Air Quality (AAQ) monitoring locations : 17
S. No.Criteria Pollutants Other Criteria PollutantsUnitMaximum ValueMinimum Value98 Percentile ValuePrescribed Standard
(1.)PM10Micro Gram per Meter Cube0000
(2.)SO2Micro Gram per Meter Cube10101080
(3.)NOxMicro Gram per Meter Cube10101080
(4.)OthersSPMMicro Gram per Meter Cube28772171.8360
(5.)PM2.5Micro Gram per Meter Cube0000
    14.2.     No. of Ground Water monitoring locations : 7
S. No.Criteria Pollutants Other Criteria PollutantsHeavy MetalUnitOther UnitMaximum ValueMinimum ValueDesirable LimitMaximum Permissible Limit
(1.)pHNA7.26.596.58.5
(2.)Total Hardnessmg/l4227200600
(3.)TDSmg/l84745002000
(4.)Chloridesmg/l14.482501000
(5.)Fluoridemg/l0011.5
(6.)Heavy MetalsZnmg/l0.210.2200600
(7.)TSSmg/l0000
    14.3.     No. of Surface Water monitoring locations : 7
S. No.Criteria Pollutants Other Criteria PollutantsUnitOther UnitMaximum ValueMinimum ValueClassification of inland water body
(1.)DOmg/l6.94.8A
(2.)pHNA7.046.8A
(3.)BODmg/l1.20.9A
(4.)CODmg/l4.12.1A
    14.4.     No. of Ambient Noise monitoring locations : 10
S. No.Parameter UnitMaximum ValueMinimum ValuePrescribed Standard
(1.)Leq(Day)A-weighted decibels(dB(A))57.24075
(2.)Leq(Night)A-weighted decibels(dB(A))42.14070
    14.5.     No. of Soil Sample Monitored locations : 5
S. No.Parameter UnitOther UnitMaximum ValueMinimum Value
(1.)N(Nitrogen)Percent0.080.01
(2.)Electric ConductivityMillisiemens per Centimetre365290
(3.)pHOthersNA6.86.4
(4.)P(Phosphorus)Kilogram per hectare274.5
(5.)K(Potassium)Kilogram per hectare250250
14.6.
Details of Ground Water Table:
(a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) From 5.5 To 9.5
(b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) From 2.5 To 5.0
(c)Whether Ground Water Intersection will be there ? No
     15.      Details of Water Requirement (During Operation)
S. No.Source Source Other Required Quantity (Kilolitre per Day (Kld))Distance from SourceCopy of Permission from Competent Authority Mode of TransportOther Mode of TransportMethod of Water WithdrawalOther Method of Water WithdrawalLetter No.Date of IssuePermitted Quantity
(1.)Surface566.6Copy of Permission LetterPipelineOthersPumphouse33517 Jan 20189166
15.1.
(a)Whether Desalination is proposed No
    16.       Waste Water Management(During Operation)
S. No.Type/Source Quantity of Waste Water Generated (Kilolitre per Day)Treatment Capacity (Kilolitre per Day) Treatment MethodMode of DisposalOther Mode of DisposalQuantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day)Quantity of Discharged Water (Kilolitre per Day)
(1.)Na000OthersNot Required as no beneficiation practice00
16.1.
(a)Total Waste Water Generation (Kilolitre per Day) 0
(b)Total Discharged Water (Kilolitre per Day) 0
(c)Total Reused Water (Kilolitre per Day) 0
    17.       Solid Waste Generation/Management
S. No.Name of Waste Item Other ItemQuantity per AnnumUnitDistance from Site(KM)Mode of TransportOther Mode of TransportMode of DisposalOther Mode of Disposal
(1.)OverburdenOthersWaste rock generated due to mining process1683000Tons0RoadOthersWaste dumps and Backfilling (Inpit Dumping)
18.
    18.1.     Air Quality Impact Prediction
S. No.Criteria Pollutants Other Criteria PollutantsUnitBaseline ConcentrationDistance GLCIncremental ConcentrationTotal GLCPrescribed Standard
(1.)PM10Microgram per Meter Cube00000
(2.)PM2.5Microgram per Meter Cube00000
(3.)SO2Microgram per Meter Cube00000
(4.)NOxMicrogram per Meter Cube00000
(5.)Others(Specify)SPMMicrogram per Meter Cube28700.60287.60360
    18.2.     Stack Details
S. No.Source FuelStack Height(m)Stack Diameter(m)PollutantsOther PollutantsEmission (GLS)
(1.)No stack in proposed project000OthersNA0
19.
Power Requirement:
(a)Quantity (Kilo Volt Amps (kVA)) 30.4
(b)Source NESCO
(c)Uploaded Copy of Agreement Copy of Agreement
(d)Standby Arrangement (Details of DG Sets) 15 KVA DG Set
(e)Stack Height (in m) 4.5
20.
Land Ownership Pattern:
(a)Forest Land (ha.) 133.174
(b)Private Land (ha.) 1.311
(c)Government Land (ha.) 34.515
(d)Revenue Land (ha.) 0
(e)Other Land (ha.) 0
    Total Land (ha.) 169
21.
Present Land Use Breakup of the Study Area in Ha:
(a)Agriculture Area (ha.) 2.647
(b)Waste/Barren Land (ha.) 23.864
(c)Grazing/ Community Land (ha.) 0
(d)Surface Water Bodies (ha.) 0
(e)Settlements (ha.) 0
(f)Industrial (ha.) 0
(g)Forest (ha.) 133.174
(h)Mangroves (ha.) 0
(i)Marine Area (ha.) 0
(j)Others (ha.) : Khani 9.315
    Total (ha.) 169
    22.     Land requirement for various activities
S. No.Description of Activity / Facility / Plant / Others OthersLand Requirement (ha.)Remarks
(1.)Quarry Area74.346As at end of life
(2.)OB Dump Area68.595As at end of life
(3.)Green belt1As at end of life
(4.)Othersnfrastructure,Mineral Storage,Roads,Untouched Area25.059Infrastructure,Roads,Untouched Area
Total (ha.) 169
23.
Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Sanctuaries; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones :
    23.1.     Details of Ecological Sensitivity :
S. No.Details of Ecological Sensitivity NameDistance from the Project (Km)Remarks
(1.)Critically Polluted AreaNA0No Critically Polluted Area
(2.)WLSNA0NA
(3.)ESZsNA0NA
(4.)Wildlife CorridorsNA0NA
(5.)NPANA0NA
(6.)ESAsNA0NA
(7.)CorridorsNA0NA
    23.2.     Details of Environmental Sensitivity :
S. No.Details of Environmental Sensitivity Other Details of Environmental Sensitivity NameDistance from the Project (Km)Remarks
(1.)Defence InstallationsNA0NA
(2.)ForestReserve Forests1.2Chamakpur RF 4.2 km NE, Baitarini RF 1.2 km NW, Siddhamath RF 3.8 km NW, Mendhamaruni RF 10.2 km W
(3.)Archaeological SitesNA0NA
23.3.
(a)Whether Noc / Permission from the competent authority is required? No
(b)Whether NBWL recommendation is required? No
24.
Forest Land:
Whether any Forest Land involved? No
25.
Tree Cutting:
(a)No. of Trees Cut for the Project (if Forest Land not Involved) 0
(b)Details of Tree Cutting and Planting of Trees Not Applicable
26.
Land Acquisition Status:
(a)Acquired Land(Ha) 0
(b)Land yet to be acquired(Ha) 0
(c)Status of Land acquisition if not acquired Not applicable to project
27.
Rehabilitation and Resettlement (R&R):
(a)No. of Villages 0
(b)No. of Households 0
(c)No. of PDFs (Project Displaced Families) 0
(d)No. of PAFs (Project Affected Families) 0
(e)Funds Allocated for R&R(in INR) (in Lacs) 0
(f)Status of R&R Completed
28.
Details of Presence of Schedule-I Species:
(a)Whether there is Presence of Schedule-I Species ? Yes
(i)Details of Schedule-I Species Sloth Bear,Elephant and python
(b)Whether conservation plan for Schedule-I Species has been prepared ? Yes
(i)Uploaded copy of conservation plan Copy of conservation plan
(ii)Fund Provision made 276.17 Lakhs
(iii)Period of Implementation 2015-20
(c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? Yes
(i)Uploaded copy of approval Copy of approval
(ii)Letter No. 7724/1WL-SSP-94/2015
(iii)Date of issue 03 Aug 2015
(iv)Recommendation NA
29.
Details of Presence of Water Bodies in Core Area:
(a)Whether there is Presence of Water Bodies in Core Area ? No
(b)Whether there is Diversion Required ? No
(c)Whether permission has been obtained from competent authority ? No
30.
Details of Presence of Water Bodies in Buffer Area:
(a)Whether there is Presence of Water Bodies in Buffer Area ? Yes
(i)Details of Water Bodies in Buffer Area Baitarni River
(ii)Direction of Water Bodies in Buffer Area East
(iii)Distance of Water Bodies in Buffer Area 4.5
31.
Manpower Requirement:
(a)Permanent Employment-During Construction 0
(b)Permanent Employment-During Operation 188
(c)Temporary Employment- During Construction 0
(d)Temporary Employment- During Operation 0
(e)No. of working days 310
(f)Total Manpower 188
32.
Green Belt in Ha:
(a)Total Area of Green Belt 1
(b)Percentage of Total Project Area 0.59
(c)No. of Plants to be Planted 100719
(d)Funds Allocated for Plantation 300000
(e)Uploaded Green Belt plan Copy of Green Belt Plan
    33.       Project Benefits
S. No. Type of Project BenefitsDetails of Project Benefits
NIL
   34.   CRZ Specific Details : Not Applicable
   35.   Sector Specific Details For Non-Coal Mining
S. No.Item Details
     1.       No. of Mineral(s) to be Mined : 1
S. No.Mineral(s) to be Mined Major or Minor Mineral
(1.)ManganeseMajor
2.
Mine Capacity in ROM (Run of Mine) 97750
3.
Uploaded 500 meters Cluster Certificate from State Mines and Geology in case of minor minerals Copy of 500 meters Cluster Certificate from State Mines and Geology
4.
Mining Plan:
(a)Approval Letter No. MSM/FM/11-ORI/BHU/2018-19/720
(b)Date of Approval 03 Jul 2018
(c)Approved Letter Copy of Approved Letter
(d)Approved By State Mining and Geology Department IBM
(e)Approved Mining Lease Area 169
(f)Approved Capacity 97750
5.
Technical Details:
(a)Total Geological Reserves (Million Ton) 0.897
(b)Mineable Reserves (Million Ton) 0.897
(c)Extractable Reserves(Million Ton) 0.717
(d)Percent(%) of Extraction 90
(e)Grade of Coal /Ore /Mineral 25
(f)Stripping Ratio 1 : 3.7
(g)Category of Gaseousness (Only for Coal Mining, Others may Write NA) NA
(h)Average Gradient(Degree) 45
(i)Mining Method Opencast
(j)Life of Mine (Years) 9
6.
Details of Beneficiations:
(a)Whether it is proposed to install beneficiation plant/Coal washery within the mining lease area No
(b)Whether it is proposed to install crusher within the mining lease area No
7.
Details of Seams:
(a)Whether details of seam applicable No
8.
Details of Mining Lease:
(a)Mining Lease Area (in Hectare) 169
(b)Whether obtained Letter of Intent (LOI) from the state government ? No
(i)Reason thereof The mine is currently operational and has been ope
(c)Whether Lease Deed Executed ? Yes
(i)Copy of Executed Lease deed valid as on Date Copy of Executed Lease deed
(ii)Provide area in Hectare as per executed lease deed (initial) document 169
(iii)Validity of the lease deed From : 01 Mar 1980 To : 31 Aug 2018
(iv)Date of Execution of Mining Lese 08 May 2015
(v)Reference Number 11031500242
(d)Whether Lease Deed Renewed ? Yes
     8.1.    Earlier Renewals:
S. No.Lease Details Date of Renewal Period Copy of Earlier Lease Letter No.Area Remarks
(1.)Renewal 16 Jan 1970 From : 01 Mar 1960 To : 29 Feb 1980 Copy of Earlier Lease114 643.710
(2.)Transfer 08 May 2015 From : 01 Mar 1980 To : 31 Aug 2018 Copy of Earlier Lease11031500242 169
(3.)Renewal 21 Mar 1985 From : 01 Mar 1980 To : 29 Feb 2000 Copy of Earlier Lease1113(O) 643.710
(4.)Initial 01 Jan 1900 From : 01 Mar 1930 To : 29 Feb 1960 Copy of Earlier Lease67 643.710
9.
OB (Over Burden) Management:
(a) Details of External Dumps:
(i)No. of OB Dumps 2
(ii)Total Area (in Hectare) 31.042
(iii)Height (in meter) 111
(iv)Quantity (in Million Cubic meter) 4.55
(v)No. of year back fill up 2
(b) Details of Internal Dumps:
(i)No. of Internal Dumps 0
(ii)Total Area (in Hectare) 0
(iii)Height (in meter) 0
(iv)Quantity (in Million Cubic meter) 0
10.
Details of Topsoil Management:
(a)Quantity of Topsoil excavated during the entire life of the mine (in Million Cubic metre) 4500
(b)Quantity of Topsoil proposed for utilization for reclamation during the entire life of the mine (in Million Cubic metre) 4500
(c)Quantity of Topsoil proposed for utilization for other activities during the entire life of the mine (in Million Cubic metre) 9
11.
Details of Final Mine Void:
(a)Area (in Hectare) 0
(b)Depth (in meter) 0
(c)Volume (in Million Cubic meter) 0
12.
Details of Quarry:
(a)Final Void of 0 (hectare) at a Depth of 0 meter which is Proposed to be Converted into a Water Body.
(b)Total Quarry Area (ha) 00
13.
Details of Transportation:
(a)In Pit/Underground to Surface NA
(b)Surface to Siding/Loading The finished manganese product will be sent to the
(c)Transportation / Conveyor Details NA
     14.      Details of Land Usage (Pre-Mining)
S. No.LAND USE Other LAND USEWITHIN ML AREA (Hectare)OUTSIDE ML AREA (Hectare)TOTAL (Hectare)
(1.)WASTE LAND35.826035.826
(2.)GRAZING LAND000
(3.)SURFACE WATER BODIES000
(4.)SETTLEMENTS000
(5.)FOREST LAND133.1740133.174
(6.)AGRICULTURE LAND000
TOTAL1690169
     15.      Details of Land Usage (Post-Mining)
S. No.LAND USE Other LAND USEPlantation (ha)Water Body (ha)Public Use (ha)Undisturbed (ha)Total
(1.)GREEN BELT1001
(2.)EXCAVATION/QUARRY40.84633.5074.346
(3.)VIRGIN AREA007.6677.667
(4.)EXTERNAL OB DUMPS68.5950068.595
(5.)TOP SOIL STORAGE0000
(6.)ROADS003.9583.958
(7.)INTERNAL OB DUMPS0000
(8.)BUILT UP AREA (COLONY/OFFICE)002.9962.996
TOTAL110.44133.514.6210158.562
16.
Details of Reclamation:
Total Afforestation Plan shall be Implemented Covering of Mining.
This will Include:
(a)External OB Dump(in hectare) 68.595
(b)Internal Dump(in hectare) 0
(c)Quarry(in hectare) 40.846
(d)Safety Zone(in hectare) 6.903
(e)Final Void of 0 (hectare) at a Depth of 0 meter which is Proposed to be Converted into a Water Body.
(f)Density of Tree Plantation per ha (in no.) 2500
(g)Others in ha (such as Excavation Area along ML Boundary, along Roads and Infrastructure, Embankment Area and in Township Located Outside the Lease etc) 0
(h)Total afforestation plant (in hectare) 110.441
17.
Status of progressive Mining Closure Plan:
Details Not Applicable
     18.      Details of Actual Coal/ ORE Production vis-a-vis Sanctioned Capacity since the Inception:
S. No.Financial Year Sanctioned Capacity as per EC (MTPA)Sanctioned Capacity as per CTOSanctioned Capacity as per approved mining planActual Production Excess Production Beyond the EC / CTO/ Mining Plan Sanctioned Capacity (MTPA)
(1.)199600132007531.9747531.974
(2.)2001001200014113.23014113.230
(3.)2002001200030350.73230350.732
(4.)2003001200047918.38947918.389
(5.)200885000850008500010009.5030
(6.)200985000850008500032288.2990
(7.)201085000850008500013170.4190
(8.)201185000850008500064070.3960
(9.)201285000850008500064070.3960
(10.)201885000850008500056845.6410
(11.)1998001200012138.04412138.044
(12.)1999001200015957.45415957.454
(13.)200000120008033.4948033.494
(14.)20040144008500071577.58371577.583
(15.)200501440085000110785.028110785.028
(16.)200685000850008500056191.7850
(17.)200785000850008500086714.7231714.723
(18.)201385000850008500073304.9460
(19.)201585000850008500018622.9700
(20.)201685000850008500030350.6650
(21.)201785000850008500027909.9790
(22.)201485000850008500084989.7910
(23.)199700132008147.6628147.662
S. No.Item Details
36.
Details of Court Cases:
(a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? No
37.
Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act:
(a)Whether any Direction issued under EPA Act/Air Act/Water Act ? No
38.
Details of EIA Consultant:
(a)Have you hired Consultant for preparing document? No
(i)Reason for not Hiring the Consultant Since the application is in pursuance of EIA notification 2006 in accordance to Notification S.O. 6
39.
Documents to be Attached:
(a)Uploaded Copy of EIA/EMP Report Copy of EIA/EMP
Copy of EIA/EMP(Annexures)
Copy of EIA/EMP(Plans/Figures)
(b)Uploaded Copy of Risk Assessment Report Copy of Risk Assessment
(c)Uploaded Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan
(d)Uploaded Copy of Final Layout Plan Copy of Final Layout Plan
(e)Uploaded Cover Letter Copy of Cover Letter
(f)Uploaded Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency
(g)Uploaded Additional File Copy of Additional File
(h)Uploaded Proposal Presentation (To be given in EAC meeting) NA
            Essential Detail Sought:
Sno. EDS Letter Remarks Date of EDS
1.NA1. Form I as per notification dated 6.04.2018 has not uploaded. 2. Copy of Mine Plan has not uploaded 3. EIA/EMP report uploaded- old copy 4. Details of past production of mine since its inception, duly authenticated by Department of Mines & Geology, State Government. 5. Copy of affidavit needs to be submitted by PP in compliance of the Ministry’s OM no. 3-50/2017-IA.III (Pt.), dated 30th May 2018. 6. Compliance of order dated 02.8.2017 in CWP No. 114/2014 of Hon'ble Supreme court (Common Cause Vs Union of India &Ors.) 7. Details of earlier CTE/CTO not opening 10 Sep 2018
2.NAThe correction have been made as per the instruction received 27 Sep 2018
      Additional Detail Sought : NIL
Undertaking
I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief. And I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity/ construction/ expansion has since been taken up.
Name of ApplicantSabyasachy Mishra
DesignationHead (Mine & Production Planning, FAMD)
Name of Company (Applicant Name should not be given here)TATA STEEL LIMITED SUKINDA CHROMITE MINE
AddressSUKINDA CHROMITE MINE P.O- KALARANGIATTA DIST- JAJPUR ODISHA
Print