1. | Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? | No | Details of Project: | (a)Name of the project(s) | APPLICATION OF EC IN RESPECT OF JODA WEST IRON & MANGANESE MINE REQUIRED UNDER THE MoEF & CC NOTIFICATION S.O. 1530(E) | (b)Name of the Company / Organisation | TATA STEEL LIMITED SUKINDA CHROMITE MINE | (c)Registered Address | SUKINDA CHROMITE MINE
P.O- KALARANGIATTA
DIST- JAJPUR
ODISHA,,Jajpur,Sikkim-755028 | (d)Legal Status of the Company | Private | (e)Joint Venture | No | |
|
2. | Address for the correspondence: | (a)Name of the Applicant | Sabyasachy Mishra | (b)Designation (Owner/ Partner/ CEO) | Head (Mine & Production Planning, FAMD) | (c)Address | Administrative office
Manganese group of Mines, ( TATA STEEL LIMITED)
At/P.O- Bichakundi
Via- Joda
District: Keonjhar
State – Odisha,,Andheri,Keonjhar,Orissa-758082 | (d)Pin code | 758082 | (e)E-mail | sabyasachy_mishra@yahoo.co.in | (f)STD Code. | 6726(f)Telephone No. | 268763 | (g)Fax No. | 06726268734 | (h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . | Annexure-Uploaded Copy of documents in support of the competence/authority | |
|
3. | Category of the Project/Activity as per Schedule of EIA Notification,2006: | (a.I)Project/Activity | 1(a) Mining of minerals
| Minor Activity | | (b)Category | A | (c)Proposal Number | IA/OR/MIN/77072/1900 | (d)Master Proposal Number(Single Window) | SW/77071/2018 | (e)EAC concerned (for category A Projects only) | Non-Coal Mining | (f)Project Type | Fresh EC |
|
|
4. | Location of the Project: | (a)Plot/Survey/Khasra No. | Village:Joda Plot no: 15,2,3,4,5,6,7,8,9,10,11,12, | (b)Pincode | 758034 | (c)Bounded Latitudes (North) | | From | | Degree | 21 | Minutes | | Second | | From | | Degree | 22 | Minutes | | Second | | (d)Bounded Longitudes (East) | | From | | Degree | 85 | Minutes | | Second | | From | | Degree | 85 | Minutes | | Second | | (e)Survey of India Topo Sheet No. | F45 N5 & F45 N8 | (f)Uploaded Topo Sheet File | Copy of Topo Sheet File | (g)Maximum Elevation Above Means Sea Level(AMSL) | 670 | (h)Uploaded (kml) File | Copy of Kml File | (i)Distance of Nearest HFL from the project boundary within the study area | 3.5 | (j)Seismic Zone | 2 | |
|
5. | (a)Number of States in which Project will be Executed | 1 | (b)Main State of the project | Orissa | |
|
|
Details of State of the project |
---|
S. No. | State Name | District Name | Tehsil Name | Village Name |
---|
NIL | |
|
6. | Details of Terms of Reference (ToR): | (a)MoEF&CC / SEIAA File Number | NIL | (b)Date of Apply of TOR | NIL | (c)Date of Issue of TOR / Standard ToR | NIL | (d)Previous TOR Letter | NIL | |
|
7. | Details of Public Consultation: | (a)Whether the Project Exempted from Public Hearing? | Yes | (b)Reason | Public hearing for the project was conducted succe | (c)Supporting Document | Copy of Supporting Document | |
|
8. | Details of Project Configuration/Product: | |
|
8.1. Project Configuration |
---|
S. No. | Plant/Equipment/Facility | Configuration | Remarks |
---|
(1.) | Excavator | 0.9 cum | Used for Mining operation | (2.) | Excavator | 1.8 cum | Used for Mining operation | (3.) | Drill | 100 mm, 365 cfm | Drilling holes for blasting | (4.) | Front End loader | 1.350 CUM | Used for Mining operation | (5.) | Water tanker | 12KL | Used for Mining operation | (6.) | Explosive Van | 10 Tonnes | Used for Mining operation | (7.) | Rock Drill | 100 mm | Used for Mining operation | (8.) | Excavator | 2.4 cum | Used for Mining operation | (9.) | Dozer | 180 HP | Used for Mining operation | (10.) | Dumper | 25 Tonnes | Used for Mining operation | |
8.2. Product |
---|
S. No. | Product/Activity (Capacity/Area) | Quantity | Unit | Other Unit | Mode of Transport / Transmission of Product | Other Mode of Transport / Transmission of Product |
---|
(1.) | Manganese Ore (Product) | 180000 | Tons per Annum | | Road | | |
|
9. | In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii): | Details Not Applicable | |
|
9.1. | Details of Consent to Operate | (i)Whether Consent to operate obtained ? | Obtained | (ii)Copies of all Consent to operate obtained since inception | Copy of Consent to Operate | (iii)Date of Issue | 18 Feb 2016 | (iv)Valid Upto | 31 Mar 2021 | (v)File No. | 3012/IND-I-CON-186 | (vi)Application No. | 442472 | (vii)Copy of Consent to operate valid as on date | Copy of Consent to Operate | |
|
|
10. | Project Cost: | (a)Total Cost of the Project at current price level (in Crores) | 2 | (b) Funds Allocated for Environment Management (Capital) (in Crores) | 0.61 | (c) Funds Allocated Towards CER (Corporate Environment Responsibility) (in Crores) | 0.02 | (d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in Crores) | 0.12 | |
|
11. | Whether project attracts the General Condition specified in the Schedule of EIA Notification ? | No | | |
12. | Whether project attract the Specific Condition specified in the Schedule of EIA Notification ? | No | | |
13. | Raw Material / Fuel Requirement: | (a)Proposed quantity of raw material/fuel | 0 | (b)Existing quantity of raw material/fuel | N/A | (c)Total quantity of raw material/fuel | 0 | |
|
  13.1. Raw Material / Fuel Profile |
---|
S. No. | Raw Material / Fuel | Quantity | Unit | Other Unit | Source (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received ) | Mode of Transport | Other Mode of Transport | Distance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received) | Type of Linkage | Other Type of Linkage | Uploaded Copy of Linkage |
---|
(1.) | HSD | 1.5 | Kilo Litre per Day | | Nearby PSU dealer | Road | | 12.5 | Open Market | | Copy of Linkage | |
|
14. | Baseline Data : | (a)Period of Base Line Data Collection | FROM 31 Dec 2002 To 28 Feb 2003 | (b)Season | Winter | |
|
14.1. No. of ambient Air Quality (AAQ) monitoring locations : 17 |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Unit | Maximum Value | Minimum Value | 98 Percentile Value | Prescribed Standard |
---|
(1.) | PM10 | | Micro Gram per Meter Cube | 0 | 0 | 0 | 0 | (2.) | PM2.5 | | Micro Gram per Meter Cube | 0 | 0 | 0 | 0 | (3.) | SO2 | | Micro Gram per Meter Cube | 3.5 | 1 | 3 | 60 | (4.) | NOx | | Micro Gram per Meter Cube | 9 | 4 | 4 | 60 | (5.) | Others | SPM | Micro Gram per Meter Cube | 183 | 75 | 179 | 140 | |
14.2. No. of Ground Water monitoring locations : 3 |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Heavy Metal | Unit | Other Unit | Maximum Value | Minimum Value | Desirable Limit | Maximum Permissible Limit |
---|
(1.) | pH | | | Others | Na | 7.2 | 6.8 | 6.5 | 8.5 | (2.) | TSS | | | mg/l | | 0 | 0 | 0 | 0 | (3.) | TDS | | | mg/l | | 98.1 | 72.9 | 500 | 2000 | (4.) | Chlorides | | | mg/l | | 14.4 | 6.4 | 250 | 1000 | (5.) | Heavy Metals | | Zn | mg/l | | 0.5 | 0.2 | 5 | 15 | (6.) | Fluoride | | | mg/l | | 0 | 0 | 1 | 1.5 | (7.) | Total Hardness | | | mg/l | | 42.1 | 39.2 | 200 | 600 | |
14.3. No. of Surface Water monitoring locations : 2 |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Unit | Other Unit | Maximum Value | Minimum Value | Classification of inland water body |
---|
(1.) | DO | | mg/l | | 5.23 | 5.1 | A | (2.) | BOD | | mg/l | | 1.6 | 0.96 | A | (3.) | COD | | mg/l | | 2.9 | 1.9 | A | (4.) | pH | | NA | | 7.56 | 7.5 | A | |
14.4. No. of Ambient Noise monitoring locations : 12 |
---|
S. No. | Parameter | Unit | Maximum Value | Minimum Value | Prescribed Standard |
---|
(1.) | Leq(Night) | A-weighted decibels(dB(A)) | 51 | 40 | 70 | (2.) | Leq(Day) | A-weighted decibels(dB(A)) | 61.2 | 40 | 75 | |
14.5. No. of Soil Sample Monitored locations : 4 |
---|
S. No. | Parameter | Unit | Other Unit | Maximum Value | Minimum Value |
---|
(1.) | pH | Others | NA | 7.8 | 6.4 | (2.) | N(Nitrogen) | Percent | | 0.013 | 0.002 | (3.) | K(Potassium) | Kilogram per hectare | | 250 | 250 | (4.) | P(Phosphorus) | Kilogram per hectare | | 40 | 16.5 | (5.) | Electric Conductivity | Millisiemens per Centimetre | | 370 | 215 | |
|
14.6. | Details of Ground Water Table: | (a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) | From 5.5 To 9 | (b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) | From 2.5 To 5 | (c)Whether Ground Water Intersection will be there ? | No | |
|
15. Details of Water Requirement (During Operation) |
---|
S. No. | Source | Source Other | Required Quantity (Kilolitre per Day (Kld)) | Distance from Source | Copy of Permission from Competent Authority | Mode of Transport | Other Mode of Transport | Method of Water Withdrawal | Other Method of Water Withdrawal | Letter No. | Date of Issue | Permitted Quantity |
---|
(1.) | Surface | | 262 | 3.5 | Not Appliacble | Pipeline | | Others | Pumphouse | 335 | 17 Jan 2018 | 9166 | |
|
15.1. | (a)Whether Desalination is proposed | No | |
|
16. Waste Water Management(During Operation) |
---|
S. No. | Type/Source | Quantity of Waste Water Generated (Kilolitre per Day) | Treatment Capacity (Kilolitre per Day) | Treatment Method | Mode of Disposal | Other Mode of Disposal | Quantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day) | Quantity of Discharged Water (Kilolitre per Day) |
---|
(1.) | NA | 0 | 0 | 0 | Others | NA | 0 | 0 | |
|
16.1. | (a)Total Waste Water Generation (Kilolitre per Day) | 0 | (b)Total Discharged Water (Kilolitre per Day) | 0 | (c)Total Reused Water (Kilolitre per Day) | 0 | |
|
17. Solid Waste Generation/Management |
---|
S. No. | Name of Waste | Item | Other Item | Quantity per Annum | Unit | Distance from Site(KM) | Mode of Transport | Other Mode of Transport | Mode of Disposal | Other Mode of Disposal |
---|
(1.) | Mining Overburden | Others | Waste Rock generated due to mining process | 2720000 | Tons | 0 | Road | | Others | Waste Dumps and Backfilling(Inpit Dumping) | |
|
|
18.1. Air Quality Impact Prediction |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Unit | Baseline Concentration | Distance GLC | Incremental Concentration | Total GLC | Prescribed Standard |
---|
(1.) | SO2 | | Microgram per Meter Cube | 0 | 0 | 0 | 0 | 0 | (2.) | Others(Specify) | SPM | Microgram per Meter Cube | 183 | 0 | 125.79 | 308.79 | 360 | (3.) | PM10 | | Microgram per Meter Cube | 0 | 0 | 0 | 0 | 0 | (4.) | PM2.5 | | Microgram per Meter Cube | 0 | 0 | 0 | 0 | 0 | (5.) | NOx | | Microgram per Meter Cube | 0 | 0 | 0 | 0 | 0 | |
|
18.2. Stack Details |
---|
S. No. | Source | Fuel | Stack Height(m) | Stack Diameter(m) | Pollutants | Other Pollutants | Emission (GLS) |
---|
(1.) | NA | NA | 0 | 0 | Others | NA | NA | |
|
19. | Power Requirement: | (a)Quantity (Kilo Volt Amps (kVA)) | 10000 | (b)Source | NESCO | (c)Uploaded Copy of Agreement | Copy of Agreement | (d)Standby Arrangement (Details of DG Sets) | 320 KVA DG Set | (e)Stack Height (in m) | 4.5 | |
|
20. | Land Ownership Pattern: | (a)Forest Land (ha.) | 1246.552 | (b)Private Land (ha.) | 191.065 | (c)Government Land (ha.) | 0.102 | (d)Revenue Land (ha.) | 0 | (e)Other Land (ha.) | 0 | Total Land (ha.) | 1437.719 | |
|
21. | Present Land Use Breakup of the Study Area in Ha: | (a)Agriculture Area (ha.) | 45.250 | (b)Waste/Barren Land (ha.) | 99.27 | (c)Grazing/ Community Land (ha.) | 0 | (d)Surface Water Bodies (ha.) | 0 | (e)Settlements (ha.) | 0 | (f)Industrial (ha.) | 0 | (g)Forest (ha.) | 1246.552 | (h)Mangroves (ha.) | 0 | (i)Marine Area (ha.) | 0 | (j)Others (ha.) : Gharabari,Karkhana,Danda,Debasthali | 46.647 | Total (ha.) | 1437.7189999999998 | |
|
22. Land requirement for various activities |
---|
S. No. | Description of Activity / Facility / Plant / Others | Others | Land Requirement (ha.) | Remarks |
---|
(1.) | Township | | 113.236 | At the end of life | (2.) | Quarry Area | | 801.69 | At the end of life | (3.) | OB Dump Area | | 160.01 | At the end of life | (4.) | Green belt | | 64.794 | | (5.) | Others | Untouched Area and Infrastructures | 297.989 | | |
|
|
23. | Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Sanctuaries; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones : | |
|
23.1. Details of Ecological Sensitivity : |
---|
S. No. | Details of Ecological Sensitivity | Name | Distance from the Project (Km) | Remarks |
---|
(1.) | ESZs | NA | 0 | NA | (2.) | Wildlife Corridors | NA | 0 | NA | (3.) | WLS | NA | 0 | na | (4.) | ESAs | NA | 0 | NA | (5.) | Corridors | NA | 0 | NA | (6.) | Critically Polluted Area | NA | 0 | NA | (7.) | NPA | NA | 0 | NA | |
23.2. Details of Environmental Sensitivity : |
---|
S. No. | Details of Environmental Sensitivity | Other Details of Environmental Sensitivity | Name | Distance from the Project (Km) | Remarks |
---|
(1.) | Forest | | Baitarini RF | 0 | Baitarini RF within the ML area, Siddhamath RF 0.2 KM NW, Uliburu RF 11.1k M NW, Karo RF 9.2 KM NW, Thakurani RF 2.2 KM NE, Chamakpur RF 4.3 KM E | (2.) | Archaeological Sites | | NA | 0 | NA | (3.) | Defence Installations | | NA | 0 | NA | |
|
23.3. | (a)Whether Noc / Permission from the competent authority is required? | No | (b)Whether NBWL recommendation is required? | No | |
|
24. | Forest Land: | Whether any Forest Land involved? | No | |
|
25. | Tree Cutting: | (a)No. of Trees Cut for the Project (if Forest Land not Involved) | Not Applicable | (b)Details of Tree Cutting and Planting of Trees | Not Applicable | |
|
26. | Land Acquisition Status: | (a)Acquired Land(Ha) | 0 | (b)Land yet to be acquired(Ha) | 0 | (c)Status of Land acquisition if not acquired | Project does not involve land acquisition | |
|
27. | Rehabilitation and Resettlement (R&R): | (a)No. of Villages | 0 | (b)No. of Households | 0 | (c)No. of PDFs (Project Displaced Families) | 0 | (d)No. of PAFs (Project Affected Families) | 0 | (e)Funds Allocated for R&R(in INR) (in Lacs) | 0 | (f)Status of R&R | Completed | |
|
28. | Details of Presence of Schedule-I Species: | (a)Whether there is Presence of Schedule-I Species ? | Yes | (i)Details of Schedule-I Species | Sloth Bear, Python, Elephant | (b)Whether conservation plan for Schedule-I Species has been prepared ? | Yes | (i)Uploaded copy of conservation plan | Copy of conservation plan | (ii)Fund Provision made | 11.38 crores | (iii)Period of Implementation | 2015-20 | (c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? | Yes | (i)Uploaded copy of approval | Copy of approval | (ii)Letter No. | 7726/1 WL-SSP-93/205 | (iii)Date of issue | 31 Aug 2015 | (iv)Recommendation | NA | |
|
29. | Details of Presence of Water Bodies in Core Area: | (a)Whether there is Presence of Water Bodies in Core Area ? | No | (b)Whether there is Diversion Required ? | No | (c)Whether permission has been obtained from competent authority ? | No | |
|
30. | Details of Presence of Water Bodies in Buffer Area: | (a)Whether there is Presence of Water Bodies in Buffer Area ? | Yes | (i)Details of Water Bodies in Buffer Area | Baitarini 3.5 KM E,Sona River along the lease boundary, Tapadihi Nallah 6.9 KM W, Kundra Nallah 7 KM NE, Teherei Nallah 10.9 km SW, Kakarpani Nallah 5.6 km SW, Banka nallah 13.6 KM E, Mahadeva Nallah 8.8 KM NE, Dalko Nallah 2.8 KM SE | (ii)Direction of Water Bodies in Buffer Area | North | (iii)Distance of Water Bodies in Buffer Area | 3.5 | |
|
31. | Manpower Requirement: | (a)Permanent Employment-During Construction | 0 | (b)Permanent Employment-During Operation | 477 | (c)Temporary Employment- During Construction | 0 | (d)Temporary Employment- During Operation | 0 | (e)No. of working days | 310 | (f)Total Manpower | 477 | |
|
32. | Green Belt in Ha: | (a)Total Area of Green Belt | 64.794 | (b)Percentage of Total Project Area | 4.51 | (c)No. of Plants to be Planted | 161985 | (d)Funds Allocated for Plantation | 300000 | (e)Uploaded Green Belt plan | Copy of Green Belt Plan | |
|
33. Project Benefits |
---|
S. No. | Type of Project Benefits | Details of Project Benefits |
---|
NIL | |
|
34. CRZ Specific Details : Not Applicable |
35. Sector Specific Details For Non-Coal Mining |
|
1. No. of Mineral(s) to be Mined : 1 |
---|
S. No. | Mineral(s) to be Mined | Major or Minor Mineral |
---|
(1.) | Manganese | Major | |
|
2. | Mine Capacity in ROM (Run of Mine) | 211764 | |
|
|
4. | Mining Plan: | (a)Approval Letter No. | MS/OTFM/18-ORI/BHU/2017-18/2016 | (b)Date of Approval | 09 Nov 2017 | (c)Approved Letter | Copy of Approved Letter | (d)Approved By State Mining and Geology Department | IBM | (e)Approved Mining Lease Area | 1437.719 | (f)Approved Capacity | 211764 | |
|
5. | Technical Details: | (a)Total Geological Reserves (Million Ton) | 1.833 | (b)Mineable Reserves (Million Ton) | 1.833 | (c)Extractable Reserves(Million Ton) | 1.649 | (d)Percent(%) of Extraction | 90 | (e)Grade of Coal /Ore /Mineral | 25 | (f)Stripping Ratio | 1 : 9.96 | (g)Category of Gaseousness (Only for Coal Mining, Others may Write NA) | NA | (h)Average Gradient(Degree) | 45 | (i)Mining Method | Opencast | (j)Life of Mine (Years) | 9 | |
|
6. | Details of Beneficiations: | (a)Whether it is proposed to install beneficiation plant/Coal washery within the mining lease area | No | (b)Whether it is proposed to install crusher within the mining lease area | No | |
|
7. | Details of Seams: | (a)Whether details of seam applicable | No | |
|
8. | Details of Mining Lease: | (a)Mining Lease Area (in Hectare) | 1437.719 | (b)Whether obtained Letter of Intent (LOI) from the state government ? | No | (i)Reason thereof | Mining lease was granted in favour of the Applican | (c)Whether Lease Deed Executed ? | Yes | (i)Copy of Executed Lease deed valid as on Date | Copy of Executed Lease deed | (ii)Provide area in Hectare as per executed lease deed (initial) document | 3152.0155 | (iii)Validity of the lease deed | From : 17 Jan 1983 To : 30 Aug 2018 | (iv)Date of Execution of Mining Lese | 06 May 2015 | (v)Reference Number | 11031500229 | (d)Whether Lease Deed Renewed ? | Yes | |
|
8.1. Earlier Renewals: |
---|
S. No. | Lease Details | Date of Renewal | Period | Copy of Earlier Lease | Letter No. | Area | Remarks |
---|
(1.) | Initial | 01 Jan 1900 | From : 17 Jan 1933 To : 16 Jan 1963 | Copy of Earlier Lease | 179 | 3152.0155 | Lease Area granted for Joda West, katamati and Khondbond | (2.) | Renewal | 27 Nov 1984 | From : 17 Jan 1983 To : 16 Jan 2003 | Copy of Earlier Lease | 65 | 1437.719 | Joda West Formed an independent block | (3.) | Renewal | 10 Jan 1978 | From : 17 Jan 1963 To : 16 Jan 1983 | Copy of Earlier Lease | 65 | 3152.0155 | Lease Area granted for Joda West, katamati and Khondbond | (4.) | Transfer | 06 May 2015 | From : 17 Jan 1983 To : 30 Aug 2018 | Copy of Earlier Lease | 11031500229 | 1437.719 | The lease validity period has been extended to 31.03.2030 | |
|
9. | OB (Over Burden) Management: | (a) Details of External Dumps: | (i)No. of OB Dumps | 13 | (ii)Total Area (in Hectare) | 86.225 | (iii)Height (in meter) | 82 | (iv)Quantity (in Million Cubic meter) | 13.06 | (v)No. of year back fill up | 3 | (b) Details of Internal Dumps: | (i)No. of Internal Dumps | 0 | (ii)Total Area (in Hectare) | 0 | (iii)Height (in meter) | 0 | (iv)Quantity (in Million Cubic meter) | 0 | |
|
10. | Details of Topsoil Management: | (a)Quantity of Topsoil excavated during the entire life of the mine (in Million Cubic metre) | 0.13 | (b)Quantity of Topsoil proposed for utilization for reclamation during the entire life of the mine (in Million Cubic metre) | 0.13 | (c)Quantity of Topsoil proposed for utilization for other activities during the entire life of the mine (in Million Cubic metre) | 0 | |
|
11. | Details of Final Mine Void: | (a)Area (in Hectare) | 0 | (b)Depth (in meter) | 0 | (c)Volume (in Million Cubic meter) | 0 | |
|
12. | Details of Quarry: | (a)Final Void of 0 (hectare) at a Depth of 0 meter which is Proposed to be Converted into a Water Body. | (b)Total Quarry Area (ha) | 0 | |
|
13. | Details of Transportation: | (a)In Pit/Underground to Surface | NA | (b)Surface to Siding/Loading | Manganese Ore product will be transported from sor | (c)Transportation / Conveyor Details | NA | |
|
|
14. Details of Land Usage (Pre-Mining) |
---|
S. No. | LAND USE | Other LAND USE | WITHIN ML AREA (Hectare) | OUTSIDE ML AREA (Hectare) | TOTAL (Hectare) |
---|
(1.) | FOREST LAND | | 1246.552 | 0 | 1246.552 | (2.) | GRAZING LAND | | 0 | 0 | 0 | (3.) | SURFACE WATER BODIES | | 0 | 0 | 0 | (4.) | SETTLEMENTS | | 0 | 0 | 0 | (5.) | AGRICULTURE LAND | | 0 | 0 | 0 | (6.) | WASTE LAND | | 191.167 | 0 | 191.167 | |
TOTAL | 1437.719 | 0 | 1437.719 | |
|
15. Details of Land Usage (Post-Mining) |
---|
S. No. | LAND USE | Other LAND USE | Plantation (ha) | Water Body (ha) | Public Use (ha) | Undisturbed (ha) | Total |
---|
(1.) | TOP SOIL STORAGE | | 0 | 0 | 0 | | 0 | (2.) | ROADS | | 0 | 0 | 20.14 | | 20.14 | (3.) | GREEN BELT | | 64.794 | 0 | 0 | | 64.794 | (4.) | BUILT UP AREA (COLONY/OFFICE) | | 0 | 0 | 113.24 | | 113.24 | (5.) | VIRGIN AREA | | 0 | 0 | 166.2 | | 166.2 | (6.) | EXTERNAL OB DUMPS | | 160.01 | 0 | 0 | | 160.01 | (7.) | INTERNAL OB DUMPS | | 0 | 0 | 0 | | 0 | (8.) | EXCAVATION/QUARRY | | 801.69 | 0 | 0 | | 801.69 | |
TOTAL | 1026.494 | 0 | 299.58 | 0 | 1326.074 | |
16. | Details of Reclamation: | Total Afforestation Plan shall be Implemented Covering of Mining.This will Include: | (a)External OB Dump(in hectare) | 160.01 | (b)Internal Dump(in hectare) | 0 | (c)Quarry(in hectare) | 801.69 | (d)Safety Zone(in hectare) | 35.116 | (e)Final Void of 0 (hectare) at a Depth of 0 meter which is Proposed to be Converted into a Water Body. | (f)Density of Tree Plantation per ha (in no.) | 2500 | (g)Others in ha (such as Excavation Area along ML Boundary, along Roads and Infrastructure, Embankment Area and in Township Located Outside the Lease etc) | 0 | (h)Total afforestation plant (in hectare) | 1026.494 | |
|
17. | Status of progressive Mining Closure Plan: | Details Not Applicable | |
|
18. Details of Actual Coal/ ORE Production vis-a-vis Sanctioned Capacity since the Inception: |
---|
S. No. | Financial Year | Sanctioned Capacity as per EC (MTPA) | Sanctioned Capacity as per CTO | Sanctioned Capacity as per approved mining plan | Actual Production | Excess Production Beyond the EC / CTO/ Mining Plan Sanctioned Capacity (MTPA) |
---|
(1.) | 1993 | 0 | 0 | 30000 | 24148 | 24148 | (2.) | 1996 | 0 | 0 | 42000 | 7892 | 7892 | (3.) | 1997 | 0 | 0 | 42000 | 13116 | 13116 | (4.) | 1999 | 0 | 0 | 16800 | 12361 | 12361 | (5.) | 2000 | 0 | 0 | 16800 | 7486 | 7486 | (6.) | 2001 | 0 | 0 | 16800 | 7486 | 7486 | (7.) | 2003 | 0 | 0 | 42000 | 42361 | 42361 | (8.) | 2004 | 0 | 0 | 145000 | 81177 | 81177 | (9.) | 2006 | 180000 | 180000 | 179500 | 170392 | 0 | (10.) | 2008 | 180000 | 180000 | 179500 | 55853 | 0 | (11.) | 2009 | 180000 | 180000 | 180000 | 104068 | 0 | (12.) | 2010 | 180000 | 180000 | 180000 | 67106 | 0 | (13.) | 2012 | 180000 | 180000 | 180000 | 12445 | 0 | (14.) | 2013 | 180000 | 180000 | 180000 | 125586 | 0 | (15.) | 2016 | 180000 | 180000 | 160000 | 97397 | 0 | (16.) | 1994 | 0 | 0 | 36000 | 18767 | 18767 | (17.) | 1995 | 0 | 0 | 42000 | 11449 | 11449 | (18.) | 1998 | 0 | 0 | 16800 | 6891 | 6891 | (19.) | 2002 | 0 | 0 | 42000 | 16177 | 16177 | (20.) | 2005 | 0 | 0 | 179500 | 170392 | 170392 | (21.) | 2007 | 180000 | 180000 | 179500 | 55853 | 0 | (22.) | 2014 | 180000 | 180000 | 140000 | 139945 | 0 | (23.) | 2015 | 180000 | 180000 | 150000 | 105067 | 0 | (24.) | 2018 | 180000 | 180000 | 180000 | 69595 | 0 | (25.) | 2011 | 180000 | 180000 | 180000 | 113666 | 0 | (26.) | 2017 | 180000 | 180000 | 170000 | 79727 | 0 | |
|
36. | Details of Court Cases: | (a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? | No | |
|
37. | Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act: | (a)Whether any Direction issued under EPA Act/Air Act/Water Act ? | No | |
|
38. | Details of EIA Consultant: | (a)Have you hired Consultant for preparing document? | No | (i)Reason for not Hiring the Consultant | Since the application is in pursuance with the MoEF & CC NOTIFICATION S.O. 1530(E), DATED
06.04.20 | |
|
|
Essential Detail Sought: |
---|
Sno. | EDS Letter | Remarks | Date of EDS |
---|
1. | NA | 1. Form I as per notification dated 6.04.2018 has not uploaded.
2. Copy of Mine Plan has not uploaded
3. EIA/EMP report uploaded- old copy
4. Details of past production of mine since its inception, duly authenticated by Department of Mines & Geology, State Government.
5. Copy of affidavit needs to be submitted by PP in compliance of the Ministry’s OM no. 3-50/2017-IA.III (Pt.), dated 30th May 2018.
6. Compliance of order dated 02.8.2017 in CWP No. 114/2014 of Hon'ble Supreme court (Common Cause Vs Union of India &Ors.)
7. Details of earlier CTE/CTO not opening | 10 Sep 2018 | 2. | NA | The correction have been made as per the instruction received | 27 Sep 2018 | |
Additional Detail Sought : NIL |
| Undertaking |
| I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief. And I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity/ construction/ expansion has since been taken up. |
| Name of Applicant | Sabyasachy Mishra | Designation | Head (Mine & Production Planning, FAMD) | Name of Company (Applicant Name should not be given here) | TATA STEEL LIMITED SUKINDA CHROMITE MINE | Address | SUKINDA CHROMITE MINE
P.O- KALARANGIATTA
DIST- JAJPUR
ODISHA |
|