Form-2
APPLICATION FOR PRIOR ENVIRONMENTAL CLEARANCE
S. No.Item Details
1.
Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? No
Details of Project:
(a)Name of the project(s) Quarrying Lease for Limekankar & Clay (others) over an extent of 479.195 hectares of M/s. The India Cements Limited in Aruppukottai Taluk, Virudhunagar District, Tamilnadu State
(b)Name of the Company / Organisation M/s. THE INDIA CEMENTS LIMITED
(c)Registered Address DHUN BUILDING, IV FLOOR, 827, ANNA SALAI, CHENNAI - 600 002,DHUN BUILDING, IV FLOOR, 827, ANNA SALAI, CHENNAI - 600 002,Tirunelveli,Tamil Nadu-627357
(d)Legal Status of the Company Private
(e)Joint Venture No
2.
Address for the correspondence:
(a)Name of the Applicant DAKSHINAMOORTHY S
(b)Designation (Owner/ Partner/ CEO) VICE PRESIDENT
(c)Address MADURAI ROAD, SANKAR NAGAR,MADURAI ROAD, SANKAR NAGAR,Tirunelveli,Tirunelveli,Tamil Nadu-627357
(d)Pin code 627357
(e)E-mail SKN_GMOFFICE@INDIACEMENTS.CO.IN
(f)STD Code. 462(f)Telephone No. 2300200
(g)Fax No. 2300395
(h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . Annexure-Uploaded Copy of documents in support of the competence/authority
3.
Category of the Project/Activity as per Schedule of EIA Notification,2006:
(a.I)Project/Activity1(a) Mining of minerals
Minor Activity
(b)Category A
(c)Proposal Number IA/TN/MIN/66148/2017
(d)Master Proposal Number(Single Window) SW/76894/2018
(e)EAC concerned (for category A Projects only) Non-Coal Mining
(f)Project Type Fresh EC
4.
Location of the Project:
(a)Plot/Survey/Khasra No. Given in Annexure 1 of EIA/EMP report
(b)Pincode 626105
(c)Bounded Latitudes (North)
From
Degree 1043211.62
Minutes
Second
From
Degree 1046220.30
Minutes
Second
(d)Bounded Longitudes (East)
From
Degree 185030.60
Minutes
Second
From
Degree 187886.20
Minutes
Second
(e)Survey of India Topo Sheet No. 58K/3
(f)Uploaded Topo Sheet File Copy of Topo Sheet File
(g)Maximum Elevation Above Means Sea Level(AMSL) 94
(h)Uploaded (kml) File Copy of Kml File      
(i)Distance of Nearest HFL from the project boundary within the study area 12
(j)Seismic Zone 2
5.
(a)Number of States in which Project will be Executed 1
(b)Main State of the project Tamil Nadu
Details of State(s) of the project
S. No. State Name District Name Tehsil Name Village Name
(1.)Tamil NaduVirudhunagarAruppukkottai
6.
Details of Terms of Reference (ToR):
(a)MoEF&CC / SEIAA File Number J-11015/71/2017-IA-II(M)
(b)Date of Apply of TOR 14 Jul 2017
(c)Date of Issue of TOR / Standard ToR 16 Jan 2018
(d)Previous TOR Letter Copy of Previous TOR letter
7.
Details of Public Consultation:
(a)Whether the Project Exempted from Public Hearing?No
(b)Whether details of Public Hearing available? Yes
(c)Whether Public hearing was presided over by an officer of the rank of Additional District Magistrate or above Yes
     7.1.       Details of Public Hearing
S. No.Details of Advertisement Details of Public Hearing Venue Location DetailsNo. of People AttendedIssues RaisedDesignation of Presiding OfficerOther Designation of Presiding Officer
(1.)
Date of Advertisement :24 May 2018
Copy of advertisement :Copy of Advertisement
Copy of Public Hearing :Copy of Public Hearing
Date :26 Jun 2018
Distance of Public Hearing Venue from the Proposed Project :24
Conference Meeting Hall, Collectorate Campus, Virudhunagar District
State :Tamil Nadu
District :Virudhunagar
Tehsil :Virudhunagar
Village :Virudhunagar
300Proper implementation of the environmental management, Employment generation, More CER initiatives, Not disturbing the flow of rainwater into nearby water bodiesDistrict Collector
8.
Details of Project Configuration/Product:
     8.1.       Project Configuration
S. No.Plant/Equipment/FacilityConfigurationRemarks
(1.)Hydraulic excavators242 HP3 Nos.
(2.)Mobile Tower Light11.3 HP2 Nos.
(3.)Water Tanker5000L1 No.
(4.)Front End Loader110 HP1 No.
(5.)Mobile Screen66HP1 No.
(6.)Dozer280 HP1 No.
     8.2.       Product
S. No.Product/Activity (Capacity/Area)QuantityUnitOther UnitMode of Transport / Transmission of ProductOther Mode of Transport / Transmission of Product
(1.)Limekankar1000000Tons per AnnumRoad
(2.)Clay (others)200000Tons per AnnumRoad
9.
In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii):
Details Not Applicable
9.1.
Details of Consent to Operate
(i)Whether Consent to operate obtained ? NA
(ii)Copies of all Consent to operate obtained since inception NA
(iii)Date of Issue N/A
(iv)Valid Upto N/A
(v)File No. NA
(vi)Application No. NA
(vii)Copy of Consent to operate valid as on date NA
10.
Project Cost:
(a)Total Cost of the Project at current price level (in Crores) 18.54
(b) Funds Allocated for Environment Management (Capital) (in Crores) 0.35
(c) Funds Allocated Towards CER (Corporate Environment Responsibility) (in Crores) 0.5
(d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in Crores) 0.9086
11.
Whether project attracts the General Condition specified in the Schedule of EIA Notification ? No
12.
Whether project attract the Specific Condition specified in the Schedule of EIA Notification ? No
13.
Raw Material / Fuel Requirement:
(a)Proposed quantity of raw material/fuel 1.5
(b)Existing quantity of raw material/fuel N/A
(c)Total quantity of raw material/fuel 1.5
    13.1.        Raw Material / Fuel Profile
S. No.Raw Material / Fuel QuantityUnitOther UnitSource (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received )Mode of TransportOther Mode of TransportDistance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received)Type of Linkage Other Type of Linkage Uploaded Copy of Linkage
(1.)HSD1.5Kilo Litre per DayLocalRoad15 Open MarketCopy of Linkage
14.
Baseline Data :
(a)Period of Base Line Data Collection FROM 04 Dec 2017 To 24 Feb 2018
(b)Season Winter
    14.1.     No. of ambient Air Quality (AAQ) monitoring locations : 6
S. No.Criteria Pollutants Other Criteria PollutantsUnitMaximum ValueMinimum Value98 Percentile ValuePrescribed Standard
(1.)SO2Micro Gram per Meter Cube5.535.280
(2.)NOxMicro Gram per Meter Cube11.96.211.280
(3.)PM2.5Micro Gram per Meter Cube38.817.834.260
(4.)PM10Micro Gram per Meter Cube68.636.562.1100
    14.2.     No. of Ground Water monitoring locations : 5
S. No.Criteria Pollutants Other Criteria PollutantsHeavy MetalUnitOther UnitMaximum ValueMinimum ValueDesirable LimitMaximum Permissible Limit
(1.)Heavy MetalsIronmg/l0.0600.30.3
(2.)TDSmg/l9202805002000
(3.)Total Hardnessmg/l480154200600
(4.)Fluoridemg/l0.670.2111.5
(5.)pHNA7.386.786.58.5
(6.)Chloridesmg/l3425.92501000
(7.)TSSmg/l0000
    14.3.     No. of Surface Water monitoring locations : 0
S. No.Criteria Pollutants Other Criteria PollutantsUnitOther UnitMaximum ValueMinimum ValueClassification of inland water body
(1.)DONA00A
(2.)CODNA00A
(3.)BODNA00A
(4.)pHNA00A
    14.4.     No. of Ambient Noise monitoring locations : 6
S. No.Parameter UnitMaximum ValueMinimum ValuePrescribed Standard
(1.)Leq(Day)A-weighted decibels(dB(A))50.242.755
(2.)Leq(Night)A-weighted decibels(dB(A))39.836.545
    14.5.     No. of Soil Sample Monitored locations : 5
S. No.Parameter UnitOther UnitMaximum ValueMinimum Value
(1.)pHOthersNot Applicable7.066.28
(2.)N(Nitrogen)Milligram per Kilogram29253.2
(3.)P(Phosphorus)Milligram per Kilogram1.440.56
(4.)K(Potassium)Milligram per Kilogram961748
(5.)Electric ConductivityOthersµmhos/ cm49.4625.52
14.6.
Details of Ground Water Table:
(a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) From 18.95 To 9.22
(b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) From 15.50 To 6.74
(c)Whether Ground Water Intersection will be there ? No
     15.      Details of Water Requirement (During Operation)
S. No.Source Source Other Required Quantity (Kilolitre per Day (Kld))Distance from SourceCopy of Permission from Competent Authority Mode of TransportOther Mode of TransportMethod of Water WithdrawalOther Method of Water WithdrawalLetter No.Date of IssuePermitted Quantity
(1.)OthersFrom outside agency2525Copy of Permission LettermodeOthersRoadOthersFrom outside agency015 Sep 201825
15.1.
(a)Whether Desalination is proposed No
    16.       Waste Water Management(During Operation)
S. No.Type/Source Quantity of Waste Water Generated (Kilolitre per Day)Treatment Capacity (Kilolitre per Day) Treatment MethodMode of DisposalOther Mode of DisposalQuantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day)Quantity of Discharged Water (Kilolitre per Day)
(1.)Workshop Effluent35Effluent Treatment PlantReuse within the Plant & Recycling3
16.1.
(a)Total Waste Water Generation (Kilolitre per Day) 3
(b)Total Discharged Water (Kilolitre per Day) 0
(c)Total Reused Water (Kilolitre per Day) 3
    17.       Solid Waste Generation/Management
S. No.Name of Waste Item Other ItemQuantity per AnnumUnitDistance from Site(KM)Mode of TransportOther Mode of TransportMode of DisposalOther Mode of Disposal
(1.)OverburdenOthersClay1130000Tons0OthersBackfillingOthers20% as additive. 80% for simultaneous backfilling
18.
    18.1.     Air Quality Impact Prediction
S. No.Criteria Pollutants Other Criteria PollutantsUnitBaseline ConcentrationDistance GLCIncremental ConcentrationTotal GLCPrescribed Standard
(1.)PM10Microgram per Meter Cube49.60554.6100
(2.)SO2Microgram per Meter Cube3.7014.780
(3.)NOxMicrogram per Meter Cube8.20412.280
(4.)PM2.5Microgram per Meter Cube26.40228.460
    18.2.     Stack Details
S. No.Source FuelStack Height(m)Stack Diameter(m)PollutantsOther PollutantsEmission (GLS)
(1.)No stacks proposed000OthersNot Applicable0
19.
Power Requirement:
(a)Quantity (Kilo Volt Amps (kVA)) 5
(b)Source Solar
(c)Uploaded Copy of Agreement Not Applicable
(d)Standby Arrangement (Details of DG Sets) 0
(e)Stack Height (in m) 0
20.
Land Ownership Pattern:
(a)Forest Land (ha.) 0
(b)Private Land (ha.) 479.195
(c)Government Land (ha.) 0
(d)Revenue Land (ha.) 0
(e)Other Land (ha.) 0
    Total Land (ha.) 479.195
21.
Present Land Use Breakup of the Study Area in Ha:
(a)Agriculture Area (ha.) 0
(b)Waste/Barren Land (ha.) 0
(c)Grazing/ Community Land (ha.) 0
(d)Surface Water Bodies (ha.) 0
(e)Settlements (ha.) 0
(f)Industrial (ha.) 0
(g)Forest (ha.) 0
(h)Mangroves (ha.) 0
(i)Marine Area (ha.) 0
(j)Others (ha.) : Patta-dry Land owned by proponent 479.195
    Total (ha.) 479.195
    22.     Land requirement for various activities
S. No.Description of Activity / Facility / Plant / Others OthersLand Requirement (ha.)Remarks
(1.)Quarry Area305.792Will be backfilled and reclaimed with plantation
(2.)Safety Zone124.160Greenbelt and Plantation
(3.)Built Up Area0.314
(4.)OthersApproach road+Untouched area48.929Approach road+Untouched area
Total (ha.) 479.195
23.
Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Sanctuaries; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones :
    23.1.     Details of Ecological Sensitivity :
S. No.Details of Ecological Sensitivity NameDistance from the Project (Km)Remarks
(1.)Critically Polluted AreaNil0Nil within 10km radius
(2.)ESAsNil0Nil within 10km radius
(3.)ESZsNil0Nil within 10km radius
(4.)CorridorsNil0Nil within 10km radius
(5.)WLSNil0Nil within 10km radius
(6.)Wildlife CorridorsNil0Nil within 10km radius
(7.)NPANil0Nil within 10km radius
    23.2.     Details of Environmental Sensitivity :
S. No.Details of Environmental Sensitivity Other Details of Environmental Sensitivity NameDistance from the Project (Km)Remarks
(1.)ForestNil0Nil within 10Km radius
(2.)Defence InstallationsNil0Nil within 10Km radius
(3.)Archaeological SitesNil0Nil within 10Km radius
23.3.
(a)Whether Noc / Permission from the competent authority is required? No
(b)Whether NBWL recommendation is required? No
24.
Forest Land:
Whether any Forest Land involved? No
25.
Tree Cutting:
(a)No. of Trees Cut for the Project (if Forest Land not Involved) Not Applicable
(b)Details of Tree Cutting and Planting of Trees Not Applicable
26.
Land Acquisition Status:
(a)Acquired Land(Ha) 479.195
(b)Land yet to be acquired(Ha) 0
(c)Status of Land acquisition if not acquired Entire lease area owned by PP(ICL)
27.
Rehabilitation and Resettlement (R&R):
(a)No. of Villages 0
(b)No. of Households 0
(c)No. of PDFs (Project Displaced Families) 0
(d)No. of PAFs (Project Affected Families) 0
(e)Funds Allocated for R&R(in INR) (in Lacs) 0
(f)Status of R&R Completed
28.
Details of Presence of Schedule-I Species:
(a)Whether there is Presence of Schedule-I Species ? Yes
(i)Details of Schedule-I Species Indian Pea Fowl (Pavocristatus) is noticed within the study area
(b)Whether conservation plan for Schedule-I Species has been prepared ? Yes
(i)Uploaded copy of conservation plan Copy of conservation plan
(ii)Fund Provision made Rs. 8.5 Lakhs for first five years
(iii)Period of Implementation Throughout the lease period
(c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? Yes
(i)Uploaded copy of approval Copy of approval
(ii)Letter No. C.No.2613/2017 D
(iii)Date of issue 12 Sep 2018
(iv)Recommendation NA
29.
Details of Presence of Water Bodies in Core Area:
(a)Whether there is Presence of Water Bodies in Core Area ? No
(b)Whether there is Diversion Required ? No
(c)Whether permission has been obtained from competent authority ? No
30.
Details of Presence of Water Bodies in Buffer Area:
(a)Whether there is Presence of Water Bodies in Buffer Area ? Yes
(i)Details of Water Bodies in Buffer Area Other than few seasonal odai, ponds (Kanmai) there are no perennial river or streams. Seasonal Uppu Odai is present.
(ii)Direction of Water Bodies in Buffer Area South East
(iii)Distance of Water Bodies in Buffer Area 2.7
31.
Manpower Requirement:
(a)Permanent Employment-During Construction 0
(b)Permanent Employment-During Operation 30
(c)Temporary Employment- During Construction 0
(d)Temporary Employment- During Operation 0
(e)No. of working days 330
(f)Total Manpower 30
32.
Green Belt in Ha:
(a)Total Area of Green Belt 473.226
(b)Percentage of Total Project Area 98.75
(c)No. of Plants to be Planted 49000
(d)Funds Allocated for Plantation 756000
(e)Uploaded Green Belt plan Copy of Green Belt Plan
    33.       Project Benefits
S. No. Type of Project BenefitsDetails of Project Benefits
NIL
   34.   CRZ Specific Details : Not Applicable
   35.   Sector Specific Details For Non-Coal Mining
S. No.Item Details
     1.       No. of Mineral(s) to be Mined : 2
S. No.Mineral(s) to be Mined Major or Minor Mineral
(1.)Limekankar (1 MTPA)Minor
(2.)Clay(Others) (0.2MTPA)Minor
2.
Mine Capacity in ROM (Run of Mine) 1200000
3.
Uploaded 500 meters Cluster Certificate from State Mines and Geology in case of minor minerals Copy of 500 meters Cluster Certificate from State Mines and Geology
4.
Mining Plan:
(a)Approval Letter No. 6573/MM10/2016/LK/Vnr
(b)Date of Approval 26 Jul 2018
(c)Approved Letter Copy of Approved Letter
(d)Approved By State Mining and Geology Department Dept. of Geology and Mining, Govt of Tamil Nadu
(e)Approved Mining Lease Area 479.195
(f)Approved Capacity 1200000
5.
Technical Details:
(a)Total Geological Reserves (Million Ton) 9.58
(b)Mineable Reserves (Million Ton) 6.11
(c)Extractable Reserves(Million Ton) 6.11
(d)Percent(%) of Extraction 64
(e)Grade of Coal /Ore /Mineral 40
(f)Stripping Ratio 1 : 0.74
(g)Category of Gaseousness (Only for Coal Mining, Others may Write NA) NA
(h)Average Gradient(Degree) 0
(i)Mining Method Opencast
(j)Life of Mine (Years) 10
6.
Details of Beneficiations:
(a)Whether it is proposed to install beneficiation plant/Coal washery within the mining lease area No
(b)Whether it is proposed to install crusher within the mining lease area No
7.
Details of Seams:
(a)Whether details of seam applicable No
8.
Details of Mining Lease:
(a)Mining Lease Area (in Hectare) 479.195
(b)Whether obtained Letter of Intent (LOI) from the state government ? Yes
(i)Copy of Letter of Intent Copy of Letter of Intent
(ii)Date of issue of LOI 23 May 2017
(iii)Validity of LOI 10
(iv)Reference No. of LOI Letter No.16025/MMC.2/2016-1
(c)Whether Lease Deed Executed ? No
(i)Reason thereof To be executed after obtaining necessary approvals
(d)Whether Lease Deed Renewed ? No
(i)Reason thereof Not applicable
9.
OB (Over Burden) Management:
(a) Details of External Dumps:
(i)No. of OB Dumps 0
(ii)Total Area (in Hectare) 0
(iii)Height (in meter) 0
(iv)Quantity (in Million Cubic meter) 0
(v)No. of year back fill up 0
(b) Details of Internal Dumps:
(i)No. of Internal Dumps 10
(ii)Total Area (in Hectare) 305.792
(iii)Height (in meter) 1.2
(iv)Quantity (in Million Cubic meter) 3.67
10.
Details of Topsoil Management:
(a)Quantity of Topsoil excavated during the entire life of the mine (in Million Cubic metre) 0
(b)Quantity of Topsoil proposed for utilization for reclamation during the entire life of the mine (in Million Cubic metre) 0
(c)Quantity of Topsoil proposed for utilization for other activities during the entire life of the mine (in Million Cubic metre) 0
11.
Details of Final Mine Void:
(a)Area (in Hectare) 0
(b)Depth (in meter) 0
(c)Volume (in Million Cubic meter) 0
12.
Details of Quarry:
(a)Final Void of 0 (hectare) at a Depth of 0 meter which is Proposed to be Converted into a Water Body.
(b)Total Quarry Area (ha) 305.792
13.
Details of Transportation:
(a)In Pit/Underground to Surface Trucks/ Tippers/Excavator/Dozer
(b)Surface to Siding/Loading Not Applicable
(c)Transportation / Conveyor Details Not Applicable
     14.      Details of Land Usage (Pre-Mining)
S. No.LAND USE Other LAND USEWITHIN ML AREA (Hectare)OUTSIDE ML AREA (Hectare)TOTAL (Hectare)
(1.)FOREST LAND000
(2.)WASTE LAND000
(3.)GRAZING LAND000
(4.)SURFACE WATER BODIES000
(5.)OTHERS(Specify)Private land owned by ICL479.1950479.195
(6.)AGRICULTURE LAND000
(7.)SETTLEMENTS000
TOTAL479.1950479.195
     15.      Details of Land Usage (Post-Mining)
S. No.LAND USE Other LAND USEPlantation (ha)Water Body (ha)Public Use (ha)Undisturbed (ha)Total
(1.)EXCAVATION/QUARRY305.79200305.792
(2.)TOP SOIL STORAGE0000
(3.)EXTERNAL OB DUMPS0000
(4.)BUILT UP AREA (COLONY/OFFICE)000.3140.314
(5.)OtherUnused area43.2740043.274
(6.)VIRGIN AREA0000
(7.)INTERNAL OB DUMPS0000
(8.)ROADS005.6555.655
(9.)GREEN BELT124.16000124.16
TOTAL473.22605.9690479.195
16.
Details of Reclamation:
Total Afforestation Plan shall be Implemented Covering of Mining.
This will Include:
(a)External OB Dump(in hectare) 0
(b)Internal Dump(in hectare) 305.792
(c)Quarry(in hectare) 0
(d)Safety Zone(in hectare) 124.160
(e)Final Void of 0 (hectare) at a Depth of 0 meter which is Proposed to be Converted into a Water Body.
(f)Density of Tree Plantation per ha (in no.) 100
(g)Others in ha (such as Excavation Area along ML Boundary, along Roads and Infrastructure, Embankment Area and in Township Located Outside the Lease etc) 43.274
(h)Total afforestation plant (in hectare) 473.226
17.
Status of progressive Mining Closure Plan:
Details Not Applicable
     18.      Details of Actual Coal/ ORE Production vis-a-vis Sanctioned Capacity since the Inception:
S. No.Financial Year Sanctioned Capacity as per EC (MTPA)Sanctioned Capacity as per CTOSanctioned Capacity as per approved mining planActual Production Excess Production Beyond the EC / CTO/ Mining Plan Sanctioned Capacity (MTPA)
(1.)000000
S. No.Item Details
36.
Details of Court Cases:
(a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? No
37.
Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act:
(a)Whether any Direction issued under EPA Act/Air Act/Water Act ? No
38.
Details of EIA Consultant:
(a)Have you hired Consultant for preparing document? Yes
(i)Accreditation No. QCI/NABET/ENV/ACO/17/0423
(ii)Name of the EIA Consultant Creative Engineers and Consultants
(iii)Address 9B/4, Bharathwajar Street, East Tambaram, Chennai-600059.
(iv)Mobile No. 9444133619
(v)Landline No. 22395170
(vi)Email Id cecgiri@yahoo.com
(vii)Category of Accreditation A
(viii)Sector of Accreditation Non-Coal Mining
(ix)Validity of Accreditation 24 Mar 2020
(x)Uploaded Certificate of Accreditation certified by QCI/NABET Copy of Certificate of Accreditation
39.
Documents to be Attached:
(a)Uploaded Copy of EIA/EMP Report Copy of EIA/EMP
Copy of EIA/EMP(Annexures)
Copy of EIA/EMP(Plans/Figures)
(b)Uploaded Copy of Risk Assessment Report Copy of Risk Assessment
(c)Uploaded Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan
(d)Uploaded Copy of Final Layout Plan Copy of Final Layout Plan
(e)Uploaded Cover Letter Copy of Cover Letter
(f)Uploaded Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency
(g)Uploaded Copy of District Survey Report Copy of District Survey Report
(h)Uploaded Copy of Replenishment Study Report & Baseline Survey Data Copy of Replenishment Study Report & Baseline Survey Data
(i)Uploaded Additional File Copy of Additional File
(j)Uploaded Proposal Presentation (To be given in EAC meeting) NA
            Essential Detail Sought:
Sno. EDS Letter Remarks Date of EDS
1.NADSR should be as per S.O.3611(E) dated 25.07.2018. Mining Plan was approved after the PH please provide a justification in this regard needs to be submitted that why public hearing was conducted based on the draft mining plan. A letter from DMG to the effect that there is no difference in the draft mining plan submitted during the PH and in the mining plan approved by DMG on 26.07.2018. Advertisement of PH in regional language needs to be submitted. Attendance sheet of PH needs to be submitted. 09 Oct 2018
2.NAThe correction have been made as per the instruction received 30 Oct 2018
            Additional Detail Sought:
Sno. ADS Letter Remarks Date of ADS
1. ADS Reply LetterAdditional details sought are attached. 22 Apr 2019
2.NA

deferred 

12 Apr 2019
3. ADS Reply LetterADS reply attached 31 Jan 2019
4.NADeferred 22 Nov 2018
Undertaking
I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief. And I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity/ construction/ expansion has since been taken up.
Name of ApplicantDAKSHINAMOORTHY S
DesignationVICE PRESIDENT
Name of Company (Applicant Name should not be given here)M/s. THE INDIA CEMENTS LIMITED
AddressDHUN BUILDING, IV FLOOR, 827, ANNA SALAI, CHENNAI - 600 002
Print