Form-2
APPLICATION FOR PRIOR ENVIRONMENTAL CLEARANCE
S. No.Item Details
1.
Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? No
Details of Project:
(a)Name of the project(s) Development Drilling of 72 wells in East Godavari, West Godavari and Krishna districts of Andhra Pradesh
(b)Name of the Company / Organisation ONGC
(c)Registered Address NIL
(d)Legal Status of the Company NIL
(e)Joint Venture No
2.
Address for the correspondence:
(a)Name of the Applicant
(b)Designation (Owner/ Partner/ CEO) ChiefGeneralManager
(c)Address NIL
(d)Pin code 110070
(e)E-mail kumar_rajeeva@ongc.co.in
(f)STD Code. (f)Telephone No.
(g)Fax No. 26129067
(h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . Annexure-Uploaded Copy of documents in support of the competence/authority
3.
Category of the Project/Activity as per Schedule of EIA Notification,2006:
(a.I)Project/Activity1(b) Offshore and onshore oil and gas exploration, development & production
Minor Activity
(b)Category A
(c)Proposal Number IA/AP/IND2/27956/2015
(d)Master Proposal Number(Single Window) SW/76383/2018
(e)EAC concerned (for category A Projects only) Industrial Projects - 3
(f)Project Type Fresh EC
4.
Location of the Project:
(a)Plot/Survey/Khasra No. Onshore development project
(b)Pincode 533106
(c)Bounded Latitudes (North)
From
Degree 61.2223
Minutes
Second
From
Degree 72.224
Minutes
Second
(d)Bounded Longitudes (East)
From
Degree 50.125
Minutes
Second
From
Degree 52.2223
Minutes
Second
(e)Survey of India Topo Sheet No. 4413
(f)Uploaded Topo Sheet File Copy of Topo Sheet File
(g)Maximum Elevation Above Means Sea Level(AMSL) 11
(h)Uploaded (kml) File Copy of Kml File      
(i)Distance of Nearest HFL from the project boundary within the study area 0
(j)Seismic Zone 3
5.
(a)Number of States in which Project will be Executed 1
(b)Main State of the project Andhra Pradesh
Details of State(s) of the project
S. No. State Name District Name Tehsil Name Village Name
(1.)Andhra PradeshEast GodavariMandapeta
(2.)Andhra PradeshEast GodavariMandapeta
(3.)Andhra PradeshEast GodavariRavulapalem
(4.)Andhra PradeshEast GodavariRavulapalem
(5.)Andhra PradeshEast GodavariAmbajipeta
(6.)Andhra PradeshEast GodavariAmbajipeta
(7.)Andhra PradeshEast GodavariMamidikuduru
(8.)Andhra PradeshEast GodavariMamidikuduru
(9.)Andhra PradeshEast GodavariMalikipuram
(10.)Andhra PradeshEast GodavariAmalapuram
(11.)Andhra PradeshEast GodavariAmalapuram
(12.)Andhra PradeshEast GodavariKatrenikona
(13.)Andhra PradeshEast GodavariKatrenikona
(14.)Andhra PradeshWest GodavariPedavegi
(15.)Andhra PradeshWest GodavariPedavegi
(16.)Andhra PradeshWest GodavariBhimavaram
(17.)Andhra PradeshWest GodavariBhimavaram
(18.)Andhra PradeshWest GodavariElamanchili
(19.)Andhra PradeshWest GodavariElamanchili
(20.)Andhra PradeshKrishnaKruthivennu
(21.)Andhra PradeshKrishnaKruthivennu
(22.)Andhra PradeshKrishnaBantumilli
(23.)Andhra PradeshKrishnaBantumilli
6.
Details of Terms of Reference (ToR):
(a)MoEF&CC / SEIAA File Number J-11011/173/2015-IA-II(I)
(b)Date of Apply of TOR 14 Oct 2015
(c)Date of Issue of TOR / Standard ToR 29 Jan 2016
(d)Previous TOR Letter Copy of Previous TOR letter
7.
Details of Public Consultation:
(a)Whether the Project Exempted from Public Hearing?No
(b)Whether details of Public Hearing available? Yes
(c)Whether Public hearing was presided over by an officer of the rank of Additional District Magistrate or above Yes
     7.1.       Details of Public Hearing
S. No.Details of Advertisement Details of Public Hearing Venue Location DetailsNo. of People AttendedIssues RaisedDesignation of Presiding OfficerOther Designation of Presiding Officer
(1.)
Date of Advertisement :19 Dec 2017
Copy of advertisement :Copy of Advertisement
Copy of Public Hearing :Copy of Public Hearing
Date :20 Jan 2018
Distance of Public Hearing Venue from the Proposed Project :1
Nagendrapuram
State :Andhra Pradesh
District :West Godavari
Tehsil :Eluru
Village :Nagendrapuram
150CSROthersADM
8.
Details of Project Configuration/Product:
     8.1.       Project Configuration
S. No.Plant/Equipment/FacilityConfigurationRemarks
(1.)NILNILNIL
     8.2.       Product
S. No.Product/Activity (Capacity/Area)QuantityUnitOther UnitMode of Transport / Transmission of ProductOther Mode of Transport / Transmission of Product
(1.)drilling72OthersnumberRoad
9.
In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii):
Details Not Applicable
9.1.
Details of Consent to Operate
(i)Whether Consent to operate obtained ? NA
(ii)Copies of all Consent to operate obtained since inception NA
(iii)Date of Issue N/A
(iv)Valid Upto N/A
(v)File No. NA
(vi)Application No. NA
(vii)Copy of Consent to operate valid as on date NA
10.
Project Cost:
(a)Total Cost of the Project at current price level (in Crores) 792
(b) Funds Allocated for Environment Management (Capital) (in Crores) 792
(c) Funds Allocated Towards CER (Corporate Environment Responsibility) (in Crores) 0
(d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in Crores) 0
11.
Whether project attracts the General Condition specified in the Schedule of EIA Notification ?
12.
Whether project attract the Specific Condition specified in the Schedule of EIA Notification ?
13.
Raw Material / Fuel Requirement:
(a)Proposed quantity of raw material/fuel
(b)Existing quantity of raw material/fuel N/A
(c)Total quantity of raw material/fuel
    13.1.        Raw Material / Fuel Profile
S. No.Raw Material / Fuel QuantityUnitOther UnitSource (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received )Mode of TransportOther Mode of TransportDistance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received)Type of Linkage Other Type of Linkage Uploaded Copy of Linkage
(1.)diesel6Kilo Litre per DayTank STorageRoad10 Not Applicable
14.
Baseline Data :
(a)Period of Base Line Data Collection FROM 01 Mar 2017 To 30 May 2017
(b)Season Pre-Monsoon
    14.1.     No. of ambient Air Quality (AAQ) monitoring locations : 56
S. No.Criteria Pollutants Other Criteria PollutantsUnitMaximum ValueMinimum Value98 Percentile ValuePrescribed Standard
(1.)PM10Micro Gram per Meter Cube61.237.544.7100
(2.)PM2.5Micro Gram per Meter Cube38.316.319.560
(3.)SO2Micro Gram per Meter Cube16.34.25.880
(4.)NOxMicro Gram per Meter Cube25.99.413.480
    14.2.     No. of Ground Water monitoring locations : 30
S. No.Criteria Pollutants Other Criteria PollutantsHeavy MetalUnitOther UnitMaximum ValueMinimum ValueDesirable LimitMaximum Permissible Limit
(1.)pHNA8.17.068.5
(2.)TSSmg/l10080200250
(3.)Total Hardnessmg/l2746119200600
(4.)Chloridesmg/l229125250500
(5.)Fluoridemg/l10.522.5
(6.)Heavy Metalsleadmg/l0.0010.0010.010.01
(7.)TDSmg/l54242525002000
    14.3.     No. of Surface Water monitoring locations : 13
S. No.Criteria Pollutants Other Criteria PollutantsUnitOther UnitMaximum ValueMinimum ValueClassification of inland water body
(1.)BODmg/l18304B
(2.)CODmg/l351018C
(3.)DOmg/l5.83.8A
(4.)pHNA7.86.7A
    14.4.     No. of Ambient Noise monitoring locations : 56
S. No.Parameter UnitMaximum ValueMinimum ValuePrescribed Standard
(1.)Leq(Night)A-weighted decibels(dB(A))43.840.945
(2.)Leq(Day)A-weighted decibels(dB(A))55.950.755
    14.5.     No. of Soil Sample Monitored locations : 14
S. No.Parameter UnitOther UnitMaximum ValueMinimum Value
(1.)pHOthersNA8.66.8
(2.)N(Nitrogen)Kilogram per hectare276175
(3.)K(Potassium)Kilogram per hectare253141
(4.)Electric ConductivityMilliequivalents per 100 Gram481120
(5.)P(Phosphorus)Kilogram per hectare19.710.3
14.6.
Details of Ground Water Table:
(a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) From 1.5 To 5
(b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) From 0 To 3
(c)Whether Ground Water Intersection will be there ? No
     15.      Details of Water Requirement (During Operation)
S. No.Source Source Other Required Quantity (Kilolitre per Day (Kld))Distance from SourceCopy of Permission from Competent Authority Mode of TransportOther Mode of TransportMethod of Water WithdrawalOther Method of Water WithdrawalLetter No.Date of IssuePermitted Quantity
(1.)OthersWater Tanks252 Not Appliacble modeOthersTankersOthersTankers1212 Jul 2017500
15.1.
(a)Whether Desalination is proposed No
    16.       Waste Water Management(During Operation)
S. No.Type/Source Quantity of Waste Water Generated (Kilolitre per Day)Treatment Capacity (Kilolitre per Day) Treatment MethodMode of DisposalOther Mode of DisposalQuantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day)Quantity of Discharged Water (Kilolitre per Day)
(1.)Industrial810ETPReuse within the Plant & Recycling8
16.1.
(a)Total Waste Water Generation (Kilolitre per Day) 8
(b)Total Discharged Water (Kilolitre per Day) 0
(c)Total Reused Water (Kilolitre per Day) 8
    17.       Solid Waste Generation/Management
S. No.Name of Waste Item Other ItemQuantity per AnnumUnitDistance from Site(KM)Mode of TransportOther Mode of TransportMode of DisposalOther Mode of Disposal
(1.)NAOthersNA0Tons0RoadOthersNA
18.
    18.1.     Air Quality Impact Prediction
S. No.Criteria Pollutants Other Criteria PollutantsUnitBaseline ConcentrationDistance GLCIncremental ConcentrationTotal GLCPrescribed Standard
(1.)PM2.5Microgram per Meter Cube58100.2258.2280
(2.)SO2Microgram per Meter Cube16.3100.2516.5580
(3.)NOxMicrogram per Meter Cube25.6106.43280
(4.)PM10Microgram per Meter Cube60.91000.3261.22100
    18.2.     Stack Details
S. No.Source FuelStack Height(m)Stack Diameter(m)PollutantsOther PollutantsEmission (GLS)
(1.)DG setsdiesel81PM1010
(2.)dg setsdiesel81SO27
(3.)DG setsdiesel81NOx9
19.
Power Requirement:
(a)Quantity (Kilo Volt Amps (kVA)) 1000
(b)Source DG sets
(c)Uploaded Copy of Agreement Not Applicable
(d)Standby Arrangement (Details of DG Sets) 3
(e)Stack Height (in m) 8
20.
Land Ownership Pattern:
(a)Forest Land (ha.) 0
(b)Private Land (ha.) 1.82
(c)Government Land (ha.) 0
(d)Revenue Land (ha.) 0
(e)Other Land (ha.) 0
    Total Land (ha.) 1.82
21.
Present Land Use Breakup of the Study Area in Ha:
(a)Agriculture Area (ha.) 1.82
(b)Waste/Barren Land (ha.) 0
(c)Grazing/ Community Land (ha.) 0
(d)Surface Water Bodies (ha.) 0
(e)Settlements (ha.) 0
(f)Industrial (ha.) 0
(g)Forest (ha.) 0
(h)Mangroves (ha.) 0
(i)Marine Area (ha.) 0
(j)Others (ha.) : NA 0
    Total (ha.) 1
    22.     Land requirement for various activities
S. No.Description of Activity / Facility / Plant / Others OthersLand Requirement (ha.)Remarks
(1.)Main Plant1.82
Total (ha.) 1.82
23.
Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Sanctuaries; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones :
    23.1.     Details of Ecological Sensitivity :
S. No.Details of Ecological Sensitivity NameDistance from the Project (Km)Remarks
(1.)Critically Polluted AreaNA0NA
(2.)CorridorsNA0NA
(3.)Wildlife CorridorsNA0NA
(4.)ESZsNA0NA
(5.)WLSKorangi RF35NA
(6.)NPANA0NA
(7.)ESAsNA0NA
    23.2.     Details of Environmental Sensitivity :
S. No.Details of Environmental Sensitivity Other Details of Environmental Sensitivity NameDistance from the Project (Km)Remarks
(1.)Defence InstallationsNA0NA
(2.)ForestKandikuppa RF2.1Gedanapalli field
(3.)Archaeological SitesNA0NA
23.3.
(a)Whether Noc / Permission from the competent authority is required? No
(b)Whether NBWL recommendation is required? No
24.
Forest Land:
Whether any Forest Land involved? No
25.
Tree Cutting:
(a)No. of Trees Cut for the Project (if Forest Land not Involved) Not Applicable
(b)Details of Tree Cutting and Planting of Trees Not Applicable
26.
Land Acquisition Status:
(a)Acquired Land(Ha) 0
(b)Land yet to be acquired(Ha) 0
(c)Status of Land acquisition if not acquired 0
27.
Rehabilitation and Resettlement (R&R):
(a)No. of Villages 0
(b)No. of Households 0
(c)No. of PDFs (Project Displaced Families) 0
(d)No. of PAFs (Project Affected Families) 0
(e)Funds Allocated for R&R(in INR) (in Lacs) 0
(f)Status of R&R Yet To Start
28.
Details of Presence of Schedule-I Species:
(a)Whether there is Presence of Schedule-I Species ? No
(b)Whether conservation plan for Schedule-I Species has been prepared ? No
(c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? No
29.
Details of Presence of Water Bodies in Core Area:
(a)Whether there is Presence of Water Bodies in Core Area ? No
(b)Whether there is Diversion Required ? No
(c)Whether permission has been obtained from competent authority ? No
30.
Details of Presence of Water Bodies in Buffer Area:
(a)Whether there is Presence of Water Bodies in Buffer Area ? No
31.
Manpower Requirement:
(a)Permanent Employment-During Construction 25
(b)Permanent Employment-During Operation 25
(c)Temporary Employment- During Construction 0
(d)Temporary Employment- During Operation 0
(e)No. of working days 80
(f)Total Manpower 50
32.
Green Belt in Ha:
(a)Total Area of Green Belt 0
(b)Percentage of Total Project Area 0.00
(c)No. of Plants to be Planted 0
(d)Funds Allocated for Plantation 0
(e)Uploaded Green Belt plan Copy of Green Belt Plan
    33.       Project Benefits
S. No. Type of Project BenefitsDetails of Project Benefits
NIL
   34.   CRZ Specific Details : Not Applicable
   35.   Sector Specific Details For Industrial Projects - 3
S. No.Item Details
S. No.Item Details
36.
Details of Court Cases:
(a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? No
37.
Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act:
(a)Whether any Direction issued under EPA Act/Air Act/Water Act ? No
38.
Details of EIA Consultant:
(a)Have you hired Consultant for preparing document? Yes
(i)Accreditation No. NABET/EIA/1518/SA 061
(ii)Name of the EIA Consultant Ramky Enviro Services
(iii)Address 2nd Floor, Ramky Grandiose, Ramky Towers Complex, Gachibowli, Hyderabd- 500032, Telangana
(iv)Mobile No. 9849597458
(v)Landline No. 0402331009
(vi)Email Id vvijaykumar@ramky.com
(vii)Category of Accreditation A
(viii)Sector of Accreditation Industrial Projects - 3
(ix)Validity of Accreditation 03 Jan 2019
(x)Uploaded Certificate of Accreditation certified by QCI/NABET Copy of Certificate of Accreditation
39.
Documents to be Attached:
(a)Uploaded Copy of EIA/EMP Report Copy of EIA/EMP
(b)Uploaded Copy of Risk Assessment Report Copy of Risk Assessment
(c)Uploaded Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan
(d)Uploaded Copy of Final Layout Plan Copy of Final Layout Plan
(e)Uploaded Cover Letter Copy of Cover Letter
(f)Uploaded Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency
(g)Uploaded Additional File NA
(h)Uploaded Proposal Presentation (To be given in EAC meeting) NA
      Essential Detail Sought : NIL
            Additional Detail Sought:
Sno. ADS Letter Remarks Date of ADS
1.NAEC letter already issued to the proposed project vide F. no. J-11011/173/2015-IA-II(I) dated 31.10.2018 03 Jul 2019
2. ADS Reply LetterEC letter issued to the proposed project vide F. no. J-11011/173/2015-IA-II(I) dated 31.10.2018 13 Nov 2018
3.NAProposal already considered in the EAC meeting held in August, 2018. 01 Sep 2018
Undertaking
I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief. And I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity/ construction/ expansion has since been taken up.
Name of Applicant
DesignationChiefGeneralManager
Name of Company (Applicant Name should not be given here)ONGC
AddressCorporate HSE, 8th Floor Core IV, SCOPE Minar, Delhi 10092