EC Report
1. Project Details
   Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? : No
1. Project Details
   i. Proposal No. : IA/CG/IND/67974/2017    ii. MoEFCC File No. : J-11011/28/2007-IA II (I)    iii.Short narrative of the project: EC for revised configuration of 7.0 MTPA Modernization-Cum-Expansion of Bhilai Steel Plant along with Captive power plant.    iv. Project Sector : Industrial Projects-1    v. Company/Proponent : SAIL BHILAI STEEL PLANT
  vi.Details of State of the project
Details of State of the project
S.no. State Name District Name Tehsil Name
1.ChhattisgarhDurgDurg
 
vii. Uploaded EC Compliance report by rigional office of MoEFCC: Annexure-Uploaded EC Compliance report viii. Certified Monitoring report by RoMoEF: Annexure-Uploaded Monitoring report    ix.Date of TOR Granted 29 Nov 2017 x.TOR letter issued by Ministry: Annexure-TOR letter ix.Date of Submission for EC: 01 Oct 2018 x.Project Type: Modernization
2. Uploaded Documents of EIA/EMP,Risk Assessment,Public Hearing etc.
i.EIA/EMP: Annexure-EIA/EMP ii.Risk Assessment: Annexure-Risk Assessment iii.Public Hearing: Annexure-Public Hearing    iv. Date of Public Hearing: 08 Jun 2018   v. Uploaded Additional Report/Study/Document as desired by Ministry/EAC: Annexure-Additional Report/Study/Document   vi. Uploaded Cover Letter: Annexure-Cover Letter   vii.Remarks: NIL
Additional Attachments, if any
S.no. Attached File Date of Submission
1. Closure Report Status Compliance EC01 Oct 2018
3. Additional Detail Sought
Additional Detail Sought
Sno. ADS Letter Remarks Date of ADS
1.NATherefore, the committee advised the PP to submit the following information for further consideration of the proposal: 1. Revised Hazard Identification and Risk Assessment report along with the action plan specific to the project addressing all possible hazards / risks. 2. Revised time bound action plan including budgetary provisions for the issues raised during the public consultation. 3. Revised CER as per the guidelines issued by the ministry vide OM dated 1st May, 2018. 4. Standard Operating Procedures (SOP) for reporting of non-compliance/infrigments to the Board of Directors at periodical interval inter alia including in case of occurance of emergency / accident. 5. Action plan for 100% utilization / disposal of solid waste. 6. Concrete action plan for disposal of hazardous 29 Nov 2018
2. ADS LetterTo, The Member Secretary (IA-Division) Ministry of Environment, Forest & Climate Change, IA Division, Indira Paryavaran Bhawan, JorBagh Road, Aliganj, New Delhi -110003. Sub: Submission of Additional Details for Environmental Clearance for Revised Configuration of 7.0 MTPA Modernization-Cum-Expansion of SAIL-Bhilai Steel Plant (BSP) along with Captive Power Plant. Ref.#1 : ToR issued by MoEFCC vide letter number J-11011/28/2007-IA II (I) dated 29.11.2017 Ref.#2 : Meeting of the Re-constituted Expert Appraisal Committee on Industry –1 project held on 26th Nov, 2018 Ref.#3: MOM issued on 10/12/2018 by MOEFCC. Respected Sir, Please find enclosed herewith the reply/clarifications on the additional details sought by the EAC vide MOM under ref#3. As desired, BSP has incorporated the revised Hazard Identification & Risk Assessment report and action plan specific to the project in addition to the all other details sought vide ADS. Thanking you, Uma Katoch DGM(En 02 Jan 2019
4. Accredited Consultant Details
   i. Accreditation status : Yes    ii. Accreditation No. : NABET/EIA/1619/RA0068    iii. Name of Consultant: MECON LIMITED   iv. Address : Vivekanand Path, P.O Doranda, District Ranchi, Jharkhand – 834002   v. Mobile No.: 9470193793   vi. Landline No.: 0651-2483247   vii. Email Id: bspenvironment@sail-bhilaisteel.com
5. Undertaking
I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief and I am aware that if any part of the data and information found to be false or misleading at at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost.
   i. Name of Applicant : Uma    ii. Designation : DGM    iii. Name of Company(Applicant Name should not be given here) : SAIL BHILAI STEEL PLANT    iv. Address : Ispat Bhawan, Bhilai Steel Plant, M/s Steel Authority of India Limited (SAIL), Bhilai, Dist. Durg, Chhattisgarh v. Uploaded copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency: Annexure-Uploaded copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency